CN211473669U - Assembled combination enclosure - Google Patents
Assembled combination enclosure Download PDFInfo
- Publication number
- CN211473669U CN211473669U CN201922206492.0U CN201922206492U CN211473669U CN 211473669 U CN211473669 U CN 211473669U CN 201922206492 U CN201922206492 U CN 201922206492U CN 211473669 U CN211473669 U CN 211473669U
- Authority
- CN
- China
- Prior art keywords
- wallboard
- enclosure
- makeup
- stand
- upper beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model belongs to the technical field of building enclosure technique and specifically relates to an assembled combination enclosure draws together wallboard, upper beam, stand and floorbar, offer the fastening groove that is used for with wallboard composite mounting on the side of stand, and the below of upper beam installs the last makeup that is used for upper beam and wallboard to link to each other, the side makeup of connecting at fastening inslot chamber is all installed in the outside of wallboard and upper beam, the groove of pouring has all been seted up at the upper and lower both ends of side makeup, last makeup, the removal wheel that makes this combination enclosure remove is installed to one side that the floorbar deviates from the wallboard, it is no less than two to remove the wheel. According to the building construction needs, make wallboard, entablature, stand and floorbar become the combination enclosure of required size, when guaranteeing combination enclosure firm intensity, make the handling process of combination enclosure, laborsaving and high-efficient.
Description
Technical Field
The utility model relates to a building enclosure technical field especially relates to an assembled combination enclosure.
Background
The combined enclosing wall is also called prefabricated enclosing wall, and is a temporary engineering enclosing wall made up by using new-type wall material magnesium chloride, pearlite, sand and cement according to scientific mixing ratio and adopting special production process.
In the construction process of the temporary engineering enclosing wall, temporary buildings are needed, the construction period is long, and the high efficiency of building engineering development is directly reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving among the prior art in the temporary works enclosure work progress, need the temporary building, construction cycle is long, has directly reduced the shortcoming of the high efficiency that building engineering developed, and the assembled combination enclosure that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the design is an assembled combined enclosing wall, which comprises a wallboard, an upper beam, a stand column and a bottom beam, wherein a fastening groove used for being assembled and installed with the wallboard is formed in the side face of the stand column, an upper jointed board used for connecting the upper beam and the wallboard is installed below the upper beam, and side jointed boards connected to the inner cavity of the fastening groove are installed on the outer sides of the wallboard and the upper beam.
Preferably, the upper end and the lower end of the side jointed board and the upper jointed board are both provided with pouring grooves.
Preferably, one side of the bottom beam, which is far away from the wallboard, is provided with a moving wheel which enables the combined enclosing wall to move, and the number of the moving wheels is not less than two.
Preferably, one side of the moving wheel, which is close to the bottom beam, is connected with a loop bar, a fixing pin rod for fixing the loop bar penetrates through the middle of the loop bar, and a mounting plate positioned outside the bottom beam is mounted at the joint of the fixing pin rod and the bottom beam.
The utility model provides a pair of assembled combination enclosure, beneficial effect lies in:
according to the building construction needs, make wallboard, entablature, stand and floorbar become the combination enclosure of required size, when guaranteeing combination enclosure firm intensity, make the handling process of combination enclosure, laborsaving and high-efficient.
The utility model discloses simple structure, the simple operation, solution prior art that can be fine needs the temporary building in the temporary works enclosure work progress, and the construction cycle is long, has directly reduced the shortcoming of the high efficiency that building engineering developed, has stronger practicality.
Drawings
Fig. 1 is a left side view structure diagram of the present invention;
fig. 2 is a schematic diagram of the right-side view structure of the present invention;
fig. 3 is a schematic view of the turning structure of the present invention;
fig. 4 is a schematic side-sectional structure diagram of the present invention.
In the figure: 1-wallboard, 2-upper beam, 21-upper jointed board, 3-upright post, 31-fastening groove, 4-bottom beam, 5-side jointed board, 6-moving wheel, 61-loop bar, 62-fixed pin bar and 63-mounting plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to FIGS. 1-4:
the first embodiment is as follows:
the utility model provides an assembled combination enclosure, including wallboard 1, upper beam 2, stand 3 and floorbar 4, offer on the side of stand 3 be used for with 1 built-up mounting's of wallboard fastening groove 31, and the below of upper beam 2 installs the last makeup 21 that is used for upper beam 2 and wallboard 1 to link to each other, wallboard 1 and the outside of upper beam 2 all install the side makeup 5 of connecting at fastening groove 31 inner chamber, in enclosure construction, make side makeup 5 fix in the fastening groove 31 of corresponding position, and the upper and lower both ends of going up makeup 21 are connected with upper beam 2 and wallboard 1 respectively, install floorbar 4 in wallboard 1's bottom, can get mounting pin etc. and rebalance floorbar 4, make wallboard 1, upper beam 2, stand 3 and floorbar 4 become the combination enclosure of required size.
The upper ends and the lower ends of the side jointed boards 5 and the upper jointed boards 21 are respectively provided with a pouring groove, in the process of installing the side jointed boards 5 in the fastening grooves 31 at the corresponding positions, firstly, specific concrete such as cement concrete required in construction is poured in the pouring grooves, then, the side jointed boards 5 are installed in the fastening grooves 31 at the corresponding positions, and the upper ends and the lower ends of the upper jointed boards 21 are connected with the upper beam 2 and the wallboard 1, so that the firmness degree of the enclosure group is further ensured.
In the second embodiment, the difference between the present embodiment and the first embodiment is:
the removal wheel 6 that makes this combination enclosure remove is installed to one side that the floorbar 4 deviates from wallboard 1, removes wheel 6 and is no less than two, makes combination enclosure make good use of, possesses mobilizable function before the installation, is convenient for remove the assigned position with the combination enclosure that assembles and installs, need not hoist and mount, transport to this enclosure, and is laborsaving and high-efficient.
Move wheel 6 and be connected with loop bar 61 near one side of floorbar 4, and link bar 61's middle part is run through and is had fixed pin 62 to it, fixed pin 62 is installed with the junction of floorbar 4 and is located the outside mounting panel 63 of floorbar 4, after removing this assembled combination enclosure to the formulation position, take off fixed pin 62, thereby make loop bar 61 drive and move wheel 6 and shift out, when not influencing the normal installation work of this assembled combination enclosure, make and move moving subassemblies such as wheel 6 and possess reuse's function, the practicality of the device has further been improved.
The working principle is as follows:
during the enclosure construction, firstly, the specific concrete required in the construction, such as cement concrete, is poured in the pouring groove, then the side splicing plates 5 are installed in the fastening grooves 31 at the corresponding positions, the upper ends and the lower ends of the upper splicing plates 21 are connected with the upper beam 2 and the wall plate 1, the bottom beam 4 is installed at the bottom of the wall plate 1, fixing members such as fixing pins and the like can be taken to re-reinforce the bottom beam 4, so that the wall plate 1, the upper beam 2, the upright post 3 and the bottom beam 4 form a combined enclosure with the required size, then the combined enclosure is pushed to enable the movable wheel 6 to rotate and drive the combined enclosure to move, the assembled combined enclosure is moved to the designated position to be installed, after the assembled combined enclosure is moved to the designated position, the fixing pin rods 62 are taken down, and the sleeve rods 61 drive the movable wheel 6 to move out.
In the description of the present invention, it should be understood that the terms "side", "lower", "outside", "inner chamber", "upper and lower ends", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
In the present invention, unless otherwise explicitly specified or limited, the terms "open," "installed," "connected," and the like are to be construed broadly, and unless otherwise explicitly limited, those skilled in the art can understand the specific meaning of the above terms in the present invention according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (4)
1. The utility model provides an assembled combination enclosure, includes wallboard, upper beam, stand and floorbar, its characterized in that: offer on the side of stand be used for with wallboard composite mounting's fastening groove, and the below of entablature is installed and is used for the last makeup that entablature and wallboard link to each other, the side makeup of connection at the fastening groove inner chamber is all installed in the outside of wallboard and entablature.
2. An assembled composite fence as defined in claim 1 wherein: and pouring grooves are formed in the upper ends and the lower ends of the side jointed boards and the upper jointed board.
3. An assembled composite fence as defined in claim 2 wherein: one side of the bottom beam, which deviates from the wallboard, is provided with moving wheels which enable the combined enclosing wall to move, and the number of the moving wheels is not less than two.
4. An assembled composite fence as defined in claim 3 wherein: one side of the moving wheel close to the bottom beam is connected with a loop bar, the middle of the loop bar is penetrated with a fixed pin rod fixed on the loop bar, and a mounting plate positioned outside the bottom beam is mounted at the joint of the fixed pin rod and the bottom beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922206492.0U CN211473669U (en) | 2019-12-10 | 2019-12-10 | Assembled combination enclosure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922206492.0U CN211473669U (en) | 2019-12-10 | 2019-12-10 | Assembled combination enclosure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211473669U true CN211473669U (en) | 2020-09-11 |
Family
ID=72358973
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922206492.0U Active CN211473669U (en) | 2019-12-10 | 2019-12-10 | Assembled combination enclosure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211473669U (en) |
-
2019
- 2019-12-10 CN CN201922206492.0U patent/CN211473669U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211473669U (en) | Assembled combination enclosure | |
CN212403160U (en) | Assembled steel structure hoist device | |
CN212358706U (en) | BIM-based fabricated building component | |
CN213014805U (en) | Frame structure building assembled based on prefabricated light aggregate concrete filled large wallboard with grooves | |
CN210507150U (en) | But segmental beam pier kicking block notch template of whole dismouting | |
CN109235709B (en) | Full cast-in-place outer wall structure of building | |
CN208294062U (en) | A kind of concrete wall template and support combinations structure | |
CN113250154A (en) | High-bent-frame parallel bidirectional fishway pool chamber structure and construction method thereof | |
CN217501030U (en) | Cast-in-place expansion joint high formwork system | |
CN220814906U (en) | Scaffold for cast-in-situ stairs | |
CN216239074U (en) | Splicing structure of heat-insulation wall boards | |
CN219654067U (en) | Assembled concrete member | |
CN215212314U (en) | Elevator shaft inner formwork supporting device | |
CN215168109U (en) | Quick connecting device of high building construction steel form | |
CN214399536U (en) | Hoisting member of assembly type building | |
CN209817407U (en) | Novel detachable steel form | |
CN113882401B (en) | Construction system applied to slide-resistant pile retaining wall structure | |
CN215442620U (en) | Assembly for non-dismantling type floor slab | |
CN212200492U (en) | River course bank protection is maintained and is used bank protection retaining wall | |
CN211421603U (en) | Prefabricated combination cast-in-place reinforced concrete assembled post | |
CN217895162U (en) | Assembled sewage treatment pond of controllable height | |
CN111550045B (en) | Secondary grouting steel formwork for embedded steel column foot plate and construction method thereof | |
CN220336496U (en) | Prefabricated member locking and positioning mechanism | |
KR200254677Y1 (en) | Concrete Form for Construction Elevator Shaft | |
CN216871428U (en) | Real analogue means that instructs of assembled component assembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |