CN211571405U - Supporting base for bridge construction - Google Patents

Supporting base for bridge construction Download PDF

Info

Publication number
CN211571405U
CN211571405U CN201921522780.0U CN201921522780U CN211571405U CN 211571405 U CN211571405 U CN 211571405U CN 201921522780 U CN201921522780 U CN 201921522780U CN 211571405 U CN211571405 U CN 211571405U
Authority
CN
China
Prior art keywords
base
supporting
bridge construction
support
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921522780.0U
Other languages
Chinese (zh)
Inventor
刘亚辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Chenxi Highway Engineering Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921522780.0U priority Critical patent/CN211571405U/en
Application granted granted Critical
Publication of CN211571405U publication Critical patent/CN211571405U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a bridge construction is with supporting base, including installation base and support roof, the screwed pipe is all installed at the both ends at installation base top, and the inside all screw threads of screwed pipe install the screw rod, the intermediate position department at installation base top is provided with the spout, two sets of mounting panels are installed through the slider to the spout, the bearing is all installed to the one end that the mounting panel is close to the screwed pipe, and the bull stick is all installed to the inside of bearing. The utility model discloses install screw rod, solenoid, bearing, bull stick and mounting panel, through rotating the screw rod, make the screw rod remove inside the solenoid for the screw rod promotes or stimulates the mounting panel through the bull stick and slides on the spout, can adjust the distance between two sets of supporting beam, makes the device adjust according to actual conditions in the use, thereby makes the device can be applicable to the bridge of different length, and the suitability of device is stronger.

Description

Supporting base for bridge construction
Technical Field
The utility model relates to a bridge construction equipment technical field specifically is a bridge construction is with supporting base.
Background
Constructing a bridge according to the design content; mainly refers to the contents of bridge construction technology and construction organization, construction management, construction quality and the like, in the construction process of a bridge, the preparation work before bridge construction is one of important links which are firmly handled according to basic procedures and construction procedures, a support base is a device for supporting a cross beam in the bridge construction process, the support base can help the cross beam to carry out butt joint and other works, most of the existing support bases for bridge construction are provided with support columns with fixed intervals, the distance between adjacent support columns can not be adjusted, so that the device can not be adjusted according to the length of the bridge and can not be used according to actual conditions, the applicability is poor, most of the existing support bases for bridge construction are simple in structure, the bottom of the bridge is directly supported through a backing plate at the top, the backing plate and the device are greatly vibrated in the bridge construction process, and internal parts of the device are easily damaged, the stability of device is relatively poor, and simultaneously, current bridge construction is with supporting the base when using, and the weight that the device bore concentrates on a supporting beam position department, and the stress that the device part bore is great, causes the local damage of device easily, reduces the life of device, consequently, the utility provides a bridge construction is with supporting the base and being used for solving above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a bridge construction is with supporting base to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a bridge construction is with supporting base, is including installing the base and supporting the roof, the screwed pipe is all installed at the both ends at installation base top, and the inside all screw threads of screwed pipe install the screw rod, the intermediate position department at installation base top is provided with the spout, two sets of mounting panels are installed through the slider to the spout, the bearing is all installed to the one end that the mounting panel is close to the screwed pipe, and the inside of bearing all installs the bull stick, the one end that the bearing was kept away from to the bull stick all is connected with the screw rod, a supporting beam is all installed at the top of mounting panel, and a supporting beam's top all installs supporting the roof, the outside reinforcing plate is all installed at the top at a supporting beam both ends, the outside.
Preferably, the intermediate position department at the inside top of installation base installs arc component force roof beam, and installs the both ends at the inside top of base and all evenly install first support column, first support column all is connected with arc component force roof beam, the inside bottom of installation base evenly installs the second support column, the second support column all is connected with arc component force roof beam.
Preferably, the top of supporting the roof all is provided with the recess, the sleeve pipe is all evenly installed to the inside bottom of recess, and the cushioning spring is all installed to the inside bottom of sleeve pipe, the bracing piece is all installed at the top of cushioning spring, and the bridge connecting plate is all installed at the top of bracing piece.
Preferably, the bottom of the mounting base is uniformly provided with fixed inserted rods.
Preferably, the screw rod is kept away from the one end of bearing and is all installed the handle, and the outside of handle all is equipped with the rubber sleeve.
Preferably, the reinforcing ribs are uniformly arranged in the supporting beam.
Compared with the prior art, the beneficial effects of the utility model are that: the supporting base for bridge construction is provided with a screw rod, a screw pipe, a bearing, a rotating rod and a mounting plate, the screw rod moves inside the screw pipe by rotating the screw rod, so that the screw rod pushes or pulls the mounting plate to slide on a sliding groove through the rotating rod, the distance between two groups of supporting beams can be adjusted, the device can be adjusted according to actual conditions in the using process, the device can be suitable for bridges with different lengths, the applicability of the device is stronger, the device is provided with a sleeve, a bridge connecting plate, a supporting rod and a cushioning spring, the cushioning spring can cushion vibration generated in bridge construction, the influence of vibration on the device is reduced, the damage of the device caused by bridge vibration is reduced, meanwhile, the device is provided with a first supporting column, a second supporting column and an arc component beam, the stress locally received by the device can be dispersed, and all parts of the device are uniformly stressed, the pressure on the local part of the device is reduced, the local part of the device is prevented from being damaged due to large stress, and the service life of the device is prolonged.
Drawings
Fig. 1 is a schematic front sectional view of the present invention;
fig. 2 is a schematic front view of the present invention;
fig. 3 is a schematic view of a partial structure of the present invention.
In the figure: 1. installing a base; 2. fixing the inserted rod; 3. a first support column; 4. a chute; 5. a screw; 6. A support beam; 7. supporting a top plate; 8. a sleeve; 9. bridge connecting plates; 10. a support bar; 11. a solenoid; 12. An outer reinforcing plate; 13. reinforcing ribs; 14. a bearing; 15. a rotating rod; 16. an arc-shaped component force beam; 17. a second support column; 18. mounting a plate; 19. a groove; 20. a cushioning spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides an embodiment: the utility model provides a bridge construction is with supporting base, including installation base 1 and roof support 7, solenoid 11 is all installed at the both ends at installation base 1 top, and screw rod 5 is all installed to all threads in solenoid 11's inside, the intermediate position department at installation base 1 top is provided with spout 4, two sets of mounting panels 18 are installed through the slider to spout 4, bearing 14 is all installed to the one end that mounting panel 18 is close to solenoid 11, and rotating rod 15 is all installed to bearing 14's inside, rotating rod 15 keeps away from the one end of bearing 14 and all is connected with screw rod 5, a supporting beam 6 is all installed at mounting panel 18's top, and roof support 7 is all installed at roof support 6's top, outside reinforcing plate 12 is all installed at the top at roof support 6 both ends, outside reinforcing plate 12 all is connected with roof support 7.
In this implementation: the middle position of the top inside the mounting base 1 is provided with an arc-shaped component force beam 16, the two ends of the top inside the mounting base 1 are uniformly provided with a first support column 3, the first support columns 3 are all connected with the arc-shaped component force beam 16, the bottom inside the mounting base 1 is uniformly provided with a second support column 17, the second support columns 17 are all connected with the arc-shaped component force beam 16, the pressure locally applied to the device is transmitted to the arc-shaped component force beam 16 through the first support columns 3 and is uniformly dispersed to the second support columns 17 through the arc-shaped component force beam 16, the pressure locally applied to the device can be reduced, the whole device is uniformly applied, the local damage caused by the pressure is avoided, the service life of the device is prolonged, the top of the supporting top plate 7 is provided with grooves 19, the bottoms inside the grooves 19 are all uniformly provided with sleeves 8, and the bottoms inside the sleeves 8 are all provided with, bracing piece 10 is all installed at bradyseism spring 20's top, and bridge connecting plate 9 is all installed at bracing piece 10's top, the vibrations that the bridge beam produced pass through bridge connecting plate 9 and transmit for bracing piece 10, and transmit for bradyseism spring 20 through bracing piece 10, bradyseism spring 20 plays the effect of buffering, can reduce the influence of vibrations to the device, be favorable to improving device's stability, fixed inserted bar 2 is evenly installed to the bottom of installation base 1, be convenient for be fixed in ground with installation base 1, the handle is all installed to the one end that bearing 14 was kept away from to screw rod 5, and the outside of handle all overlaps and is equipped with the rubber sleeve, the constructor of being convenient for rotates screw rod 5, strengthening rib 13 is all evenly installed to supporting beam 6's inside.
The working principle is as follows: when the installation base 1 is used, the installation base 1 is fixed on the ground through the fixed inserting rod 2, then a constructor can adjust the distance between the two groups of supporting beams 6 according to the length of the bridge, when the distance between the two groups of supporting beams 6 needs to be increased, the constructor can rotate the screw rod 5 clockwise to enable the screw rod 5 to move towards one end far away from the supporting beams 6 in the spiral pipe 11, so that the screw rod 5 pulls the installation plate 18 to slide towards one end of the spiral pipe 11 on the sliding chute 4 through the rotating rod 15, the distance between the two groups of supporting beams 6 is increased, when the distance between the two groups of supporting beams 6 needs to be reduced, the constructor can rotate the screw rod 5 anticlockwise to enable the screw rod 5 to move towards one end of the supporting beams 6 in the spiral pipe 11, so that the screw rod 5 pushes the installation plate 18 to slide towards one end far away from the spiral pipe 11 on the sliding chute, make bridge connecting plate 9's top and bridge crossbeam bottom laminate, can support the bridge, in the bridge work progress, the vibrations that the bridge crossbeam produced transmit for bracing piece 10 through bridge connecting plate 9, and transmit for bradyseism spring 20 through bracing piece 10, bradyseism spring 20 plays the effect of buffering, can reduce the influence of vibrations to the device, be favorable to improving the stability of device, in the device use, the pressure that the device part received transmits for arc component roof beam 16 through first support column 3, and give second support column 17 through arc component roof beam 16 homodisperse, can reduce the pressure that the device part received, make the whole atress of device even, avoid the device part to receive the great damage of pressure, be favorable to extension fixture's life.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (6)

1. The utility model provides a bridge construction is with supporting base, includes installation base (1) and roof support (7), its characterized in that: both ends of the top of the mounting base (1) are provided with screw tubes (11), the screw rods (5) are arranged inside the screw tubes (11) in a threaded manner, a sliding chute (4) is arranged in the middle of the top of the mounting base (1), two groups of mounting plates (18) are mounted on the sliding chute (4) through a sliding block, one end of the mounting plate (18) close to the solenoid (11) is provided with a bearing (14), rotating rods (15) are arranged in the bearings (14), one ends of the rotating rods (15) far away from the bearings (14) are connected with the screw rods (5), supporting beams (6) are arranged at the tops of the mounting plates (18), and the top of a supporting beam (6) is provided with a supporting top plate (7), the tops of the two ends of the supporting beam (6) are provided with outer side reinforcing plates (12), and the outer side reinforcing plates (12) are connected with the supporting top plate (7).
2. The support base for bridge construction according to claim 1, wherein: the utility model discloses a mounting base, including mounting base (1), installation base, first support column (3), second support column (17) are evenly installed to the inside bottom of mounting base (1), second support column (17) all are connected with arc component roof beam (16), the intermediate position department at the inside top of mounting base (1) installs arc component roof beam (16), and the both ends at the inside top of mounting base (1) all evenly install first support column (3), first support column (3) all are connected with arc component roof beam (16).
3. The support base for bridge construction according to claim 1, wherein: the top of roof support (7) all is provided with recess (19), sleeve pipe (8) are all evenly installed to the inside bottom of recess (19), and sleeve pipe (8) inside bottom all installs bradyseism spring (20), bracing piece (10) are all installed at the top of bradyseism spring (20), and bridge connecting plate (9) are all installed at the top of bracing piece (10).
4. The support base for bridge construction according to claim 1, wherein: the bottom of the mounting base (1) is uniformly provided with fixed inserted rods (2).
5. The support base for bridge construction according to claim 1, wherein: the handle is all installed to the one end that bearing (14) were kept away from in screw rod (5), and the outside of handle all is equipped with the rubber sleeve.
6. The support base for bridge construction according to claim 1, wherein: reinforcing ribs (13) are uniformly arranged in the supporting beam (6).
CN201921522780.0U 2019-09-12 2019-09-12 Supporting base for bridge construction Active CN211571405U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921522780.0U CN211571405U (en) 2019-09-12 2019-09-12 Supporting base for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921522780.0U CN211571405U (en) 2019-09-12 2019-09-12 Supporting base for bridge construction

Publications (1)

Publication Number Publication Date
CN211571405U true CN211571405U (en) 2020-09-25

Family

ID=72522477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921522780.0U Active CN211571405U (en) 2019-09-12 2019-09-12 Supporting base for bridge construction

Country Status (1)

Country Link
CN (1) CN211571405U (en)

Similar Documents

Publication Publication Date Title
CN110617370B (en) Petrochemical pipeline installing support
CN112064780A (en) Splicing device for overhead gallery bridge
CN211571405U (en) Supporting base for bridge construction
CN112942145A (en) Prestressed anchoring device for concrete bridge and construction method thereof
CN211499182U (en) Reinforced steel structure at joint of steel structure
CN219622339U (en) Building beam reinforced structure
CN211286904U (en) Wire pole that stability is good
CN112323982A (en) Temporary building beam column connection supporting structure
CN210263912U (en) Floor support plate connecting piece
CN108166379B (en) Replaceable transverse wind-resistant structure and method suitable for cable-stayed bridge and suspension bridge
CN202215909U (en) Camera fixing frame on cylindrical barrier
CN213358295U (en) High-performance insulating damping bridge support
CN210423970U (en) Pipeline reinforcing equipment for hydraulic engineering
CN211312250U (en) Bridge reinforcing structure
CN211145569U (en) Mounting bracket of building component
CN207163813U (en) The sample support device of static load anchoring test
CN206438389U (en) Pier stud connecting bracket component
CN211420836U (en) Bridge bearing embedded bolt belonging to railway multi-element co-permeation metal piece
CN111676810A (en) Bridge support capable of being partially replaced and mounting method thereof
CN210288087U (en) Easy-to-detach Bailey sheet
CN219672938U (en) Pre-fixing device of fan bracket
CN210565994U (en) Matrix noise-reducing shock absorber convenient to mount
CN220686844U (en) Reinforcing structure for reinforcing concrete column
CN218562072U (en) Be used for spacing buffer of bridge beam supports antidetonation
CN220908134U (en) Novel anchoring device for bridge support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210517

Address after: 550081 No.87, 2nd floor, building 9, area C, Tiansheng International Trade City, Huangguoshu street, development zone, Anshun City, Guizhou Province

Patentee after: Guizhou Xinghui Lianchuang Engineering Co.,Ltd.

Address before: Greenland Yuansheng international, No.49, Jinshui East Road, Zhengdong New District, Zhengzhou City, Henan Province, 450000

Patentee before: Liu Yahui

TR01 Transfer of patent right

Effective date of registration: 20240607

Address after: Room 301, No. 99 Guijia Investment, South China Avenue, Sanjiao Village, Sanjiao Town, Meijiang District, Meizhou City, Guangdong Province, 514000

Patentee after: Guangdong Chenxi Highway Engineering Co.,Ltd.

Country or region after: China

Address before: 550081 No.87, 2nd floor, building 9, area C, Tiansheng International Trade City, Huangguoshu street, development zone, Anshun City, Guizhou Province

Patentee before: Guizhou Xinghui Lianchuang Engineering Co.,Ltd.

Country or region before: China