CN211452486U - High-temperature water elbow flowmeter - Google Patents

High-temperature water elbow flowmeter Download PDF

Info

Publication number
CN211452486U
CN211452486U CN202020139344.1U CN202020139344U CN211452486U CN 211452486 U CN211452486 U CN 211452486U CN 202020139344 U CN202020139344 U CN 202020139344U CN 211452486 U CN211452486 U CN 211452486U
Authority
CN
China
Prior art keywords
flowmeter
plate
temperature water
flowmeter body
high temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020139344.1U
Other languages
Chinese (zh)
Inventor
于建忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Economic And Technological Development Zone Heating Co ltd
Original Assignee
Dalian Economic And Technological Development Zone Heating Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Economic And Technological Development Zone Heating Co ltd filed Critical Dalian Economic And Technological Development Zone Heating Co ltd
Priority to CN202020139344.1U priority Critical patent/CN211452486U/en
Application granted granted Critical
Publication of CN211452486U publication Critical patent/CN211452486U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

The utility model discloses a high-temperature water elbow flowmeter, which belongs to the technical field of pipeline fluid measurement and comprises a flowmeter body, wherein a support frame is fixed below the flowmeter body, the water inlet end of the flowmeter body is connected with a water injection pipe, the water outlet end of the flowmeter body is connected with a water outlet pipe, and one end of the flowmeter body, which is close to the water injection pipe, is provided with three mounting grooves; the utility model discloses a through setting up filter plate, opening, barrel and filtration pore, multiple structure mutually supports, can filter the high temperature water that gets into in the flowmeter body, avoids the structure of the impurity jam flowmeter body of high temperature aquatic, reduces the maintenance number of times of flowmeter body, reduces the maintenance cost; simultaneously through setting up mounting panel, mounting groove and fastening bolt, multiple structure mutually supports, can realize filtration's dismouting function, and then conveniently carry out periodic maintenance to filtration, extension filtration's life.

