CN211576388U - Fixing device and heat pump equipment - Google Patents

Fixing device and heat pump equipment Download PDF

Info

Publication number
CN211576388U
CN211576388U CN201922495790.6U CN201922495790U CN211576388U CN 211576388 U CN211576388 U CN 211576388U CN 201922495790 U CN201922495790 U CN 201922495790U CN 211576388 U CN211576388 U CN 211576388U
Authority
CN
China
Prior art keywords
opening
sleeve
fixing device
temperature
split sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922495790.6U
Other languages
Chinese (zh)
Inventor
杨磊
李建民
魏爱国
康乐
刘玉君
管祥华
高家富
侯梅梅
李羲龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haier Smart Home Co Ltd
Qingdao Economic and Technological Development Zone Haier Water Heater Co Ltd
Qingdao Haier New Energy Electric Appliance Co Ltd
Original Assignee
Haier Smart Home Co Ltd
Qingdao Economic and Technological Development Zone Haier Water Heater Co Ltd
Qingdao Haier New Energy Electric Appliance Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haier Smart Home Co Ltd, Qingdao Economic and Technological Development Zone Haier Water Heater Co Ltd, Qingdao Haier New Energy Electric Appliance Co Ltd filed Critical Haier Smart Home Co Ltd
Application granted granted Critical
Publication of CN211576388U publication Critical patent/CN211576388U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The utility model belongs to the technical field of electrical equipment, in particular to a fixing device, which comprises a first opening sleeve with a first opening along the axial direction and a second opening sleeve with a second opening along the axial direction, wherein the first opening is arranged towards the second opening, the first side of the first opening is connected with the first side of the second opening, and the second side of the first opening and the second side of the second opening are free sides and form an installation opening of the fixing device; the cylinder corresponding to the first split sleeve is circumscribed with the cylinder corresponding to the second split sleeve. Fixing device structure succinct, be convenient for fix a structure in the outside of another kind of structure closely, do not need the welding. The utility model discloses still relate to an utilization heat pump equipment of fixing device installation temperature sensing probe.

