CN211569610U - Heavy hammer tensioning pipeline reel - Google Patents
Heavy hammer tensioning pipeline reel Download PDFInfo
- Publication number
- CN211569610U CN211569610U CN202020118590.9U CN202020118590U CN211569610U CN 211569610 U CN211569610 U CN 211569610U CN 202020118590 U CN202020118590 U CN 202020118590U CN 211569610 U CN211569610 U CN 211569610U
- Authority
- CN
- China
- Prior art keywords
- reel
- pipeline
- wire rope
- steel wire
- weight
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Tension Adjustment In Filamentary Materials (AREA)
Abstract
The invention belongs to the technical field of pipeline reels, and particularly relates to a heavy hammer tensioning pipeline reel which comprises a pipeline reel, wherein a steel wire rope reel is fixed on the pipeline reel and synchronously rotates with the pipeline reel; the initial end of the pipeline wound on the pipeline reel is fixed on the linear operation equipment, and the steel wire rope wound on the steel wire rope reel is wound around the pulley block and then is connected with the heavy hammer; the winding direction of the pipeline is opposite to that of the steel wire rope. The heavy hammer tensioning pipeline reel pipeline winding structure is simple, low in cost and convenient to install.
Description
Technical Field
The invention belongs to the technical field of pipeline reels, and particularly relates to a heavy hammer tensioning pipeline reel.
Background
At present, the tubing reels are mainly resilient tubing reels and motorized tubing reels. The elastic pipeline reel winds the pipeline by utilizing the force of the spring, the working principle is very similar to that of a tape measure, so that the elastic pipeline reel is suitable for winding the pipeline within 30 meters, and the pipeline is difficult to run when the length of the pipeline exceeds 30 meters; the electric pipeline reel has high manufacturing cost and complex structure, needs various devices such as a driving mechanism, a sensor, a controller and the like, and has a plurality of fault points, large noise and large energy consumption in the using process.
Disclosure of Invention
The invention aims to overcome the defects of the background technology and provide a heavy hammer tensioning pipeline reel.
The invention is realized by the following technical scheme:
a heavy hammer tensioning pipeline reel comprises a pipeline reel, wherein a steel wire rope reel is coaxially fixed on the pipeline reel and synchronously rotates with the pipeline reel; the initial end of the pipeline wound on the pipeline reel is fixed on the running equipment, and the steel wire rope wound on the steel wire rope reel is wound around the pulley block and then is connected with the heavy hammer; the winding direction of the pipeline is opposite to that of the steel wire rope.
Furthermore, the pulley block comprises a fixed pulley block above and a movable pulley block below.
Furthermore, the weight of the heavy hammer is adjustable.
Further, the running equipment is walking equipment, further preferably walking water equipment, and further preferably a distributing machine.
Further, the pipeline is a flexible water pipe.
Furthermore, the pulley block is fixed through a support.
Further, the pipeline reel is located below the operating equipment.
Furthermore, the pulley block is fixed below the pipeline reel.
Further, the pipeline reel is located in the middle of the running track of the running equipment.
The heavy hammer tensioning pipeline reel pipeline winding structure is simple, low in cost and convenient to install.
Drawings
Fig. 1 is a schematic structural diagram of the operation device of the present embodiment when the operation device is operated to the leftmost end.
Fig. 2 is a schematic structural diagram of the operation device of the present embodiment when the operation device is operated to the rightmost end.
Fig. 3 is a schematic structural diagram of the operation device of the embodiment when the operation device is operated to the intermediate position.
In the figure, 1 pipeline reel, 2 steel wire rope reel, 3 pipeline, 4 running equipment, 5 steel wire rope, 6 pulley block, 7 heavy hammer, 8 track, 9 fixed pulley block and 10 movable pulley block.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention.
The invention comprises a pipeline reel 1, wherein a steel wire rope reel 2 is fixed on the pipeline reel 1, so that the steel wire rope reel 2 and the pipeline reel 1 synchronously rotate. In order to realize synchronous rotation of the steel wire rope reel 2 and the pipeline reel 1, the disc body of the steel wire rope reel 2 and the disc body of the pipeline reel 1 are fixed together in the embodiment, so that the steel wire rope reel 2 and the pipeline reel 1 rotate synchronously. Also can fix wire rope reel 2 in the pivot of pipeline reel 1, for example key-type connection or interference fit connection realize wire rope reel 2 and pipeline reel 1 coaxial rotation. There are various conventional means for achieving the above-mentioned object, and the present invention is not limited thereto, and the conventional structure for achieving the above-mentioned object is within the scope of the present invention.
The pipeline 3 is wound on the pipeline reel 1, the steel wire rope 5 is wound on the steel wire rope reel 2, and the winding directions of the pipeline 3 and the steel wire rope 5 are opposite. The initial end of the pipeline 3 wound on the pipeline reel 1 is fixed on the operation device 4, the operation device 4 is a walking device which needs to be connected with the pipeline 3, for example, the walking device may be a water-using device such as a material distributor, and the present embodiment is described in detail by taking the operation device 4 as a material distributor and the pipeline 3 as a flexible water pipe, but not limited thereto. If the laying-out machine is running on the track 8, the pipe reel 1 is first fixed to a plane below the track 8, such as the building surface on which the track 8 is located, and then the initial end of the pipe 3 is fixed to the laying-out machine. Preferably, the pipe reel 1 is located in the middle of the running track of the running device 4.
The steel wire rope 5 wound on the steel wire rope reel 2 passes through the pulley block 6 and then is connected with the heavy hammer 7. The weight of the weight 7 can be adjusted, and the weight can be increased or decreased according to actual conditions. The pulley block 6 comprises an upper fixed pulley block 9 and a lower movable pulley block 10, the number of the pulleys of the fixed pulley block 9 and the movable pulley block 10 is set according to requirements, the upper fixed pulley block 9 is fixed on the plane where the pipeline reel 1 is located through a support, and the support is not shown in the attached drawings.
When the distributor works, the distributor reciprocates on the upper track 8, when the distributor runs leftwards, the distributor drags the pipeline 3 to run leftwards together, so that the pipeline 3 is continuously pulled out, the pipeline reel 1 rotates clockwise, meanwhile, the steel wire rope reel 2 also synchronously rotates clockwise, the steel wire rope 5 on the right is continuously wound on the steel wire rope reel 2, and the heavy hammer 7 is lifted upwards; when the material distributing machine runs to the leftmost side, then the material distributing machine starts to run to the right, at this time, due to the action of the heavy hammer 7, the heavy hammer 7 can enable the steel wire rope reel 2 to rotate anticlockwise, the heavy hammer 7 continuously descends, and meanwhile, the pipeline reel 1 also rotates anticlockwise to start to wind the pipeline 3; when the running device 4 runs to the middle position of the running track, the rolling of the pipeline 3 reaches the maximum, and the heavy hammer 7 is at the lowest position; when the operation equipment 4 continues to move right from the middle position of the operation track, the operation equipment 4 continuously pulls out the pipeline 3 at the moment, the pipeline reel 1 rotates clockwise, meanwhile, the steel wire rope reel 2 also synchronously rotates clockwise, the steel wire rope 5 is continuously wound on the steel wire rope reel 2, the heavy hammer 7 is lifted upwards, and the pipeline 1 is wound repeatedly.
Finally, it should be noted that: the above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; those of ordinary skill in the art will understand that: the technical solutions described in the above embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.
Claims (10)
1. A weight-tensioned pipe reel comprising a pipe reel (1), characterized in that: the steel wire rope reel (2) is coaxially fixed on the pipeline reel (1), and the steel wire rope reel (2) and the pipeline reel (1) synchronously rotate; the initial end of a pipeline (3) wound on the pipeline reel (1) is fixed on the operation equipment (4), and a steel wire rope (5) wound on the steel wire rope reel (2) bypasses the pulley block (6) and is connected with a heavy hammer (7); the winding direction of the pipeline (3) is opposite to that of the steel wire rope (5).
2. The weight-tensioned tubing reel of claim 1, wherein: the pulley block (6) comprises a fixed pulley block (9) at the upper part and a movable pulley block (10) at the lower part.
3. The weight-tensioned tubing reel of claim 1, wherein: the weight of the heavy hammer (7) is adjustable.
4. The weight-tensioned tubing reel of claim 1, wherein: the running equipment (4) is walking equipment.
5. The weight-tensioned tubing reel of claim 4, wherein: the operation equipment (4) is a distributing machine.
6. The weight-tensioned tubing reel of claim 1, wherein: the pipeline (3) is a flexible water pipe.
7. The weight-tensioned tubing reel of claim 1, wherein: the pulley block (6) is fixed through a support.
8. The weight-tensioned tubing reel of claim 1, wherein: the pipeline reel (1) is located below the operating device (4).
9. The weight-tensioned tubing reel of claim 8, wherein: the pulley block (6) is fixed below the pipeline reel (1).
10. The weight-tensioned tubing reel of claim 1, wherein: the pipeline reel (1) is located in the middle of the running track of the running equipment (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020118590.9U CN211569610U (en) | 2020-01-16 | 2020-01-16 | Heavy hammer tensioning pipeline reel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020118590.9U CN211569610U (en) | 2020-01-16 | 2020-01-16 | Heavy hammer tensioning pipeline reel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211569610U true CN211569610U (en) | 2020-09-25 |
Family
ID=72524440
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020118590.9U Active CN211569610U (en) | 2020-01-16 | 2020-01-16 | Heavy hammer tensioning pipeline reel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211569610U (en) |
-
2020
- 2020-01-16 CN CN202020118590.9U patent/CN211569610U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102171451B (en) | Maintenance system for wind turbine equipment | |
CN208086946U (en) | A kind of electric wire bobbin winder device | |
CN203127905U (en) | Steel wire rope winding machine | |
CN107640669A (en) | A kind of adjustable hawser draw off gear of cornerite | |
CN204490159U (en) | A kind of tension roller mechanism | |
CN204607212U (en) | Two tension detect setting devices of wound roll material soft packaging equipment | |
CN207986410U (en) | A kind of automatic ship winding charge cable device | |
CN202214597U (en) | Special bobbin winder for sewing machine | |
CN211569610U (en) | Heavy hammer tensioning pipeline reel | |
CN207061504U (en) | A kind of new wound-rotor device | |
CN219751507U (en) | Constant tension control mechanism of cable storage winch of friction cable storage system | |
CN203714885U (en) | Active unwinding mechanism | |
CN206266012U (en) | Automatic retraction device for cable | |
CN211088973U (en) | Intraductal threading of building electrical engineering is threaded and is put | |
CN107954280A (en) | A kind of automatic ship winding charge cable device | |
CN218893299U (en) | Yarn guiding device in polyester winding machine | |
CN208429700U (en) | A kind of wirerope meter is long, blanking device | |
CN207124076U (en) | A kind of wrapped core body tension monitoring device of cable | |
CN102311012A (en) | Circular-orbit tangent envelop type winding robot | |
CN202862421U (en) | Four-roller winding mechanism | |
CN102146667B (en) | Lifting starting and stopping system for rotating gate | |
CN211351661U (en) | Auxiliary device is retrieved to cable | |
CN209852527U (en) | Anchor chain product traction guide device | |
CN202687592U (en) | Winding tension automatic control device | |
CN203714886U (en) | Active unwinding mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |