CN211455211U - Bulletin board for building engineering management - Google Patents

Bulletin board for building engineering management Download PDF

Info

Publication number
CN211455211U
CN211455211U CN201922329933.6U CN201922329933U CN211455211U CN 211455211 U CN211455211 U CN 211455211U CN 201922329933 U CN201922329933 U CN 201922329933U CN 211455211 U CN211455211 U CN 211455211U
Authority
CN
China
Prior art keywords
bulletin board
spout
hole
engineering management
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922329933.6U
Other languages
Chinese (zh)
Inventor
姜加平
叶冠群
陈琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922329933.6U priority Critical patent/CN211455211U/en
Application granted granted Critical
Publication of CN211455211U publication Critical patent/CN211455211U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drawing Aids And Blackboards (AREA)

Abstract

The utility model discloses a bulletin board for building engineering management, including bulletin board and spout, the left end downside is done to the bulletin board and is provided with the extension board, the lateral wall passes through hinge fixed connection on bulletin board left side wall and the extension board, set up flutedly in the middle of the extension board, swing joint has the bull stick in the recess, bull stick upper end fixedly connected with branch, the spout is seted up in the middle of the lateral wall of bulletin board left side. The utility model discloses a spout has been seted up at bulletin board left side wall, and swing joint has the slider in the spout, can make slider left end fixedly connected with branch freely reciprocate to can be according to the demand of oneself, adjust the gradient of bulletin board, the effectual stability that has improved bulletin board and place, and move the spout upper end when the slider and can make extension board and bulletin board coincide each other, the transportation of being convenient for is favorable to more practical use bulletin board for the building engineering management, and is comparatively practical, is fit for extensively promoting and using.

Description

Bulletin board for building engineering management
Technical Field
The utility model relates to a bulletin board technical field specifically is a bulletin board for building engineering management.
Background
At present, the building engineering refers to an engineering entity formed by the construction of various building buildings and their auxiliary facilities and the installation activities of lines, pipelines and equipment matched with them. The building construction has top cover, beam column, wall, foundation and can form inner space to meet the requirement of people in production, living, learning and public activity.
In the process of implementing the invention, the inventor finds that at least the following problems in the prior art are not solved: however, the bulletin boards in the market are fixed, so that the bulletin boards can be informed only by facing the bulletin boards, and in addition, the visual angle and the stability of the prior bulletin boards cannot be adjusted.
Therefore, we propose a bulletin board for building engineering management, through having seted up the spout at bulletin board left side wall, and swing joint has the slider in the spout, can make slider left end fixedly connected with branch freely reciprocate to can be according to the demand of oneself, adjust the gradient of bulletin board, the effectual stability of placing of bulletin board that has improved, and can make extension board and bulletin board coincide each other when the slider moves the spout upper end, be convenient for transport.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a bulletin board for building engineering management has solved the problem that proposes in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: a bulletin board for building engineering management comprises a bulletin board and a sliding chute;
a supporting plate is arranged on the lower side of the left end of the bulletin board, the left side wall of the bulletin board is fixedly connected with the upper side wall of the supporting plate through a hinge, a groove is formed in the middle of the supporting plate, a rotating rod is movably connected in the groove, and a supporting rod is fixedly connected to the upper end of the rotating rod;
the sliding groove is formed in the middle of the left side wall of the bulletin board, a sliding block is movably connected in the sliding groove, a supporting rod is fixedly connected to the right end of the sliding block, a first positioning hole is formed in the middle of the sliding block, second positioning holes are formed in the sliding groove from top to bottom, and a plurality of groups of the second positioning holes are communicated with the sliding groove.
As a preferred embodiment of the present invention, a plurality of groups the second positioning hole corresponds to the first positioning hole, and the placement groove is provided in the middle of the right side wall of the bulletin board.
As an optimal implementation mode of the utility model, first through-hole and second through-hole have been seted up respectively to both sides around the standing groove upper end, the equal swing joint of first through-hole and second through-hole has the pillar, and is two sets of the pillar lateral wall all is provided with the spring, both ends respectively with pillar upper end and bulletin board side wall fixed connection about the spring.
As an embodiment of the utility model, it is two sets of the pillar runs through the equal fixedly connected with separation blade of first through-hole and second through-hole respectively, standing groove lower extreme fixedly connected with baffle.
As a preferred embodiment of the utility model, two sets of the lateral wall all bonds there is the protection pad behind the separation blade, the protection pad is the rubber material.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a spout has been seted up at bulletin board left side wall, and swing joint has the slider in the spout, can make slider left end fixedly connected with branch freely reciprocate to can be according to the demand of oneself, adjust the gradient of bulletin board, the effectual stability that has improved bulletin board and place, and move the spout upper end when the slider and can make extension board and bulletin board coincide each other, the transportation of being convenient for is favorable to more practical use bulletin board for the building engineering management.
2. The utility model discloses a first through-hole and second through-hole have been seted up respectively to both sides around the standing groove upper end to swing joint has the pillar, and the spring through two sets of pillar lateral walls can be favorable to more practical use bulletin board for building engineering management with the bulletin poster firmly with the separation blade of two sets of pillar lower extremes in the standing groove.
3. The utility model discloses a be equipped with the protection pad, the lateral wall all bonds the protection pad behind two sets of separation blades, can effectually increase the fastness of separation blade and poster to it is comparatively convenient to use, is favorable to more practical use bulletin board for the building engineering management.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a schematic view of the overall structure of the bulletin board for construction engineering management of the present invention;
fig. 2 is a schematic view of the fixing structure of the bulletin board for construction engineering management of the present invention.
In the figure: 1, bulletin board 2, extension board 3, hinge 4, recess 5, pivot 6, branch 7, spout 8, slider 9, first locating hole 10, second locating hole 11, standing groove 12, first through-hole 13, second through-hole 14, pillar 15, spring 16, separation blade 17, baffle 18, protection pad.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it should be noted that, unless explicitly stated or limited otherwise, the terms "mounted," "connected" and "disposed" are to be interpreted broadly, and may be, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed; the utility model discloses in provide only supply the reference with the model of electrical apparatus. For those skilled in the art, different types of electrical appliances with the same function can be replaced according to actual use conditions, and for those skilled in the art, the specific meaning of the above terms in the present invention can be understood in specific situations.
Referring to fig. 1-2, the present invention provides a technical solution: a bulletin board for building engineering management comprises a bulletin board 1 and a chute 7;
a support plate 2 is arranged on the lower side of the left end of the bulletin board 1, the left side wall of the bulletin board 1 is fixedly connected with the upper side wall of the support plate 2 through a hinge 3, a groove 4 is formed in the middle of the support plate 2, a rotating rod 5 is movably connected in the groove 4, and a support rod 6 is fixedly connected to the upper end of the rotating rod 5;
the novel bulletin board is characterized in that the sliding groove 7 is formed in the middle of the left side wall of the bulletin board 1, a sliding block 8 is movably connected in the sliding groove 7, a supporting rod 6 is fixedly connected to the right end of the sliding block 8, a first positioning hole 9 is formed in the middle of the sliding block 8, second positioning holes 10 are formed in the sliding groove 7 from top to bottom, and the second positioning holes 10 are communicated with the sliding groove 7 in a plurality of groups.
In this embodiment, please refer to fig. 1 and set up spout 7 through the left side wall of bulletin board 1, and swing joint has slider 8 in spout 7, can make slider 8 left end fixedly connected with branch 6 freely reciprocate to can be according to the demand of oneself, adjust the gradient of bulletin board 1, the effectual stability of placing of bulletin board 1 that has improved, and move to spout 7 upper ends when slider 8 and can make extension board 2 and bulletin board 1 coincide each other, the transportation of being convenient for is favorable to more practical use bulletin board for building engineering management.
The plurality of groups of second positioning holes 10 correspond to the first positioning holes 9, and a placement groove 11 is formed in the middle of the right side wall of the bulletin board 1.
Wherein, first through-hole 12 and second through-hole 13 have been seted up respectively to both sides around the standing groove 11 upper end, the equal swing joint of first through-hole 12 and second through-hole 13 has pillar 14, and is two sets of the 14 lateral walls of pillar all are provided with spring 15, both ends are respectively with pillar 14 upper end and lateral wall fixed connection on the bulletin board 1 about spring 15.
In this embodiment, please refer to fig. 1 and 2, the front and rear sides of the upper end of the placement slot 11 are respectively provided with the first through hole 12 and the second through hole 13, and the pillars 14 are movably connected, so that the blocking pieces 16 at the lower ends of the two groups of pillars 14 can firmly post the bulletin board in the placement slot 11 through the springs 15 at the outer side walls of the two groups of pillars 14, which is beneficial to more practical use of the bulletin board for building engineering management.
Wherein, two groups of the pillars 14 respectively penetrate through the first through hole 12 and the second through hole 13 and are fixedly connected with a baffle 16, and the lower end of the placing groove 11 is fixedly connected with a baffle 1.
Wherein, the back side walls of the two groups of baffle plates 16 are both adhered with protection pads 18, and the protection pads 18 are made of rubber materials.
In the embodiment, referring to fig. 1, the protection pad 18 is arranged, and the protection pad 18 is adhered to the rear side walls of the two groups of blocking pieces 16, so that the firmness of the blocking pieces 16 and the poster can be effectively improved, the use is convenient, and the practical use of the bulletin board for building engineering management is facilitated.
When a bulletin board for building engineering management is used, the device is moved to a designated place firstly, prepared posters are placed in the placing groove 11, the rear side wall of the baffle 17 is attached to the front side wall of the poster board, the two groups of pillars 14 are moved upwards, the rear side wall of the bulletin board is attached to the placing groove 11, the two groups of pillars 14 are loosened, and finally the bulletin board 1 is adjusted to a proper angle through the movable sliding block 8.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. A bulletin board for building engineering management, its characterized in that: comprises a bulletin board (1) and a chute (7);
a support plate (2) is arranged on the lower side of the left end of the bulletin board (1), the left side wall of the bulletin board (1) is fixedly connected with the upper side wall of the support plate (2) through a hinge (3), a groove (4) is formed in the middle of the support plate (2), a rotating rod (5) is movably connected in the groove (4), and a support rod (6) is fixedly connected to the upper end of the rotating rod (5);
the utility model discloses a bulletin board, including spout (7), spout (7) are seted up in the middle of bulletin board (1) left side wall, swing joint has slider (8) in spout (7), slider (8) right-hand member fixedly connected with branch (6), first locating hole (9) have been seted up in the middle of slider (8), second locating hole (10), a plurality of groups have all been seted up by last to spout (7) second locating hole (10) communicate each other with spout (7).
2. The bulletin board for construction engineering management according to claim 1, wherein: the second positioning holes (10) in a plurality of groups correspond to the first positioning holes (9), and a placing groove (11) is formed in the middle of the right side wall of the bulletin board (1).
3. A bulletin board for construction engineering management as claimed in claim 2, wherein: first through-hole (12) and second through-hole (13) have been seted up respectively to both sides around standing groove (11) upper end, the equal swing joint of first through-hole (12) and second through-hole (13) has pillar (14), and is two sets of pillar (14) lateral wall all is provided with spring (15), both ends are respectively with pillar (14) upper end and bulletin board (1) side wall fixed connection about spring (15).
4. A bulletin board for construction engineering management as claimed in claim 3, wherein: the two groups of the supporting columns (14) penetrate through the first through hole (12) and the second through hole (13) respectively and are fixedly connected with blocking pieces (16), and the lower end of the placing groove (11) is fixedly connected with a baffle plate (17).
5. The bulletin board for construction engineering management according to claim 4, wherein: protection pads (18) are bonded to the rear side walls of the two groups of blocking pieces (16), and the protection pads (18) are made of rubber materials.
CN201922329933.6U 2019-12-23 2019-12-23 Bulletin board for building engineering management Expired - Fee Related CN211455211U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922329933.6U CN211455211U (en) 2019-12-23 2019-12-23 Bulletin board for building engineering management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922329933.6U CN211455211U (en) 2019-12-23 2019-12-23 Bulletin board for building engineering management

Publications (1)

Publication Number Publication Date
CN211455211U true CN211455211U (en) 2020-09-08

Family

ID=72318586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922329933.6U Expired - Fee Related CN211455211U (en) 2019-12-23 2019-12-23 Bulletin board for building engineering management

Country Status (1)

Country Link
CN (1) CN211455211U (en)

Similar Documents

Publication Publication Date Title
CN206363692U (en) Solar energy electronic message board
CN211455211U (en) Bulletin board for building engineering management
CN204814190U (en) Medical bracelet
CN205640145U (en) Liquid crystal display moves movable support
CN208136742U (en) A kind of photovoltaic barn door
CN110896866A (en) Excrement leaking floor
CN215118237U (en) Multi-functional ideological and political education propaganda mobile platform
CN211103501U (en) Adjustable fixing device for sand blasting equipment
CN212153187U (en) Fixed firm anticreep type direction signboard
CN210048785U (en) Culture dish rack among operation process is banked up with earth to group
CN207852248U (en) A kind of human resource information showing stand
CN216119365U (en) Portable LED large screen mounting structure
CN215106206U (en) Civil engineering damping device
CN210920594U (en) Movable base of indoor skiing machine
CN213216083U (en) Board is used in workshop mechanical equipment management
CN211479382U (en) Exhibition board structure for music education
CN209928698U (en) Demonstration teaching aid for Chinese teaching
CN208889207U (en) A kind of real estate Multifunctional warning board
CN201608837U (en) Adjustable equipment cabinet bed frame and equipment cabinet bed frame component
CN212226565U (en) LED billboard mounting rack convenient to mount
CN202138112U (en) Backlight blackboard
CN210271265U (en) Computer network practice teaching comprehensive experiment platform
CN209881294U (en) Tray type light high-strength cable bridge capable of adjusting use depth
CN210828343U (en) Concrete building template for civil engineering
CN208240234U (en) A kind of management demonstration teaching aid for oil recovery factory

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200908

Termination date: 20211223