CN211572708U - Install elevator well mounting structure additional - Google Patents

Install elevator well mounting structure additional Download PDF

Info

Publication number
CN211572708U
CN211572708U CN201922342241.5U CN201922342241U CN211572708U CN 211572708 U CN211572708 U CN 211572708U CN 201922342241 U CN201922342241 U CN 201922342241U CN 211572708 U CN211572708 U CN 211572708U
Authority
CN
China
Prior art keywords
plate
mounting structure
clamping plate
wing
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922342241.5U
Other languages
Chinese (zh)
Inventor
董安国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Butian Jindao Engineering Co ltd
Original Assignee
Fujian Butian Jindao Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Butian Jindao Engineering Co ltd filed Critical Fujian Butian Jindao Engineering Co ltd
Priority to CN201922342241.5U priority Critical patent/CN211572708U/en
Application granted granted Critical
Publication of CN211572708U publication Critical patent/CN211572708U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model relates to the technical field of the additionally installed elevator engineering, in particular to an additionally installed elevator shaft installation structure, wherein a standard section comprises a stand column and a connecting piece; the wing plate at the butt joint of the upright post and the other upright post is provided with a notch; the connecting piece comprises a filling plate and clamping plates, wherein the filling plate is arranged in the notch, the two clamping plates are respectively positioned on the inner side and the outer side of the wing plate, and the clamping plates are respectively connected with the filling plate and two adjacent stand columns. The utility model provides an install elevator well mounting structure additional has improved well installation quality and security, accords with national installation standard.

Description

Install elevator well mounting structure additional
Technical Field
The utility model relates to an install elevator engineering technical field additional, especially relate to an install elevator well mounting structure additional.
Background
At present, when a hoistway is additionally arranged on the outer layer of an original building and elevator equipment is installed again, installation personnel are required to splice standard sections on site, adjacent standard sections are fixedly connected through glue and high-strength bolts, and wallboards on the standard sections are installed on the standard sections through bolts. The existing standard section connecting structure is basically in a form of 'weak column and strong beam', namely the function of a column is weakened, the structure of the strong beam is weakened, specifically, after the column is in butt joint, a crane is used for lifting a person to install glass, and after welding, bolt locking and other operations, the sealing plate is completed, so that the field workload is large, the installation quality can not meet the national standard, and great potential safety hazards exist.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects of the prior art, the utility model aims to solve the technical problem that an install elevator well mounting structure additional that installation quality is high, the security is good is provided.
In order to solve the technical problem, the utility model discloses a technical scheme be: an installation structure for an additionally-installed elevator shaft comprises more than two groups of standard sections spliced end to end, wherein each standard section comprises an upright post and a connecting piece;
the wing plate at the butt joint of the upright post and the other upright post is provided with a notch;
the connecting piece comprises a filling plate and clamping plates, wherein the filling plate is arranged in the notch, the two clamping plates are respectively positioned on the inner side and the outer side of the wing plate, and the clamping plates are respectively connected with the filling plate and two adjacent stand columns.
In an alternative embodiment, two adjacent upright posts are provided with notches on two wing plates which are positioned on the same side at the butt joint.
In an optional embodiment, the additional elevator shaft mounting structure further comprises a wall plate, the upright post is arranged at an internal corner of the wall plate, and the notch is arranged on a wing plate of the upright post far away from the internal corner.
In an alternative embodiment, the distance between the edge of the wing plate and the wall plate is in the range of 5cm to 10 cm.
In an alternative embodiment, the wall panels are of the same length in the vertical direction as the uprights.
In an optional embodiment, the connecting piece further includes a second clamping plate and a third clamping plate, the second clamping plate is located on the inner side and the outer side of the other wing plate, the second clamping plate is respectively connected with the two adjacent columns, the third clamping plate is located on the opposite sides of the web plate of the column, and the third clamping plate is respectively connected with the two adjacent columns.
In an alternative embodiment, the second clamping plate is riveted with two adjacent upright posts respectively, and the third clamping plate is riveted with two adjacent upright posts respectively.
In an alternative embodiment, the clamping plate is riveted with the filling plate and two adjacent upright posts respectively.
The beneficial effects of the utility model reside in that: the utility model provides an install elevator well mounting structure additional, including the standard festival of concatenation of more than two sets of head and the tail, the standard festival includes stand and connecting piece, be equipped with the opening on the pterygoid lamina of stand, during the installation, the workman can pass the opening and stretch into the side of stand and carry out the lock joint to the bolt on web and another pterygoid lamina, after the installation, reuse filling plate to pack the opening, through pterygoid lamina lock joint two stand and the filling plate that need connect together, compare in the installation form of conventional "weak post strong beam", adopt this kind of structure to ensure the intensity of stand, accord with national standard, installation quality is high, and can design the limit of glass and post into the parallel and level form, two standard festival can directly dock, can realize the seamless butt joint of standard festival through the operation such as beating glue, the operation such as lock joint, need not to carry out the operation such as excision of shrouding or after-installing the shrouding, when satisfying the mechanical properties requirement of cylinder, the joint connection structure is simplified, workers only need to operate in the well, the safety is good, and the field construction amount is small.
Drawings
Fig. 1 is a schematic structural diagram of an elevator hoistway mounting structure according to an embodiment of the present invention;
fig. 2 is another schematic structural view of an elevator shaft mounting structure according to an embodiment of the present invention;
description of reference numerals:
1-upright column; 11-a gap; 12-a wing plate; 13-a web;
2-a connector; 21-a filler board; 22-a clamping plate; 23-a second clamping plate; 24-a third clamping plate;
and 3-wallboard.
Detailed Description
In order to explain the technical content, the objects and the effects of the present invention in detail, the following description is made with reference to the accompanying drawings in combination with the embodiments.
Referring to fig. 1 and 2, an installed elevator shaft installation structure of the present invention includes more than two groups of standard joints spliced end to end, where the standard joints include vertical columns and connecting pieces;
the wing plate at the butt joint of the upright post and the other upright post is provided with a notch;
the connecting piece comprises a filling plate and clamping plates, wherein the filling plate is arranged in the notch, the two clamping plates are respectively positioned on the inner side and the outer side of the wing plate, and the clamping plates are respectively connected with the filling plate and two adjacent stand columns.
From the above description, the beneficial effects of the present invention are: the utility model provides an install elevator well mounting structure additional, including the standard festival of concatenation of more than two sets of head and the tail, the standard festival includes stand and connecting piece, be equipped with the opening on the pterygoid lamina of stand, during the installation, the workman can pass the opening and stretch into the side of stand and carry out the lock joint to the bolt on web and another pterygoid lamina, after the installation, reuse filling plate to pack the opening, through pterygoid lamina lock joint two stand and the filling plate that need connect together, compare in the installation form of conventional "weak post strong beam", adopt this kind of structure to ensure the intensity of stand, accord with national standard, installation quality is high, and can design the limit of glass and post into the parallel and level form, two standard festival can directly dock, can realize the seamless butt joint of standard festival through the operation such as beating glue, the operation such as lock joint, need not to carry out the operation such as excision of shrouding or after-installing the shrouding, when satisfying the mechanical properties requirement of cylinder, the joint connection structure is simplified, workers only need to operate in the well, the safety is good, and the field construction amount is small.