Description

High-temperature water elbow flowmeter
Technical Field
The utility model belongs to the technical field of pipeline fluid measurement, concretely relates to high temperature water return bend flowmeter.
Background
While existing high temperature water elbow flow meters are being produced in a process that is becoming mature, the flow meters are meters that indicate the measured flow rate and/or the total amount of fluid that is flowing in a selected time interval, but some of them are still not satisfactory.
The prior art has the following problems: the existing high-temperature water elbow flowmeter is not provided with a filtering structure, and although the normal measurement work of the high-temperature water elbow flowmeter is not influenced, the impurities of high-temperature water easily block the flowmeter pipe body in the measurement process, so that the flowmeter pipe body is frequently maintained, and the maintenance cost is increased.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a high temperature water return bend flowmeter has and to filter the high temperature water that gets into in the flowmeter body, avoids the structure of the impurity jam flowmeter body of high temperature aquatic, reduces the maintenance number of times of flowmeter body, reduces the characteristics of maintenance cost.
In order to achieve the above object, the utility model provides a following technical scheme: a high-temperature water elbow flowmeter comprises a flowmeter body, wherein a support frame is fixed below the flowmeter body, a water inlet end of the flowmeter body is connected with a water injection pipe, a water outlet end of the flowmeter body is connected with a water outlet pipe, three mounting grooves are formed in one end, close to the water injection pipe, of the flowmeter body, a first splitter plate is mounted in the mounting grooves on the left side, a second splitter plate is mounted in the mounting grooves in the middle, a plurality of splitter holes are uniformly formed in the first splitter plate and the second splitter plate, a filter plate is mounted in the mounting grooves on the right side, mounting plates are fixed on the outer sides of the filter plate, the first splitter plate and the second splitter plate, the three mounting plates and the corresponding mounting grooves are fastened through fastening bolts, an opening is formed in the interior of the filter plate, and a cylinder is fixed at one end, far away from the second splitter plate, of the, a plurality of filter holes are uniformly formed in one side wall of the cylinder body, which is far away from the filter plate.
Preferably, the flowmeter body is arranged in an arc structure.
Preferably, the flowmeter pipe body and the support frame are fixed in a welding mode.
Preferably, the fastening bolt comprises a nut and a screw rod, wherein one end of the nut is connected with the screw rod, the nut is made of waterproof high-temperature-resistant stainless steel materials, and the screw rod is made of carbon steel alloy.
Preferably, the mounting plate is arranged in a T-shaped structure.
Preferably, the first flow dividing plate and the second flow dividing plate are both arranged in an inclined structure.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a through setting up filter plate, opening, barrel and filtration pore, multiple structure mutually supports, can filter the high temperature water that gets into in the flowmeter body, avoids the structure of the impurity jam flowmeter body of high temperature aquatic, reduces the maintenance number of times of flowmeter body, reduces the maintenance cost; simultaneously through setting up mounting panel, mounting groove and fastening bolt, multiple structure mutually supports, can realize filtration's dismouting function, and then conveniently carry out periodic maintenance to filtration, extension filtration's life.
2. The utility model discloses a through setting up first splitter plate, second splitter plate and reposition of redundant personnel hole, multiple structure mutually supports, can shunt the high temperature water that gets into in the flowmeter body, and then effectively avoid the impact force in the high temperature water to cause the harm to the barrel, prolong filtration's service life; simultaneously through setting up mounting panel, mounting groove and fastening bolt, the dismouting function of flow distribution plate can be realized to multiple structure mutually supporting, and then convenient maintenance or change flow distribution plate have good market competition.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic cross-sectional view of the present invention shown in FIG. 1A;
in the figure: 1. a water injection pipe; 2. a flowmeter body; 3. a support frame; 4. a water outlet pipe; 5. fastening a bolt; 6. mounting a plate; 7. installing a groove; 8. an opening; 9. filtering holes; 10. a barrel; 11. filtering the plate; 12. a shunt hole; 13. a first splitter plate; 14. a second shunting plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides the following technical solutions: a high-temperature water elbow flowmeter comprises a flowmeter pipe body 2, wherein the flowmeter pipe body 2 is preferably arranged in an arc structure in order to be matched with a water injection pipe 1 and a water outlet pipe 4, a support frame 3 is fixed below the flowmeter pipe body 2, in order to enhance the connection strength between the flowmeter pipe body 2 and the support frame 3, in the embodiment, the flowmeter pipe body 2 and the support frame 3 are preferably fixed in a welding mode, the water inlet end of the flowmeter pipe body 2 is connected with the water injection pipe 1, the water outlet end of the flowmeter pipe body 2 is connected with the water outlet pipe 4, one end of the flowmeter pipe body 2 close to the water injection pipe 1 is provided with three mounting grooves 7, a first flow dividing plate 13 is arranged inside the left mounting groove 7, a second flow dividing plate 14 is arranged inside the middle mounting groove 7, in order to achieve better flow dividing effect, in the embodiment, the flowmeter, the first splitter plate 13 and the second splitter plate 14 are both arranged in an inclined structure, a plurality of splitter holes 12 are uniformly formed in the first splitter plate 13 and the second splitter plate 14, a filter plate 11 is arranged in the right mounting groove 7, mounting plates 6 are fixed on the outer sides of the filter plate 11, the first splitter plate 13 and the second splitter plate 14, so that the contact area of the mounting plates 6 is larger, in the embodiment, preferably, the mounting plates 6 are arranged in a T-shaped structure, the three mounting plates 6 and the corresponding mounting grooves 7 are fastened through fastening bolts 5, in order to avoid rusting of the fastening bolts 5, in the embodiment, preferably, the fastening bolts 5 comprise nuts and screws, wherein one ends of the nuts are connected with screws made of waterproof and high-temperature-resistant stainless steel materials, the screws are made of carbon steel alloy, openings 8 are formed in the filter plate 11, and a cylinder 10 is fixed at one end of the filter plate 11, which is far away from the second, a plurality of filter holes 9 are uniformly arranged on one side wall of the cylinder 10 far away from the filter plate 11.
The utility model discloses a theory of operation and use flow: the utility model discloses assembly work: inserting the mounting plate 6 of the filter plate 11 into the rightmost mounting groove 7, fixing the mounting plate 6 by the fastening bolt 5, inserting the mounting plate 6 of the second splitter plate 14 into the middle mounting groove 7, fixing the mounting plate by the fastening bolt 5, inserting the mounting plate 6 of the first splitter plate 13 into the leftmost mounting groove 7, fixing the mounting plate by the fastening bolt 5, completing the assembly of the flowmeter tube 2, fixing the flowmeter tube 2 between the water injection pipe 1 and the water outlet pipe 4 by a thread manner, completing the measurement after the integral assembly, when the measurement is performed, high-temperature water enters the flowmeter tube 2 through the water injection pipe 1, the high-temperature water entering the flowmeter tube 2 is firstly split by the split holes 12 on the first splitter plate 13, then is secondarily split by the split holes 12 on the second splitter plate 14, and the secondarily split high-temperature water enters the cylinder 10 through the opening 8 of the filter plate 11, then filtering is carried out by a filtering hole 9 on the cylinder 10, the filtered high-temperature water is measured by a flowmeter (not shown in the figure) on the flowmeter tube body 2, and the measured high-temperature water flows out through the water outlet pipe 4; when the first splitter plate 13 and the second splitter plate 14 need maintenance or overhaul, the fastening bolts 5 are disassembled, and the first splitter plate 13 and the second splitter plate 14 are taken out (the mounting groove 7 is larger than the mounting plate 6, and the mounting plate 6 can be obliquely taken out), so that maintenance or overhaul can be carried out; when the filter holes 9 are blocked, the filter plates 11 are taken out in the same way, and the filter holes 9 are cleaned.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a high temperature water return bend flowmeter, includes flowmeter body (2), its characterized in that: the below of flowmeter body (2) is fixed with support frame (3), the end of intaking of flowmeter body (2) is connected with water injection pipe (1), and the play water end of flowmeter body (2) is connected with outlet pipe (4), three mounting groove (7) have been seted up to flowmeter body (2) one end near water injection pipe (1), lean on the left side the internally mounted of mounting groove (7) has first splitter plate (13), and is middle the internally mounted of mounting groove (7) has second splitter plate (14), a plurality of diffluence orifice (12) have all evenly been seted up on first splitter plate (13) and second splitter plate (14), lean on the right side the internally mounted of mounting groove (7) has filter plate (11), the outside of filter plate (11), first splitter plate (13) and second splitter plate (14) all is fixed with mounting panel (6), three mounting panel (6) and corresponding all through fastening bolt (5) between mounting groove (7) ) The filter plate is fastened, an opening (8) is formed in the filter plate (11), a cylinder body (10) is fixed at one end, far away from the second flow dividing plate (14), of the filter plate (11), and a plurality of filter holes (9) are uniformly formed in one side wall, far away from the filter plate (11), of the cylinder body (10).
2. A high temperature water elbow meter according to claim 1, wherein: the flowmeter pipe body (2) is arranged in an arc-shaped structure.
3. A high temperature water elbow meter according to claim 1, wherein: the flowmeter pipe body (2) and the support frame (3) are fixed in a welding mode.
4. A high temperature water elbow meter according to claim 1, wherein: the fastening bolt (5) comprises a nut and a screw rod, wherein one end of the nut is connected with the screw rod, the nut is made of waterproof high-temperature-resistant stainless steel materials, and the screw rod is made of carbon steel alloy.
5. A high temperature water elbow meter according to claim 1, wherein: the mounting plate (6) is arranged in a T-shaped structure.
6. A high temperature water elbow meter according to claim 1, wherein: the first flow dividing plate (13) and the second flow dividing plate (14) are arranged in an inclined structure.
CN202020139344.1U 2020-01-21 2020-01-21 High-temperature water elbow flowmeter Active CN211452486U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020139344.1U CN211452486U (en) 2020-01-21 2020-01-21 High-temperature water elbow flowmeter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020139344.1U CN211452486U (en) 2020-01-21 2020-01-21 High-temperature water elbow flowmeter

Publications (1)

Publication Number Publication Date
CN211452486U true CN211452486U (en) 2020-09-08

Family

ID=72305372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020139344.1U Active CN211452486U (en) 2020-01-21 2020-01-21 High-temperature water elbow flowmeter

Country Status (1)

Country Link
CN (1) CN211452486U (en)

Similar Documents

Publication Publication Date Title
CN211452486U (en) High-temperature water elbow flowmeter
CN110613976B (en) Pipeline filter of easily clearing up filter screen
CN209840788U (en) Combined tube type heat exchanger
CN110844984A (en) Magnetic water treatment device
CN217304044U (en) Detachable cleaning ultrasonic basic meter
CN216347974U (en) Wall-hanging plate cooler convenient to dismouting equipment
CN210473364U (en) Purifier for air separation
CN213397448U (en) Heat meter with anti-blocking function
CN212133758U (en) Thing networking water gauge convenient to dismantle
CN104606950A (en) Device for filtering sand in water flow
CN211121425U (en) Water meter movement with filtering function
CN211226491U (en) Magnetic water treatment device
CN221155650U (en) Valve filter convenient to change filter component
CN211513595U (en) High efficiency filter with detection device
CN211570163U (en) Industrial wastewater detection and treatment device
CN215573135U (en) Liquid turbine flowmeter with filtering mechanism
CN221075366U (en) Check valve with double valves
CN220956069U (en) Fluorine axial flow pump with multiunit filter component
CN111473506A (en) Filtering type water collector
CN210934061U (en) Y-shaped filter and oil temperature machine with same
CN212206232U (en) Flowmeter with anti-interference performance
CN212782172U (en) Card type prepayment gas table is sought in initiative
CN211448638U (en) Novel oil recovery water injection measurement device
CN220669828U (en) Condenser assembly of air-cooled chiller
CN212721592U (en) Ultrasonic water meter with preposed filtering function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant