CN211473452U - Millimeter-scale accurate positioning system in prefabricated stand hoist and mount process - Google Patents

Millimeter-scale accurate positioning system in prefabricated stand hoist and mount process Download PDF

Info

Publication number
CN211473452U
CN211473452U CN201921858198.1U CN201921858198U CN211473452U CN 211473452 U CN211473452 U CN 211473452U CN 201921858198 U CN201921858198 U CN 201921858198U CN 211473452 U CN211473452 U CN 211473452U
Authority
CN
China
Prior art keywords
prefabricated
positioning system
bearing platform
millimeter
bell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921858198.1U
Other languages
Chinese (zh)
Inventor
魏志松
张航
王君
魏力
苗子臻
郭彦杰
于洋
李生龙
王丽华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Construction Co Ltd
Beijing No 4 Municipal Construction Engineering Co Ltd
Original Assignee
Beijing Municipal Construction Co Ltd
Beijing No 4 Municipal Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Construction Co Ltd, Beijing No 4 Municipal Construction Engineering Co Ltd filed Critical Beijing Municipal Construction Co Ltd
Priority to CN201921858198.1U priority Critical patent/CN211473452U/en
Application granted granted Critical
Publication of CN211473452U publication Critical patent/CN211473452U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an accurate positioning system of millimeter level in prefabricated stand hoist and mount process. The utility model adopts a bellmouth limiting plate, a pulp blocking template and a central adjusting cushion block; the utility model discloses a set up the horn mouth limiting plate at cushion cap and prefabricated stand concatenation face, let prefabricated stand can follow the rapid and gently whereabouts of horn mouth limiting plate in hoisting process, cup joint smoothly with the reinforcing bar that the cushion cap was reserved to accomplish prefabricated stand hoist and mount fast accurately; the utility model has the characteristics of safety, green, environmental protection, economy, efficient to the reinforcing bar that can protect the cushion cap reservation is not damaged, can improve work efficiency effectively, and is used splendid to adopt the prefabricated technique of assembling and time limit for a project, the town road engineering that the safety requirement is high.

