CN211473423U - Building concrete pouring device - Google Patents
Building concrete pouring device Download PDFInfo
- Publication number
- CN211473423U CN211473423U CN201921925381.9U CN201921925381U CN211473423U CN 211473423 U CN211473423 U CN 211473423U CN 201921925381 U CN201921925381 U CN 201921925381U CN 211473423 U CN211473423 U CN 211473423U
- Authority
- CN
- China
- Prior art keywords
- welded
- bottom plate
- hose
- concrete pouring
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model belongs to the technical field of the architectural equipment technique and specifically relates to a building concrete pouring device, comprising a base plate, the welding of bottom plate top has L type backup pad, the spout has been seted up to L type backup pad top one side, slidable placement has the slider in the spout, the other end welding of slider has first fixed plate, first fixed plate one side threaded connection has the lead screw, the lead screw other end passes L type backup pad and installs the motor, the opposite side welding of first fixed plate has telescopic cylinder, the piston rod welding of the telescopic cylinder other end has the second fixed plate, second fixed plate opposite side rotates and is connected with the fixed block, the other end welding of fixed block has the third fixed plate, the welding of third fixed plate opposite side has the connecting rod of two symmetries, the arc hoop has.
Description
Technical Field
The utility model relates to a construction equipment technical field especially relates to a building concrete placement device.
Background
The concrete pouring refers to a process of pouring concrete into a mold until the concrete is plasticized, in the civil engineering and building engineering, materials such as concrete are put into the mold to form a preset shape, the free height of the concrete is not more than 2m when the concrete is poured, and corresponding measures are taken when the free height of the concrete exceeds 3 m. The existing concrete pouring device needs to manually hold the pipe to pour concrete, the arm of a worker is easy to ache for a long time, a rest needs to be carried out for many times, and the working efficiency is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a building concrete pouring device.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a building concrete pouring device is designed, and comprises a bottom plate, wherein a roller with a brake structure is installed below the bottom plate through a rotating shaft, a push handle is welded at one end above the bottom plate, a stirring box is installed above the bottom plate through a screw, a first box opening of an integrated structure is welded above the stirring box, a connector is welded at one side above the stirring box, a first hose is sleeved at the other end of the connector, the other end of the first hose is connected with a pump body, an L-shaped supporting plate is welded above the bottom plate, a sliding groove is formed in one side above the L-shaped supporting plate, a sliding block is arranged in the sliding groove in a sliding mode, a first fixing plate is welded at the other end of the sliding block, a lead screw is connected to one side of the first fixing plate in a threaded mode, a shaft sleeve is sleeved at the lower end of, the output of motor is connected the lead screw, telescopic cylinder has been welded to the opposite side of first fixed plate, telescopic cylinder has the second fixed plate in the piston rod welding of the other end, second fixed plate opposite side rotates and is connected with the fixed block, the other end welding of fixed block has the third fixed plate, the welding of third fixed plate opposite side has the connecting rod of two symmetries, two the arc hoop has all been welded to the other end of connecting rod, the welding of bottom plate top has a plurality of fixture block.
Preferably, the other end of the pump body is connected with a second hose, and the other end of the second hose is fixed between the two arc-shaped hoops.
Preferably, a plurality of the water tank is clamped between the other ends of the clamping blocks, a plurality of clamping grooves are formed in the lower surface of the water tank, a second tank opening is welded to the upper portion of the water tank, and a tank cover is covered on the upper portion of the second tank opening.
Preferably, the jack has been seted up to the water tank top, the handle has all been welded to water tank top both sides.
Preferably, the other end of the shaft sleeve is welded above the bottom plate.
The utility model provides a pair of building concrete pouring device, beneficial effect lies in: can carry out automatic pouring concrete, improve work efficiency, when the workman need have a rest, can be through inserting the hose in the water tank, carry water washing hose inner wall, prevent that the concrete from blockking up the hose after doing.
Drawings
Fig. 1 is a schematic structural view of a construction concrete pouring device provided by the present invention;
fig. 2 is a schematic top view of the structure of fig. 1 according to the present invention;
fig. 3 is a schematic structural diagram of the arc-shaped hoop and the second hose of the present invention.
In the figure: the device comprises a bottom plate 1, a roller 2, a pushing handle 3, a stirring box 4, a first box opening 5, a connector 6, a pump body 7, a first hose 8, an L-shaped supporting plate 9, a sliding groove 10, a sliding block 11, a first fixing plate 12, a screw rod 13, a shaft sleeve 14, a motor 15, a telescopic cylinder 16, a second fixing plate 17, a third fixing plate 18, a connecting rod 19, an arc-shaped hoop 20, a clamping block 21, a water tank 22, a clamping groove 23, a second box opening 24, a box cover 25, a jack 26, a handle 27, a fixing block 28 and a second hose 29.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a building concrete pouring device comprises a bottom plate 1, a roller 2 with a brake structure is installed below the bottom plate 1 through a rotating shaft, a pushing handle 3 is welded at one end above the bottom plate 1, a stirring tank 4 is installed above the bottom plate 1 through a screw, a first tank opening 5 with an integrated structure is welded above the stirring tank 4, a connector 6 is welded at one side above the stirring tank 4, a first hose 8 is sleeved at the other end of the connector 6, a pump body 7 is connected at the other end of the first hose 8, the model of the pump body 7 is TA0140, a second hose 29 is connected at the other end of the pump body 7, the roller 2 facilitates the movement of the device, can work by pushing a moving device of the pushing handle 3, can pour raw materials and water into the stirring tank 4 from the first tank opening 5, a stirring mechanism is installed in the stirring tank 4, and the stirring mechanism is the most common concrete, therefore, without further elaboration, the mixing of the raw materials to form the concrete can be performed, and the concrete in the mixing tank 4 can be extracted by actuating the pump body 7 and the concrete can be poured by transporting the concrete through the hose.
An L-shaped supporting plate 9 is welded above the bottom plate 1, a sliding groove 10 is formed in one side above the L-shaped supporting plate 9, a sliding block 11 is arranged in the sliding groove 10 in a sliding mode, a first fixing plate 12 is welded at the other end of the sliding block 11, a lead screw 13 is connected to one side of the first fixing plate 12 in a threaded mode, a shaft sleeve 14 is sleeved at the lower end of the lead screw 13, the other end of the shaft sleeve 14 is welded above the bottom plate 1, a motor 15 is installed at the other end of the lead screw 13 after penetrating through the L-shaped supporting plate 9, the input end of the motor 15 is connected with an external power supply, the output end of the motor 15 is connected with the lead screw 13, a telescopic cylinder 16 is welded at the other side of the first fixing plate 12, the model of the telescopic cylinder 16 is MSR20X60SP, a second fixing plate 17, the other ends of the two connecting rods 19 are welded with the arc hoops 20, the other end of the second hose 29 is fixed between the two arc hoops 20, the other end of the second hose 29 is placed between the two arc hoops 20, the two arc hoops 20 are fixed and locked together through screws, the second hose 29 is fixed, the motor 15 can be started, the model of the motor 15 is a 24BYJ48 speed reduction stepping motor, the motor 15 drives the first fixing plate 12 on the driving screw rod 13 to move up and down, so that the height of the concrete to be poured of the second hose 29 fixed on the arc hoops 20 can be adjusted, the second hose 29 on the arc hoops 20 is driven by the telescopic cylinder 16 to be stretched to the position to be poured, the second fixing plate 17 is rotatably connected with the fixing block 28, the inclination angle of the concrete to be poured of the second hose 29 can be adjusted by rotating the fixing block 28 up and down, so that the device only needs to be pushed to a certain, the concrete is automatically poured through the device, and the working efficiency is improved.
The welding of bottom plate 1 top has a plurality of fixture block 21, the joint has water tank 22 between the other end of a plurality of fixture block 21, a plurality of draw-in groove 23 has been seted up to water tank 22 lower surface, the welding of water tank 22 top has second case mouth 24, second case mouth 24 top is covered with case lid 25, jack 26 has been seted up to water tank 22 top, handle 27 has all been welded to water tank 22 top both sides, can follow second case mouth 24 and pour into water in to water tank 22, when needs rest, can pull out first hose 8 from connector 6, reinsert in jack 26, restart the pump body 7, water will be taken out, water is through the hose inner wall, wash the hose, prevent that time is long, the concrete blocks up the hose after doing in the pipeline.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (5)
1. The building concrete pouring device comprises a bottom plate (1) and is characterized in that rollers (2) with a brake structure are mounted below the bottom plate (1) through rotating shafts, a pushing handle (3) is welded at one end above the bottom plate (1), a stirring box (4) is mounted above the bottom plate (1) through screws, a first box opening (5) of an integral structure is welded above the stirring box (4), a connector (6) is welded on one side above the stirring box (4), a first hose (8) is sleeved at the other end of the connector (6), a pump body (7) is connected at the other end of the first hose (8), an L-shaped supporting plate (9) is welded above the bottom plate (1), a sliding groove (10) is formed in one side above the L-shaped supporting plate (9), a sliding block (11) is arranged in the sliding groove (10), a first fixing plate (12) is welded at the other end of the sliding block (11), the screw rod (13) is connected to one side of the first fixing plate (12) in a threaded manner, an axle sleeve (14) is sleeved at the lower end of the screw rod (13), the other end of the screw rod (13) penetrates through the L-shaped supporting plate (9) to be installed with a motor (15), the input end of the motor (15) is connected with an external power supply, the output end of the motor (15) is connected with the screw rod (13), a telescopic cylinder (16) is welded at the other side of the first fixing plate (12), a second fixing plate (17) is welded on a piston rod at the other end of the telescopic cylinder (16), a fixing block (28) is rotatably connected at the other side of the second fixing plate (17), a third fixing plate (18) is welded at the other end of the fixing block (28), two symmetrical connecting rods (19) are welded at the other side of the third, a plurality of clamping blocks (21) are welded above the bottom plate (1).
2. A construction concrete pouring device according to claim 1, characterized in that a second hose (29) is connected to the other end of said pump body (7), the other end of said second hose (29) being fixed between said two arched hoops (20).
3. The building concrete pouring device according to claim 1, wherein a water tank (22) is clamped between the other ends of a plurality of clamping blocks (21), a plurality of clamping grooves (23) are formed in the lower surface of the water tank (22), a second tank opening (24) is welded above the water tank (22), and a tank cover (25) is covered above the second tank opening (24).
4. A concrete pouring arrangement according to claim 3, characterized in that the water tank (22) is provided with a socket (26) at the top and that handles (27) are welded to both sides of the top of the water tank (22).
5. A construction concrete pouring arrangement according to claim 1, characterised in that the other end of said sleeve (14) is welded above the floor (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921925381.9U CN211473423U (en) | 2019-11-10 | 2019-11-10 | Building concrete pouring device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921925381.9U CN211473423U (en) | 2019-11-10 | 2019-11-10 | Building concrete pouring device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211473423U true CN211473423U (en) | 2020-09-11 |
Family
ID=72374948
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921925381.9U Expired - Fee Related CN211473423U (en) | 2019-11-10 | 2019-11-10 | Building concrete pouring device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211473423U (en) |
-
2019
- 2019-11-10 CN CN201921925381.9U patent/CN211473423U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211473423U (en) | Building concrete pouring device | |
CN209413294U (en) | A kind of beam form board mount for saving construction space | |
CN220348245U (en) | Butt joint appurtenance is used in plumbing installation | |
CN211313404U (en) | Concrete pouring support | |
CN203701597U (en) | Outer wall formwork supporting and bearing device | |
CN212053828U (en) | Steel construction engineering component rotating device | |
CN204851564U (en) | Manual grouting pump of cylinder body rotation type | |
CN213436763U (en) | Precision pipe pointing machine | |
CN202430718U (en) | Slurry pressing machine | |
CN213859911U (en) | Precast beam yard concrete conveying device | |
CN220228111U (en) | Municipal works road pipeline construction equipment | |
CN218464911U (en) | Pneumatic steel pipe erecting mechanism | |
CN213651740U (en) | Mortar promotes material loading auxiliary assembly for building engineering | |
CN210064146U (en) | Piping lane piping erection conveyor | |
CN210281685U (en) | Plastic conduit port grinding device | |
CN214233608U (en) | Water paint agitating unit | |
CN217756507U (en) | Hoisting tool and hoisting structure of prefabricated square culvert pipe | |
CN218085653U (en) | Sluice pump station auxiliary device of convenient construction | |
CN213625702U (en) | Pipe gallery roof construction trolley and trolley set | |
CN213332730U (en) | Underground waste pipeline dismantling device | |
CN221251248U (en) | Cement pipe clamping and transporting device | |
CN221027443U (en) | Magnesia carbon brick carrying clamp | |
CN211440347U (en) | Heavy plate cutting device | |
CN215484718U (en) | Controllable pressure grouting machine | |
CN220449749U (en) | Manhole cover opening tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200911 Termination date: 20211110 |
|
CF01 | Termination of patent right due to non-payment of annual fee |