CN211590675U - Detachable tensioning anchorage device for machining electric tower - Google Patents
Detachable tensioning anchorage device for machining electric tower Download PDFInfo
- Publication number
- CN211590675U CN211590675U CN202020002707.7U CN202020002707U CN211590675U CN 211590675 U CN211590675 U CN 211590675U CN 202020002707 U CN202020002707 U CN 202020002707U CN 211590675 U CN211590675 U CN 211590675U
- Authority
- CN
- China
- Prior art keywords
- electric power
- pulling plate
- bottom plate
- detachable
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000003754 machining Methods 0.000 title claims description 7
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 11
- 239000010959 steel Substances 0.000 claims abstract description 11
- 238000004873 anchoring Methods 0.000 claims abstract description 8
- 238000001125 extrusion Methods 0.000 claims description 4
- 230000003014 reinforcing effect Effects 0.000 abstract description 16
- 238000010276 construction Methods 0.000 abstract description 4
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
The utility model discloses a detachable tensioning anchorage device for processing an electric power tower, which comprises a bottom plate, wherein the bottom plate is connected with a pulling plate through a distance adjusting device, and the distance adjusting device can adjust the distance between the bottom plate and the pulling plate along the axial direction of the electric power tower; the pull plate is provided with a detachable anchoring device, and the anchoring device is used for temporarily fixing the steel bars in the electric power rod and the pull plate. The utility model discloses simple structure passes the perforation in arm-tie and the toper clamp cover in proper order with the reinforcing bar in the electric power pole, then cup joints the screw ring in the toper clamp cover, utilizes the clamping jaw that the screw ring extruded the toper clamp on the cover to press from both sides tight reinforcing bar, makes reinforcing bar and arm-tie fixed connection, then rotates the screw rod, drives the arm-tie and keeps away from the bottom plate, realizes the drawing to the reinforcing bar, then can building concrete, this device simple structure, convenient operation can save construction equipment cost.
Description
Technical Field
The utility model relates to an electric power pole technical field especially relates to a detachable stretch-draw ground tackle of electric power tower processing usefulness.
Background
The electric power tower is a necessary device in the process of erecting and transmitting power. The floor area can not be overlarge due to the limitation of sections and routes. The steel consumption of the single-column steel pipe rod is large, the cost is high, the deflection of the rod body is large, and the single-column steel pipe rod cannot be popularized and used comprehensively. Therefore, the existing electric power tower processing and production process is urgently needed to be improved, the production efficiency is improved, the quality is ensured, and the actual requirements are met.
In the existing process of processing the electric power tower, in order to improve the rigidity and the strength of the electric power tower, reinforcing steel bars need to be bundled together to form a framework, and then concrete is poured on the framework. The existing steel bar is generally elongated by a tension anchor device, and concrete pouring is carried out when the existing steel bar is in a tensile state. Therefore, when the concrete is solidified, the tensioning anchorage device is loosened, and the concrete is compressed under the action of stress in the steel bars, so that the electric tower obtains better rigidity and strength.
Traditional anchor clamps are comparatively complicated, and manufacturing cost is higher, and construction anchor clamps occupy the cycle longer, lead to the engineering cost spending in, anchor clamps cost account for than great, are unfavorable for developing of engineering.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a detachable tensioning anchorage device for processing an electric power tower.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a detachable tensioning anchorage device for machining an electric power tower comprises a bottom plate, wherein the bottom plate is connected with a pulling plate through a distance adjusting device, and the distance adjusting device can adjust the distance between the bottom plate and the pulling plate along the axial direction of an electric power rod;
the pull plate is provided with a detachable anchoring device, and the anchoring device is used for temporarily fixing the steel bars in the electric power rod and the pull plate.
Preferably, the distance adjusting device comprises a screw rod which is rotatably connected to the center of the bottom plate and penetrates through the center of the pulling plate, and the screw rod is in threaded connection with the pulling plate.
Preferably, the detachable anchoring device comprises a conical jacket, a thread ring is sleeved on the conical jacket in a threaded manner, notches are formed in one end of the conical jacket at equal intervals, the conical jacket is divided into a plurality of clamping jaws by the notches, and the clamping jaws fixedly clamp and fix the steel bar under the extrusion of the thread ring.
Preferably, the outer ring of the bottom plate on one side close to the pulling plate is connected with a limiting rod, and the pulling plate is provided with a limiting hole corresponding to the limiting rod and used for limiting the pulling plate to move axially along the screw.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses simple structure passes the perforation in arm-tie and the toper clamp cover in proper order with the reinforcing bar in the electric power pole, then cup joints the screw ring in the toper clamp cover, utilizes the clamping jaw that the screw ring extruded the toper clamp on the cover to press from both sides tight reinforcing bar, makes reinforcing bar and arm-tie fixed connection, then rotates the screw rod, drives the arm-tie and keeps away from the bottom plate, realizes the drawing to the reinforcing bar, then can building concrete, this device simple structure, convenient operation can save construction equipment cost.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is a schematic structural view of a tapered jacket.
In the figure: the device comprises a bottom plate 1, a limiting rod 2, a through hole 3, a pulling plate 4, a threaded ring 5, a screw rod 6, a rotating wheel 7, a conical jacket 8 and a notch 9.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-2, a detachable tensioning anchorage device for processing an electric power tower comprises a base plate 1, wherein the base plate 1 is connected with a pulling plate 4 through a distance adjusting device, the distance adjusting device can adjust the distance between the base plate 1 and the pulling plate 4 along the axial direction of an electric power rod, the distance adjusting device comprises a screw rod 6, the screw rod 6 is rotatably connected to the center of the base plate 1 and penetrates through the center of the pulling plate 4, the screw rod 6 is in threaded connection with the pulling plate 4, the distance between the base plate 1 and the pulling plate 4 can be adjusted by rotating the screw rod 6, a limiting rod 2 is connected to the outer ring of one side, close to the pulling plate 4, of the base plate 1, and a limiting hole corresponding to the limiting rod 2 is formed in the pulling plate 4 and used;
be equipped with removable anchor on arm-tie 4, anchor is used for fixing reinforcing bar and arm-tie 4 temporarily in the electric power pole, can dismantle anchor and include that the toper presss from both sides cover 8, the toper presss from both sides the cover 8 and goes up the screw thread and has cup jointed threaded ring 5, the one end equidistance that the toper pressed from both sides cover 8 is equipped with breach 9, breach 9 presss from both sides cover 8 with the toper and falls into a plurality of clamping jaws, the clamping jaw is fixed with reinforcing bar fixed clamp under the extrusion of threaded ring 5 for with arm-tie 4 and reinforcing bar temporary fixation an organic whole, be convenient for tensile the reinforcing.
In the present case, pass the perforation 3 in arm-tie 4 and the toper clamp cover 8 with the reinforcing bar in the electric power pole in proper order, then cup joint screw ring 5 at toper clamp cover 8, utilize screw ring 5 extrusion toper clamp to press from both sides the clamping jaw on the cover 8 and press from both sides tight reinforcing bar, make reinforcing bar and arm-tie 4 fixed connection, then rotate screw rod 6, drive arm-tie 4 and keep away from bottom plate 1, realize the drawing to the reinforcing bar, then can the building concrete, this device simple structure, and convenient operation can save construction equipment cost.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (4)
1. A detachable tensioning anchorage device for machining an electric power tower comprises a bottom plate (1) and is characterized in that the bottom plate (1) is connected with a pulling plate (4) through a distance adjusting device, and the distance adjusting device can adjust the distance between the bottom plate (1) and the pulling plate (4) along the axial direction of an electric power rod;
the pulling plate (4) is provided with a detachable anchoring device, and the anchoring device is used for temporarily fixing the steel bars in the electric power rod and the pulling plate (4).
2. The detachable tensioning anchor for machining the electric tower as claimed in claim 1, wherein the distance adjusting device comprises a screw rod (6), the screw rod (6) is rotatably connected to the center of the bottom plate (1) and penetrates through the center of the pulling plate (4), and the screw rod (6) is in threaded connection with the pulling plate (4).
3. The detachable tensioning anchor for machining the electric tower as claimed in claim 2, wherein the detachable anchoring device comprises a conical jacket (8), a threaded ring (5) is sleeved on the conical jacket (8) in a threaded manner, notches (9) are equidistantly formed in one end of the conical jacket (8), the conical jacket (8) is divided into a plurality of clamping jaws by the notches (9), and the clamping jaws clamp and fix the steel bars under the extrusion of the threaded ring (5).
4. The detachable tensioning anchorage device for machining the electric tower as claimed in claim 1, wherein a limiting rod (2) is connected to an outer ring of the bottom plate (1) on one side close to the pulling plate (4), and a limiting hole corresponding to the limiting rod (2) is formed in the pulling plate (4) and used for limiting the pulling plate (4) to move axially along the screw (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020002707.7U CN211590675U (en) | 2020-01-02 | 2020-01-02 | Detachable tensioning anchorage device for machining electric tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020002707.7U CN211590675U (en) | 2020-01-02 | 2020-01-02 | Detachable tensioning anchorage device for machining electric tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211590675U true CN211590675U (en) | 2020-09-29 |
Family
ID=72599958
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020002707.7U Expired - Fee Related CN211590675U (en) | 2020-01-02 | 2020-01-02 | Detachable tensioning anchorage device for machining electric tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211590675U (en) |
-
2020
- 2020-01-02 CN CN202020002707.7U patent/CN211590675U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9783987B2 (en) | Pre-tensioned centrifugal concrete structure with steel strands | |
CN110644774B (en) | Aluminum alloy template fixing bolt building structure | |
CN207524882U (en) | Inner blocking type stretch-draw jack | |
CN211590675U (en) | Detachable tensioning anchorage device for machining electric tower | |
CN203716508U (en) | Fork lug pin type anchoring pull cable tensioning device | |
CN112359862B (en) | Quick-release supporting device for foundation cup opening template | |
CN201649646U (en) | Support protection structure for cement templates | |
CN216615808U (en) | Bored concrete pile steel reinforcement cage positioner for super high-rise building construction | |
CN210140398U (en) | Multifunctional suspension equipment for mechanical engineering | |
CN210177820U (en) | Deviation reinforcing bar toper clamping piece quick connector | |
CN107724679A (en) | The bracing means of lateral wall falsework | |
CN203317289U (en) | Wrench for fastening nut | |
CN211057792U (en) | Adjusting tool for cable structure matched tensioning | |
CN214653461U (en) | Device for stretching and drawing inhaul cable construction in prestressed steel structure | |
CN205709591U (en) | The novel flexible attachment device of derrick crane | |
CN215053018U (en) | Device for horizontally mounting straight-thread sleeve | |
CN221422451U (en) | Reinforcing steel bar fastening device for reinforcing steel bar mechanical connection | |
CN218467134U (en) | Be used for super large-span strength nature reinforced concrete equipment | |
CN217201626U (en) | Steel construction section bar hoist device | |
CN210953611U (en) | Tensile frock of anchor board | |
CN214786040U (en) | Diagonal brace for construction of aluminum mold split screw and climbing frame wall-attached support | |
CN221271551U (en) | Tubular pile die tensioning device | |
CN213879096U (en) | Pre-buried pipe threading device | |
CN211821009U (en) | Pipe jacking construction counter-force support frame | |
CN215319533U (en) | Tubular pile stretch-draw lead screw fixing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200929 |