CN211565833U - Weak current engineering is with overhauing toolbox - Google Patents

Weak current engineering is with overhauing toolbox Download PDF

Info

Publication number
CN211565833U
CN211565833U CN201922430647.9U CN201922430647U CN211565833U CN 211565833 U CN211565833 U CN 211565833U CN 201922430647 U CN201922430647 U CN 201922430647U CN 211565833 U CN211565833 U CN 211565833U
Authority
CN
China
Prior art keywords
block
overhauing
fixed
weak current
adjusting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922430647.9U
Other languages
Chinese (zh)
Inventor
彭堂生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Junan Intelligent Technology Co ltd
Original Assignee
Zhejiang Junan Intelligent Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Junan Intelligent Technology Co ltd filed Critical Zhejiang Junan Intelligent Technology Co ltd
Priority to CN201922430647.9U priority Critical patent/CN211565833U/en
Application granted granted Critical
Publication of CN211565833U publication Critical patent/CN211565833U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Workshop Equipment, Work Benches, Supports, Or Storage Means (AREA)

Abstract

The utility model discloses a weak current engineering is with overhauing toolbox, including overhauing instrument box and second installation piece, the left end of overhauing the instrument box is fixed with the fixed block, the top of overhauing the instrument box is fixed with the handle, and the right side of overhauing the instrument box is provided with the door that opens and shuts, the bottom of overhauing the instrument box is provided with the pulley, the internal connection of resettlement groove has the connecting block, and the internal connection of connecting block has the regulation ball, the inboard of adjusting the ball is connected with deposits the panel, and the upper surface of depositing the panel is provided with the constraint area, the standing groove has been seted up to the below in constraint area, and the internal connection of standing groove has the regulation pole, the left end of adjusting the pole is fixed with ejecting piece, and the right side below of adjusting the pole is fixed with first installation piece, the second installation piece sets. This weak current engineering is with overhauing toolbox, labour saving and time saving, and convenient categorised placing tool conveniently takes out the instrument moreover.

Description

Weak current engineering is with overhauing toolbox
Technical Field
The utility model relates to a light current engineering technical field specifically is a light current engineering is with overhauing toolbox.
Background
Large-scale power equipment is frequently used in weak current engineering, the equipment needs to be periodically maintained when running for a long time, the variety of maintenance tools is large, and the demand for a maintenance tool box for the weak current engineering is larger;
however, the common maintenance tool box for the weak current engineering is portable, wastes time and labor, is inconvenient for placing tools in a classified manner, and is inconvenient for taking out the tools, so that the maintenance tool box for the weak current engineering is provided, and the problems in the prior art are solved.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a weak current engineering is with overhauing toolbox to what provide common weak current engineering in solving above-mentioned background art with overhauing toolbox uses is portable, wastes time and energy, and inconvenient categorised placement tool, the inconvenient problem of taking out the instrument moreover.
In order to achieve the above object, the utility model provides a following technical scheme: an overhaul tool box for weak current engineering comprises an overhaul tool box body and a second installation block, wherein a fixed block is fixed at the left end of the overhaul tool box body, a first stretching rod is fixed inside the fixed block, the first stretching rod is connected inside the first stretching rod in a clamping manner, a handle is fixed at the top end of the overhaul tool box body, an opening and closing door is arranged on the right side of the overhaul tool box body, pulleys are arranged at the bottom of the overhaul tool box body, mounting grooves are formed in the front and rear surfaces of the inner side of the overhaul tool box body, a connecting block is connected inside the mounting grooves, adjusting balls are connected inside the connecting block, a storage panel is connected inside the adjusting balls, a constraint belt is arranged on the upper surface of the storage panel, a placing groove is formed below the constraint belt, an adjusting rod is connected inside the placing groove, and an ejection block is fixed at the left end of the adjusting rod, and a first mounting block is fixed at the right lower part of the adjusting rod, and a second mounting block is arranged below the first mounting block.
Preferably, the second stretching rod forms a lifting structure inside the first stretching rod, and the second stretching rod is fixedly connected to the first stretching rod by a bolt.
Preferably, the left end part of the placement groove is of an inclined structure, and the placement grooves and the storage panels are arranged in a one-to-one correspondence manner.
Preferably, the longitudinal section of the connecting block is of a T-shaped structure, the connecting block forms a sliding structure in the placing groove, and the storage panel forms a rotating structure with the connecting block through the adjusting balls.
Preferably, the placing grooves are arranged in the storage panel at equal intervals, the placing grooves and the binding belts are arranged in a one-to-one correspondence manner, and the storage panel and the adjusting rods form a rotating structure.
Preferably, the adjusting rod is connected with the second mounting block in a clamping mode through the first mounting block, and the second mounting block is fixedly connected with the storage panel.
Compared with the prior art, the beneficial effects of the utility model are that: the maintenance tool box for the weak current engineering is time-saving and labor-saving, facilitates the classified placement of tools and the taking out of the tools;
1. the second stretching rod and the first stretching rod are arranged, the second stretching rod is lifted in the first stretching rod and fixed at a proper position through a bolt, the proper height is conveniently adjusted, and the second stretching rod is moved to the proper position through a pulley, so that time and labor are saved;
2. the storage panel is arranged in the storage groove with the left end in an inclined structure to form a sliding structure, the storage panels are arranged in the maintenance tool box body at equal intervals, and the storage grooves are arranged in the storage panel at equal intervals to facilitate the classification of tools;
3. the tool ejecting device is provided with the ejecting block and the adjusting rod, the adjusting rod and the storage panel rotate by pressing the right end of the adjusting rod, the ejecting block ejects a tool to store the panel, and therefore the tool is convenient to take out.
Drawings
Fig. 1 is a schematic view of the front cross-sectional structure of the present invention;
FIG. 2 is a schematic view of a side view structure of the connection between the box body and the connecting block of the maintenance tool of the present invention;
FIG. 3 is a schematic view of the top view of the storage panel and the binding band;
fig. 4 is an enlarged schematic structural view of a portion a in fig. 1 according to the present invention.
In the figure: 1. overhauling the tool box body; 2. a fixed block; 3. a first stretching rod; 4. a second stretch rod; 5. a handle; 6. opening and closing the door; 7. a pulley; 8. a placing groove; 9. connecting blocks; 10. adjusting the ball; 11. a storage panel; 12. a binding belt; 13. a placement groove; 14. adjusting a rod; 15. ejecting a block; 16. a first mounting block; 17. and a second mounting block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: an overhaul tool box for weak current engineering comprises an overhaul tool box body 1, a fixing block 2, a first stretching rod 3, a second stretching rod 4, a handle 5, an opening and closing door 6, a pulley 7, a placing groove 8, a connecting block 9, an adjusting ball 10, a storage panel 11, a constraint belt 12, a placing groove 13, an adjusting rod 14, an ejection block 15, a first mounting block 16 and a second mounting block 17, wherein the fixing block 2 is fixed at the left end of the overhaul tool box body 1, the first stretching rod 3 is fixed inside the fixing block 2, the second stretching rod 4 is connected inside the first stretching rod 3 in a clamping manner, the handle 5 is fixed at the top end of the overhaul tool box body 1, the opening and closing door 6 is arranged on the right side of the overhaul tool box body 1, the pulley 7 is arranged at the bottom of the overhaul tool box body 1, the placing grooves 8 are formed in the front surface and the rear surface of the inner side of the overhaul tool box body 1, the connecting block 9 is connected inside the placing grooves, and the inside of the connecting block 9 is connected with an adjusting ball 10, the inner side of the adjusting ball 10 is connected with a storage panel 11, the upper surface of the storage panel 11 is provided with a constraint belt 12, a placing groove 13 is arranged below the constraint belt 12, the inside of the placing groove 13 is connected with an adjusting rod 14, the left end of the adjusting rod 14 is fixed with an ejection block 15, the right lower part of the adjusting rod 14 is fixed with a first mounting block 16, and a second mounting block 17 is arranged below the first mounting block 16.
As shown in fig. 1 and 2, the second stretching rod 4 forms a lifting structure inside the first stretching rod 3, and the second stretching rod 4 is fixedly connected with the first stretching rod 3 through a bolt, so that time and labor are saved, the left end part of the accommodating groove 8 is of an inclined structure, and the accommodating grooves 8 and the storage panels 11 are arranged in a one-to-one correspondence manner, thereby facilitating the classified placement of tools;
like the longitudinal section of connecting block 9 in fig. 3 and 4 is "T" font structure, and connecting block 9 constitutes sliding construction in the inside of depositing the groove 8, and deposit panel 11 and constitute rotating-structure through adjusting ball 10 and connecting block 9, conveniently adjust the position of depositing panel 11, standing groove 13 is equidistant setting in the inside of depositing panel 11, and standing groove 13 is the one-to-one setting with constraint area 12, and deposit panel 11 and adjust pole 14 and constitute rotating-structure, conveniently take out the instrument, it is connected with second installation piece 17 block through first installation piece 16 to adjust pole 14, and second installation piece 17 with deposit panel 11 fixed connection, make things convenient for the position of location adjustment pole 14.
The working principle is as follows: when the maintenance tool box for the weak current engineering is used, the second stretching rod 4 is lifted to a proper height in the first stretching rod 3 and fixed at a proper position through a bolt, the proper height is convenient to adjust, the second stretching rod is moved to a proper position under the action of the pulley 7, time and labor are saved, the opening and closing door 6 is opened, the storage panel 11 slides rightwards in the arrangement groove 8 through the connecting block 9 with the longitudinal section in a T-shaped structure and rotates along with the adjusting ball 10, and the storage panel 11 is convenient to adjust to a proper angle;
then press the right-hand member of regulation pole 14 downwards again for adjust pole 14 and deposit panel 11 and take place to rotate, and make ejecting piece 15 with the inside of the ejecting panel 11 of depositing of instrument, thereby conveniently take out the instrument, deposit the inside constitution sliding construction of panel 11 at the mounting groove 8 that the left end portion is the slope column structure, it is equidistant in the inside of maintenance instrument box 1 to deposit panel 11, and mounting groove 13 is equidistant in the inside of depositing panel 11 and sets up, make things convenient for categorised placement tool, just accomplish a series of operations of this maintenance instrument box for weak current engineering above that.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a weak current engineering is with overhauing toolbox, is including overhauing instrument box (1) and second installation piece (17), its characterized in that: the maintenance tool box is characterized in that a fixing block (2) is fixed at the left end of the maintenance tool box body (1), a first stretching rod (3) is fixed inside the fixing block (2), a second stretching rod (4) is connected to the inside of the first stretching rod (3) in a clamping manner, a handle (5) is fixed at the top end of the maintenance tool box body (1), an opening and closing door (6) is arranged on the right side of the maintenance tool box body (1), pulleys (7) are arranged at the bottom of the maintenance tool box body (1), arrangement grooves (8) are formed in the front surface and the rear surface of the inner side of the maintenance tool box body (1), a connecting block (9) is connected inside the arrangement grooves (8), an adjusting ball (10) is connected inside the connecting block (9), a storage panel (11) is connected inside the adjusting ball (10), and a restraining belt (12) is arranged on the upper surface of the storage panel (11, a placing groove (13) is formed in the lower portion of the binding belt (12), an adjusting rod (14) is connected to the inside of the placing groove (13), an ejection block (15) is fixed to the left end of the adjusting rod (14), a first installation block (16) is fixed to the right lower portion of the adjusting rod (14), and a second installation block (17) is arranged below the first installation block (16).
2. The weak current engineering overhauls toolbox for characterized in that of claim 1: the second stretching rod (4) forms a lifting structure in the first stretching rod (3), and the second stretching rod (4) is fixedly connected with the first stretching rod (3) through a bolt.
3. The weak current engineering overhauls toolbox for characterized in that of claim 1: the left end part of the placing groove (8) is of an inclined structure, and the placing groove (8) and the storage panel (11) are arranged in a one-to-one correspondence mode.
4. The weak current engineering overhauls toolbox for characterized in that of claim 1: the longitudinal section of the connecting block (9) is of a T-shaped structure, the connecting block (9) forms a sliding structure in the placing groove (8), and the storage panel (11) forms a rotating structure with the connecting block (9) through the adjusting ball (10).
5. The weak current engineering overhauls toolbox for characterized in that of claim 1: the placing grooves (13) are arranged in the storage panel (11) at equal intervals, the placing grooves (13) and the binding belts (12) are arranged in a one-to-one correspondence mode, and the storage panel (11) and the adjusting rods (14) form a rotating structure.
6. The weak current engineering overhauls toolbox for characterized in that of claim 1: the adjusting rod (14) is connected with the second mounting block (17) in a clamping mode through the first mounting block (16), and the second mounting block (17) is fixedly connected with the storage panel (11).
CN201922430647.9U 2019-12-30 2019-12-30 Weak current engineering is with overhauing toolbox Expired - Fee Related CN211565833U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922430647.9U CN211565833U (en) 2019-12-30 2019-12-30 Weak current engineering is with overhauing toolbox

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922430647.9U CN211565833U (en) 2019-12-30 2019-12-30 Weak current engineering is with overhauing toolbox

Publications (1)

Publication Number Publication Date
CN211565833U true CN211565833U (en) 2020-09-25

Family

ID=72552291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922430647.9U Expired - Fee Related CN211565833U (en) 2019-12-30 2019-12-30 Weak current engineering is with overhauing toolbox

Country Status (1)

Country Link
CN (1) CN211565833U (en)

Similar Documents

Publication Publication Date Title
CN211565833U (en) Weak current engineering is with overhauing toolbox
CN206732603U (en) A kind of convertible interior stationary fixture
CN213918217U (en) Toolbox convenient to secondary wiring
CN205238003U (en) Stromatolite workstation
CN210305168U (en) Hydraulic plate bending machine
CN110216919B (en) Double-station integrated plastic bag finishing device
CN111958408A (en) Multi-station machining platform device for oil cylinder machining
CN207479667U (en) A kind of drilling equipment of electroplated product
CN203779730U (en) Drying feeding device
CN207344742U (en) A kind of edge milling machines of timber processing
CN215143670U (en) Bending device is used in processing of aluminium alloy photovoltaic frame
CN204819825U (en) Multi -functional juxtaposition machine work platform
CN204280671U (en) A kind of wood covering processing operator's station
CN210908748U (en) Welding device for machining steel members
CN221164727U (en) Communication box high-efficient conveyor
CN219426766U (en) Part processing refitting tool
CN206702687U (en) A kind of machining flat-nose pliers
CN109941651A (en) A kind of new-energy automobile lithium battery production of intelligent arrangement Palletizer
CN216261652U (en) Portable dismantled and assembled zip fastener head surface paint infiltration device
CN213645447U (en) Numerical control bender convenient to get piece
CN209140387U (en) A kind of tooling for processing rear flange
CN213469737U (en) Shaping machine for machining railway accessories
CN216709361U (en) Carrying device for producing adjustable television backshell
CN218367928U (en) Transfer device for workpiece workshop
CN203485159U (en) Auxiliary fixture for cavity filter assembling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200925

Termination date: 20211230

CF01 Termination of patent right due to non-payment of annual fee