CN211454903U - Novel power substation power supply system simulation operation board - Google Patents
Novel power substation power supply system simulation operation board Download PDFInfo
- Publication number
- CN211454903U CN211454903U CN202020477794.1U CN202020477794U CN211454903U CN 211454903 U CN211454903 U CN 211454903U CN 202020477794 U CN202020477794 U CN 202020477794U CN 211454903 U CN211454903 U CN 211454903U
- Authority
- CN
- China
- Prior art keywords
- operation panel
- aluminum alloy
- alloy frame
- supply system
- power supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Illuminated Signs And Luminous Advertising (AREA)
Abstract
The utility model relates to the field of electric power technology, a novel substation power supply system simulation operation board is disclosed, including aluminum alloy frame, operation panel and LED display screen, the operation panel is inlayed and is installed in the aluminum alloy frame, LED display screen fixed mounting is in the upper portion of operation panel, the operation panel divide into high nip and low-pressure area, the equipartition office has analog circuit in high nip and the low-pressure area, be connected with LED lamp and switching element on the analog circuit. The aluminum alloy frame is characterized in that mounting lugs are integrally formed on the top edge of the aluminum alloy frame, mounting holes are formed in the center of the mounting lugs, and the number of the mounting lugs is three. The utility model discloses can make the adjustment according to the in-service use condition at any time. Meanwhile, the LED display screen is attractive and practical, power is saved, the display effect is clear, and related propaganda warning slogans such as safety protection can be replaced at any time according to the field environment. The use is more flexible, and the circuit switching manual regulation is accurate again convenient.
Description
Technical Field
The utility model relates to a technical field that charges especially relates to a novel power substation power supply system simulation operation board.
Background
With the rapid development of the economy in China, the power construction in China is different day by day, new voltage levels are continuously increased, various power facilities are distributed in the south and north of the great river, the mileage of a power transmission (distribution) transformation line is continuously increased, operation and maintenance are important links for ensuring the safe and reliable operation of power equipment, live working is an important technical means in operation and maintenance work, and the live working is a work with strong comprehensiveness, high technical content and complex working conditions, so that the familiarity of multiple lines of line operation and inspection personnel needs to be improved by drilling in advance. The training quality becomes one of the important tasks of the power enterprise training work, which is also a necessary requirement for the development of the power enterprise. At the present stage, the development speed of power grid construction becomes a primary task of training for personnel operation training, and the key point is how to carry out occupational training of a system. In the current electric power accidents, a considerable number of accidents occur on old workers with years of experience, so that cultivation of mental quality and monitoring of mental states of the workers become brand new subjects which various training centers in China have to face at present. Therefore, a system is needed to simulate the disconnection of the line, so as to achieve the purpose of training the system for the staff.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model aims at providing a novel substation power supply system simulation operation panel, the utility model discloses a in high pressure and low pressure part, through cutting off and closed switch element, when the return circuit that uses was the closed condition, the LED pilot lamp showed red, and when the return circuit was the off-state, the LED pilot lamp showed green. Therefore, the operation is simple and clear, and the adjustment can be made at any time according to the actual use condition. Meanwhile, the LED display screen is attractive and practical, power is saved, the display effect is clear, and related propaganda warning slogans such as safety protection can be replaced at any time according to the field environment. The use is more flexible, and the circuit switching manual regulation is accurate again convenient.
The utility model discloses an above-mentioned technical problem is solved to following technical means:
the utility model discloses a novel power substation power supply system simulation operation board includes aluminum alloy frame, operation panel and LED display screen, the operation panel is inlayed and is installed in the aluminum alloy frame, LED display screen fixed mounting be in the upper portion of operation panel, the operation panel divide into high nip and low-pressure area, the equipartition has analog circuit in high nip and the low-pressure area, be connected with LED lamp and switching element on the analog circuit.
Furthermore, an installation lug is integrally formed on the top edge of the aluminum alloy frame, and an installation hole is formed in the center of the installation lug.
Furthermore, the number of the mounting lugs is three, and the mounting lugs are uniformly spaced and integrally formed on the top edge of the aluminum alloy frame.
Furthermore, time display screens are uniformly arranged below the LED display screens at intervals.
The utility model discloses theory of use: the operating area is divided into a high-voltage part and a low-voltage part, and the LED indicator light displays red when the used loop is in a closed state and displays green when the loop is in an open state by switching off and switching on the switch element. Therefore, the operation is simple and clear, and the adjustment can be made at any time according to the actual use condition.
The utility model has the advantages that: by switching off and on the switching elements in the high-voltage and low-voltage sections, the LED indicator light displays red when the used circuit is in a closed state, and the LED indicator light displays green when the circuit is in an open state. Therefore, the operation is simple and clear, and the adjustment can be made at any time according to the actual use condition. Meanwhile, the LED display screen is attractive and practical, power is saved, the display effect is clear, and related propaganda warning slogans such as safety protection can be replaced at any time according to the field environment. The use is more flexible, and the circuit switching manual regulation is accurate again convenient.
Drawings
Fig. 1 is a schematic overall structure diagram of a power supply system simulation operation panel of the novel substation;
the LED display screen comprises an operating panel 1, an aluminum alloy frame 10, a high-voltage area 11, a low-voltage area 12, an analog circuit 2, an LED lamp 21, a switch element 22, a mounting lug 3, a mounting hole 31, an LED display screen 4 and a time display screen 5.
Detailed Description
The invention will be described in detail with reference to the following drawings and specific embodiments:
as shown in fig. 1, the utility model discloses a novel substation power supply system simulation operation board includes aluminum alloy frame 10, operation panel 1 and LED display screen 4, operation panel 1 is inlayed and is installed in aluminum alloy frame 10, 4 fixed mounting on LED display screen are in the upper portion of operation panel 1, operation panel 1 divide into high nip 11 and low-pressure area 12, the equipartition has analog circuit 2 in high nip 11 and the low-pressure area 12, be connected with LED lamp 21 and switching element 22 on the analog circuit 2.
In this embodiment, the top edge of the aluminum alloy frame 10 is integrally formed with a mounting lug 3, and a mounting hole 31 is formed in the center of the mounting lug 3.
In this embodiment, the number of the mounting lugs 31 is three, and the mounting lugs are uniformly spaced and integrally formed on the top edge of the aluminum alloy frame 10.
In this embodiment, the time display screens 5 are uniformly arranged below the LED display screens 4 at intervals.
Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art will understand that the present invention can be modified or replaced with other embodiments without departing from the spirit and scope of the present invention, which should be construed as limited only by the appended claims. The technology, shape and construction parts which are not described in detail in the present invention are all known technology.
Claims (4)
1. The utility model provides a novel power substation power supply system simulation operation board which characterized in that: including aluminum alloy frame (10), operation panel (1) and LED display screen (4), install is inlayed in operation panel (1) in aluminum alloy frame (10), LED display screen (4) fixed mounting be in the upper portion of operation panel (1), operation panel (1) divide into high-voltage region (11) and low-voltage area (12), the equipartition is local in high-voltage region (11) and low-voltage area (12) has analog circuit (2), be connected with LED lamp (21) and switching element (22) on analog circuit (2).
2. The novel power transformation substation power supply system simulation operation panel of claim 1, characterized in that: the aluminum alloy frame is characterized in that a mounting lug (3) is integrally formed on the top edge of the aluminum alloy frame (10), and a mounting hole (31) is formed in the center of the mounting lug (3).
3. The novel power transformation substation power supply system simulation operation panel of claim 2, characterized in that: the number of the mounting lugs (3) is three, and the mounting lugs are uniformly spaced and integrally formed on the top edge of the aluminum alloy frame (10).
4. The novel power transformation substation power supply system simulation operation panel of claim 1, characterized in that: and time display screens (5) are uniformly arranged below the LED display screens (4) at intervals.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020477794.1U CN211454903U (en) | 2020-04-03 | 2020-04-03 | Novel power substation power supply system simulation operation board |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020477794.1U CN211454903U (en) | 2020-04-03 | 2020-04-03 | Novel power substation power supply system simulation operation board |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211454903U true CN211454903U (en) | 2020-09-08 |
Family
ID=72303858
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020477794.1U Active CN211454903U (en) | 2020-04-03 | 2020-04-03 | Novel power substation power supply system simulation operation board |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211454903U (en) |
-
2020
- 2020-04-03 CN CN202020477794.1U patent/CN211454903U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202736379U (en) | Transformer station comprehensive automation skill training system | |
CN211454903U (en) | Novel power substation power supply system simulation operation board | |
CN208954379U (en) | A kind of transmission line malfunction analog training device | |
CN206364576U (en) | PT secondary voltages switching circuit and its protective loop that double-bus is powered | |
CN201255955Y (en) | Integrated automation experimental system for transforming plant | |
CN112467589A (en) | In put cabinet intelligent security warning device | |
CN203673691U (en) | Substation training device based on PLC control | |
CN210137212U (en) | Signal intelligent uploading device | |
CN210775698U (en) | Quick detection device of electric interlocking trouble of transformer substation | |
CN202550381U (en) | Comprehensive display of switch cabinet operation state | |
CN209200309U (en) | A kind of fast changeable 10kV protective device | |
CN110767077A (en) | 35kV double-bus double-section wiring structure overhauling billboard | |
CN220509566U (en) | Dynamic simulation demonstration platform for faults of distribution line | |
CN204441874U (en) | A kind of Novel lightning-proof cabinet | |
CN211403820U (en) | Intelligent industrial electricity demonstration device | |
CN210804996U (en) | 35kV double-bus double-section wiring structure overhauling billboard | |
CN116470649B (en) | Power distribution network reliability judging and early warning system based on data communication | |
CN108306188A (en) | A kind of open air intelligent power distribution low-tension switch cabinet | |
CN220914855U (en) | Switch state indicator of power switch cabinet | |
CN202324909U (en) | Padlock mechanism for low-voltage switchgear assemblies | |
CN214473781U (en) | Detection apparatus for auxiliary switch of GIS mechanism | |
CN218886701U (en) | Motor and electrical control cabinet | |
CN215580543U (en) | Signal comprehensive surge protection monitoring system and signal comprehensive monitoring cabinet | |
CN217281804U (en) | Detachable high-low voltage complete switch equipment | |
CN105390965A (en) | Transformer substation switching operation simulation board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |