CN211447629U - Assembled elevator shaft - Google Patents
Assembled elevator shaft Download PDFInfo
- Publication number
- CN211447629U CN211447629U CN201922201639.7U CN201922201639U CN211447629U CN 211447629 U CN211447629 U CN 211447629U CN 201922201639 U CN201922201639 U CN 201922201639U CN 211447629 U CN211447629 U CN 211447629U
- Authority
- CN
- China
- Prior art keywords
- partition wall
- heat preservation
- side column
- post
- well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The utility model discloses an assembled elevartor shaft, including well (1) and be located the partition wall of well (1), the partition wall includes the partition wall frame and sets up heat preservation puigging (5) in the partition wall frame, the partition wall frame includes partition wall post (2), be located side column (3) of partition wall post (2) both sides and connect many horizontal keel (4) of partition wall post (2) and side column (3), many horizontal keel (4) will be separated into a plurality of independent spaces with the region division between partition wall post (2) and side column (3), heat preservation puigging (5) set up in a plurality of independent spaces, two inside and outside terminal surfaces of heat preservation puigging (5) set up fire prevention panel (6) respectively. The utility model discloses an assemble the partition wall in the factory, both improved the field operation's efficiency, can reduce high altitude construction's risk again.
Description
Technical Field
The utility model belongs to the technical field of the assembly type structure, concretely relates to assembled elevartor shaft.
Background
When the assembly type building relates to shaft installation, a building block wall or a batten partition wall is usually adopted between two elevator shafts for separation, and the construction speed is low; in the construction process, other processes of partition wall construction are often crossed in a shaft, so that the objects falling from the high altitude easily cause personal injury and other safety accidents, the construction platform is time-consuming and labor-consuming to set up, and the efficiency is extremely low.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model aims at prior art not enough, provide an assembled elevartor shaft, the utility model discloses an assembly partition wall in the factory has both improved the efficiency of field operation, can reduce high altitude construction's risk again.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an assembled elevartor shaft, includes the well and is located the partition wall of well, the partition wall includes the partition wall frame and sets up the heat preservation puigging in the partition wall frame, the partition wall frame includes the partition wall post, is located the side column of partition wall post both sides and connects many horizontal keels of partition wall post and side column, and many horizontal keels divide into a plurality of independent spaces with the region division between partition wall post and the side column, and the heat preservation puigging sets up in a plurality of independent spaces, and two inside and outside terminal surfaces of heat preservation puigging set up fire proof board respectively.
Further, the well is the truss structure who has floorbar and back timber, the upper and lower terminal surface of floorbar and back timber all sets up the slide of arranging along the horizontal direction.
The utility model has the advantages that:
1. the utility model discloses an assemble the partition wall in the factory, both improved the field operation's efficiency, can reduce high altitude construction's risk again.
2. Set up heat preservation puigging and PLASTIC LAMINATED in the partition wall, effectively improve the fire behavior of elevator well.
3. Be equipped with the slide in the well, be convenient for the fast assembly and the location of partition wall.
Drawings
Fig. 1 is a plan view of the present invention in an embodiment;
fig. 2 is a front view of the present invention in the embodiment;
fig. 3 is a side view of the present invention in an embodiment;
FIG. 4 is an enlarged view of reference character A in FIG. 3;
FIG. 5 is a front view of the steel frame of the present invention in the embodiment;
reference numbers in the figures: 1-well, 2-partition wall columns, 3-side columns, 4-cross keels, 5-heat preservation and sound insulation layers, 6-fireproof panels, 7-slideways, 8-bottom beams and 9-top beams.
Detailed Description
The invention is further described with reference to the following figures and examples.
As shown in fig. 1, the utility model discloses an assembled elevator shaft, including well 1 and be located the partition wall in well 1.
As shown in fig. 3 and 4, the hoistway 1 is a truss structure having a bottom beam 8 and a top beam 9, the top and bottom end surfaces of the bottom beam 8 and the top beam 9 are both provided with a slide 7 arranged along the horizontal direction, and the slide 7 is surrounded by two angle steels.
As shown in fig. 5, the partition wall includes partition wall frame and heat preservation puigging 5 of setting in the partition wall frame, partition wall frame includes partition wall post 2, be located the side column 3 of partition wall post 2 both sides and connect many horizontal keel 4 of partition wall post 2 and side column 3, many horizontal keel 4 divide into a plurality of independent spaces with the region between partition wall post 2 and the side column 3, heat preservation puigging 5 sets up in a plurality of independent spaces, two inside and outside terminal surfaces of heat preservation puigging 5 set up fire prevention panel 6 respectively, as shown in fig. 2-4, two side columns 3 slide respectively and set up in slide 7.
