CN211468513U - Handling device is used in steel construction - Google Patents
Handling device is used in steel construction Download PDFInfo
- Publication number
- CN211468513U CN211468513U CN201921924517.4U CN201921924517U CN211468513U CN 211468513 U CN211468513 U CN 211468513U CN 201921924517 U CN201921924517 U CN 201921924517U CN 211468513 U CN211468513 U CN 211468513U
- Authority
- CN
- China
- Prior art keywords
- baffle
- bottom plate
- fixed mounting
- base
- steel construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Handcart (AREA)
Abstract
The utility model discloses a handling device is used in steel construction, the on-line screen storage device comprises a base, the upper end left side fixed mounting of base has the pivot, the outside swing joint of pivot has the bottom plate, both ends have all been seted up around the bottom plate and have been placed the hole, two place downthehole equal swing joint have a bracing piece, two the equal fixed mounting of the other end of bracing piece has the curb plate, two the equal fixed mounting of left end of curb plate has the fixed block. The utility model discloses an in the fixed block was arranged in the fixed orifices, thereby then arrange the dead lever in spacing downthehole and constitute a container with baffle and curb plate, then place little steel construction, then promote handle cooperation walking wheel and remove the steel construction and stack the region, then take the dead lever out and increase the jack and unload the steel construction again, thereby convenient carry the steel construction, then arrange the bracing piece in through to both sides pulling curb plate with the extension bottom plate on, thereby can effectually increase the capacity of container and can increase the efficiency of transport.
Description
Technical Field
The utility model relates to a handling device specifically is a handling device is used in steel construction.
Background
The application of steel construction in each item engineering construction is very extensive, like steel bridge, steel factory building, steel gate, various large-scale pipeline containers, high-rise building and tower rail mechanism etc. when carrying out the construction, carry piling up steel construction adopts the mode of crane usually, but when less steel construction ground removal was carried, the crane often removed inconveniently, and the efficiency of manpower transport is low, and workman's physical waste is serious, is unfavorable for going on of time limit for a project.
The prior patent (publication number: CN201721616787.X) discloses a carrying device for steel structure construction, which comprises a carrying plate; the bearing plate is in a cuboid shape and is made of steel; a connecting rod is welded on the right side wall of the side guard plate in an inclined mode; the supporting rods are symmetrically and obliquely welded on the left side wall and the right side wall of the bearing plate, and bearing conveyor belts are connected to the supporting rods; the bearing conveyor belt is wound on the pulley roller and is transversely connected in the conveying cavity; the belt wheel roller is arranged in the middle of the bearing plate, and clamping blocks are clamped on the left side and the right side of the belt wheel roller; the clamping block is arranged on the inner side of the bearing conveyer belt, and the end part of the clamping block is welded with the telescopic block; the telescopic block is movably connected into the fixed block; the fixed block is welded on the wall of the bearing plate, and an electromagnet is fixedly embedded in the fixed block; the right side of the electromagnet is connected with a connecting spring; the right end of the connecting spring is connected to the permanent magnet.
In implementing the present invention, the inventor finds that at least the following problems exist in the prior art and are not solved: 1. the device can only carry the steel construction to fixed distance, if the distance is far away or near unable realization transport to the practicality is relatively poor.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a handling device is used in steel construction, has solved the problem that proposes in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: a carrying device for steel structure construction comprises a base;
the left side of the upper end of the base is fixedly provided with a rotating shaft, the outer side of the rotating shaft is movably connected with a bottom plate, placing holes are formed in the front end and the rear end of the bottom plate, supporting rods are movably connected in the two placing holes, the other ends of the two supporting rods are fixedly provided with side plates, fixed blocks are fixedly arranged at the left ends of the two side plates, limiting holes are formed in the two fixed blocks, a hinge A is fixedly arranged at the left end of the bottom plate, the bottom plate is fixedly hinged with a baffle through the hinge A, extension baffles penetrate through the front end and the rear end of the baffle, fixed holes are formed in the two extension baffles, and fixed rods are arranged in the two fixing holes;
two equal fixed mounting has the bolt, two on the inboard of curb plate equal swing joint has a backup pad, two on the bolt the equal fixed mounting of inboard lower extreme of curb plate has hinge B, two the curb plate has the extension bottom plate through hinge B fixed hinge respectively, the upper end right side fixed mounting of base has the jack, the upper end of jack and the lower extreme fixed connection of bottom plate, the equal fixed mounting of lower extreme four corners department of base has the walking wheel, the right-hand member slope fixed mounting of base has the handle.
As a preferred embodiment of the present invention, the upper end fixedly connected with of the side plate is connected with a rope, the other end of the connection rope is fixedly connected with the fixing rod.
As a preferred embodiment of the present invention, the connecting portion of the baffle and the extension baffle is provided with a rubber pad.
As an optimal implementation manner of the utility model, the equal fixed mounting in both ends has the stopper about the inboard of extension baffle.
As a preferred embodiment of the utility model, a spongy cushion is fixedly arranged on the handle.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model relates to a handling device is used in steel construction, arrange the fixed orifices in through the fixed block, thereby then arrange the dead lever in spacing downthehole with baffle and curb plate constitution container, then place little steel construction, then promote handle cooperation walking wheel and remove the steel construction to stacking the region, then take the dead lever out and increase again and unload the steel construction to the jack, thereby convenient carry the steel construction, through to both sides pulling curb plate then will prolong the bottom plate and arrange the bracing piece in, thereby can effectual increase the capacity of container can increase the efficiency of transport.
2. The utility model relates to a handling device is used in steel construction connects the dead lever through connecting the rope thereby can effectually prevent that the dead lever from losing.
3. The utility model relates to a handling device is used in steel construction can reduce the gap between baffle and the extension baffle through the rubber pad to increase the stability between baffle and the extension baffle.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
FIG. 1 is a front view of the carrying device for steel structure construction of the present invention;
FIG. 2 is a top view of the conveying device for steel structure construction of the present invention;
FIG. 3 is a front view of a side plate of the conveying device for steel structure construction of the present invention;
FIG. 4 is a side view of the bottom plate of the conveying device for steel structure construction of the present invention;
fig. 5 is the utility model relates to a side view of handling device baffle is used in steel construction.
In the figure: 1. a base; 2. a hinge A; 3. a baffle plate; 4. a fixed block; 5. fixing the rod; 6. a limiting hole; 7. Connecting ropes; 8. a rotating shaft; 9. a side plate; 10. a jack; 11. a handle; 12. a traveling wheel; 13. a base plate; 14. a support bar; 15. a fixing hole; 16. extending the baffle; 17. a sponge cushion; 18. a bolt; 19. a support plate; 20. extending the base plate; 21. a hinge B; 22. placing holes; 23. a limiting block; 24. and (7) a rubber pad.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected" and "disposed" are to be construed broadly, and may for example be fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-5, the present invention provides a technical solution: a carrying device for steel structure construction comprises a base 1;
a rotating shaft 8 is fixedly installed on the left side of the upper end of the base 1, a bottom plate 13 is movably connected to the outer side of the rotating shaft 8, placing holes 22 are formed in the front end and the rear end of the bottom plate 13, supporting rods 14 are movably connected to the two placing holes 22, side plates 9 are fixedly installed at the other ends of the two supporting rods 14, fixed blocks 4 are fixedly installed at the left ends of the two side plates 9, limiting holes 6 are formed in the two fixed blocks 4, a hinge A2 is fixedly installed at the left end of the bottom plate 13, the bottom plate 13 is fixedly hinged to a baffle 3 through a hinge A2, extension baffles 16 penetrate through the front end and the rear end of the baffle 3, fixing holes 15 are formed in the two extension baffles 16, and fixing rods 5 are arranged in the two fixing holes 15;
In this embodiment (as shown in fig. 1), the upper end of the side plate 9 is fixedly connected with a connection rope 7, the other end of the connection rope 7 is fixedly connected with the fixing rod 5, and the fixing rod 5 is connected through the connection rope 7, so that the fixing rod 5 can be effectively prevented from being lost.
In this embodiment (see fig. 5), a rubber pad 24 is disposed at a joint of the baffle 3 and the extension baffle 16, and a gap between the baffle 3 and the extension baffle 16 can be reduced by the rubber pad 24, so as to increase stability between the baffle 3 and the extension baffle 16.
In this embodiment (please refer to fig. 5), the left end and the right end of the inner side of the extension baffle 16 are both fixedly provided with the limiting blocks 23, and the extension baffle 16 and the baffle 3 can be effectively prevented from falling off to influence the use of the extension baffle 16 through the limiting blocks 23.
In this embodiment (see fig. 2), the handle 11 is fixedly provided with a sponge pad 17, and the comfort of the operator holding the handle 11 by hand can be effectively improved by the sponge pad 17.
It should be noted that the utility model relates to a handling device for steel structure construction, which comprises a base 1, a hinge A2, a baffle 3, a fixing block 4, a fixing rod 5, a limiting hole 6, a connecting rope 7, a rotating shaft 8, a side plate 9, a jack 10, a handle 11, a traveling wheel 12, a bottom plate 13, a supporting rod 14, a fixing hole 15, an extension baffle 16, a spongy cushion 17, a bolt 18, a supporting plate 19, an extension bottom plate 20, a hinge B21, a placing hole 22, a limiting block 23 and a rubber pad 24, wherein the components are all universal standard components or components known by technicians in the field, the structure and the principle of the components can be known by technical manuals or conventional experimental methods, when in operation, the components are placed in the fixing hole 15 through the fixing block 4, then the fixing rod 5 is placed in the limiting hole 6, so that the baffle 3 and the side plate 9 form a container, then a small steel structure is placed, then the handle 11 is pushed to cooperate with the travelling wheels 12 to move the steel structure to a stacking area, then the fixed rod 5 is drawn out, the jack 10 is added to unload the steel structure, thereby conveniently carrying the steel structure, by pulling the side plates 9 to both sides and then placing the extension bottom plate 20 on the support rods 14, thereby effectively increasing the capacity of the container and the carrying efficiency, effectively preventing the fixed rod 5 from being lost by connecting the fixed rod 5 through the connecting rope 7, reducing the gap between the baffle 3 and the extension baffle 16 through the rubber pad 24, thereby increase the stability between baffle 3 and the extension baffle 16, can effectually prevent to drop in extension baffle 16 and the baffle 3 through stopper 23 and influence the use of extension baffle 16, can effectual increase operating personnel handheld handle 11's travelling comfort through foam-rubber cushion 17.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (5)
1. The carrying device for steel structure construction is characterized by comprising a base (1);
the upper end left side of the base (1) is fixedly provided with a rotating shaft (8), the outer side of the rotating shaft (8) is movably connected with a bottom plate (13), the front end and the rear end of the bottom plate (13) are respectively provided with a placing hole (22), two supporting rods (14) are movably connected in the placing holes (22), the other ends of the two supporting rods (14) are respectively fixedly provided with a side plate (9), the left ends of the two side plates (9) are respectively fixedly provided with a fixed block (4), the two fixed blocks (4) are respectively provided with a limiting hole (6), the left end of the bottom plate (13) is fixedly provided with a hinge A (2), the bottom plate (13) is fixedly hinged with a baffle (3) through the hinge A (2), the front end and the rear end of the baffle (3) are respectively penetrated with an extension baffle (16), and the two extension baffles (16) are respectively, fixing rods (5) are arranged in the two fixing holes (15);
two equal fixed mounting has bolt (18), two on the inboard of curb plate (9) equal swing joint has backup pad (19), two on bolt (18) the equal fixed mounting of inboard lower extreme of curb plate (9) has hinge B (21), two curb plate (9) have extension bottom plate (20) through hinge B (21) fixed hinge respectively, the upper end right side fixed mounting of base (1) has jack (10), the upper end of jack (10) and the lower extreme fixed connection of bottom plate (13), the equal fixed mounting of lower extreme four corners department of base (1) has walking wheel (12), the right-hand member slope fixed mounting of base (1) has handle (11).
2. The carrying device for steel structure construction as claimed in claim 1, wherein: the upper end fixedly connected with of curb plate (9) connects rope (7), the other end and dead lever (5) fixed connection of connecting rope (7).
3. The carrying device for steel structure construction as claimed in claim 1, wherein: and a rubber pad (24) is arranged at the joint of the baffle (3) and the extension baffle (16).
4. The carrying device for steel structure construction as claimed in claim 1, wherein: the left end and the right end of the inner side of the extension baffle (16) are fixedly provided with limit blocks (23).
5. The carrying device for steel structure construction as claimed in claim 1, wherein: a spongy cushion (17) is fixedly arranged on the handle (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921924517.4U CN211468513U (en) | 2019-11-09 | 2019-11-09 | Handling device is used in steel construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921924517.4U CN211468513U (en) | 2019-11-09 | 2019-11-09 | Handling device is used in steel construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211468513U true CN211468513U (en) | 2020-09-11 |
Family
ID=72365573
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921924517.4U Expired - Fee Related CN211468513U (en) | 2019-11-09 | 2019-11-09 | Handling device is used in steel construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211468513U (en) |
-
2019
- 2019-11-09 CN CN201921924517.4U patent/CN211468513U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210505336U (en) | Special elevating gear of superelevation pier stud construction | |
CN111576894B (en) | Rail mounted building floor material conveyer | |
CN211468513U (en) | Handling device is used in steel construction | |
CN210914981U (en) | Automatic unhooking device of crane | |
CN112067101B (en) | Truck scale weighing platform with dust removal function | |
CN213569181U (en) | Small crane with anti-collision function | |
CN211139411U (en) | Material transporting vehicle for constructional engineering | |
CN211496728U (en) | Lifting hook with damping function for electric hoist | |
CN211712542U (en) | Safe hoisting system | |
CN211110698U (en) | Prevent rocking hoist device | |
CN208325261U (en) | A kind of cover board transport installation vehicle | |
CN213008264U (en) | Plate conveying device | |
CN202046338U (en) | Multi-purpose manually pushed carrier | |
CN217755377U (en) | Concrete block carrying device convenient for loading and unloading | |
CN221739684U (en) | Lifting appliance for lifting and overturning objects | |
CN219603128U (en) | Beam unloading equipment | |
CN213009507U (en) | Special ash bucket of municipal administration cement road construction | |
CN216153805U (en) | Concrete carrying handcart | |
CN210795488U (en) | Building material overhead hoist | |
CN215706562U (en) | Jack conveyer during pile foundation underpins | |
CN217479905U (en) | Novel curb installation device | |
CN213920812U (en) | Ballastless track plate transportation device | |
CN220642428U (en) | Auxiliary supporting frame of crane | |
CN219687385U (en) | Transportation trolley for subway storage battery | |
CN216185339U (en) | Handling device for construction engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200911 Termination date: 20211109 |
|