CN211477800U - Pretreatment equipment suitable for water injection well choke heavy metal migration volume is measured - Google Patents

Pretreatment equipment suitable for water injection well choke heavy metal migration volume is measured Download PDF

Info

Publication number
CN211477800U
CN211477800U CN201922054312.1U CN201922054312U CN211477800U CN 211477800 U CN211477800 U CN 211477800U CN 201922054312 U CN201922054312 U CN 201922054312U CN 211477800 U CN211477800 U CN 211477800U
Authority
CN
China
Prior art keywords
water
injection well
well choke
heavy metal
water injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922054312.1U
Other languages
Chinese (zh)
Inventor
马洁清
马东伟
赵凯
洪苑
丁枫芸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU QUALITY TECHNOLOGY SUPERVISION INSPECTION INSTITUTE
Original Assignee
HANGZHOU QUALITY TECHNOLOGY SUPERVISION INSPECTION INSTITUTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU QUALITY TECHNOLOGY SUPERVISION INSPECTION INSTITUTE filed Critical HANGZHOU QUALITY TECHNOLOGY SUPERVISION INSPECTION INSTITUTE
Priority to CN201922054312.1U priority Critical patent/CN211477800U/en
Application granted granted Critical
Publication of CN211477800U publication Critical patent/CN211477800U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model provides a pretreatment equipment suitable for water injection well choke heavy metal migration volume is measured for the preliminary treatment water injection well choke that awaits measuring includes at least: the device comprises a device body, a processing assembly and a fixing assembly arranged on the device body; wherein the processing assembly includes the water tank at least, the water pipe of being connected with the water tank, the water injection well choke stopper has been put to the one end cover of water pipe, fixed subassembly is at least including arranging a plurality of mountings on the equipment body in, the water injection well choke that awaits measuring is fixed in on the mounting, the water injection well choke position of water injection well choke is arranged in to the water injection well choke stopper, this pretreatment equipment is applicable to go on simultaneously in the measurement pretreatment test of multiunit water injection well choke heavy metal migration volume, and this pretreatment equipment can guarantee that the soak solution in the water injection well choke is not influenced by interference factor, can be.

Description

Pretreatment equipment suitable for water injection well choke heavy metal migration volume is measured
Technical Field
The utility model relates to an auxiliary measuring field, in particular to preceding processing equipment suitable for water injection well choke heavy metal migration volume is measured.
Background
The water tap, also known as a water nozzle, is closely related to the daily life of people and widely applied to the field of bathrooms. However, because the raw materials for preparing the water nozzle contain various heavy metals, the migration amount of the heavy metals in the using process of the water nozzle also becomes one of the environmental health safety indexes concerned by the building hardware industry. When the migration amount of heavy metals in the water nozzle is measured, a water nozzle sample needing to be measured needs to be pretreated, the conventional pretreatment step at present is to place a soak solution in the inner cavity of the water nozzle to be measured, carry out sealed idle soaking treatment, then take out the soak solution and measure the heavy metals in the soak solution to obtain the migration amount of the heavy metals in the water nozzle.
However, no equipment for the pretreatment of the water nozzle samples is available in the market at present, and because the shape of the water nozzle is irregular, the water nozzle to be detected needs to be placed at a fixed position for storage in the pretreatment process, and the soaking liquid in the water nozzle needs to be ensured not to seep out; in addition, interference factors cannot be carefully introduced in the process of adding the soaking solution into the inner cavity of the water nozzle to be measured and taking out the soaking solution, and once the interference factors are introduced, the measurement result generates errors and the soaking time needs to be carried out again; moreover, multiple sets of tests need to be compared in the test process, i.e. if the high-efficiency and high-quality completion of the multiple sets of tests is ensured, the problem troubling operators is also caused.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a preceding treatment facility suitable for water injection well choke heavy metal migration volume is measured, and this preceding treatment facility is applicable to go on simultaneously in multiunit water injection well choke heavy metal migration volume measurement preceding treatment test, and this preceding treatment facility can guarantee that the soak in the water injection well choke does not receive the influence of interference factor, can be favorable to the high-efficient high-quality completion of water injection well choke heavy metal migration volume survey experiment.
This technical scheme provides a pretreatment equipment suitable for water injection well choke heavy metal migration volume is measured for the preliminary treatment water injection well choke that awaits measuring includes at least: the device comprises a device body, a processing assembly and a fixing assembly arranged on the device body; wherein the processing assembly at least comprises a water tank and a water pipe connected with the water tank, a water nozzle plug is sleeved at one end of the water pipe, the fixing assembly at least comprises a plurality of fixing pieces arranged on the equipment body, the water nozzle to be detected is fixed on the fixing pieces, and the water nozzle plug is arranged at the position of the water nozzle opening.
In some embodiments, the water nozzle plug sleeved at one end of the water pipe is made of soft materials, and the size area of the cross section of the water nozzle plug is not smaller than that of the water nozzle opening.
In some embodiments, the water nozzle plug is a rubber plug.
In some embodiments, the water pipes include a main water pipe and a branch water pipe, wherein the branch water pipe and the main water pipe are connected by an adaptor.
In some embodiments, at least one support is arranged on the equipment body, the fixing piece is arranged on the support, a through hole is formed in the fixing piece, and the aperture size of the through hole is larger than the size of the pipeline piece of the water nozzle to be detected and smaller than the size of the clamping piece on the pipeline piece.
In some embodiments, the fixed member includes a fixed plate fixed to the bracket, a movable plate having one end rotatably connected to the fixed plate, and a connecting member, wherein the movable plate rotates relative to the fixed plate to change the fixed member between a closed state and an open state.
In some embodiments, the fixing plate and the movable plate are oppositely provided with semicircular grooves, and when the fixing member is in a closed state, the semicircular grooves are spliced to form the through hole.
In some embodiments, the connecting member is a screw and a nut disposed on the movable plate, and an internally threaded hole slot for the screw to pass through is formed at a corresponding position on the fixed plate.
In some embodiments, a plurality of fasteners are spaced apart on the bracket.
In some embodiments, the fixture is disposed parallel to the ground surface.
Compared with the prior art, the technical scheme has the following characteristics and beneficial effects:
1. set up the treatment component on this pretreatment equipment, the treatment component includes the multiunit water pipe that links to each other with the water tank, and the water injection well choke stopper is put to the one end cover of water pipe, and water injection well choke stopper is put and is played sealed effect in the water injection well choke head, and the soak solution is added to the water pipe toward the water injection well choke inner chamber of water injection well choke, and this treatment component can guarantee that the soak solution in the water injection well choke conveniently gets and unloads and do not receive the interference of interference factor promptly.
2. The fixed assembly is arranged and comprises a plurality of fixing pieces arranged at intervals, the water nozzle to be tested is suspended and fixed on the fixing pieces, the water nozzle plug is arranged on the water nozzle head to perform a soaking test, the pretreatment test of the heavy metal migration measurement of the multiple groups of water nozzles can be performed simultaneously, and the soaking liquid in the water nozzle is guaranteed to be difficult to seep under the self-weight action of the water nozzle.
3. The water pipe sets up an at least branch, and it cooperates a plurality of fixed subassemblies to realize that multiunit water injection well choke heavy metal migration volume measures the pretreatment test and goes on simultaneously, improves the experimental efficiency of water injection well choke heavy metal migration volume measurement pretreatment.
Drawings
Fig. 1 is a schematic structural diagram of a pretreatment device suitable for water injection well choke heavy metal migration volume measurement according to an embodiment of the utility model.
Fig. 2 is an enlarged schematic view of a pretreatment apparatus according to an embodiment of the present invention.
In the figure: 10-equipment body, 11-bracket, 20-treatment component, 21-water pipe, 22-water nozzle plug, 23-water tank, 30-fixing component and 31-fixing component.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art all belong to the protection scope of the present invention.
It will be understood by those skilled in the art that in the present disclosure, the terms "longitudinal," "lateral," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in a generic and descriptive sense only and not for purposes of limitation, as the terms are used in the description to indicate that the referenced device or element must have the specified orientation, be constructed and operated in the specified orientation, and not for the purposes of limitation.
It is understood that the terms "a" and "an" should be interpreted as meaning that a number of one element or element is one in one embodiment, while a number of other elements is one in another embodiment, and the terms "a" and "an" should not be interpreted as limiting the number.
The utility model provides a pretreatment equipment suitable for water injection well choke heavy metal migration volume is measured for the preliminary treatment water injection well choke that awaits measuring, this pretreatment equipment includes at least: the water injection well choke comprises an equipment body (10), a processing assembly (20) and a fixing assembly (30) arranged on the equipment body (10), wherein the processing assembly (20) at least comprises a water tank (23), a water pipe (21) connected with the water tank (23), a water nozzle plug (22) is sleeved at one end of the water pipe (21), the fixing assembly (30) at least comprises a plurality of fixing pieces (31) arranged on the equipment body (10), a water nozzle to be detected is fixed on the fixing pieces (31), and the water nozzle plug (22) is plugged at the position of the water nozzle.
Wherein the equipment body (10) is provided with at least one bracket (11), and the fixing piece (31) is arranged on the bracket (11). A through hole is formed in the fixing part (31), the aperture size of the through hole is larger than the size of the pipeline piece of the water nozzle to be detected, and is smaller than the size of a clamping piece on the pipeline piece, so that the water nozzle to be detected can be hung and fixed on the fixing part (31).
In order to facilitate taking and placing of the water nozzle to be tested, the fixing piece (31) comprises a fixing plate fixed on the support (11), a movable plate and a connecting piece, one end of the movable plate is rotatably connected with the fixing plate, the movable plate rotates relative to the fixing plate to enable the fixing piece (31) to be in a changing state between a closed state and an opened state, and when the fixing piece (31) is in the closed state, the connecting piece is connected with the fixing plate and the movable plate which are fixedly in the closed.
A semicircular groove is formed in the opposite position of the fixed plate and the movable plate, and when the fixing piece (31) is in a closed state, the semicircular groove is spliced to form a through hole.
In the embodiment of the technical scheme, the connecting piece is a screw rod and a nut which are arranged on the movable plate, an internal thread hole groove for the screw rod to pass through is formed in the corresponding position on the fixed plate, and when the fixing piece (31) is in a closed state, the screw rod is rotated into the internal thread hole groove and is fixed through the nut.
Of course, a plurality of fixing pieces (31) are arranged on the bracket (11) at intervals; meanwhile, a plurality of supports (11) can be arranged on the equipment body (10) so as to realize the pretreatment of a plurality of water nozzles at the same time.
In addition, preferably, the fixing piece (31) is arranged parallel to the ground surface, so that when the water nozzle is hung on the fixing piece (31), the self weight of the water nozzle is vertically arranged to ensure that the soak solution in the water nozzle inner cavity of the water nozzle opening cannot seep out.
The water pipe (31) of the processing assembly (20) is fixed on the equipment body (10). In the embodiment of the technical scheme, the water pipe (31) is fixed on the bracket (11) or is erected on the fixing piece (31).
The water nozzle plug (22) sleeved at one end of the water pipe (31) is made of soft materials, the cross section size area of the water nozzle plug (22) is not smaller than that of the water nozzle opening, and the water nozzle opening can be sealed when the water nozzle plug is arranged in the water nozzle opening. In addition, because the water injection well choke stopper (22) is established in the water pipe (31) outside, water in the water pipe (31) still can flow the water injection well choke intracavity promptly, can be plugged in water injection well choke stopper (22) earlier and will pour the immersion fluid into water injection well choke intracavity through water pipe (31) this moment, guaranteed not have the influence of other interference factors.
In one embodiment, the water pipe (31) comprises a main water pipe and branch water pipes, wherein the branch water pipes and the main water pipe are connected through an adapter piece, and in this way, a plurality of water nozzle pretreatment tests can be completed simultaneously by matching with the fixing piece.
In this technical scheme, three branch water pipes are connected to main water pipe, and it connects through the communicating adaptor of cross, and it is worth mentioning that the type and the quantity of branch water pipe can be changed according to actual conditions to the testing personnel, and this preliminary treatment equipment can be used in being applied to a plurality of application scenes promptly.
In this technical scheme, water injection well choke stopper (22) are the rubber buffer, have certain deformability in order to better seal the water injection well choke.
The present invention is not limited to the above-mentioned preferred embodiments, and any other products in various forms can be obtained by the teaching of the present invention, but any changes in the shape or structure thereof, which have the same or similar technical solutions as the present invention, fall within the protection scope of the present invention.

Claims (10)

1. The utility model provides a pretreatment equipment suitable for water injection well choke heavy metal migration volume is surveyed for the preliminary treatment water injection well choke that awaits measuring, its characterized in that includes at least:
the device comprises a device body (10), a processing assembly (20) and a fixing assembly (30) arranged on the device body (10);
wherein processing assembly (20) include water tank (23) at least, water pipe (21) be connected with water tank (23), and water injection well choke plug (22) have been put to the one end cover of water pipe (21), and fixed subassembly (30) are including arranging a plurality of mounting (31) on equipment body (10) at least, and the water injection well choke that awaits measuring is fixed in on mounting (31), and water injection well choke plug (22) stopper is put in the water injection well choke mouth position of water injection well choke.
2. The pretreatment equipment suitable for measuring the heavy metal migration amount of the water nozzle as claimed in claim 1, wherein the water nozzle plug (22) sleeved at one end of the water pipe (21) is made of soft materials, and the cross-sectional dimension area of the water nozzle plug (22) is not smaller than that of the water nozzle opening.
3. The pretreatment equipment suitable for measuring the heavy metal migration amount of the water nozzle as claimed in claim 2, wherein the water nozzle plug (22) is a rubber plug.
4. The pretreatment equipment suitable for measuring the heavy metal migration amount of the water nozzle according to claim 1, wherein the water pipe (21) comprises a main water pipe and a branch water pipe, and the branch water pipe and the main water pipe are connected through an adapter.
5. The pretreatment equipment suitable for measuring the heavy metal migration amount of the water nozzle according to claim 1, wherein at least one support (11) is arranged on the equipment body (10), the fixing member (31) is arranged on the support (11), a through hole is formed in the fixing member (31), and the aperture size of the through hole is larger than the size of a pipeline piece of the water nozzle to be measured and smaller than the size of a clamping piece on the pipeline piece.
6. The pretreatment equipment for measuring the heavy metal migration amount of the water nozzle as claimed in claim 5, wherein the fixing member (31) comprises a fixed plate fixed on the bracket (11), a movable plate having one end rotatably connected with the fixed plate, and a connecting member, and the movable plate rotates relative to the fixed plate to enable the fixing member (31) to be in a changing state between a closed state and an open state.
7. The pretreatment equipment suitable for measuring the heavy metal migration amount of the water nozzle as claimed in claim 6, wherein a semicircular groove is formed in the relative position of the fixed plate and the movable plate, and when the fixing member (31) is in a closed state, the semicircular grooves are spliced to form a through hole.
8. The pretreatment equipment suitable for measuring the heavy metal migration amount of the water nozzle as claimed in claim 5, wherein the connecting piece is a screw rod and a nut which are arranged on the movable plate, and an internal thread hole groove for the screw rod to pass through is formed in a corresponding position on the fixed plate.
9. The pretreatment equipment suitable for measuring the heavy metal migration amount of the water nozzle according to claim 1, wherein a plurality of fixing pieces (31) are arranged on the bracket (11) at intervals.
10. The pretreatment equipment for measuring the heavy metal migration amount of the water nozzle as claimed in claim 1, wherein the fixing member (31) is arranged in parallel with the ground surface.
CN201922054312.1U 2019-11-25 2019-11-25 Pretreatment equipment suitable for water injection well choke heavy metal migration volume is measured Expired - Fee Related CN211477800U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922054312.1U CN211477800U (en) 2019-11-25 2019-11-25 Pretreatment equipment suitable for water injection well choke heavy metal migration volume is measured

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922054312.1U CN211477800U (en) 2019-11-25 2019-11-25 Pretreatment equipment suitable for water injection well choke heavy metal migration volume is measured

Publications (1)

Publication Number Publication Date
CN211477800U true CN211477800U (en) 2020-09-11

Family

ID=72359497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922054312.1U Expired - Fee Related CN211477800U (en) 2019-11-25 2019-11-25 Pretreatment equipment suitable for water injection well choke heavy metal migration volume is measured

Country Status (1)

Country Link
CN (1) CN211477800U (en)

Similar Documents

Publication Publication Date Title
CN106121603B (en) A kind of device and method for simulating different angle oil reservoir oil displacement efficiency
CN110133090B (en) In-situ hydrogen charging experimental device
CN108344653B (en) Device and method for testing scouring resistance of soil body
CN110274869A (en) A kind of in-situ monitoring experimental rig and method for metal material crevice corrosion
CN104931373A (en) Corrosion fatigue crack propagation testing device
CN208206745U (en) It is a kind of for evaluating the device of crack plugging effect under pressure water action
CN211477800U (en) Pretreatment equipment suitable for water injection well choke heavy metal migration volume is measured
CN109253948B (en) Device and method for testing free energy of solid surface by hanging drop method
CN108867555A (en) A kind of device and method for evaluating crack plugging effect under pressure water action
CN104075986A (en) Device for simulating hydrogen permeation behavior under wave splashing zone corrosion condition
CN208333589U (en) A kind of mathematics measuring instrument
CN109725031A (en) Solution concentration measurement method based on capacitance method
CN208554290U (en) Novel geological chemically examines experimental bench
CN213706506U (en) Food detects uses sample constant temperature storage device
CN203324148U (en) Salt mist machine
CN217766002U (en) Concrete durability simulation device based on corrosive environment
CN210376043U (en) Testing device for measuring dissolution rate of salt rock
CN114383904A (en) Geological experiment tests mineral products sample with acidification device
CN216309514U (en) Sampling container for oil field chemical examination
CN220709008U (en) Flushing device for exterior wall coating test
CN206639473U (en) A kind of buoyancy experiment device
CN107101909B (en) Wet density testing device
CN212111067U (en) Support for salt spray test measurement auditing
CN218393729U (en) High-low temperature test equipment
CN208356831U (en) It is a kind of adjustable convenient for clean ceramic water trough table top

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200911

Termination date: 20211125