When the partition wall is manufactured, firstly, the partition wall columns and two side columns are welded into a partition wall frame through a plurality of transverse keels, a plurality of independent spaces of the partition wall frame are filled with light refractory materials, such as rock wool, to form a heat preservation and sound insulation layer, then the two sides of a refractory plate are covered with fireproof panels, and the fireproof panels are made of calcium silicate plates to form a complete partition wall; finally, fixedly welding slideways arranged along the horizontal direction on a bottom beam and a top beam of the well to serve as partition wall installation guide and positioning; and finally, positioning and installing the partition wall in the slideway by erecting and manually pushing and pulling the partition wall, and fixedly connecting the side column and the partition wall column with the slideway through bolts or directly welding the side column and the partition wall column after installation.
Finally, the above embodiments are only used for illustrating the technical solutions of the present invention and not for limiting, and other modifications or equivalent replacements made by the technical solutions of the present invention by those of ordinary skill in the art should be covered within the scope of the claims of the present invention as long as they do not depart from the spirit and scope of the technical solutions of the present invention.
Claims (2)
1. The utility model provides an assembled elevartor shaft, includes well (1) and is located the partition wall of well (1), its characterized in that, the partition wall includes partition wall frame and sets up heat preservation puigging (5) in partition wall frame, partition wall frame includes partition wall post (2), is located side column (3) of partition wall post (2) both sides and many horizontal keel (4) of connecting partition wall post (2) and side column (3), and many horizontal keel (4) divide into a plurality of independent spaces with the region between partition wall post (2) and side column (3), and heat preservation puigging (5) set up in a plurality of independent spaces, and two inside and outside terminal surfaces of heat preservation puigging (5) set up fire behavior board (6) respectively.
2. A fabricated elevator hoistway according to claim 1, wherein: well (1) is the truss structure for having floorbar (8) and back timber (9), the upper and lower terminal surface of floorbar (8) and back timber (9) all sets up slide (7) of arranging along the horizontal direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922201639.7U CN211447629U (en) | 2019-12-10 | 2019-12-10 | Assembled elevator shaft |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922201639.7U CN211447629U (en) | 2019-12-10 | 2019-12-10 | Assembled elevator shaft |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211447629U true CN211447629U (en) | 2020-09-08 |
Family
ID=72316312
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922201639.7U Active CN211447629U (en) | 2019-12-10 | 2019-12-10 | Assembled elevator shaft |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211447629U (en) |
-
2019
- 2019-12-10 CN CN201922201639.7U patent/CN211447629U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105064717B (en) | A kind of construction method of steel slideway jacking architecture adding-floor | |
CN204940886U (en) | A kind of mechanism of handling vestibule | |
CN108005410A (en) | A kind of assembled Residential System of Steel-concrete Composite Structure and its construction method | |
CN108049666B (en) | A kind of echelon installation method of super plane multilayer steel truss electronic workshop steel construction | |
CN109436984A (en) | A kind of basic and full module-assembled elevator shaft of steel superstructure | |
CN104631719B (en) | Prefabricated reinforced concrete shockproof stair and construction method | |
CN211447629U (en) | Assembled elevator shaft | |
CN210767432U (en) | Cold-formed thin-walled steel structure villa shock attenuation sound insulation floor of built-in honeycomb core | |
CN105587114A (en) | Improved construction ascending and descending platform | |
CN211873363U (en) | Plugging structure and secondary structure | |
CN208964324U (en) | A kind of full module-assembled elevator shaft | |
CN111705919A (en) | Shock insulation conversion structure of TOD upper cover plate | |
CN115247457A (en) | Light modular steel structure combined house and building method thereof | |
CN205348439U (en) | Fire prevention antiknock board | |
CN213897562U (en) | Integrated building house | |
CN210562784U (en) | Prefabricated corner wall | |
CN210032084U (en) | Modularization steel structure node | |
CN210263361U (en) | Frame structure for reducing torsional deformation | |
CN209579951U (en) | A kind of outer wall template | |
CN206319463U (en) | A kind of floor system framework and floor system | |
CN218028616U (en) | Structural heat-insulating decorative integrated wallboard | |
CN101215939A (en) | Positive-pressure explosion-proof house | |
CN209556344U (en) | A kind of inside wall formwork | |
CN210178181U (en) | Assembled steel sheet shear force wall and outer eaves window connection structure | |
CN201158953Y (en) | Positive pressure explosion-proof house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |