CN211448694U - 在软弱土层隧道内架设的预制垫块连梁结构 - Google Patents
在软弱土层隧道内架设的预制垫块连梁结构 Download PDFInfo
- Publication number
- CN211448694U CN211448694U CN202020008584.8U CN202020008584U CN211448694U CN 211448694 U CN211448694 U CN 211448694U CN 202020008584 U CN202020008584 U CN 202020008584U CN 211448694 U CN211448694 U CN 211448694U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- concrete
- tunnel
- pad
- pads
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000002689 soil Substances 0.000 title claims abstract description 21
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 74
- 239000010959 steel Substances 0.000 claims abstract description 74
- 239000004567 concrete Substances 0.000 claims abstract description 64
- 239000011178 precast concrete Substances 0.000 claims description 35
- 125000006850 spacer group Chemical group 0.000 claims description 14
- 230000008878 coupling Effects 0.000 claims description 13
- 238000010168 coupling process Methods 0.000 claims description 13
- 238000005859 coupling reaction Methods 0.000 claims description 13
- 239000011378 shotcrete Substances 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 14
- 230000000694 effects Effects 0.000 abstract description 2
- 238000009412 basement excavation Methods 0.000 description 14
- 238000000034 method Methods 0.000 description 5
- 125000004122 cyclic group Chemical group 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000007921 spray Substances 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000000844 transformation Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
- -1 wooden boards Substances 0.000 description 1
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020008584.8U CN211448694U (zh) | 2020-01-03 | 2020-01-03 | 在软弱土层隧道内架设的预制垫块连梁结构 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020008584.8U CN211448694U (zh) | 2020-01-03 | 2020-01-03 | 在软弱土层隧道内架设的预制垫块连梁结构 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211448694U true CN211448694U (zh) | 2020-09-08 |
Family
ID=72316836
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202020008584.8U Active CN211448694U (zh) | 2020-01-03 | 2020-01-03 | 在软弱土层隧道内架设的预制垫块连梁结构 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211448694U (zh) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111101970A (zh) * | 2020-01-03 | 2020-05-05 | 济南城建集团有限公司 | 在软弱土层隧道内架设的预制垫块连梁结构及施工方法 |
-
2020
- 2020-01-03 CN CN202020008584.8U patent/CN211448694U/zh active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111101970A (zh) * | 2020-01-03 | 2020-05-05 | 济南城建集团有限公司 | 在软弱土层隧道内架设的预制垫块连梁结构及施工方法 |
| CN111101970B (zh) * | 2020-01-03 | 2025-06-24 | 济南城建集团有限公司 | 在软弱土层隧道内架设的预制垫块连梁结构及施工方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104863614B (zh) | 由波纹钢板与混凝土组合结构替代钢格栅初期支护的方法 | |
| CN106761810A (zh) | 一种软岩大变形隧道支护结构体系及其施工方法 | |
| CN206205908U (zh) | 一种预防隧道沉降变形的槽钢拱架托梁 | |
| CN104847380B (zh) | 一种减小隧道衬砌结构内力的结构及其施工方法 | |
| CN107100653A (zh) | 一种平顶直墙管幕结构修建超浅埋暗挖地铁车站的施工方法 | |
| CN106050245A (zh) | 矩形隧道断面零距离下穿既有车站的支护结构及构建方法 | |
| CN108612110B (zh) | 一种地铁车站深基坑复合式支护施工方法 | |
| CN109322241B (zh) | 栈桥结构及施工方法 | |
| CN207229131U (zh) | 一种陡峭破碎地层隧道洞口段支护结构 | |
| CN107035159A (zh) | 一种适用于框架结构独立基础建筑物地下增层的方法 | |
| CN111395390A (zh) | 既有结构开洞与新结构接驳节点的加固结构与方法 | |
| CN104975606B (zh) | 逆作基坑与相邻基坑相邻处高低跨处理方法 | |
| KR101187170B1 (ko) | 마이크로파일로 전달하는 경사기둥과 기초부 연장 기둥을 라멘골조로 이용한 수직하향증축 시공방법 | |
| CN211448694U (zh) | 在软弱土层隧道内架设的预制垫块连梁结构 | |
| CN217870505U (zh) | 一种隧道上方基坑开挖的开挖支护结构 | |
| CN113684833A (zh) | 基于拱形梁结构的装配式支撑系统 | |
| CN208734343U (zh) | 一种带有临时中隔柱支撑的车站隧道开挖结构 | |
| CN116289971A (zh) | 深基坑邻近建筑物的地下联合支护结构及其施工方法 | |
| CN114718596A (zh) | 软岩大变形隧道初支加固装置及其施工方法 | |
| CN118345872B (zh) | 一种装配式u型槽结构及施工方法 | |
| CN205778936U (zh) | 一种支护架及支护结构 | |
| CN115538778B (zh) | 逆施工结构的竖向结构对接方法 | |
| CN103291328A (zh) | 一种膨胀岩巷道底板治理方法 | |
| CN217923621U (zh) | 一种组合式多层直立自稳式围护结构 | |
| CN111101970B (zh) | 在软弱土层隧道内架设的预制垫块连梁结构及施工方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CB03 | Change of inventor or designer information |
Inventor after: Zhou Mo Inventor after: Wang Yiliang Inventor after: Zhao Hao Inventor after: Xu Xingchao Inventor after: Liu Mingda Inventor after: Li Meng Inventor after: Li Haibin Inventor after: Shao Guangbiao Inventor after: Jin Bao Inventor before: Zhou Mo Inventor before: Wang Yiliang Inventor before: Zhao Hao Inventor before: Xu Xingchao Inventor before: Liu Mingda Inventor before: Li Meng Inventor before: Li Haibin Inventor before: Shao Guangbiao Inventor before: Jin Bao |
|
| CB03 | Change of inventor or designer information |