CN211449881U - Building pipeline mounting rack - Google Patents

Building pipeline mounting rack Download PDF

Info

Publication number
CN211449881U
CN211449881U CN201921913728.8U CN201921913728U CN211449881U CN 211449881 U CN211449881 U CN 211449881U CN 201921913728 U CN201921913728 U CN 201921913728U CN 211449881 U CN211449881 U CN 211449881U
Authority
CN
China
Prior art keywords
supporting table
top end
face
base
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201921913728.8U
Other languages
Chinese (zh)
Inventor
王涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi juntong Construction Engineering Co., Ltd
Original Assignee
王涛
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王涛 filed Critical 王涛
Priority to CN201921913728.8U priority Critical patent/CN211449881U/en
Application granted granted Critical
Publication of CN211449881U publication Critical patent/CN211449881U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

A building pipeline mounting frame comprises a base (1) and a supporting table (5), wherein a buffer groove (2) with an upward opening is formed in the base (1), the supporting table (5) is arranged in the buffer groove (2) in a sliding fit connection mode, an annular limiting sliding plate (6) is arranged on the outer side of the supporting table (5), a buffer spring (3) is arranged at the bottom of the supporting table (5), a groove (7) is formed in the top end face of the supporting table (5), jacks (10) are symmetrically formed in the left side and the right side of the groove (7), a hinge base (8) is further arranged at the position, close to the left side, of the top end face of the supporting table (5), a flexible toothed belt (12) is hinged to the hinge base (8), and a connecting block (13) is further arranged at the position, close to the right side; the device has simple structure, and is convenient and quick to install and use.

Description

Building pipeline mounting rack
Technical Field
The utility model belongs to the technical field of the piping erection technique and specifically relates to a building piping erection frame.
Background
In the building construction, pipeline facilities matched with a house need to be arranged, the installation quality of the pipeline directly influences the overall quality of the house, and the pipeline installation method is also an important technical problem in the building construction industry. Traditional pipeline installation is fixed and is used the pipe strap of steel or plastic usually fixed with the pipeline, then fixed with the pipe strap with the bolt, and the working process is comparatively loaded down with trivial details, and the shock attenuation effect is poor, and is very inconvenient, greatly reduced dismouting efficiency.
SUMMERY OF THE UTILITY MODEL
Not enough to above-mentioned technique, the utility model provides a building pipeline mounting bracket can overcome above-mentioned defect.
The utility model relates to a building pipeline mounting rack, which comprises a base and a supporting table, wherein a buffer groove with an upward opening is arranged in the base, the supporting table is arranged in the buffer groove in a sliding fit connection manner, an annular limiting slide plate is arranged outside the supporting table, a buffer spring is arranged at the bottom of the supporting table, a groove is arranged in the top end surface of the supporting table, jacks are symmetrically arranged at the left side and the right side of the groove, a hinged seat is also arranged at the left side of the top end surface of the supporting table, a flexible toothed belt is hinged on the hinged seat, a connecting block is also arranged at the right side of the top end surface of the supporting table, a through hole which is arranged in a left-right penetrating manner is arranged in the connecting block, a slide way is arranged in the top wall of the through hole, a sliding block is connected in a sliding fit manner in, slide fit is connected with the connecting rod that extends the setting from top to bottom in the roof of slide, the bottom of connecting rod terminal with the top end face fixed connection of sliding block, the top of connecting rod extends terminal and stretches out outside the top end face of connecting block, just the top of connecting rod extends terminal and has set firmly the ejector pin that extends the setting to the right side, the sliding seat has set firmly on the top end face of connecting block, running fit is connected with the stick-up pole on the sliding seat, be equipped with on the stick-up pole with the arm-ups of ejector pin bottom terminal surface looks butt.
Preferably, the left side and the right side of the base are fixedly provided with fixed lug parts.
Preferably, the annular limited sliding plate is fixedly matched and connected with the top end surface of the base through a bolt.
Preferably, a pipeline is arranged in the groove, a U-shaped clamping piece is sleeved on the outer surface of the pipeline, and a U-shaped arm on the U-shaped clamping piece is connected with the jack in a matched mode.
Preferably, the movable seat is located at the right side position of the connecting rod.
To sum up, this device simple structure, convenient quick installation and use have shock-absorbing function, have improved shock-absorbing efficiency, can realize the quick location work of pipeline through the U-shaped fastener, prevent the skew, are connected through the cooperation of flexible cingulum with the wedge, and then realize quick locking work, have improved the convenience of locking, reciprocate work through stick-up pole control wedge, and then realize quick control dismantlement work, make things convenient for quick assembly disassembly to maintain.
Drawings
In order to illustrate the embodiments of the present invention or the technical solutions in the prior art more clearly, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of a building pipeline mounting frame of the present invention;
fig. 2 is a partially enlarged schematic view of a in fig. 1 according to the present invention.
Detailed Description
All of the features disclosed in this specification, or all of the steps in any method or process so disclosed, may be combined in any combination, except combinations of features and/or steps that are mutually exclusive.
The present invention will be described in detail with reference to fig. 1-2, and for convenience of description, the following orientations will be defined as follows: the up, down, left, right, and front-back directions described below correspond to the up, down, left, right, and front-back directions in the projection relationship of fig. 1 itself.
As shown in the figures 1-2, the building pipeline mounting frame of the utility model comprises a base 1 and a supporting platform 5, a buffer groove 2 with an upward opening is arranged in the base 1, the supporting platform 5 is arranged in the buffer groove 2 in a sliding fit connection manner, an annular limiting slide plate 6 is arranged outside the supporting platform 5, a buffer spring 3 is arranged at the bottom of the supporting platform 5, a groove 7 is arranged in the top end surface of the supporting platform 5, jacks 10 are symmetrically arranged at the left side and the right side of the groove 7, a hinge seat 8 is arranged at the left side position of the top end surface of the supporting platform 5, a flexible toothed belt 12 is hinged on the hinge seat 8, a connecting block 13 is arranged at the right side position of the top end surface of the supporting platform 5, a through hole 14 which is arranged in a penetrating manner from left to right is arranged in the connecting block 13, a slide 15 is arranged in the top wall of, the bottom end of sliding block 17 has set firmly wedge 19, the cooperation of top roof pressure of sliding block 17 is connected with reset spring 18, sliding fit is connected with the connecting rod 16 that extends the setting from top to bottom in the roof of slide 15, the bottom end of connecting rod 16 with the top end fixed connection of sliding block 17, the top of connecting rod 16 extends terminal and stretches out outside the top end face of connecting block 13, just the top of connecting rod 16 extends terminal and has set firmly the ejector pin 20 that extends the setting to the right side, sliding seat 21 has set firmly on the top end face of connecting block 13, the cooperation of rotating on the sliding seat 21 is connected with stick-up pole 22, be equipped with on the stick-up pole 22 with the arm 23 that sticks up of 20 bottom end face looks butt of ejector pin.
Preferably, the left and right sides of the base 1 are fixedly provided with fixing lug parts 4.
Preferably, the annular sliding limiting plate 6 is fixedly matched and connected with the top end face of the base 1 through a bolt, so that the rapid disassembly and assembly maintenance is facilitated.
Preferably, a pipeline 9 is arranged in the groove 7, a U-shaped clamping piece 11 is sleeved on the outer surface of the pipeline 9, and a U-shaped arm on the U-shaped clamping piece 11 is connected with the insertion hole 10 in a matching mode.
Advantageously, said movable seat 21 is located in a right position of said connecting rod 16.
When the pipeline installation device starts to work, a pipeline 9 is placed in the groove 7, then the U-shaped clamping piece 11 is connected with the pipeline 9 in a matched mode, meanwhile, the U-shaped clamping piece 11 is connected with the jack in a matched mode in an inserted mode, then the flexible toothed belt 12 bypasses the U-shaped clamping piece 11 and abuts against the top end face of the U-shaped clamping piece 11, meanwhile, one side, far away from the hinge seat 8, of the flexible toothed belt 12 penetrates through the through hole 14, the wedge-shaped block 19 is connected with the flexible toothed belt 12 in a meshed mode, and therefore the pipeline 9 is installed quickly; the raising arm 23 is abutted against the ejector rod 20 by breaking the raising rod 22, so that the ejector rod 20 drives the sliding block 17 at the bottom of the connecting rod 16 to slide towards the top of the slideway 15 against the jacking force of the return spring 18, and the wedge block 19 is separated from the flexible toothed belt 12, thereby realizing the unlocking work of the flexible toothed belt 12.
The above description is only the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that are not thought of through creative work should be covered within the scope of the present invention. Therefore, the protection scope of the present invention should be subject to the protection scope defined by the claims.

Claims (5)

1. The utility model provides a building piping erection frame, includes base (1) and brace table (5), its characterized in that: the buffer tank (2) with an opening arranged upwards is arranged in the base (1), the supporting table (5) is arranged in the buffer tank (2) in a sliding fit connection mode, an annular limiting sliding plate (6) is arranged on the outer side of the supporting table (5), a buffer spring (3) is arranged at the bottom of the supporting table (5), a groove (7) is formed in the top end face of the supporting table (5), jacks (10) are symmetrically formed in the left side and the right side of the groove (7), a hinge base (8) is further arranged at the position, close to the left side, of the top end face of the supporting table (5), a flexible toothed belt (12) is hinged to the hinge base (8), a connecting block (13) is further arranged at the position, close to the right side, of the top end face of the supporting table (5), a through hole (14) penetrating through the left side and the right side is, a sliding block (17) is connected in the slideway (15) in a sliding fit manner, a wedge-shaped block (19) is fixedly arranged at the tail end of the bottom of the sliding block (17), the top of the sliding block (17) is connected with a return spring (18) in a jacking fit manner, the top wall of the slideway (15) is connected with a connecting rod (16) which extends up and down in a sliding fit manner, the bottom tail end of the connecting rod (16) is fixedly connected with the top end surface of the sliding block (17), the top extending tail end of the connecting rod (16) extends out of the top end surface of the connecting block (13), and the extending tail end of the top of the connecting rod (16) is fixedly provided with a mandril (20) extending towards the right side, a movable seat (21) is fixedly arranged on the top end face of the connecting block (13), a raising rod (22) is connected on the movable seat (21) in a rotating matching manner, the tilting rod (22) is provided with a tilting arm (23) which is abutted against the end face of the bottom of the ejector rod (20).
2. The building duct mounting rack of claim 1, wherein: the left and right sides of base (1) has set firmly fixed lug portion (4) to the convenience is installed base (1) is firm.
3. The building duct mounting rack of claim 1, wherein: the annular limiting sliding plate (6) is fixedly matched and connected with the top end face of the base (1) through a bolt.
4. The building duct mounting rack of claim 1, wherein: a pipeline (9) is arranged in the groove (7), a U-shaped clamping piece (11) is sleeved on the outer surface of the pipeline (9), and a U-shaped arm on the U-shaped clamping piece (11) is connected with the insertion hole (10) in a matched mode.
5. The building duct mounting rack of claim 1, wherein: the movable seat (21) is positioned at the right side of the connecting rod (16).
CN201921913728.8U 2019-11-07 2019-11-07 Building pipeline mounting rack Withdrawn - After Issue CN211449881U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921913728.8U CN211449881U (en) 2019-11-07 2019-11-07 Building pipeline mounting rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921913728.8U CN211449881U (en) 2019-11-07 2019-11-07 Building pipeline mounting rack

Publications (1)

Publication Number Publication Date
CN211449881U true CN211449881U (en) 2020-09-08

Family

ID=72300324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921913728.8U Withdrawn - After Issue CN211449881U (en) 2019-11-07 2019-11-07 Building pipeline mounting rack

Country Status (1)

Country Link
CN (1) CN211449881U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113529966A (en) * 2021-08-25 2021-10-22 成都兰腾科技有限公司 Steel construction building assembly damping device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113529966A (en) * 2021-08-25 2021-10-22 成都兰腾科技有限公司 Steel construction building assembly damping device
CN113529966B (en) * 2021-08-25 2022-11-01 安阳智振测控技术有限公司 Steel construction building assembly damping device

Similar Documents

Publication Publication Date Title
CN211449881U (en) Building pipeline mounting rack
CN211597659U (en) Anti-falling device for outer wall climbing frame
CN213297078U (en) Climb a shore monitoring subassembly
CN216341040U (en) Building engineering assembled bearing structure
CN215484042U (en) Fireproof heat-preservation decoration integrated ceramic partition plate and mounting structure thereof
CN209818280U (en) Structure of fire-fighting motor-fixed hand-lifting motor-driven fire pump
CN213144351U (en) Hydraulic engineering overhauls cat ladder
CN211039278U (en) Complete set of hoop
CN205017257U (en) Photovoltaic assembling mounting system
CN211901057U (en) Centrifugal pump with axial force balancing mechanism of centrifugal pump
CN211218816U (en) Portable drilling equipment for overhauling large natural gas pipeline
CN208563931U (en) A kind of lift construction detection platform
CN111636670A (en) Climbing frame top support monitoring assembly and monitoring method
CN210861750U (en) Flat plate integrated solar water heater
CN210319170U (en) Screen mounting rack of hoisting structure
CN219786310U (en) Hinge strengthening iron riveting mechanism
CN214980743U (en) Auxiliary mounting device for steel pipe hanging plate
CN220622972U (en) Pipeline erection and installation auxiliary device for petrochemical engineering construction
CN220323973U (en) All-purpose card management platform
CN220184634U (en) Lintel and ring beam formwork combined fixture device
CN211231200U (en) Fixed pin
CN213268411U (en) Waterborne Pir foam insulation board convenient to installation
CN214834608U (en) Building engineering building climbing frame
CN214702228U (en) Full-period dynamic monitoring device for building settlement
CN212564707U (en) High-strength base structure of anti-slip anti-seismic comprehensive pipeline support hanger

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201127

Address after: Xiangtang Zhen Jian Xin Lu, Nanchang County, Nanchang City, Jiangxi Province

Patentee after: Jiangxi juntong Construction Engineering Co., Ltd

Address before: 312352 new rural area of Xin Sha Ju, Cao E Street, Shangyu District, Shaoxing, Zhejiang

Patentee before: Wang Tao

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20200908

Effective date of abandoning: 20201215

AV01 Patent right actively abandoned

Granted publication date: 20200908

Effective date of abandoning: 20201215