CN211499467U - Prefabricated integrated configuration post suitable for steel construction building - Google Patents

Prefabricated integrated configuration post suitable for steel construction building Download PDF

Info

Publication number
CN211499467U
CN211499467U CN201921528282.7U CN201921528282U CN211499467U CN 211499467 U CN211499467 U CN 211499467U CN 201921528282 U CN201921528282 U CN 201921528282U CN 211499467 U CN211499467 U CN 211499467U
Authority
CN
China
Prior art keywords
steel
shaped
gasket
end plate
structural
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921528282.7U
Other languages
Chinese (zh)
Inventor
谢骁蒙
蒋路
杨宇焜
张莉莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Green Building Integration Technology Co Ltd
Original Assignee
Zhejiang Green Building Integration Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Green Building Integration Technology Co Ltd filed Critical Zhejiang Green Building Integration Technology Co Ltd
Priority to CN201921528282.7U priority Critical patent/CN211499467U/en
Application granted granted Critical
Publication of CN211499467U publication Critical patent/CN211499467U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a prefabricated combined structure constructional column suitable for steel structure building, which is used for being connected with a structural beam and comprises C-shaped steel, an end plate, batten strips, gaskets, screw rods and concrete; the C-shaped steel comprises a main body part, side edges and an opening edge; the side edges are formed by bending two sides of the main body part; the opening edge is formed by bending the side edge inwards; the end plates are welded at two ends of the C-shaped steel; the lacing bars are welded on the opening edge at equal intervals, so that three closed faces and one grid-shaped structural column steel rib are formed; the gasket is padded on the end plate; the screw rod is welded on the structural beam, penetrates through the end plate and the gasket, is screwed with a nut, and abuts against the gasket; the concrete is filled in the C-shaped steel. The utility model discloses a prefabricated integrated configuration constructional column suitable for steel construction building has that the degree of prefabrication is high, reduction of erection time, and a great deal of advantage such as with low costs.