Description

Millimeter-scale accurate positioning system in prefabricated stand hoist and mount process
Technical Field
The utility model relates to a prefabricated assembled bridge erection construction technique, concretely relates to accurate positioning system of millimeter level in prefabricated stand hoist and mount process.
Background
Compared with the traditional cast-in-place construction process, the prefabricated assembly type construction process has the advantages that the construction period is effectively shortened, the occupied area is reduced, and the prefabricated assembly type construction process is particularly important for projects constructed in city centers. In addition, the prefabricated bridge effectively reduces environmental pollution and has remarkable help for green civilized construction.
To prefabricated assembled bridge, for the fastness of guaranteeing the connection, the cushion cap need reserve out partly reinforcing bar, is connected with the hole of prefabricated stand bottom. The error value of each reinforcing bar and corresponding hole needs to be controlled at 2mm, because the hole is more, is influenced by accumulated error, and there is great degree of difficulty in the successful installation of prefabricated stand.
Traditional solution, through the precision that people's visual observation comes control stand hoist and mount, operation process and loaded down with trivial details need the workman to observe for a long time, closely with hoist and mount operating personnel in addition. There are numerous danger sources in prefabricated stand hoist and mount process, and closely the observation has very big potential safety hazard, and fine setting distance is less when prefabricated stand docks with the reinforcing bar that exposes of cushion cap, and hoist and mount mechanical movement accuracy control is difficult to accomplish fast, needs the debugging of relapse, also has certain influence to the engineering progress.
Disclosure of Invention
In order to improve the security of prefabricated stand hoist and mount process and advocate green civilized construction, guarantee smooth efficient and accomplish the hoist and mount work of prefabricated stand, the utility model provides an accurate positioning system of millimeter level and method among prefabricated stand hoist and mount process.
When the bearing platform is used for binding the steel bars on site, the steel bars connected with the prefabricated stand columns need to be reserved at the installation parts of the prefabricated stand columns, and the reserved steel bars are installed by adopting a pedestal which is the same as the prefabricated stand columns, so that the accuracy of the positions of the steel bars is ensured; the position of the bottom of the prefabricated upright post, which is contacted with the steel bar, is reserved with a corresponding hole during prefabrication, a grouting sleeve is embedded into the hole, and after the prefabricated upright post is successfully installed, connecting mortar is poured into the hole through the grouting sleeve, so that the grouting compactness is increased to ensure the connection stability; the inner diameter of the grouting sleeve is larger than the outer diameter of the steel bar.
The utility model discloses an accurate positioning system of millimeter level in prefabricated stand hoist and mount process includes: the horn mouth limiting plate, the slurry blocking template and the central adjusting cushion block are arranged on the outer wall of the shell; wherein, the central lines of the four side surfaces of the prefabricated upright post are pasted with elastic line pasting strips; the edge of the splicing surface position on the upper surface of the bearing platform is marked with a control line; roughening the splicing surface of the bearing platform except for the region for placing the central adjusting cushion block; four slurry blocking templates are respectively arranged on the splicing surface of the bearing platform along a control line; respectively placing a pair of bell-mouth limiting plates at four right angles of the outer edge of the slurry blocking template, wherein the four pairs of bell-mouth limiting plates are total, and two bell-mouth limiting plates in each pair of bell-mouth limiting plates are mutually placed at right angles; each bell mouth limiting plate comprises a base, a supporting plate and a bell mouth plate, the horizontal base is fixed on the upper surface of the bearing platform, the bell mouth plate is fixed on the base, the lower part of the bell mouth plate is vertical to the base, the lower parts of the bell mouth plates in each pair of bell mouth limiting plates are vertical to each other and surround a right angle of the splicing surface, the top of the bell mouth plate is provided with an outward-bent radian, and the vertical supporting plate is arranged between the outer side surface of the lower part of the bell mouth plate and the base; and a central adjusting cushion block is arranged at the position where the scabbling is not formed in the center of the splicing surface of the bearing platform.
The crane lifts the top of the prefabricated stand column, the prefabricated stand column is lowered down along the bell mouth plate of the bell mouth limiting plate, and the steel bar of the bearing platform is sleeved in the grouting sleeve at the bottom of the prefabricated stand column; the elastic line sticking strip positioned at the center line of the prefabricated stand column is aligned with the center line of the bearing platform; the prefabricated stand column is lowered to the central adjusting cushion block; the prefabricated vertical column is characterized by further comprising brackets and jacks, wherein the brackets are respectively arranged on four side surfaces of the prefabricated vertical column, and the lower part of each bracket is supported by the jacks; the crane carries out graded force unloading, the jack synchronously supports and adjusts the coordinates of the upper opening of the prefabricated stand column; then the upright post is lifted upwards along the vertical direction and leaves the bearing platform, and the horizontal plane position is not moved; paving mortar into the mortar blocking template, wherein the height of the mortar is consistent with that of the central adjusting cushion block, and a mortar stopping ring is arranged on each reinforcing steel bar; the prefabricated upright post descends to a jack through a bell-mouth limiting plate; grouting and grouting are carried out, and the prefabricated stand column hoisting is completed.
The grout blocking template adopts angle steel.
The top of horn mouth board has the radian of outside bending, and the angle of radian is 15 ~ 30.
The grout blocking template is installed on the upper surface of the bearing platform through a connecting bolt. The limiting plate is connected with the bearing platform through expansion screws.
In order to avoid deviation caused by jack faults in the assembling adjustment process, the edge of the prefabricated stand column with the length larger than 2m can be provided with a plurality of brackets. And screwing out a nut of the side mold of the pier stud sleeve before the bracket is installed.
The height h of the central adjusting cushion block is 2-3 cm. The height h of the central adjusting cushion block is consistent with the thickness of the mortar.
The utility model has the advantages that:
the utility model discloses a set up the horn mouth limiting plate at cushion cap and prefabricated stand concatenation face, let prefabricated stand can follow the rapid and gently whereabouts of horn mouth limiting plate in hoisting process, cup joint smoothly with the reinforcing bar that the cushion cap was reserved to accomplish prefabricated stand hoist and mount fast accurately; the utility model has the characteristics of safety, green, environmental protection, economy, efficient to the reinforcing bar that can protect the cushion cap reservation is not damaged, can improve work efficiency effectively, and is used splendid to adopt the prefabricated technique of assembling and time limit for a project, the town road engineering that the safety requirement is high.
Drawings
Fig. 1 is a schematic diagram of an embodiment of a millimeter-scale precision positioning system in a process of hoisting a prefabricated stand column according to the present invention;
fig. 2 is the utility model discloses an accurate positioning system's of millimeter level in prefabricated stand hoist and mount process schematic diagram of horn mouth limiting plate of an embodiment.
Detailed Description
The invention will be further elucidated by means of specific embodiments in the following with reference to the drawings.
When the bearing platform is used for binding the steel bars on site, the steel bars 01 connected with the prefabricated stand columns need to be reserved at the installation positions of the prefabricated stand columns, and the reserved steel bars are installed by adopting a pedestal which is the same as the prefabricated stand columns, so that the accuracy of the positions of the steel bars is ensured; the position of the bottom of the prefabricated upright post, which is contacted with the steel bar, is reserved with a corresponding hole during prefabrication, a grouting sleeve is embedded into the hole, and after the prefabricated upright post is successfully installed, connecting mortar is poured into the hole through the grouting sleeve, so that the grouting compactness is increased to ensure the connection stability; the inner diameter of the grouting sleeve is larger than the outer diameter of the steel bar.
As shown in fig. 1, the millimeter-scale accurate positioning system in the hoisting process of the prefabricated column of this embodiment includes: the device comprises a bell-mouth limiting plate 1, a grout blocking template 2, a center adjusting cushion block, a bracket and a jack; wherein, the central lines of the four side surfaces of the prefabricated upright post are pasted with elastic line pasting strips; the edge of the splicing surface on the upper surface of the bearing platform is marked with a control line, the splicing surface is rectangular, and the control line is positioned on four edges of the rectangle; roughening the splicing surface of the bearing platform except for the region for placing the central adjusting cushion block; four slurry blocking templates 2 are respectively arranged on the splicing surface of the bearing platform along a control line through connecting bolts 3; a pair of bell-mouth limiting plates 1 are respectively arranged at four right angles of the outer edge of the grout blocking template 2, the four pairs of bell-mouth limiting plates 1 are totally arranged, and two bell-mouth limiting plates 1 in each pair of bell-mouth limiting plates 1 are mutually arranged at right angles; each bell mouth limiting plate 1, as shown in fig. 2, comprises a base 11, a supporting plate 12 and a bell mouth plate 13, wherein the horizontal base 11 is fixed on the upper surface of the bearing platform, the bell mouth plate 13 is fixed on the base 11, the lower part of the bell mouth plate 13 is perpendicular to the base 11, the lower parts of the bell mouth plates 13 in each pair of bell mouth limiting plates 1 are perpendicular to each other and surround a right angle of a splicing surface, the top of the bell mouth plate 13 has an outward-bent radian, and the perpendicular supporting plate 12 is arranged between the outer side surface of the lower part of the bell mouth plate 13 and the base 11; and a central adjusting cushion block is arranged at the position, where the scabbling is not formed, of the center of the splicing surface of the bearing platform, and the height h of the central adjusting cushion block is consistent with the thickness of the mortar.
In the embodiment, the material of the pulp blocking template 2 is made of Q235B angle steel with the size of 40 multiplied by 4mm, and in order to ensure the compactness, the side of each of two symmetrical sides is selected to be 100mm out of the pulp sitting area; the grout blocking templates 2 and the limiting plates are connected with the bearing platform by adopting M16 bolts, each grout blocking template 2 on each side is fixed by adopting 2M 16 bolts, each grout blocking template is 340mm away from the corner, each bell-mouth limiting plate 1 is fixed by adopting 4M 16 bolts and is symmetrically arranged along the supporting plate; the bell-mouth limiting plate 1 is welded on site by adopting a steel plate with the thickness of 8mm, and the two sides of the joint are fully welded; the central adjusting cushion block adopts a rubber cushion block with the thickness of 200mm multiplied by 21.4 mm.
The positioning method of the millimeter-scale accurate positioning system in the hoisting process of the prefabricated stand column comprises the following steps:
1) prefabricated stand transportation approach: the prefabricated stand columns are transported by a trailer, so that the transportation road is smooth, and if the road surface has a groove phenomenon in the transportation process, the prefabricated stand columns are required to be repaired immediately; after entering the field, unloading the vehicle through a soft sling, and placing the vehicle on a sleeper paved with cotton cloth;
2) rechecking the model and the size of the prefabricated stand column by comparing with a drawing, sticking elastic line sticking strips at the central lines of the four side surfaces after confirming that no error exists, and preferably, sticking the sticking strips at positions 1m away from the top and the bottom of the prefabricated stand column;
3) a scale bar and a level mark are pasted along an elastic line pasting strip at the position of a longitudinal and transverse strip-direction central line on the prefabricated stand column, the scale bar and the level mark are made of waterproof coating materials, and scales are clear and free of dirt;
4) marking a control line on the edge of the splicing surface position on the upper surface of the bearing platform;
5) in order to enhance the bonding property of the splicing surfaces of the stand columns and the bearing platform, chiseling is carried out on the splicing surfaces of the bearing platform except for the area where the central adjusting cushion block is placed until concrete aggregate is exposed, the chiseling is washed clean by a high-pressure water gun after chiseling, water and dust in the chiseling area are sucked clean by a dust collector, and meanwhile, the elevations and positions of four angular points of the splicing surfaces of the lofting bearing platform are measured again;
6) according to the retest elevation and the control line in the step 5), respectively installing four slurry blocking templates on the splicing surface of the bearing platform along the control line;
7) respectively placing a pair of bell-mouth limiting plates at four right angles of the outer edge of the slurry blocking template, wherein the four pairs of bell-mouth limiting plates are total, and two bell-mouth limiting plates in each pair of bell-mouth limiting plates are mutually placed at right angles; each bell mouth limiting plate comprises a base, a supporting plate and a bell mouth plate, the horizontal base is fixed on the upper surface of the bearing platform, the bell mouth plate is fixed on the base, the lower part of the bell mouth plate is vertical to the base, the lower parts of the bell mouth plates in each pair of bell mouth limiting plates are vertical to each other and surround a right angle of the splicing surface, the top of the bell mouth plate is provided with an outward-bent radian, and the vertical supporting plate is arranged between the outer side surface of the lower part of the bell mouth plate and the base;
8) a central adjusting cushion block is arranged at the position, where the scabbling is not formed, of the center of the splicing surface of the bearing platform, and the height of the central adjusting cushion block is 2cm and is consistent with the thickness of the mortar;
9) the crane lifts the top of the prefabricated stand column, the prefabricated stand column is lowered down along the bell mouth plate of the bell mouth limiting plate, the prefabricated stand column is initially adjusted, when the distance between the prefabricated stand column and the top end of the steel bar is about 2cm, the position of the prefabricated stand column is adjusted, the prefabricated stand column is further lowered after the stand column is stabilized, and the steel bar of the bearing platform is sleeved into a grouting sleeve at the bottom of the prefabricated stand column;
10) when the distance between the prefabricated stand column and the central adjusting cushion block is about 2cm, adjusting an elastic line strip at the central line of the prefabricated stand column to be aligned with the central line of the bearing platform, and lowering the prefabricated stand column onto the central adjusting cushion block after the central line of the prefabricated stand column is aligned with the central line of the bearing platform;
11) respectively installing brackets on four side surfaces of the prefabricated stand column, supporting the brackets by using jacks, installing 2 brackets when the side length of the prefabricated stand column is more than 2m, unloading force by stages by using a crane, synchronously supporting by using the jacks, adjusting the upper opening coordinate of the prefabricated stand column according to a drawing, and lowering the prefabricated stand column while measuring and adjusting the prefabricated stand column during the adjustment process; determining, from the measured values, an adjustment method: the direction with larger deviation is adjusted firstly, then the direction with smaller deviation is adjusted, one direction is adjusted, and then the other direction is adjusted; after the adjustment is finished, the position and the height of the jack are recorded, then the upright column is lifted upwards vertically and leaves the bearing platform, and the horizontal plane position is fixed;
12) before paving the mortar, ensuring that the splicing surfaces are fully wet and have no accumulated water, after stirring the high-strength shrinkage-free mortar, paving the mortar in a mortar blocking template, wherein the height of the mortar is consistent with that of a central adjusting cushion block, and each reinforcing steel bar is provided with a mortar stopping ring;
13) the prefabricated upright column is descended onto a jack (30t) through a bell-mouth limiting plate, then a reference point and related data during hoisting test hoisting are rechecked and locked, and grouting is carried out after 24h of completion of positioning;
14) grouting and grouting are carried out, and prefabricated stand column hoisting is completed:
a) high-strength non-shrinkage mortar is adopted for grouting, and special equipment is adopted for stirring slurry to ensure that no dry materials exist in the barrel; after the slurry is stirred well, standing for 3-5 minutes until the slurry brought by high-speed stirring is eliminated;
b) during grouting, slurry is poured into grouting equipment and is connected with a grouting port for grouting, smoothness of the sleeve is checked before grouting, a grouting pipe is checked and a slurry outlet test is carried out, air is removed, continuous and uninterrupted grouting is ensured during grouting, grouting is stopped after the slurry flows out of an L-shaped pipe of the grouting port, and lower part grouting is blocked.
Finally, it is noted that the disclosed embodiments are intended to aid in further understanding of the invention, but will be understood by those skilled in the art that: various substitutions and modifications are possible without departing from the spirit and scope of the present invention and the appended claims. Therefore, the present invention should not be limited to the embodiments disclosed, and the scope of the present invention is defined by the appended claims.

Claims (8)

1. The utility model provides an accurate positioning system of millimeter level among prefabricated stand hoist and mount process, its characterized in that, accurate positioning system of millimeter level includes: the horn mouth limiting plate, the slurry blocking template and the central adjusting cushion block are arranged on the outer wall of the shell; wherein, the central lines of the four side surfaces of the prefabricated upright post are pasted with elastic line pasting strips; the edge of the splicing surface position on the upper surface of the bearing platform is marked with a control line; roughening the splicing surface of the bearing platform except for the region for placing the central adjusting cushion block; four slurry blocking templates are respectively arranged on the splicing surface of the bearing platform along a control line; respectively placing a pair of bell-mouth limiting plates at four right angles of the outer edge of the slurry blocking template, wherein the four pairs of bell-mouth limiting plates are total, and two bell-mouth limiting plates in each pair of bell-mouth limiting plates are mutually placed at right angles; each bell mouth limiting plate comprises a base, a supporting plate and a bell mouth plate, the horizontal base is fixed on the upper surface of the bearing platform, the bell mouth plate is fixed on the base, the lower part of the bell mouth plate is vertical to the base, the lower parts of the bell mouth plates in each pair of bell mouth limiting plates are vertical to each other and surround a right angle of the splicing surface, the top of the bell mouth plate is provided with an outward-bent radian, and the vertical supporting plate is arranged between the outer side surface of the lower part of the bell mouth plate and the base; and a central adjusting cushion block is arranged at the position where the scabbling is not formed in the center of the splicing surface of the bearing platform.
2. The millimeter-scale accurate positioning system of claim 1, further comprising brackets and jacks, wherein the crane suspends the top of the prefabricated upright column, the prefabricated upright column is lowered along the bell mouth plate of the bell mouth limiting plate, and the steel bar of the bearing platform is sleeved in the grouting sleeve at the bottom of the prefabricated upright column; the elastic line sticking strip positioned at the center line of the prefabricated stand column is aligned with the center line of the bearing platform; the prefabricated stand column is lowered to the central adjusting cushion block; and brackets are respectively arranged on four side surfaces of the prefabricated upright post, and the lower parts of the brackets are supported by jacks.
3. The millimeter-scale precision positioning system of claim 1, wherein the grout stop template is an angle iron.
4. The millimeter-scale precision positioning system of claim 1, wherein the top of the flared plate has an outward curvature with an angle of 15-30 °.
5. The millimeter-scale precision positioning system of claim 1, wherein a plurality of corbels are installed when the length of a side of the pre-fabricated column is greater than 2 m.
6. The millimeter-scale precision positioning system of claim 1, wherein the height h of the center adjustment spacer is 2-3 cm.
7. The millimeter-scale precision positioning system of claim 1, wherein the grout template is mounted to the upper surface of the bearing platform by attachment bolts.
8. The millimeter-scale precision positioning system of claim 1, wherein the limiting plate is connected to the bearing platform with expansion screws.
CN201921858198.1U 2019-10-31 2019-10-31 Millimeter-scale accurate positioning system in prefabricated stand hoist and mount process Active CN211473452U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921858198.1U CN211473452U (en) 2019-10-31 2019-10-31 Millimeter-scale accurate positioning system in prefabricated stand hoist and mount process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921858198.1U CN211473452U (en) 2019-10-31 2019-10-31 Millimeter-scale accurate positioning system in prefabricated stand hoist and mount process

Publications (1)

Publication Number Publication Date
CN211473452U true CN211473452U (en) 2020-09-11

Family

ID=72376875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921858198.1U Active CN211473452U (en) 2019-10-31 2019-10-31 Millimeter-scale accurate positioning system in prefabricated stand hoist and mount process

Country Status (1)

Country Link
CN (1) CN211473452U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714621A (en) * 2019-10-31 2020-01-21 北京市市政四建设工程有限责任公司 Millimeter-scale accurate positioning system and method in prefabricated stand column hoisting process
CN114893005A (en) * 2022-06-24 2022-08-12 北京博大新元房地产开发有限公司 Positioning mechanism for assembled wall body component and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714621A (en) * 2019-10-31 2020-01-21 北京市市政四建设工程有限责任公司 Millimeter-scale accurate positioning system and method in prefabricated stand column hoisting process
CN114893005A (en) * 2022-06-24 2022-08-12 北京博大新元房地产开发有限公司 Positioning mechanism for assembled wall body component and construction method
CN114893005B (en) * 2022-06-24 2024-04-02 北京博大新元房地产开发有限公司 Positioning mechanism for assembled wall member and construction method

Similar Documents

Publication Publication Date Title
CN110714621A (en) Millimeter-scale accurate positioning system and method in prefabricated stand column hoisting process
CN111851565B (en) Steel structure stand column alignment structure with cup-mouth type foundation and construction method thereof
CN211473452U (en) Millimeter-scale accurate positioning system in prefabricated stand hoist and mount process
CN108678398B (en) Pre-assembly method for steel structure truss of reinforced layer of super high-rise building
CN109505424B (en) Large-span steel pipe truss unloading bracket capable of being accurately adjusted and using method thereof
CN105926672A (en) Mined metro station steel pipe column construction method
CN104674665A (en) Installation method for corridor bridge of large space steel structure
CN113202222A (en) Construction method for assembled type superposed beam slab
CN113152306A (en) Small-radius large-gradient prefabricated T beam frame construction method
CN111877814A (en) Construction method for prefabricating bare concrete stand plate
CN110700083A (en) Installation measurement control method for prefabricated bridge pier stud
CN212477455U (en) Pre-buried positioner of bridge suspension cable anchor cylinder
CN112064849B (en) Construction method for accurately hoisting and preventing slurry leakage of assembled laminated slab
CN110076468B (en) Secondary truss installation method and temporary fixing device thereof
CN209907206U (en) Auxiliary device for installing dumbbell-shaped arch ribs
CN114753259A (en) Alignment leveling method for precast beam erection construction
CN108179749B (en) Lattice column positioner and positioning method thereof
CN113585079B (en) Method for quickly installing steel structure stand column
CN113062225B (en) Temporary supporting device and method for improving stability of mounting and positioning precision of T-shaped beam
JPH10331427A (en) Vibration isolation device installation jig and vibration isolation device installation method using the same
CN115058977A (en) Construction method for prefabricated pier stud of urban bridge
CN114439242A (en) Construction method for optimizing and hoisting and reinforcing assembled overhanging complex component
CN113832828A (en) Cast-in-place box girder side form back rib and bracing sleeve pipe support system
CN217579798U (en) Prefabricated bent cap high accuracy mounting structure
CN212957702U (en) BIM-based rectangular positioning frame for steel pipe stand column of subway station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant