CN211550766U - Can guarantee that equal concentric pipeline of different floors wears floor slab thimble assembly - Google Patents

Can guarantee that equal concentric pipeline of different floors wears floor slab thimble assembly Download PDF

Info

Publication number
CN211550766U
CN211550766U CN201921815454.9U CN201921815454U CN211550766U CN 211550766 U CN211550766 U CN 211550766U CN 201921815454 U CN201921815454 U CN 201921815454U CN 211550766 U CN211550766 U CN 211550766U
Authority
CN
China
Prior art keywords
matched
floor slab
adjusting
pipeline
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921815454.9U
Other languages
Chinese (zh)
Inventor
刘国栋
刘清学
张婕妤
孟坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Yilian Construction Group Co ltd
Original Assignee
Qingdao Yilian Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Yilian Construction Group Co ltd filed Critical Qingdao Yilian Construction Group Co ltd
Priority to CN201921815454.9U priority Critical patent/CN211550766U/en
Application granted granted Critical
Publication of CN211550766U publication Critical patent/CN211550766U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model provides a can guarantee that equal endocentric pipeline of different floors wears floor slab thimble assembly, including the floor, the inside of floor is equipped with the mounting hole, the inside of mounting hole is equipped with the steel bushing, the inside of steel bushing is equipped with rather than matched with pipeline, one side of steel bushing is equipped with rather than matched with regulation locating plate, the top of steel bushing is equipped with rather than matched with fluting, the bottom of adjusting the locating plate is equipped with rather than matched with backing sheet with floor matched with, the bottom of backing sheet is equipped with the extension board, the bottom of extension board is equipped with rather than matched with position circle, the inside of position circle is equipped with the cavity, one side of cavity is equipped with rather than matched with. The beneficial effects are that: the effectual equipment of having guaranteed can possess good regulating power, and equipment can effectually install the pipeline straightness's that hangs down regulation in whole installation to make equipment more nimble, and can guarantee the precision, increase the practicality.

Description

Can guarantee that equal concentric pipeline of different floors wears floor slab thimble assembly
Technical Field
The utility model relates to a pipeline field particularly, relates to a can guarantee the equal concentric pipeline of different floors and wear floor thimble assembly.
Background
The sleeve is classified into a rigid sleeve, a flexible waterproof sleeve, a steel pipe sleeve, an iron sheet sleeve and the like. In-process at floor piping erection, the sheathed tube effect is very big, but when utilizing the sleeve pipe to piping erection, because mostly be hard installation, so after the installation, because the reason of numerous floors if too much deviation appears, can cause the decentraction to make the installation difficult, need can guarantee to carry out the micronic adjustment in the installation and guarantee concentric equipment, and this equipment can carry out concentric location in addition, can increase the convenience of using like this.
An effective solution to the problems in the related art has not been proposed yet.
SUMMERY OF THE UTILITY MODEL
To the problem in the correlation technique, the utility model provides a can guarantee the equal concentric pipeline of different floors and wear floor sleeve subassembly to overcome the above-mentioned technical problem that current correlation technique exists.
Therefore, the utility model discloses a specific technical scheme as follows:
the utility model provides a can guarantee that equal endocentric pipeline of different floors wears floor slab thimble assembly, includes the floor, the inside of floor is equipped with the mounting hole, the inside of mounting hole is equipped with the steel bushing, the inside of steel bushing is equipped with rather than matched with pipeline, one side of steel bushing is equipped with rather than matched with regulation locating plate, the top of steel bushing is equipped with rather than matched with fluting, the bottom of adjusting the locating plate be equipped with floor matched with backing sheet, the bottom of backing sheet is equipped with the extension board, the bottom of extension board is equipped with rather than matched with position circle, the inside of position circle is equipped with the cavity, one side of cavity is equipped with rather than matched with filling opening.
Furthermore, a filler is arranged between the adjusting positioning plate and the steel sleeve, and the filler is glass wool.
Furthermore, a plurality of springs are arranged between the adjusting positioning plate and the cylinder sleeve.
Furthermore, the both sides of extending the board all be equipped with respectively with pipeline matched with adjusting pin, the adjusting pin with be equipped with solid fixed ring between the extension board.
Furthermore, the bottom end of the cavity is provided with an outflow port matched with the cavity.
Furthermore, both sides of the steel jacket are respectively provided with a fixing screw matched with the floor slab.
Furthermore, the top of the adjusting and positioning plate is provided with a locking ring matched with the adjusting and positioning plate.
The utility model has the advantages that: the effectual equipment of having guaranteed can possess good regulating power, and equipment can effectually be installed the pipeline and hang down straightness's regulation to the pipeline is constantly installing the in-process of location, utilizes to adjust can effectually carry out concentric adjustment, makes the assurance that equipment between the two-layer floor can be accurate like nature, thereby makes equipment more nimble, and can guarantee the precision, increases the practicality.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is according to the utility model discloses a can guarantee the equal concentric pipeline of different floors and wear the structure schematic diagram of floor sleeve subassembly.
In the figure:
1. a floor slab; 2. mounting holes; 3. steel jacket; 4. a pipeline; 5. adjusting the positioning plate; 6. grooving; 7. a support sheet; 8. an extension plate; 9. positioning rings; 10. a cavity; 11. a fill port; 12. a filler; 13. a spring; 14. an adjustment pin; 15. a fixing ring; 16. an outflow port; 17. fixing the screw; 18. and a locking ring.
Detailed Description
For further explanation of the embodiments, the drawings are provided as part of the disclosure and serve primarily to illustrate the embodiments and, together with the description, to explain the principles of operation of the embodiments, and to provide further explanation of the invention and advantages thereof, it will be understood by those skilled in the art that various other embodiments and advantages of the invention are possible, and that elements in the drawings are not to scale and that like reference numerals are generally used to designate like elements.
According to the utility model discloses an embodiment provides one kind and can guarantee the equal concentric pipeline of different floors and wear floor sleeve subassembly.
The first embodiment is as follows:
as shown in fig. 1, according to the utility model discloses can guarantee the equal concentric pipeline of different floors and wear floor thimble assembly, including floor 1, floor 1's inside is equipped with mounting hole 2, the inside of mounting hole 2 is equipped with steel bushing 3, steel bushing 3's inside is equipped with rather than matched with pipeline 4, one side of steel bushing 3 is equipped with rather than matched with regulation locating plate 5, steel bushing 3's top is equipped with rather than matched with fluting 6, the bottom of adjusting locating plate 5 be equipped with floor 1 matched with backing sheet 7, the bottom of backing sheet 7 is equipped with extension plate 8, the bottom of extension plate 8 is equipped with rather than matched with position circle 9, the inside of position circle 9 is equipped with cavity 10, one side of cavity 10 is equipped with rather than matched with filling opening 11.
In the following, the concrete arrangement and functioning of the floor 1, the spacer ring 9, the pipe 4, the outflow opening 16, the spring 13, the support piece 7, the slot 6 and the steel jacket 3 will be described.
As shown in figure 1, when the device is used, the steel sleeve 3 is installed into the installation hole 2 in the floor slab 1, at the moment, the pipeline 4 is placed into the adjusting positioning plate 5, in the putting process, the equipment can adjust the falling track and the central point of the pipeline 4 through continuous screwing and shrinking and the diameter of the locking ring 18, when the pipeline slowly falls down and the distance between the adjusting positioning plates 5 is adjusted, the pipeline 4 falls to the extending plate 8, the pipeline 4 is continuously installed, if deviation occurs, fine adjustment can still be carried out by screwing the adjusting pin 14, before that, by filling the packing material into the positioning ring 9 so that it is vertically and concentrically marked in the shape of the outflow opening 16, thus, when the pipeline 4 continues to be installed downwards and next with installed equipment, enough accurate concentricity can be ensured, and the concentricity between multiple layers can be ensured through accurate positioning and adjustment during installation.
Example two:
as shown in fig. 1, the adjusting and positioning plate 5 and the filler 12 between the steel sleeve 3, the filler 12 is glass wool, the adjusting and positioning plate 5 and the cylinder sleeve are provided with a plurality of springs 13 therebetween, the two sides of the extension plate 8 are respectively provided with adjusting pins 14 matched with the pipelines 4, a fixing ring 15 is arranged between the adjusting pins 14 and the extension plate 8, the bottom end of the cavity 10 is provided with an outflow port 16 matched with the cavity, the two sides of the steel sleeve 3 are respectively provided with fixing screws 17 matched with the floor slab 1, the top of the adjusting and positioning plate 5 is provided with a locking ring 18 matched with the fixing screws, and the fixing screws 17 can ensure better stability and firm connectivity of the equipment after installation.
For the convenience of understanding the technical solution of the present invention, the following detailed description is made on the working principle or the operation mode of the present invention in the practical process.
In practical application, the steel sleeve 3 is arranged in the mounting hole 2 in the floor slab 1, the pipeline 4 is arranged in the adjusting and positioning plate 5, in the putting process, the equipment can adjust the falling track and the central point of the pipeline 4 through continuous screwing and shrinking and the diameter of the locking ring 18, when the pipeline slowly falls down and the distance between the adjusting positioning plates 5 is adjusted, the pipeline 4 falls to the extending plate 8, the pipeline 4 is continuously installed, if deviation occurs, fine adjustment can still be carried out by screwing the adjusting pin 14, before that, by filling the packing material into the positioning ring 9 so that it is vertically and concentrically marked in the shape of the outflow opening 16, thus, when the pipeline 4 continues to be installed downwards and next with installed equipment, enough accurate concentricity can be ensured, and the concentricity between multiple layers can be ensured through accurate positioning and adjustment during installation.
To sum up, with the help of the above technical scheme of the utility model, effectual equipment of having guaranteed can possess good regulating power, and equipment can effectually install the pipeline straightness's that hangs down regulation in whole installation to the pipeline is constantly installing the in-process of location, utilizes to adjust can effectually carry out concentric adjustment, makes the assurance that equipment between the two-layer floor can be accurate like nature, thereby makes equipment more nimble, and can guarantee the precision, increases the practicality.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. A pipe through floor slab sleeve assembly capable of ensuring different floors to be concentric, which is characterized by comprising a floor slab (1), the interior of the floor slab (1) is provided with a mounting hole (2), the interior of the mounting hole (2) is provided with a steel sleeve (3), a pipeline (4) matched with the steel sleeve (3) is arranged in the steel sleeve (3), an adjusting positioning plate (5) matched with the steel sleeve (3) is arranged on one side of the steel sleeve (3), the top end of the steel sleeve (3) is provided with a slot (6) matched with the steel sleeve, the bottom end of the adjusting and positioning plate (5) is provided with a supporting sheet (7) matched with the floor slab (1), the bottom end of the supporting sheet (7) is provided with an extending plate (8), the bottom end of the extending plate (8) is provided with a positioning ring (9) matched with the extending plate, a cavity (10) is arranged in the positioning ring (9), and a filling port (11) matched with the cavity (10) is formed in one side of the cavity.
2. A pipe through floor sleeve assembly capable of ensuring concentricity of different floors according to claim 1, wherein a filler (12) is filled between the adjusting positioning plate (5) and the steel sleeve (3), and the filler (12) is glass wool.
3. A pipe floor slab bushing assembly capable of ensuring concentricity of different floors as claimed in claim 1, wherein a plurality of springs (13) are provided between said adjusting and positioning plate (5) and said cylinder sleeve.
4. A pipe floor slab bushing assembly according to claim 1, wherein the extension plate (8) is provided with adjusting pins (14) on both sides for engaging with the pipes (4), and a fixing ring (15) is provided between the adjusting pins (14) and the extension plate (8).
5. A pipe floor sleeve assembly according to claim 1, characterized in that the bottom end of the cavity (10) is provided with an outflow opening (16) adapted to fit the cavity.
6. A pipe floor slab-penetrating sleeve assembly capable of ensuring concentricity of different floors as claimed in claim 1, wherein both sides of the steel sleeve (3) are respectively provided with a fixing screw (17) matched with the floor slab (1).
7. A pipe floor slab bushing assembly capable of ensuring concentricity of different floors as claimed in claim 1, wherein the top of the adjusting and positioning plate (5) is provided with a locking ring (18) matched with the adjusting and positioning plate.
CN201921815454.9U 2019-10-25 2019-10-25 Can guarantee that equal concentric pipeline of different floors wears floor slab thimble assembly Expired - Fee Related CN211550766U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921815454.9U CN211550766U (en) 2019-10-25 2019-10-25 Can guarantee that equal concentric pipeline of different floors wears floor slab thimble assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921815454.9U CN211550766U (en) 2019-10-25 2019-10-25 Can guarantee that equal concentric pipeline of different floors wears floor slab thimble assembly

Publications (1)

Publication Number Publication Date
CN211550766U true CN211550766U (en) 2020-09-22

Family

ID=72498041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921815454.9U Expired - Fee Related CN211550766U (en) 2019-10-25 2019-10-25 Can guarantee that equal concentric pipeline of different floors wears floor slab thimble assembly

Country Status (1)

Country Link
CN (1) CN211550766U (en)

Similar Documents

Publication Publication Date Title
CN211550766U (en) Can guarantee that equal concentric pipeline of different floors wears floor slab thimble assembly
CN203432564U (en) Valve core displacement measuring device
CN212027826U (en) Municipal administration tunnel reinforced structure
CN210053113U (en) High secondary cable laying guiding device of security
CN106087934A (en) A kind of coaxality measuring mechanism installed for hydraulic-floating vertical ship lift vertical shaft steel lining and detection method
CN210531750U (en) Pipeline mounting bracket convenient to use
CN209354168U (en) The adjustable bracketing of pipe curtain inner support
CN207729051U (en) A kind of underground drainage pipeline fixing device
CN216275814U (en) Novel water supply and drainage engineering uses utility tunnel
CN211145569U (en) Mounting bracket of building component
CN214305586U (en) Building pipeline reinforcing structure
CN212584421U (en) Combined pipe gallery support with high shock strength
CN205957884U (en) A axiality measuring apparatus that is used for floating vertical ship lift shaft steel lining of water conservancy to install
CN215173215U (en) Gallows structure is used in building engineering construction
CN212772851U (en) Pipe fitting building node waterproof construction
CN212527934U (en) Portable pipeline cutting fixing device for water conservancy construction
CN111215654A (en) Flange plate punching equipment
CN216009799U (en) Supporting component for laying drainage pipeline
CN211949217U (en) Constructional engineering reinforcing bar stirrup
CN107701233A (en) A kind of extension type cable bearer
CN220957177U (en) Pipe frame structure of preset vertical pipe
CN110185843A (en) A kind of steel pipe construction method in jacking construction
CN217273019U (en) Fixing device for anti-seismic support detection
CN210372300U (en) Overhead heat distribution pipeline assembly
CN215410539U (en) Quick installation fixing device of utility tunnel water supply pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200922