Description

Prefabricated integrated configuration post suitable for steel construction building
[ technical field ] A method for producing a semiconductor device
The utility model relates to a steel construction constructional column, concretely relates to prefabricated integrated configuration constructional column suitable for steel construction building belongs to building engineering technical field.
[ background of the invention ]
The constructional column is a non-structural column arranged in a masonry wall and connected with each layer of ring beam to form a space frame capable of resisting bending and shearing in order to enhance the integrity and stability of a building, and is an effective measure for preventing a house from collapsing.
The arrangement positions of the constructional columns are at four corners of the outer wall, the joints of the cross walls and the outer longitudinal walls at staggered layers, two sides of a larger hole, the joints of the inner wall and the outer wall of a large room, and the like. The constructional columns adopted by the traditional masonry wall are mostly cast-in-place reinforced concrete constructional columns even in a steel structure. However, the cast-in-place reinforced concrete constructional column has high construction difficulty, long construction period and high cost in actual construction.
Therefore, in order to solve the above technical problems, it is necessary to provide an innovative prefabricated composite structural construction column suitable for steel structural buildings to overcome the above-mentioned drawbacks of the prior art.
[ Utility model ] content
In order to solve the problems, the utility model aims to provide a prefabricated combined structure constructional column that degree of prefabrication is high, reduction of erection time, and with low costs is applicable to steel construction building.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a prefabricated composite structure constructional column suitable for steel structure buildings is used for being connected with a structural beam and comprises C-shaped steel, end plates, batten strips, gaskets, screw rods and concrete; the C-shaped steel comprises a main body part, side edges and an opening edge; the side edges are formed by bending two sides of the main body part; the opening edge is formed by bending the side edge inwards; the end plates are welded at two ends of the C-shaped steel; the lacing bars are welded on the opening edge at equal intervals, so that three closed faces and one grid-shaped structural column steel rib are formed; the gasket is padded on the end plate; the screw rod is welded on the structural beam, penetrates through the end plate and the gasket, is screwed with a nut, and abuts against the gasket; the concrete is filled in the C-shaped steel.
The utility model discloses a prefabricated integrated configuration constructional column suitable for steel construction building further does: the end plate is provided with a U-shaped groove, and the direction of a notch of the U-shaped groove is the same as that of the opening of the C-shaped steel.
The utility model discloses a prefabricated integrated configuration constructional column suitable for steel construction building further does: two U-shaped grooves are formed in the end plate, and the depth of each U-shaped groove reaches the middle of the C-shaped steel.
The utility model discloses a prefabricated integrated configuration constructional column suitable for steel construction building still does: a cavity is arranged between the end plate and the concrete; the gasket and the nut are contained in the cavity.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the prefabricated combined structure constructional column suitable for the steel structure building is connected with the structure beam through the bolt, has definite stress and accords with the characteristics of a steel structure; meanwhile, the combined section is adopted, so that the bearing capacity and rigidity of the structural column are greatly enhanced, and the steel consumption is reduced; the C-shaped steel can be cold-formed thin-wall steel, and all the parts are produced in a factory, installed by bolts on site, operated without humidity, and installed simply and conveniently.
2. The utility model discloses a prefabricated integrated configuration constructional column suitable for steel construction building can reduce the construction degree of difficulty, reduces at the reinforced and strong potential safety hazard of outer wall formwork, and artifical input is few, the loss is few, has shortened the time limit for a project, practices thrift the cost. Simultaneously: the bearing capacity and the rigidity of the combined structure constructional column are better than those of a concrete constructional column in terms of mechanical properties.
3. The utility model discloses a C shaped steel itself suitable for prefabricated integrated configuration constructional column of steel construction building can regard as the template when concrete placement, reaches the effect of exempting from the mould to pour.
[ description of the drawings ]
Fig. 1 is a perspective view of the prefabricated composite structure constructional column suitable for steel structure building of the utility model.
Fig. 2 is a perspective view of another perspective view of the prefabricated composite structure constructional column suitable for steel structure building of the utility model.
Fig. 3 is the utility model discloses a precast combined structure constructional column does not fill concrete's perspective view suitable for steel construction building.
Fig. 4 is a partially enlarged view of a portion a in fig. 3.
Fig. 5 is a partially enlarged view at B in fig. 3.
[ detailed description ] embodiments
Referring to the accompanying drawings 1 to 5, the present invention relates to a prefabricated composite structural column for steel structure building, which is used for connecting with a structural beam (not shown), and is composed of a C-shaped steel 1, an end plate 2, a batten 3, a gasket 4, a screw rod 5, and concrete 6.
The C-shaped steel 1 consists of a main body part 11, side edges 12 and an opening edge 13, can be formed by cold-bending thin walls, and is convenient to produce and process. The side edges 12 are formed by bending two sides of the main body 11. The opening edge 13 is formed by bending the side edge 12 inwards. The C-shaped steel 1 adopts a combined section, so that the bearing capacity and rigidity of the structural column are greatly enhanced, and the steel consumption is reduced.
The end plates 2 are welded at two ends of the C-shaped steel 1 and provided with U-shaped grooves 21, and the direction of the notches of the U-shaped grooves 21 is the same as that of the openings of the C-shaped steel 1. In the present embodiment, the U-shaped groove 21 on the end plate 2 is opened twice, and the depth of the U-shaped groove 21 reaches the middle of the C-shaped steel 1.
The lacing strips 3 are welded on the opening edge 13 at equal intervals, so that the C-shaped steel 1 forms a three-sided closed structural column steel rib in a grid mode.
The gasket 4 is padded on the end plate 2, and the width of the gasket is larger than that of the U-shaped groove 21.
The screw 5 is welded on the structural beam, penetrates through the end plate 2 and the gasket 4, is screwed with the nut 7, and the nut 7 abuts against the gasket 4, so that the constructional column is connected with the structural beam and is connected through the bolt (the screw 5 and the nut 7), and the stress clearly accords with the characteristic of a steel structure.
The concrete 6 is filled in the C-shaped steel 1, and the C-shaped steel 1 can be used as a template during concrete pouring, so that the effect of mold-free pouring is achieved. A cavity 8 is arranged between the end plate 2 and the concrete 6; the gasket 4 and the nut 7 are accommodated in the cavity 8, so that the gasket 4 can be conveniently padded and the nut 7 can be screwed when the device is installed.
The utility model discloses a construction method suitable for steel construction building's prefabricated integrated configuration constructional column as follows:
1) c-shaped steel 1 is used as a main body part of the constructional column, and lacing strips 3 are welded on an opening face of the C-shaped steel 1 at intervals of fixed distance and attached to an opening edge 13 to form a steel skeleton of the constructional column with three closed faces and one lattice form;
2) two ends of a steel skeleton of the constructional column are welded with end plates 2 with U-shaped grooves 21;
3) the steel ribs of the constructional column are laid flat, foam partition plates are adopted at positions close to the end plates 2, and hollow parts 8 for bolt connection are protected; the opening surface is upward, concrete 6 is filled in gaps of the batten strips 3 and vibrated, and the foam partition plate is removed after maintenance;
4) detecting the concrete pouring compactness, welding quality and initial cracks before delivery, and delivering to the site after qualification;
5) taking the end plate 2 as a lifting lug fixing sling, lifting and placing to an accurate position, then adjusting the position of the constructional column, sliding into a fixing screw rod 5 welded on the structural beam along a U-shaped groove 21, inserting a gasket 4, and screwing a nut 7 to a fixed degree;
6) and detecting the mounting precision, finely adjusting if deviation exists, and then screwing the nut 7.
The above embodiments are merely preferred embodiments of the present disclosure, which are not intended to limit the present disclosure, and any modifications, equivalents, improvements and the like, which are within the spirit and principle of the present disclosure, should be included in the scope of the present disclosure.

Claims (4)

1. The utility model provides a prefabricated integrated configuration post suitable for steel construction building, its be used for with the structural beam connection, its characterized in that: the concrete plate comprises C-shaped steel, end plates, batten strips, gaskets, screw rods and concrete; the C-shaped steel comprises a main body part, side edges and an opening edge; the side edges are formed by bending two sides of the main body part; the opening edge is formed by bending the side edge inwards; the end plates are welded at two ends of the C-shaped steel; the lacing bars are welded on the opening edge at equal intervals, so that three closed faces and one grid-shaped structural column steel rib are formed; the gasket is padded on the end plate; the screw rod is welded on the structural beam, penetrates through the end plate and the gasket, is screwed with a nut, and abuts against the gasket; the concrete is filled in the C-shaped steel.
2. The prefabricated composite structural constructional column for steel structural building as recited in claim 1, wherein: the end plate is provided with a U-shaped groove, and the direction of a notch of the U-shaped groove is the same as that of the opening of the C-shaped steel.
3. The prefabricated composite structural constructional column for steel structural building as recited in claim 2, wherein: two U-shaped grooves are formed in the end plate, and the depth of each U-shaped groove reaches the middle of the C-shaped steel.
4. The prefabricated composite structural constructional column for steel structural building as recited in claim 1, wherein: a cavity is arranged between the end plate and the concrete; the gasket and the nut are contained in the cavity.
CN201921528282.7U 2019-09-16 2019-09-16 Prefabricated integrated configuration post suitable for steel construction building Active CN211499467U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921528282.7U CN211499467U (en) 2019-09-16 2019-09-16 Prefabricated integrated configuration post suitable for steel construction building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921528282.7U CN211499467U (en) 2019-09-16 2019-09-16 Prefabricated integrated configuration post suitable for steel construction building

Publications (1)

Publication Number Publication Date
CN211499467U true CN211499467U (en) 2020-09-15

Family

ID=72405347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921528282.7U Active CN211499467U (en) 2019-09-16 2019-09-16 Prefabricated integrated configuration post suitable for steel construction building

Country Status (1)

Country Link
CN (1) CN211499467U (en)

Similar Documents

Publication Publication Date Title
CN108824818B (en) Construction method of assembled concrete filled steel tube frame-shear wall structure system
CN101691784B (en) Steel structured wide-bay energy-saving residential building with gypsum walls and on-site layering and sectioning manufacturing method
CN107975160B (en) Shear wall structure with lateral connecting key groove, manufacturing and assembling method
CN203977572U (en) A kind of high-rise building that adopts cast-in-situ hollow building roof
CN103850363A (en) Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
CN110670720A (en) Connecting structure of prefabricated column and superposed beam and construction method thereof
CN203769116U (en) Prefabricated through hole assembly type reinforced concrete shear wall
CN110685404A (en) Construction method of prefabricated combined structure constructional column
CN107965053B (en) Anti-seismic frame structure formed by combining upright columns and connecting beams and construction method thereof
CN101936074A (en) Fast building earthquake-resisting reinforcing method and device
CN211499467U (en) Prefabricated integrated configuration post suitable for steel construction building
CN104153463A (en) Assembled integrated frame system and construction method thereof
CN109339436B (en) Special-shaped concrete hole body assembled formwork supporting device
CN107023078B (en) Assembled cast-in-situ combined type superposed box net beam floor and construction method
CN208502067U (en) A kind of partial precast assembly prestress steel reinforced concrete hybrid beam
CN207003719U (en) A kind of prefabricated steel faced wall with steel bar girder
CN211774531U (en) Connecting structure of prefabricated column and superposed beam
CN216740195U (en) Shear wall mixed structure system connected by grouting sleeve
CN209975803U (en) Ecological composite wall structure
CN201857766U (en) Shortcut house anti-seismic reinforcing device
CN209975804U (en) Ecological composite wall
CN210316179U (en) Assembled building block and assembled building block lock anchor wall building system
CN106088398A (en) A kind of combined wall board
CN206769153U (en) Assemble cast-in-place combined type superposed box mesh-beam floor system attachment structure
CN105604246A (en) Construction method of steel-section-concrete T-shaped section column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Anhui Zhihong Precision Construction Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023990000037

Denomination of utility model: A prefabricated composite structural constructional column suitable for steel structure buildings

Granted publication date: 20200915

License type: Common License

Record date: 20230113

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Jiangxi Huahong Jinggong Steel Structure Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023980034645

Denomination of utility model: A prefabricated composite structural column suitable for steel structure buildings

Granted publication date: 20200915

License type: Common License

Record date: 20230413

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Jiangsu Lvjian Jinggong Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023980034833

Denomination of utility model: A prefabricated composite structural column suitable for steel structure buildings

Granted publication date: 20200915

License type: Common License

Record date: 20230421