Furthermore, two adjacent upright posts are provided with notches on the two wing plates which are positioned at the same side of the butt joint part.
As can be seen from the above description, the same position of each upright post is provided with a notch, which is beneficial to batch production.
Further, install elevator well mounting structure additional still includes the wallboard, the stand sets up the reentrant corner department at the wallboard, the opening sets up on the pterygoid lamina of keeping away from the reentrant corner of stand.
According to the description, the notch is formed in the wing plate, far away from the internal corner, of the stand column, a hand can penetrate through the notch to perform locking operation, and finally the clamping plate is connected, so that the structure is reasonable.
Furthermore, the distance between the edge of the wing plate and the wall plate ranges from 5cm to 10 cm.
As can be seen from the above description, the distance in this range can be used for hand-passing to perform the locking operation, and the construction is easy.
Further, the wall plate and the upright post are equal in length in the vertical direction.
Can know from the above-mentioned description, adopt the utility model provides a mounting structure can be directly with the wallboard design for with the same length of stand, during the installation directly splice can, need not operations such as follow-up shrouding.
Furthermore, the connecting piece still includes second grip block and third grip block, the second grip block is located the inside and outside both sides of another pterygoid lamina, the second grip block is connected with two adjacent stands respectively, the third grip block is located the relative both sides of the web of stand, the third grip block is connected with two adjacent stands respectively.
From the above description, the second clamping plate is used to connect the wing plate on the other side, and the third clamping plate is used to connect the two webs.
Furthermore, the second clamping plate is riveted with two adjacent stand columns respectively, and the third clamping plate is riveted with two adjacent stand columns respectively.
Further, the clamping plate is riveted with the filling plate and the two adjacent stand columns respectively.
As can be seen from the above description, the riveted connection structure is stable, convenient to install and meets the national standard.
Referring to fig. 1 and fig. 2, a first embodiment of the present invention is: an installing structure for an additionally-installed elevator shaft comprises more than two groups of standard sections spliced end to end, wherein each standard section comprises an upright post 1 and a connecting piece 2;
a gap 11 is arranged on a wing plate 12 at the butt joint of the upright post 1 and the other upright post 1;
the connecting piece 2 comprises a filling plate 21 and clamping plates 22, wherein the filling plate 21 is arranged in the gap 11, the two clamping plates 22 are respectively positioned at the inner side and the outer side of the wing plate 12, and the clamping plates 22 are respectively connected with the filling plate 21 and the two adjacent upright posts 1.
Referring to fig. 1 and fig. 2, a second embodiment of the present invention is: an installing structure for an additionally-installed elevator shaft comprises more than two groups of standard sections spliced end to end, wherein each standard section comprises an upright post 1 and a connecting piece 2;
a gap 11 is arranged on a wing plate 12 at the butt joint of the upright post 1 and the other upright post 1;
the connecting piece 2 comprises a filling plate 21 and clamping plates 22, wherein the filling plate 21 is arranged in the gap 11, the two clamping plates 22 are respectively positioned at the inner side and the outer side of the wing plate 12, and the clamping plates 22 are respectively connected with the filling plate 21 and the two adjacent upright posts 1.
Two adjacent upright posts 1 are provided with notches 11 on two wing plates 12 which are positioned on the same side at the butt joint part. Install elevator well mounting structure additional still includes wallboard 3, stand 1 sets up in wallboard 3's reentrant corner department, opening 11 sets up on stand 1's the pterygoid lamina 12 of keeping away from the reentrant corner. The distance between the edge of the wing 12 and the wall plate 3 is 5 cm. The wall plate 3 and the upright post 1 are equal in length in the vertical direction. The connecting piece 2 further comprises a second clamping plate 23 and a third clamping plate 24, the second clamping plate 23 is located on the inner side and the outer side of the other wing plate 12, the second clamping plate 23 is respectively connected with the two adjacent upright posts 1, the third clamping plate 24 is located on the two opposite sides of the web plate 13 of the upright posts 1, and the third clamping plate 24 is respectively connected with the two adjacent upright posts 1. The second clamping plate 23 is riveted with two adjacent upright posts 1 respectively, and the third clamping plate 24 is riveted with two adjacent upright posts 1 respectively. The clamping plate 22 is riveted with the filling plate 21 and two adjacent upright posts 1 respectively.
To sum up, the utility model provides an install elevator well mounting structure additional, including more than two sets of standard festival of end to end concatenation, the standard festival includes stand and connecting piece, be equipped with the opening on the pterygoid lamina of stand, during the installation, the workman can pass the opening with the hand and stretch into the side of stand and carry out the lock joint to the bolt on web and another pterygoid lamina, after the installation, reuse the packing plate to pack the opening, through pterygoid lamina with two stands and the packing plate of need connecting lock joint together, compare the installation form of conventional "weak post strong beam", adopt this kind of structure to ensure the intensity of stand, accord with national standard, installation quality is high, and can design the limit of glass and post into the parallel and level form, two standard festival can directly dock, can realize the seamless butt joint of standard festival through the operation such as beating glue, lock joint, need not to carry out the excision of shrouding or operation such as after install additional shrouding, the column body has the advantages that the requirement on the mechanical property of the column body is met, meanwhile, the node connection structure is simplified, workers only need to operate in a well, the safety is good, and the field construction amount is small.
The above mentioned is only the embodiment of the present invention, and not the limitation of the patent scope of the present invention, all the equivalent transformations made by the contents of the specification and the drawings, or the direct or indirect application in the related technical field, are included in the patent protection scope of the present invention.

Claims (8)

1. An additional elevator shaft installation structure comprises more than two groups of standard joints spliced end to end, and is characterized in that each standard joint comprises an upright post and a connecting piece;
the wing plate at the butt joint of the upright post and the other upright post is provided with a notch;
the connecting piece comprises a filling plate and clamping plates, wherein the filling plate is arranged in the notch, the two clamping plates are respectively positioned on the inner side and the outer side of the wing plate, and the clamping plates are respectively connected with the filling plate and two adjacent stand columns.
2. The mounting structure for an elevator hoistway according to claim 1, wherein two adjacent columns are provided with notches on two wing plates located on the same side at the butt joint.
3. The retrofitted elevator hoistway mounting structure of claim 1, further comprising a wall panel, said stud being disposed at an internal corner of said wall panel, said gap being disposed in a wing of said stud distal from said internal corner.
4. The retrofitted elevator hoistway mounting structure according to claim 3, wherein a distance between an edge of said wing plate and said wall plate is in a range of 5cm to 10 cm.
5. The retrofitted elevator hoistway mounting structure of claim 3, wherein said wall panel is of equal length to said column in the vertical direction.
6. The retrofitted elevator hoistway mounting structure of claim 1, wherein said connecting member further comprises a second clamping plate and a third clamping plate, said second clamping plate is positioned on both the inner side and the outer side of the other wing plate, said second clamping plate is connected to two adjacent columns, respectively, said third clamping plate is positioned on the opposite side of the web of the column, and said third clamping plate is connected to two adjacent columns, respectively.
7. The retrofitted elevator hoistway mounting structure of claim 6, wherein said second clamping plate is riveted to each of two adjacent columns and said third clamping plate is riveted to each of two adjacent columns.
8. The retrofitted elevator hoistway mounting structure of claim 1, wherein said clamping plates are riveted to said filler plate and to said two adjacent columns, respectively.
CN201922342241.5U 2019-12-24 2019-12-24 Install elevator well mounting structure additional Expired - Fee Related CN211572708U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922342241.5U CN211572708U (en) 2019-12-24 2019-12-24 Install elevator well mounting structure additional

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922342241.5U CN211572708U (en) 2019-12-24 2019-12-24 Install elevator well mounting structure additional

Publications (1)

Publication Number Publication Date
CN211572708U true CN211572708U (en) 2020-09-25

Family

ID=72548418

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922342241.5U Expired - Fee Related CN211572708U (en) 2019-12-24 2019-12-24 Install elevator well mounting structure additional

Country Status (1)

Country Link
CN (1) CN211572708U (en)

Similar Documents

Publication Publication Date Title
CN102251606B (en) Outer partition wall built by adopting light concrete partition wall boards and construction method thereof
CN107338873B (en) Unilateral buckling restrained steel beam and column connecting node and steel structure building
CN110284732A (en) A kind of modular containers building connecting node
CN207004146U (en) A kind of bracing means for high voltage power transmission angle steel tower principal post angle steel
CN103774838B (en) A kind of construction of lift well assembling safe operation platform and using method
CN110541478A (en) Steel pipe column and steel beam connecting joint with internally inserted connecting piece
CN211572708U (en) Install elevator well mounting structure additional
CN107178242A (en) A kind of bracing means for high voltage power transmission angle steel tower principal post angle steel
CN112681518B (en) Steel construction assembled beam column node connecting device
CN110284594B (en) Full-bolt connection assembly type floor composite beam steel pipe column frame joint and forming method thereof
CN211548042U (en) Steel pipe column and steel beam connecting joint with internally inserted connecting piece
CN216616284U (en) Steel splint that girder steel butt joint was used
CN210216729U (en) Node device for rigidly connecting assembled truss steel beam and steel column
CN210827835U (en) Beam column rigid connection structure
CN210622016U (en) Prefabricated wallboard of modularization
CN209891401U (en) Connecting structure for square steel tube concrete column and combination beam node
CN209556351U (en) A kind of readily removable section construction aluminum alloy pattern plate
CN208456276U (en) Steel can have enough to meet the need enclosure wall
CN202064480U (en) Outer separating wall built with lightweight concrete separating plates
CN206646649U (en) The connecting joint structure of column and girder steel
CN206655103U (en) A kind of assembled Wavelike steel webplate continuous composite beam
CN212518283U (en) Bus duct T-shaped joint side plate
CN204715725U (en) Overhanging type discharging platform node fixed structure
CN218758100U (en) Embedded crossbeam formula ALC prevents hot wall
CN211007202U (en) Superimposed shear wall for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200925

Termination date: 20211224