Description

Fixing device and heat pump equipment
Technical Field
The utility model belongs to the technical field of electrical equipment, specifically speaking relates to a fixing device and heat pump equipment.
Background
In an air conditioning system, when outdoor working conditions are severe, the system pressure is abnormally high, the exhaust temperature is much higher than that under the outdoor normal working conditions, and the temperature of a cylinder body of a compressor exceeds a safety range, so that the compressor is frequently started and stopped. In order to ensure the operation safety of the air conditioning system, the temperature of the refrigerant needs to be measured by the temperature sensing head to adjust the operation state of the air conditioner.
In the prior art, a temperature sensing probe is fixed through a probe copper pipe, a copper temperature sensing sleeve is welded on the surface of a pipe fitting to be subjected to temperature measurement firstly, the probe copper pipe is welded on the pipe fitting to be subjected to temperature measurement in a welding mode, the temperature sensing probe is inserted into the probe copper pipe and fixed through a spring piece, the temperature sensing probe is pressed tightly, and meanwhile, the temperature sensing probe is close to the inner pipe wall of the temperature sensing sleeve. However, the temperature sensing sleeve is likely to be subjected to cold joint or weld misalignment during welding, which causes variations in the test temperature. Different positions of the clamp springs can also lead to different positions of the temperature sensing probe attached to the inner wall of the temperature sensing sleeve, and the temperature deviation can be tested, so that the running accuracy of the unit is reduced. In addition, the welding consumes higher energy, and the temperature sensing sleeve is easy to be deformed in the transportation process, thereby influencing the assembly efficiency of the temperature sensing bulb. Moreover, various materials are needed in the final assembly process, and the assembly efficiency is low.
The fixing device of some current temperature sensing package is equipped with two archs, sets up the bayonet socket at the opening side, constitutes annular fixing clip, but this kind of assembly mode requires that temperature sensing package and pipeline put together earlier, then adds the temperature sensing package, has increased the operation degree of difficulty. And the shape of fixing clip need be adjusted when using, can cause fixing clip and pipeline laminating imperfect, and its arch face is relatively poor with the pipeline laminating degree after the processing, the installation of being not convenient for.
In view of this special feature, the present invention is provided.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to provide a fixing device.
In order to solve the technical problem, the utility model adopts the following basic concept:
a fixing device comprises a first opening sleeve provided with a first opening along the axial direction, and a second opening sleeve provided with a second opening along the axial direction, wherein the first opening is arranged towards the second opening, the first side of the first opening is connected with the first side of the second opening, and the second side of the first opening and the second side of the second opening are free sides and form a mounting opening of the fixing device; the first split sleeve circumscribes the second split sleeve.
In one embodiment, the second side of the first opening extends outward to form a flange structure.
In one embodiment, the flanging structure is a fourth split sleeve with a third opening along the axial direction, the central axis of the fourth split sleeve is parallel to the central axis of the first split sleeve, and the orientation of the third opening is opposite to the orientation of the first opening.
In one embodiment, the first end of the second split sleeve extends axially outward to form a guide structure.
In one embodiment, the guide structure is a third split sleeve having a radius greater than a radius of the second split sleeve. Through setting up the radius of third opening sleeve pipe into being greater than the radius of second opening sleeve pipe for the opening that the end was inserted to the second opening sleeve pipe is bigger, makes the part that inserts from second opening sleeve pipe tip can receive the guide effect of third opening sleeve pipe and correspond corresponding inserting, and then has promoted the smoothness degree and the smooth and easy nature of inserting that correspond the installation component in the second opening sleeve pipe.
As an embodiment, the second end of the second split sleeve is provided with a limiting structure, and the limiting structure extends from the inner peripheral wall of the second split sleeve to a direction perpendicular to the axial direction of the second split sleeve.
As an implementation manner, the fixing device further includes a plurality of spring plates, a plurality of positioning holes are formed in the circumferential wall of the second opening sleeve, and the spring plates are arranged in the positioning holes.
In one embodiment, the radian of the first split sleeve is alpha, and the radian of the second split sleeve is beta, wherein beta is less than or equal to pi rad and less than alpha is less than 2 pi rad. Through setting up the circumference extension angle of first opening sleeve pipe for being greater than 180 degrees, the circumference extension angle of second opening sleeve pipe sets up for being less than 180 degrees for the part that corresponds the assembly in the first opening sleeve pipe can be fixed, and make its and the part of installing in the second opening sleeve pipe laminate contact each other and receive the extrusion and fixed assembly, realized two parts laminating contact and firm fixed effect in fixing device, promoted the firm degree after the assembly of different parts.
In one embodiment, β is π rad and α is 1.4 π rad.
As an implementation manner, a plurality of hollow structures are arranged on the peripheral wall of the first opening sleeve or/and the second opening sleeve, and the hollow structures extend along the circumferential direction.
The utility model discloses still relate to a heat pump equipment, including heat pump, the temperature body and the temperature probe of awaiting measuring connect through as above an arbitrary fixing device, the first opening of first opening sheathed tube is located through fixing device's installation mouth card to the temperature body of awaiting measuring, the temperature probe passes in second opening sheathed tube second opening is located to second opening sheathed tube tip.
In one embodiment, a flange structure extends outwards from the second side of the first opening, and the electric wire of the temperature sensing probe is arranged in the flange structure.
In one embodiment, the flanging structure is a fourth opening sleeve with a third opening along the axial direction, the central axis of the fourth opening sleeve is parallel to the central axis of the first opening sleeve, the orientation of the third opening is opposite to the orientation of the first opening, and the electric wire of the temperature sensing probe is arranged in the fourth opening sleeve.
In one embodiment, the heat pump device is an air conditioner or a water heater having a heat pump.
After the technical scheme is adopted, compared with the prior art, the utility model following beneficial effect has:
fixing device structure succinct, be convenient for fix a structure in the outside of another kind of structure closely, laminating, do not need the welding.
The two opening sleeves of the fixing device are externally tangent, so that the two parts are directly fixedly connected together in a mutually attached contact manner through the fixing device, and the using effects of attaching, contacting, assembling and fixing different parts are realized; meanwhile, different parts can be correspondingly inserted into the fixing device from the mounting openings, so that the assembly between the parts is quicker and more efficient.
In addition, when the fixing device is used for fixing the temperature sensing probe of the air conditioner or the water heater with the heat pump, the temperature sensing probe is tightly attached to a pipeline to be measured, so that accurate temperature can be obtained conveniently, and the operation accuracy of the unit can be improved.
The following describes embodiments of the present invention in further detail with reference to the accompanying drawings.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention, are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention without undue limitation. It is obvious that the drawings in the following description are only some embodiments, and that for a person skilled in the art, other drawings can be derived from them without inventive effort. In the drawings:
fig. 1 is a schematic structural view of the fixing structure of the present invention;
FIG. 2 is a side view of the fixation structure shown in FIG. 1;
3 FIG. 3 3 3 is 3 a 3 sectional 3 view 3 taken 3 along 3 A 3- 3 A 3 of 3 the 3 fixation 3 structure 3 shown 3 in 3 FIG. 32 3; 3
Fig. 4 is a schematic view of the fixing structure of the present invention assembled in an air conditioner;
fig. 5 is a partial cross-sectional view of fig. 4.
The figure is marked with: 100. a fixing device; 101. a first split sleeve; 1011. a first opening; 102. a second split sleeve; 1021. A second opening; 103. a flanging structure; 1031. a third opening; 1032. a tightening part; 104. a guide structure; 105. a limiting structure; 106. a spring plate; 107. an installation port; 108. positioning holes; 109. a hollow structure; 200. a pipe body to be measured; 300. a temperature sensing probe; 400. an electric wire.
It should be noted that the drawings and the description are not intended to limit the scope of the inventive concept in any way, but to illustrate the inventive concept by those skilled in the art with reference to specific embodiments.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings in the embodiments of the present invention are combined below to clearly and completely describe the technical solutions in the embodiments, and the following embodiments are used for illustrating the present invention, but do not limit the scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "front", "rear", "left", "right", "vertical", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example 1
Referring to fig. 1-5, the present invention discloses a fixing device 100, the fixing device 100 includes a first opening sleeve 101 and a second opening sleeve 102, the first opening sleeve 101 has a first opening 1011 along the axial direction, the second opening sleeve 102 has a second opening 1021 along the axial direction; the first opening 1011 is disposed toward the second opening 1021, a first side of the first opening 1011 is connected to a first side of the second opening 1021, and a second side of the first opening 1011 and a second side of the second opening 1021 are not connected to form a free side, so as to form the mounting opening 107 of the fixing device 100; the corresponding cylinder of the first split sleeve 101 is circumscribed with the corresponding cylinder of the second split sleeve 102.
The first opening sleeve and the second opening sleeve are arranged in an outward tangent mode, so that parts mounted in the two opening sleeves can be correspondingly attached and contacted through the tangent line, the using effects that two different parts are assembled and fixed through the fixing device, and adjacent sides are correspondingly attached and contacted through the tangent position are achieved. Meanwhile, the two parts are correspondingly installed through the installation ports of the fixing devices, so that the assembly rate is greatly improved.
It should be noted that the open sleeve is a structure that an opening is arranged on the hollow cylindrical sleeve body along the axial direction, and the cylinder corresponding to the open sleeve is a cylinder which is coaxial with the arc surface formed by the wall of the open sleeve and is arranged in the same diameter.
The radius of the first split sleeve 101 or the radius of the second split sleeve 102 can be specifically set according to the size of the structure to be installed and fixed, and the radius of the first split sleeve 101 can be set to be the same as or different from that of the second split sleeve 102.
The fixing device 100 can perfectly fit the first structure and the second structure through the structure of the fixing device, tightly fix the first structure on the periphery of the second structure, and is quick to install.
As an example, the specific installation process of the fixing device 100 is as follows: the first structure is engaged with the first opening 1011 of the first split sleeve 101 through the attachment opening 107, the first structure is engaged with the first split sleeve 101, and then the second structure is inserted into the second split sleeve 102 from the end of the second split sleeve 102. Because the cylinder corresponding to the first split sleeve 101 is circumscribed with the cylinder corresponding to the second split sleeve 102, the first structure and the second structure are tightly attached, and the installation is stable.
Preferably, in order to make the second structure more smoothly installed in the second split sleeve 102, the first end of the second split sleeve 102 for inserting the second structure is provided with a guiding structure 104 extending axially outwards.
The guiding structure 104 has a smooth inner surface, and as a specific implementation manner, the guiding structure 104 is a third opening sleeve, and the radius of the third opening sleeve is greater than that of the second opening sleeve 102, so that the third opening sleeve with a larger radius forms a smooth transition curved surface, and the corresponding mounting component is smoothly inserted into the second opening sleeve under the action of the transition curved surface with a larger curvature when correspondingly inserted, thereby achieving the use effect of improving the assembly rate.
In order to improve the overall stability and the aesthetic property of the fixing device 100, it is preferable that the third split sleeve and the second split sleeve 102 are coaxially disposed, so that the component to be assembled can be smoothly and correspondingly inserted into the second split sleeve from the third split sleeve, thereby improving the convenience of assembly.
The utility model discloses still relate to a heat pump equipment, it includes the heat pump, awaits measuring temperature body 200 and temperature probe 300, await measuring temperature body 200 and temperature probe 300 through as above fixing device connect, the first opening 1011 of first open sleeve 101 is located through fixing device's installing port 107 card to the temperature body 200 that awaits measuring, temperature probe 300 passes in second open sleeve 102's second opening 1021 is located to the tip. Through the arrangement, the temperature sensing probe which is in the corresponding column shape and the temperature pipe body to be detected can be respectively and correspondingly assembled in the first opening sleeve and the second opening Europe sleeve, so that the two parts are fixedly arranged on the same fixing device and mutually correspond to each other to be attached and contacted, and the effects of effectively contacting the temperature pipe body to be detected and accurately detecting the temperature of the temperature pipe body to be detected are achieved.
Example 2
This embodiment is a further optimization or limitation or equivalent replacement of embodiment 1.
A fixing device 100 comprises a first opening sleeve 101 and a second opening sleeve 102, wherein the first opening sleeve 101 and the second opening sleeve 102 are provided with a first opening 1011 and a second opening 1021 which penetrate through the axial direction; the first opening 1011 is disposed opposite to the second opening 1021, a first side of the first opening 1011 is connected to a first side of the second opening 1021, and a second side of the first opening 1011 and a second side of the second opening 1021 are free sides and form the mounting opening 107 of the fixing device 100; the corresponding cylinder of the first split sleeve 101 is circumscribed with the corresponding cylinder of the second split sleeve 102, and the radius of the first split sleeve 101 is larger than that of the second split sleeve 102.
Referring to fig. 1 and 2, the radian of the first split sleeve 101 is alpha, and the radian of the second split sleeve 102 is beta, wherein beta ≦ pi rad < alpha < 2 pi rad. The circumferential extension angles of the first opening sleeve and the second opening sleeve are respectively set to be larger than 180 degrees and smaller than 180 degrees, so that the first opening sleeve with a larger radius has a larger wrapping area to the inner assembly part of the first opening sleeve, and the inner assembly part of the second opening sleeve with a smaller radius is fixedly held in the inner part by clamping of the fixing device and the inner assembly part of the first opening sleeve, and the effect of reliably assembling two different parts is realized.
The fixing device 100 may be used to fix a device including a first structure, a second structure and a third structure, the second side of the first opening 1011 extends outwards to form a flange structure 103, and the third structure is disposed in the flange structure 103. The flanging structure extending outwards is arranged at the mounting opening of the fixing device, so that the flanging structure forms a third structure for other parts to be assembled, and the fixing device can correspondingly assemble three different parts into different structures one by one respectively to achieve the effect of fixing the parts.
Specifically, the flanging structure is a fourth opening sleeve with a third opening 1031 penetrating through the axial direction, the direction of the third opening 1031 is opposite to the direction of the first opening 1011, the central axis of the fourth opening sleeve is arranged in parallel with the central axis of the first opening sleeve, and as a specific implementation manner, the radian of the fourth opening sleeve is greater than or equal to pi rad. The installation opening of the fixing device is provided with the outward bent flanging structure to form a fourth opening sleeve which protrudes outwards, so that a user can conveniently hold the fourth opening sleeve, and the elastic opening or closing using effect of the installation opening of the fixing device is realized. Preferably, the free side of the third opening 1031 of the fourth opening sleeve extends and contracts towards the outer peripheral wall of the first opening sleeve 101 to form a tightening part 103, so as to reduce the width of the third opening and provide a limiting effect for the loading part.
In order to allow the second structure to be more smoothly mounted in the second split sleeve 102, a guide structure 104 is provided at a first end of the second split sleeve 102 for inserting the second structure and extending outward in the axial direction. The other end, i.e. the second end, of the second split sleeve 102 is provided with a limiting structure 105, and the limiting structure 105 extends from the inner peripheral wall of the second split sleeve 102 to a direction perpendicular to the axial direction of the second split sleeve 102, so that the second structure can be prevented from being inserted too deeply or sliding out from the end.
Specifically, the limiting structure 105 is a plate-shaped structure extending from the inner peripheral wall of the second split sleeve 102 toward a direction perpendicular to the axial direction of the second split sleeve 102. Through the arrangement of the plate-shaped structure, the radial protruding part is formed at the second opening sleeve to axially limit the part inserted into the second opening sleeve, so that the axial relative position of the inserted part in the fixing device is ensured, and the relative position inserted into the second opening sleeve is ensured to be fixed.
The utility model discloses still relate to a heat pump equipment, it includes the heat pump, the temperature body 200 and the temperature sensing probe 300 that await measuring, temperature sensing probe 300 is through more than fixing device 100 set up the temperature body 200 that awaits measuring on, the temperature body 200 that awaits measuring locates the first opening 1011 of first opening sleeve pipe 101 through fixing device's installing port 107 card, the periphery local of temperature measurement body 200 is treated in the parcel at least to first opening 1011, in temperature sensing probe 300 passes the second opening 1021 of second opening sleeve pipe 102 is located to the tip of second opening sleeve pipe 102, one side periphery and the laminating of the temperature body 200 that awaits measuring of temperature sensing probe 300, electric wire 400 of temperature sensing probe 300 is located in the third opening 1031 of turn-up structure 103, make temperature sensing probe 300 and its additional structure pleasing to the eye, closely and firmly set up the periphery at the temperature body 200 that awaits measuring.
When the fixing device is used for fixing the temperature sensing probe 300 of the heat pump equipment, the temperature sensing probe 300 is tightly attached to the pipe body 200 to be measured, so that accurate temperature can be conveniently obtained, and the operation accuracy of the unit can be improved.
Example 3
This example is a further optimization or limitation or equivalent replacement to example 1 or example 2.
Referring to fig. 1, 3 and 4, the circumferential wall of the second opening sleeve 102 is provided with a plurality of positioning holes 108, the elastic sheet 106 is disposed in the positioning holes 108, and the elastic sheet 106 is inserted into the positioning holes 108 to further press the temperature sensing probe 300, so that the temperature sensing probe 300 is more tightly attached to the temperature measuring pipe 200, and the temperature measurement is more accurate.
The peripheral wall of the first opening sleeve 101 is provided with a plurality of hollow structures 109, and the hollow structures 109 extend along the circumferential direction of the first opening sleeve 101, so that the rigidity of the first opening sleeve 101 is moderate, and the clamping installation is labor-saving and convenient.
Referring to fig. 2, 3 and 4, the free side of the third opening 1031 of the cuff structure 103 extends and contracts toward the peripheral wall of the first opening sleeve 101 to form a constriction 1032. The electric wire 400 of the temperature sensing probe 300 can be provided in the third opening 1031 through the tightening part 1032, and the tightening part 1032 returns to the state of being in contact with the outer peripheral wall of the first opening sleeve 101, so that the electric wire 400 is fastened in the third opening 1031 and is not easily detached. And because turn-ups structure 103 and first split sleeve 101, second split sleeve 102 integrated into one piece, structural stability is better.
Example 4
This embodiment is a further optimization or limitation or equivalent replacement of embodiment 1 or embodiment 2 or embodiment 3.
A fixing device 100 comprises a first opening sleeve 101 and a second opening sleeve 102, wherein the first opening sleeve 101 and the second opening sleeve 102 are provided with a first opening 1011 and a second opening 1021 which penetrate through the axial direction, the first opening 1011 and the second opening 1021 are arranged oppositely, the first side of the first opening 1011 is connected with the first side of the second opening 1021, the second side of the first opening 1011 and the second side of the second opening 1021 are free sides, and an installation opening 107 of the fixing device 100 is formed;
the cylinder corresponding to the first split sleeve 101 is circumscribed with the cylinder corresponding to the second split sleeve 102, the radian of the first split sleeve 101 is alpha, the radian of the second split sleeve 102 is beta, wherein beta is pi rad, and alpha is 1.4 pi rad.
The inner surface or/and the outer surface of the fixing device 100 is/are provided with a metal anticorrosive layer, and the inner surface of the first split sleeve 101 or/and the second split sleeve 102 is/are provided with a structure for increasing static friction force, so that the phenomenon that the fixing device 100 shakes to cause pipe grinding in the transportation process can be avoided.
Example 5
This example is a further illustration or limitation of examples 1-4.
Specifically, the heat pump device is an air conditioner, the air conditioner has a heat pump, a temperature-measuring tube 200 and a temperature sensing probe 300, and the heat pump needs to measure the temperature of the refrigerant in the temperature-measuring tube 200 through the temperature sensing probe 300 during operation to adjust the operation state of the air conditioner. The temperature sensing probe 300 is arranged on the temperature-measuring pipe body 200 through the fixing device 100, the temperature-measuring pipe body 200 is clamped in the first opening 1011 of the first opening sleeve 101 through the mounting port 107 of the fixing device, the first opening 1011 at least wraps the periphery of the temperature-measuring pipe body 200, the temperature sensing probe 300 passes through the end part of the second opening sleeve 102 and is arranged in the second opening 1021 of the second opening sleeve 102, the periphery of one side of the temperature sensing probe 300 is attached to the temperature-measuring pipe body 200, the electric wire 400 of the temperature sensing probe 300 is arranged in the third opening 1031 of the flanging structure 103, and the temperature sensing probe 300 and the accessory structures thereof are arranged on the periphery of the temperature-measuring pipe body 200 in an attractive, tight and firm manner.
Alternatively, as another specific embodiment, the heat pump device is a water heater.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in any way, and although the present invention has been disclosed with reference to the above preferred embodiment, but not to limit the present invention, any person skilled in the art can make some changes or modifications to equivalent embodiments without departing from the scope of the present invention, and any simple modification, equivalent change and modification made to the above embodiments by the technical spirit of the present invention still fall within the scope of the present invention.

Claims (10)

1. The utility model provides a fixing device, includes and offers the first open sleeve pipe of first opening, offers the second open sleeve pipe of second opening along the axial, its characterized in that:
the first opening is arranged towards the second opening, the first side of the first opening is connected with the first side of the second opening, and the second side of the first opening and the second side of the second opening are free sides and form an installation opening of the fixing device;
the cylinder corresponding to the first split sleeve is circumscribed with the cylinder corresponding to the second split sleeve.
2. The fastening device of claim 1, wherein the second side of the first opening extends outwardly to provide a flange structure; the flanging structure is a fourth opening sleeve with a third opening arranged along the axial direction, the central shaft of the fourth opening sleeve is arranged in parallel with the central shaft of the first opening sleeve, and the orientation of the third opening is opposite to that of the first opening.
3. The fastening device of claim 1, wherein the first end of the second split sleeve extends axially outwardly with a guide structure; the guide structure is a third split sleeve having a radius greater than a radius of the second split sleeve.
4. The fastening device of claim 1, wherein the second end of the second split sleeve is provided with a stop structure extending from an inner peripheral wall of the second split sleeve in a direction perpendicular to an axial direction of the second split sleeve.
5. The fixing device according to claim 1, comprising a plurality of resilient pieces, wherein the second opening sleeve has a plurality of positioning holes on a peripheral wall thereof, and the resilient pieces are disposed in the positioning holes.
6. The fastening device of any one of claims 1-5, wherein the first split sleeve has a radian alpha and the second split sleeve has a radian beta, wherein beta ≦ π rad < α < 2 π rad.
7. The fixing device according to any one of claims 1 to 5, wherein a plurality of hollowed-out structures are arranged on the peripheral wall of the first opening sleeve or/and the second opening sleeve, and the hollowed-out structures extend along the circumferential direction; the inner surface or/and the outer surface of the fixing device is/are provided with a metal anticorrosive layer, and the inner surface of the first split sleeve or/and the second split sleeve is/are provided with a structure for increasing static friction force.
8. A heat pump device comprises a heat pump, a temperature-measuring pipe body and a temperature-sensing probe, and is characterized in that the temperature-measuring pipe body and the temperature-sensing probe are connected through the fixing device according to any one of claims 1 to 7, the temperature-measuring pipe body is clamped in a first opening of a first opening sleeve through a mounting hole of the fixing device, and the temperature-sensing probe penetrates through the end part of a second opening sleeve and is arranged in a second opening of the second opening sleeve.
9. The heat pump equipment according to claim 8, wherein a flange structure extends outwards from the second side of the first opening, and the electric wire of the temperature sensing probe is arranged in the flange structure; the flanging structure is a fourth opening sleeve with a third opening arranged along the axial direction, the central shaft of the fourth opening sleeve is arranged in parallel with the central shaft of the first opening sleeve, the orientation of the third opening is opposite to that of the first opening, and the electric wire of the temperature sensing probe is arranged in the fourth opening sleeve.
10. The heat pump apparatus according to claim 8 or 9, wherein the heat pump apparatus is an air conditioner or a water heater having a heat pump.
CN201922495790.6U 2019-08-20 2019-12-31 Fixing device and heat pump equipment Active CN211576388U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2019213560353 2019-08-20
CN201921356035 2019-08-20

Publications (1)

Publication Number Publication Date
CN211576388U true CN211576388U (en) 2020-09-25

Family

ID=72554093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922495790.6U Active CN211576388U (en) 2019-08-20 2019-12-31 Fixing device and heat pump equipment

Country Status (1)

Country Link
CN (1) CN211576388U (en)

Similar Documents

Publication Publication Date Title
CN211576388U (en) Fixing device and heat pump equipment
JPWO2007066604A1 (en) Drain hose coupling and drain piping installation method for air conditioning indoor unit
CN112414572A (en) Fixing device and heat pump equipment
CN204128694U (en) Temperature sensing device and air conditioner
CN219830137U (en) Temperature sensor and heating equipment
CN212389773U (en) Electronic expansion valve
CN113883705B (en) Temperature sensing tube fixing assembly and fixing method
CN210463458U (en) Fixed subassembly and temperature sensing package subassembly, air conditioner that have it
CN216744650U (en) Temperature sensor&#39;s fastener and air conditioner
CN212111517U (en) General termination of main low-voltage test that becomes
CN212692668U (en) Nut embedded structure convenient to connect
CN215863977U (en) Temperature sensing pipe fixation clamp
CN210198581U (en) Temperature sensing fixing device, air conditioner and dehumidifier
CN218763715U (en) Air conditioner connecting pipe and air conditioner
CN214305696U (en) Copper pipe of easily connecting
CN218914045U (en) Pipeline connecting device
CN210135673U (en) Pipeline connection anti-disassembly assembly and air conditioner
CN215767413U (en) Temperature sensing pipe fixation clamp locking jump ring
CN212108753U (en) Cold-drawn pipe fitting joint structure
CN217664368U (en) Glue supply structure
CN211335514U (en) Automobile air conditioner evaporator shell structure
CN211695513U (en) Capillary tube and air conditioner throttling device
CN214368316U (en) Casing, combined joint and pipe fitting combination applying combined joint
CN218876826U (en) Automobile condenser bracket
CN219734206U (en) Sealing ring, exhaust system and vehicle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant