CN211572585U - Plastic embedded pipe for building construction - Google Patents

Plastic embedded pipe for building construction Download PDF

Info

Publication number
CN211572585U
CN211572585U CN201921795035.3U CN201921795035U CN211572585U CN 211572585 U CN211572585 U CN 211572585U CN 201921795035 U CN201921795035 U CN 201921795035U CN 211572585 U CN211572585 U CN 211572585U
Authority
CN
China
Prior art keywords
fixture block
fixing hole
fixed orifices
diameter
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921795035.3U
Other languages
Chinese (zh)
Inventor
张敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hongye Plastic Co ltd
Original Assignee
Anhui Hongye Plastic Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Hongye Plastic Co ltd filed Critical Anhui Hongye Plastic Co ltd
Priority to CN201921795035.3U priority Critical patent/CN211572585U/en
Application granted granted Critical
Publication of CN211572585U publication Critical patent/CN211572585U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to a pre-buried tub of technical field of plastic, and a pre-buried tub of plastic for construction is disclosed, including first body and second body, the spout has all been seted up to the top and the bottom on second body right side, first fixed orifices, second fixed orifices and third fixed orifices have been seted up at the top of spout, three sliding blocks of group of left top of first body and the equal fixedly connected with in bottom. This plastic embedded pipe for construction, through setting up first fixture block, the second fixture block, the third fixture block, first fixed orifices, second fixed orifices and third fixed orifices, and then the device can divide into two parts with whole, thereby it is more convenient when transportation and installation, and when dismantling the device, need not destroy the device's body, only need divide into first body and second body with the device and can accomplish the dismantlement, thereby make the use that the device can relapse, construction cost has been reduceed from this and operating personnel's the work degree of difficulty has been reduced.

Description

Plastic embedded pipe for building construction
Technical Field
The utility model relates to a pre-buried tub of technical field of plastic specifically is a pre-buried tub of plastic for construction.
Background
At present, in the building work progress, when pouring concrete usually, can lay the plastic buried pipe on floor concrete form, and present plastic buried pipe is mostly inconvenient in the transportation because of the length problem, and if concrete form error appears when needing to repack, the buried pipe also will be demolishd thereupon, but present buried pipe is demolishd the back and is destroyed so just can not reuse because of the body, great increase construction cost and strengthened operating personnel's the work degree of difficulty.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a plastic pre-buried pipe for construction has solved the inconvenient problem that just can not reuse of current plastic pre-buried pipe transportation.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a plastic embedded pipe for construction, includes first body and second body, the spout has all been seted up to top and bottom on second body right side, first fixed orifices, second fixed orifices and third fixed orifices have been seted up at the top of spout, the sliding blocks of three groups of equal fixedly connected with in the left top of first body and bottom, the recess has been seted up to the inside of sliding block, the inner bottom lateral wall fixedly connected with spring of recess, three groups the top of the spring that lies in the front side in the spring and the bottom fixed connection of third fixture block, three groups lie in the top of the spring at middle part and the bottom fixed connection of second fixture block in the spring, three groups the top of the spring that lies in the rear side in the spring and the bottom fixed connection of first fixture block, the recess is all worn out and is extended outside the sliding block in the top of first fixture block, second fixture block and third fixture block.
Preferably, the first fixing hole is located at a rear side of the second fixing hole, and the third fixing hole is located at a front side of the second fixing hole.
Preferably, the diameter of the first fixture block is larger than that of the second fixture block, and the diameter of the third fixture block is smaller than that of the second fixture block.
Preferably, the diameter of the first fixture block is matched with the diameter of the first fixing hole, the diameter of the second fixture block is matched with the diameter of the second fixing hole, and the diameter of the third fixture block is matched with the diameter of the third fixing hole.
Preferably, the width of sliding block and the width looks adaptation of spout, the length of spout is less than the length of second body.
Preferably, the cross sections of the first pipe body and the second pipe body are both semicircular, and the radius of the first pipe body is matched with the radius of the second pipe body.
(III) advantageous effects
Compared with the prior art, the utility model provides a plastic pre-buried pipe for construction possesses following beneficial effect:
this plastic embedded pipe for construction, through setting up first fixture block, the second fixture block, the third fixture block, first fixed orifices, second fixed orifices and third fixed orifices, and then the device can divide into two parts with whole, thereby it is more convenient when transportation and installation, and when dismantling the device, need not destroy the device's body, only need divide into first body and second body with the device and can accomplish the dismantlement, thereby make the use that the device can relapse, construction cost has been reduceed from this and operating personnel's the work degree of difficulty has been reduced.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a sectional view of the sliding block structure of the present invention.
In the figure: 1. a first pipe body; 2. a first clamping block; 3. a first fixing hole; 4. a second tube body; 5. a second fixing hole; 6. a third fixing hole; 7. a chute; 8. a slider; 9. a third fixture block; 10. a second fixture block; 11. a spring; 12. and (4) a groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, a plastic pre-buried pipe for building construction includes a first pipe body 1 and a second pipe body 4, a sliding groove 7 is formed at the top and bottom of the right side of the second pipe body 4, the cross sections of the first pipe body 1 and the second pipe body 4 are both semicircular, the radius of the first pipe body 1 is adapted to the radius of the second pipe body 4, the length of the first pipe body 1 is the same as that of the second pipe body 4, a first fixing hole 3, a second fixing hole 5 and a third fixing hole 6 are formed at the top of the sliding groove 7, the first fixing hole 3 is located at the rear side of the second fixing hole 5, the diameter of the first clamping block 2 is adapted to the diameter of the first fixing hole 3, the diameter of the second clamping block 10 is adapted to the diameter of the second fixing hole 5, the diameter of the third clamping block 9 is adapted to the diameter of the third fixing hole 6, the third fixing hole 6 is located at the front side of the second fixing hole 5, three sets of sliding blocks 8 are fixedly connected to the top and the bottom of the left side of the first pipe body, the width of the sliding block 8 is matched with the width of the sliding groove 7, the length of the sliding groove 7 is smaller than that of the second tube body 4, a groove 12 is formed in the sliding block 8, a spring 11 is fixedly connected to the inner bottom side wall of the groove 12, the top end of the spring 11 located on the front side in the three groups of springs 11 is fixedly connected to the bottom end of the third clamping block 9, the top end of the spring 11 located on the middle portion in the three groups of springs 11 is fixedly connected to the bottom end of the second clamping block 10, the top end of the spring 11 located on the rear side in the three groups of springs 11 is fixedly connected to the bottom end of the first clamping block 2, the diameter of the first clamping block 2 is larger than that of the second clamping block 10, the diameter of the third clamping block 9 is smaller than that of the second clamping block 10, the top ends of the first clamping block 2, the second clamping block 10 and the third clamping block 9 penetrate through the groove 12 and extend out of the sliding block 8, and the first clamping, Second fixed orifices 5 and third fixed orifices 6, and then the device can divide into two parts with whole to more convenient when transportation and installation, when dismantling the device moreover, need not destroy the device's body, only need divide into first body 1 and second body 4 with the device and can accomplish the dismantlement, thereby make the use that the device can relapse, has reduceed construction cost and has reduced operating personnel's the work degree of difficulty from this.
When the first fixture block 2, the second fixture block 10 and the third fixture block 9 are pressed into the groove 12, the sliding block 8 is inserted from the front side of the sliding groove 7, when the first fixture block 2 is overlapped with the third fixing hole 6 and the second fixing hole 5, the diameter of the first fixture block 2 is larger than that of the third fixing hole 6 and the second fixing hole 5, so the spring 11 can not eject the first fixture block 2, when the first fixture block 2 is overlapped with the first fixing hole 3, the spring 11 ejects the first fixture block 2 to clamp the first fixture block 2 into the first fixing hole 3, meanwhile, the second fixture block 10 is ejected by the spring 11 and clamped into the second fixing hole 5, the third fixture block 9 is ejected by the spring 11 and clamped into the third fixing hole 6, thereby the combination of the first tube body 1 and the second tube body 4 is completed, and when disassembly is needed, the first fixture block 2, the second fixture block 10 and the third fixture block 9 are pressed into the groove 12 again, then the second pipe body 4 is pulled forwards to be separated from the first pipe body 1, and the disassembly can be completed.
To sum up, this plastic buried pipe for construction, through setting up first fixture block 2, second fixture block 10, third fixture block 9, first fixed orifices 3, second fixed orifices 5 and third fixed orifices 6, and then the device can divide into two parts with whole, thereby more convenient when transportation and installation, and when dismantling the device, and when not needing to destroy the device's body, only need divide into first body 1 and second body 4 with the device and can accomplish the dismantlement, thereby make the use that the device can relapse, construction cost has been reduceed from this and operating personnel's the work degree of difficulty has been reduced.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a plastic pre-buried pipe for construction, includes first body (1) and second body (4), its characterized in that: the top and the bottom of the right side of the second pipe body (4) are respectively provided with a sliding groove (7), the top of each sliding groove (7) is provided with a first fixing hole (3), a second fixing hole (5) and a third fixing hole (6), the top and the bottom of the left side of the first pipe body (1) are respectively and fixedly connected with three groups of sliding blocks (8), the inside of each sliding block (8) is provided with a groove (12), the inner bottom side wall of each groove (12) is fixedly connected with a spring (11), the top end of the spring (11) positioned on the front side in the three groups of springs (11) is fixedly connected with the bottom end of the third clamping block (9), the top end of the spring (11) positioned on the middle part in the three groups of springs (11) is fixedly connected with the bottom end of the second clamping block (10), and the top end of the spring (11) positioned on the rear side in the three groups of springs (11) is, the top ends of the first clamping block (2), the second clamping block (10) and the third clamping block (9) penetrate out of the groove (12) and extend out of the sliding block (8).
2. The plastic pre-buried pipe for building construction according to claim 1, wherein: the first fixing hole (3) is located on the rear side of the second fixing hole (5), and the third fixing hole (6) is located on the front side of the second fixing hole (5).
3. The plastic pre-buried pipe for building construction according to claim 1, wherein: the diameter of the first fixture block (2) is larger than that of the second fixture block (10), and the diameter of the third fixture block (9) is smaller than that of the second fixture block (10).
4. The plastic pre-buried pipe for building construction according to claim 1, wherein: the diameter of the first fixture block (2) is matched with that of the first fixing hole (3), the diameter of the second fixture block (10) is matched with that of the second fixing hole (5), and the diameter of the third fixture block (9) is matched with that of the third fixing hole (6).
5. The plastic pre-buried pipe for building construction according to claim 1, wherein: the width of sliding block (8) and the width looks adaptation of spout (7), the length of spout (7) is less than the length of second body (4).
6. The plastic pre-buried pipe for building construction according to claim 1, wherein: the cross sections of the first pipe body (1) and the second pipe body (4) are semicircular, and the radius of the first pipe body (1) is matched with the radius of the second pipe body (4).
CN201921795035.3U 2019-10-24 2019-10-24 Plastic embedded pipe for building construction Active CN211572585U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921795035.3U CN211572585U (en) 2019-10-24 2019-10-24 Plastic embedded pipe for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921795035.3U CN211572585U (en) 2019-10-24 2019-10-24 Plastic embedded pipe for building construction

Publications (1)

Publication Number Publication Date
CN211572585U true CN211572585U (en) 2020-09-25

Family

ID=72529780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921795035.3U Active CN211572585U (en) 2019-10-24 2019-10-24 Plastic embedded pipe for building construction

Country Status (1)

Country Link
CN (1) CN211572585U (en)

Similar Documents

Publication Publication Date Title
CA2301361A1 (en) Headwall structure
CN211572585U (en) Plastic embedded pipe for building construction
IT1318888B1 (en) FITTING FOR PIPES WITH A FITTING SECTION CONTAINED IN THE PIPE
CN102767281A (en) Construction method and device for concrete fire wall
CN213174153U (en) Improved beam-column connecting structure for steel structure building
CN206110294U (en) Water drain pipe and water drainage system comprising same
CN210998641U (en) Pipe fitting rack for civil engineering
CN205347810U (en) Washing machine and drainage structures thereof
CN204826221U (en) Pre -buried component of infilled wall drawknot muscle
CN206053294U (en) A kind of scaffold
CN212140191U (en) Quick water changing auxiliary device of water dispenser
CN208879419U (en) A kind of bend pipe mould component on bending machine
CN209777107U (en) marker post containing box for engineering surveying and mapping
CN208633580U (en) The removal tool of concrete embedded tubing
CN206128420U (en) Prefabricated building block
CN204995049U (en) Double track way mosquito net frame
CN211644486U (en) Pipe burying device for hydraulic engineering
CN210344572U (en) Polyethylene winding arrangement wall tubular product of high ring stiffness
CN217232759U (en) Beam column joint department concrete intercepting device
CN103850426A (en) Scaffold embedded part and scaffold set-up process adopting same
CN211368788U (en) Cement building block line laying structure for well
CN218733036U (en) Civil engineering BIM pipeline laying frame
CN217326113U (en) Installation fastener of plastic tubing for sleeve grout
CN210503739U (en) Storage box
CN211599822U (en) Adjustable dismantlement formula PVC pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant