CN211570482U - Preheater based on cement production - Google Patents

Preheater based on cement production Download PDF

Info

Publication number
CN211570482U
CN211570482U CN201922246427.0U CN201922246427U CN211570482U CN 211570482 U CN211570482 U CN 211570482U CN 201922246427 U CN201922246427 U CN 201922246427U CN 211570482 U CN211570482 U CN 211570482U
Authority
CN
China
Prior art keywords
connecting flange
preheater
gas outlet
flange
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922246427.0U
Other languages
Chinese (zh)
Inventor
刘仕臣
张仕丹
黄中桂
丁苏平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Sandu Southwest Cement Co ltd
Original Assignee
Guizhou Sandu Southwest Cement Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Sandu Southwest Cement Co ltd filed Critical Guizhou Sandu Southwest Cement Co ltd
Priority to CN201922246427.0U priority Critical patent/CN211570482U/en
Application granted granted Critical
Publication of CN211570482U publication Critical patent/CN211570482U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Furnace Details (AREA)

Abstract

The utility model discloses a pre-heater based on cement manufacture, including the pre-heater body, the top of pre-heater body is provided with first gas outlet and second gas outlet respectively, the first outlet duct of top fixedly connected with of first gas outlet, be provided with the windage detector on the first outlet duct, the input of windage detector extends to the inside of first outlet duct, be provided with the control valve on the second gas outlet, the utility model relates to a pre-heater technical field. This pre-heater based on cement manufacture can be controlled the traffic volume according to the demand of using, and first outlet duct wind speed when normal operating is too fast, and when the resistance was too high, detects and observes through the windage detector, and maintainer is through starting control valve to the convenience is opened the second gas outlet and is used, thereby increases the circulation space, reduces wind speed and resistance, stability and the security that improve equipment used, the life of extension equipment simultaneously.

Description

Preheater based on cement production
Technical Field
The utility model relates to a pre-heater technical field specifically is a pre-heater based on cement manufacture.
Background
In recent years, because raw materials are easy to burn and have large component fluctuation, more importantly, high-sulfur anthracite is used as fuel, and the combustion performance is poor, the problems of shrinkage of a decomposing furnace, furnace tail smoke chamber skinning and the like are caused. At present, the preheater has high resistance and low clinker yield. The high-temperature fan has high power consumption due to the high resistance of the preheater; due to the low clinker yield, the heat consumption is increased, and the unit clinker power consumption is also obviously increased.
In the prior art, when the preheaters are in working states, the diameters and the inlet areas of ascending pipelines of all stages of preheaters are small, and when the overproduction range of a system exceeds more than 10%, the wind speed is too high, and the resistance is too high
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a preheater based on cement manufacture has solved the pipeline diameter problem on the small side of single channel.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a preheater based on cement production comprises a preheater body, wherein a first air outlet and a second air outlet are respectively arranged at the top of the preheater body, a first air outlet pipe is fixedly connected to the top of the first air outlet, a wind resistance detector is arranged on the first air outlet pipe, the input end of the wind resistance detector extends into the first air outlet pipe, a control valve is arranged on the second air outlet, a first connecting flange is fixedly connected to the top of the second air outlet, positioning grooves are respectively arranged at two sides of the first connecting flange, a bottom sealing groove is arranged at the top of the first connecting flange, a second connecting flange is arranged at the top of the first connecting flange, a top sealing groove is arranged at the bottom of the second connecting flange, a limiting connecting ring is fixedly connected to the outer side of the bottom of the second connecting flange, mounting grooves are respectively arranged at two sides of the inner wall of the limiting connecting ring, the mounting groove with be provided with positioning bolt between the constant head tank, bottom seal groove with be provided with the sealing washer between the seal groove of top, second flange's top fixedly connected with second outlet duct to the solid fixed ring of inboard fixedly connected with of second flange, solid fixed ring's inboard fixedly connected with go-between, the bottom of go-between extends to first flange's inboard.
Further, the bottom sealing groove is an annular inner groove, and the size of the bottom sealing groove is the same as that of the top sealing groove.
Further, the sealing ring is of an annular structure.
Further, the surface of positioning bolt is half thread face and half cylinder type plane to cylindrical plane's size with the internal surface joint of constant head tank.
Further, the inner surface of the mounting groove is an internal thread surface, and the thread surface is in threaded connection with the inner surface of the mounting groove.
Further, the inner diameter of the second connecting flange is the same as the inner diameter of the first connecting flange, and the outer diameter of the second connecting flange is larger than the outer diameter of the first connecting flange.
Furthermore, the difference between the inner diameter of the limiting connecting ring and the inner diameter of the first connecting flange is 0.5-1 cm, and the bottom of the limiting connecting ring and the bottom of the first connecting flange are on the same horizontal plane.
Compared with the prior art, the beneficial effects of the utility model are that:
this pre-heater based on cement manufacture, replace the structure of original single channel output through being provided with binary channels's export, change original traffic volume, and can control the traffic volume according to the demand of using, first outlet duct wind speed when normal operating is too fast, when the resistance is too high, detect and observe through the windage detector, maintainer is through starting the control valve, thereby the convenience is opened and is used the second gas outlet, thereby increase the circulation space, reduce wind speed and resistance, improve the stability and the security that equipment used, the life of extension equipment simultaneously.
Drawings
Fig. 1 is a schematic structural diagram of a preferred embodiment of the present invention;
FIG. 2 is an enlarged view taken at A of FIG. 1;
fig. 3 is a schematic structural view of the fixing ring portion shown in fig. 2.
In the figure: 1-a preheater body, 2-a first air outlet, 3-a first air outlet pipe, 4-a wind resistance detector, 5-a second air outlet, 6-a control valve, 7-a first connecting flange, 71-a positioning groove, 72-a bottom sealing groove, 8-a second connecting flange, 801-a top sealing groove, 81-a limiting connecting ring, 811-a mounting groove, 82-a positioning bolt, 9-a sealing ring, 10-a second air outlet pipe, 11-a fixing ring and 111-a connecting ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a preheater based on cement production comprises a preheater body 1, wherein a first air outlet 2 and a second air outlet 5 are respectively arranged at the top of the preheater body 1, a first air outlet pipe 3 is fixedly connected to the top of the first air outlet 2, a wind resistance detector 4 is arranged on the first air outlet pipe 3, the input end of the wind resistance detector 4 extends into the first air outlet pipe 3, a control valve 6 is arranged on the second air outlet 5, a first connecting flange 7 is fixedly connected to the top of the second air outlet 5, positioning grooves 71 are respectively arranged on two sides of the first connecting flange 7, a bottom sealing groove 72 is arranged at the top of the first connecting flange 7, a second connecting flange 8 is arranged at the top of the first connecting flange 7, a top sealing groove 801 is arranged at the bottom of the second connecting flange 8, a limiting connecting ring 81 is fixedly connected to the outer side of the bottom of the second connecting flange 8, mounting groove 811 has all been seted up to the both sides of spacing go-between 81 inner walls, mounting groove 811 with be provided with positioning bolt 82 between the constant head tank 71, bottom seal groove 72 with be provided with sealing washer 9 between the top seal groove 801, the top fixedly connected with second outlet duct 10 of second flange 8 to the solid fixed ring 11 of the inboard fixedly connected with of second flange 8, gu the inboard fixedly connected with go-between 111 of fixed ring 11, the bottom of go-between 111 extends to the inboard of first flange 7.
Replace the structure of original single channel output through being provided with binary channels's export, change original traffic volume, and can control the traffic volume according to the demand of using, 3 wind speeds of first outlet duct when normal operating are too fast, when the resistance is too high, detect and observe through windage detector 4, maintainer is through starting control valve 6, thereby the convenience is opened and is used second gas outlet 5, thereby increase the circulation space, reduce wind speed and resistance, improve the stability and the security that equipment used, the life of extension equipment simultaneously.
The bottom seal groove 72 is an annular inner groove, and the size of the bottom seal groove 72 is the same as that of the top seal groove 801.
The sealing performance of the connection between the first connecting flange 7 and the second connecting flange 8 is increased between the bottom sealing groove 72 and the top sealing groove 801 by the sealing ring 9.
The sealing ring 9 is of an annular structure, and the sealing ring 9 is installed between the bottom sealing groove 72 and the top sealing groove 801, so that the sealing effect of connection is improved.
The surface of the positioning bolt 82 is a half thread surface and a half cylindrical plane, and the size of the cylindrical plane is clamped with the inner surface of the positioning groove 71.
Positioning bolt 82 passes through the threaded structural mounting on spacing go-between 81, positioning bolt 82 passes through the joint between cylindrical planar structure and the constant head tank 71, thereby reach spacing to first connecting flange 7, carry out bolted connection and fix through the flange hole between first connecting flange 7 and the second connecting flange 8, convenient dismantlement and the change to second outlet duct 10 of structure through flange connection, when need not use second outlet duct 10, can select not to install the structure of second connecting flange 8 and second outlet duct 10, the cost is saved, pre-heater body 1 reserves first connecting flange 7 with reserve, need use binary channels structure when avoiding adding man-hour wind speed excessively fast, provide different user demands for the user.
The inner surface of the mounting groove 811 is an inner threaded surface, and the threaded surface is in threaded connection with the inner surface of the mounting groove 811.
The inner diameter of the second connecting flange 8 is the same as the inner diameter of the first connecting flange 7, and the outer diameter of the second connecting flange 8 is larger than the outer diameter of the first connecting flange 7.
The difference between the inner diameter of the limiting connection ring 81 and the inner diameter of the first connection flange 7 is 0.5-1 cm, and the bottom of the limiting connection ring 81 and the bottom of the first connection flange 7 are on the same horizontal plane.
When the preheater works, the positioning bolt 82 is clamped with the positioning groove 71 through the cylindrical plane structure, so that the first connecting flange 7 is limited, the first connecting flange 7 and the second connecting flange 8 are in bolted connection and fixed through the flange holes, the second outlet pipe 10 is convenient to detach and replace through the flange connection structure, when the second outlet pipe 10 is not needed, the structure without the second connecting flange 8 and the second outlet pipe 10 can be selected, the cost is saved, the first connecting flange 7 is reserved on the preheater body 1 for standby, the double-channel structure is avoided being used when the air speed is too high in the process, and different use requirements are provided for a user;
replace the structure of original single channel output through being provided with binary channels's export, change original traffic volume, and can control the traffic volume according to the demand of using, 3 wind speeds of first outlet duct when normal operating are too fast, when the resistance is too high, detect and observe through windage detector 4, maintainer is through starting control valve 6, thereby the convenience is opened and is used second gas outlet 5, thereby increase the circulation space, reduce wind speed and resistance, improve the stability and the security that equipment used, the life of extension equipment simultaneously.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. A preheater based on cement production, includes preheater body (1), its characterized in that: the preheater comprises a preheater body (1), and is characterized in that a first gas outlet (2) and a second gas outlet (5) are respectively arranged at the top of the preheater body (1), a first gas outlet pipe (3) is fixedly connected to the top of the first gas outlet (2), a wind resistance detector (4) is arranged on the first gas outlet pipe (3), the input end of the wind resistance detector (4) extends into the first gas outlet pipe (3), a control valve (6) is arranged on the second gas outlet (5), a first connecting flange (7) is fixedly connected to the top of the second gas outlet (5), positioning grooves (71) are respectively arranged on two sides of the first connecting flange (7), a bottom sealing groove (72) is arranged at the top of the first connecting flange (7), a second connecting flange (8) is arranged at the top of the first connecting flange (7), a top sealing groove (801) is arranged at the bottom of the second connecting flange (8), the utility model discloses a fixing ring for connecting the automobile seat, including first flange (8), the outside fixedly connected with of second flange (8) bottom is spacing go-between (81), mounting groove (811) have all been seted up to the both sides of spacing go-between (81) inner wall, mounting groove (811) with be provided with positioning bolt (82) between constant head tank (71), bottom seal groove (72) with be provided with between top seal groove (801) sealing washer (9), the top fixedly connected with second outlet duct (10) of second flange (8) to the solid fixed ring (11) of inboard fixedly connected with of second flange (8), the inboard fixedly connected with go-between (111) of solid fixed ring (11), the bottom of go-between (111) extends to the inboard of first flange (7).
2. A cement production based preheater as claimed in claim 1, wherein: the bottom sealing groove (72) is an annular inner groove, and the size of the bottom sealing groove (72) is the same as that of the top sealing groove (801).
3. A cement production based preheater as claimed in claim 1, wherein: the sealing ring (9) is of an annular structure.
4. A cement production based preheater as claimed in claim 1, wherein: the surface of the positioning bolt (82) is a half thread surface and a half cylindrical plane, and the size of the cylindrical plane is connected with the inner surface of the positioning groove (71) in a clamping mode.
5. A cement production based preheater as claimed in claim 1, wherein: the inner surface of the mounting groove (811) is an internal thread surface, and the thread surface is in threaded connection with the inner surface of the mounting groove (811).
6. A cement production based preheater as claimed in claim 1, wherein: the inner diameter of the second connecting flange (8) is the same as the inner diameter of the first connecting flange (7), and the outer diameter of the second connecting flange (8) is larger than the outer diameter of the first connecting flange (7).
7. A cement production based preheater as claimed in claim 1, wherein: the difference between the inner diameter of the limiting connecting ring (81) and the inner diameter of the first connecting flange (7) is 0.5-1 cm, and the bottom of the limiting connecting ring (81) and the bottom of the first connecting flange (7) are on the same horizontal plane.
CN201922246427.0U 2019-12-16 2019-12-16 Preheater based on cement production Expired - Fee Related CN211570482U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922246427.0U CN211570482U (en) 2019-12-16 2019-12-16 Preheater based on cement production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922246427.0U CN211570482U (en) 2019-12-16 2019-12-16 Preheater based on cement production

Publications (1)

Publication Number Publication Date
CN211570482U true CN211570482U (en) 2020-09-25

Family

ID=72548277

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922246427.0U Expired - Fee Related CN211570482U (en) 2019-12-16 2019-12-16 Preheater based on cement production

Country Status (1)

Country Link
CN (1) CN211570482U (en)

Similar Documents

Publication Publication Date Title
CN204921055U (en) Brush vapor seal of sealed clearance adjustable honeycomb between gland casing and rotor
CN110685755A (en) High-efficiency organic working medium expander
CN211570482U (en) Preheater based on cement production
CN104514633A (en) Efficient three-level air filtration device for gas turbine
CN103307401B (en) Double water-cooled expansion joint
CN112627905A (en) Internal combustion wave rotor exhaust mixing device based on blade diversion pressure relief
CN205745741U (en) A kind of pipe connector
CN107559052B (en) A kind of Novel unilateral is around core clamped-in style brush seal structure
CN211011313U (en) Preheating type water supply structure for pure water boiler
CN203614142U (en) Building block technology-based modular steam seal
CN207848627U (en) A kind of sealing ring with oil-leakage-prevention function
CN203375075U (en) Double-layer water-cooled expansion joint
CN218844388U (en) Steam turbine transformed from steam extraction and condensing type reaction unit
CN205936778U (en) Agricultural machinery blast pipe
CN209277993U (en) A kind of intercooler for charged piston engine
CN105987396B (en) Regenerative air preheater Recovery of Seal Oil energy conserving system
CN219623466U (en) Heating and ventilation pipeline with good ventilation performance
CN205145774U (en) Fuel strainer valve filter core
CN220633548U (en) Tail gas filtering pipeline for combustion equipment
CN216245756U (en) Novel heat accumulator for heat recovery and cyclic utilization
CN221549375U (en) Waste heat recovery device
CN206738015U (en) A kind of engine inlets flexible connecting structure
CN2451564Y (en) Bottom igniting building block type two-in-one graphite hydrogen chloride synthetic furnace
CN208382853U (en) The dedicated high temperature resistant settlement cooler of enclosed calcium carbide furnace gas
CN212431375U (en) Geothermal well geothermal composite exploitation pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200925

Termination date: 20211216