CN211446859U - Theme park construction platform - Google Patents

Theme park construction platform Download PDF

Info

Publication number
CN211446859U
CN211446859U CN201921897807.4U CN201921897807U CN211446859U CN 211446859 U CN211446859 U CN 211446859U CN 201921897807 U CN201921897807 U CN 201921897807U CN 211446859 U CN211446859 U CN 211446859U
Authority
CN
China
Prior art keywords
platform
fixed
isolation
theme park
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921897807.4U
Other languages
Chinese (zh)
Inventor
温旭东
龚喜朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Tongwei Decoration Design Engineering Co ltd
Original Assignee
Shenzhen Tongwei Decoration Design Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Tongwei Decoration Design Engineering Co ltd filed Critical Shenzhen Tongwei Decoration Design Engineering Co ltd
Priority to CN201921897807.4U priority Critical patent/CN211446859U/en
Application granted granted Critical
Publication of CN211446859U publication Critical patent/CN211446859U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a theme park construction platform, including construction operation platform, spacing post, the separation net, spacing post vertical fixation is on construction operation platform, be fixed with the separation net between two adjacent spacing posts, be equipped with a plurality of meshs on the separation net, the inboard of separation net all is equipped with a plurality of spacing blocks, be equipped with the cavity in the separation block, the body has been stored in the cavity, all connect a connection rope on the spacing block, the mesh that the one end of connecting the rope passed the separation net extends to construction operation platform's below, the this end of connecting the rope is fixed with a supporting shoe, the supporting shoe adsorbs to be fixed in construction operation platform's below, the bottom of supporting shoe is equipped with an opening, the opening part is equipped with a plurality of inlet openings. The utility model has stable structure and high safety; the self-rescue device can timely perform self-rescue after falling into water and timely find the position of falling into water, is convenient for rescuing workers, and ensures the life safety of constructors.

Description

Theme park construction platform
Technical Field
The utility model relates to a theme paradise construction platform.
Background
The water park is one of theme parks, and most of amusement facilities are related to water, and common facilities include: water slides, wave making equipment, drift rivers, paddling gadgets, skateboard surfing and interactive water houses.
Along with the development of economy in China, the income level and the consumption level of people are obviously improved, the continuous development and maturity of the third industry and the tourism industry are promoted, and the water park is taken as a theme park and becomes the most popular star in tourism products in the city at present by unique cultural connotation, scientific and technological content and strong entertainment function.
When the water park is constructed, workers can stand on the operation construction platform for construction, but the possibility of falling into water exists, and potential safety hazards exist.
Disclosure of Invention
The utility model aims to solve the technical problem that a theme park construction platform that can solve above-mentioned problem.
The utility model discloses a realize through following technical scheme: a theme park construction platform comprises a construction operation platform, limiting columns and isolating nets, wherein the limiting columns are vertically fixed on the construction operation platform, the isolating net is fixed between every two adjacent limiting columns, a plurality of meshes are arranged on the isolating net, a plurality of isolating blocks are arranged on the inner sides of the isolating net, cavities are formed in the isolating blocks, floating bodies are stored in the cavities, connecting ropes are connected to the isolating blocks, one ends of the connecting ropes penetrate through the meshes of the isolating net and extend to the lower side of the construction operation platform, a supporting block is fixed to the end of each connecting rope, the supporting block is fixedly adsorbed to the lower side of the construction operation platform, an opening is formed in the bottom of the supporting block, a plurality of water inlet holes are formed in the opening, a liquid storage cavity is formed in the supporting block, and the water inlet holes are communicated; a central channel is arranged in the limiting column, a connecting column is arranged in the central channel, a cavity is arranged in the connecting column, and colored particles are stored in the cavity.
As preferred technical scheme, be equipped with a connecting channel in connecting the rope, connecting channel switches on with the stock solution chamber mutually, connects the rope and adopts rubber to make, connects the structure of rope, spacing block, supporting shoe formula as an organic whole.
As a preferred technical scheme, the diameter of the isolation block is larger than that of the mesh.
According to the preferable technical scheme, the magnets are fixed on the supporting blocks, the plurality of metal blocks are arranged at the bottom of the construction operation platform, the magnets are fixed on the metal blocks in an adsorption mode, the water absorption layer made of sponge is arranged at the opening of the supporting blocks, and the water inlet hole is not covered by the water absorption layer.
As the preferred technical scheme, the isolation net is made of stainless steel, a plurality of aligned screw holes are formed between the isolation net and the limiting columns, and fixing screws are inserted into the screw holes.
As the preferred technical scheme, the connecting column is made of rubber, a water inlet hole is formed in the top of the connecting column, a water outlet hole is formed in the bottom of the connecting column, the diameter of the water outlet hole is larger than that of the water inlet hole, and the particles are lime.
The utility model has the advantages that: the utility model has stable structure and high safety; the self-rescue device can timely perform self-rescue after falling into water and timely find the position of falling into water, is convenient for rescuing workers, and ensures the life safety of constructors.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a top view of the present invention;
FIG. 2 is a structural diagram of the connecting column of the present invention;
fig. 3 is a front view of the present invention.
Detailed Description
All of the features disclosed in this specification, or all of the steps in any method or process so disclosed, may be combined in any combination, except combinations of features and/or steps that are mutually exclusive.
Any feature disclosed in this specification (including any accompanying claims, abstract and drawings), may be replaced by alternative features serving equivalent or similar purposes, unless expressly stated otherwise. That is, unless expressly stated otherwise, each feature is only an example of a generic series of equivalent or similar features.
In the description of the present invention, it is to be understood that the terms "one end", "the other end", "the outside", "upper", "inside", "horizontal", "coaxial", "central", "end", "length", "outer end", etc. indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Furthermore, in the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
The use of terms herein such as "upper," "above," "lower," "below," and the like in describing relative spatial positions is for the purpose of facilitating description to describe one element or feature's relationship to another element or feature as illustrated in the figures. The spatially relative positional terms may be intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the figures. For example, if the device in the figures is turned over, elements described as "below" or "beneath" other elements or features would then be oriented "above" the other elements or features. Thus, the exemplary term "below" can encompass both an orientation of above and below. The device may be otherwise oriented (rotated 90 degrees or at other orientations) and the spatially relative descriptors used herein interpreted accordingly.
In the present invention, unless otherwise explicitly specified or limited, the terms "set", "coupled", "connected", "penetrating", "plugging", and the like are to be understood in a broad sense, and may be, for example, fixedly connected, detachably connected, or integrated; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
As shown in fig. 1, the construction work platform comprises a construction work platform 1, limiting columns 2 and an isolation net 3, wherein the limiting columns 2 are vertically fixed on the construction work platform 1 through reinforcing bolts, the isolation net 3 is fixed between two adjacent limiting columns 2, a plurality of meshes are arranged on the isolation net 3, a plurality of isolation blocks 5 are arranged on the inner side of the isolation net 3, cavities 511 are arranged in the isolation blocks 5, floating bodies 7 such as wood and other objects floating on the water surface are stored in the cavities 511, a connecting rope 6 is connected to each isolation block 5, one end of each connecting rope 6 penetrates through the meshes of the isolation net 3 and extends to the lower part of the construction work platform 1, a supporting block 8 made of rubber is fixed at the end of each connecting rope 6, the supporting block 8 is fixedly adsorbed below the construction work platform 1 and plays a supporting and damping effect of the bottom, an opening 811 is arranged at the bottom of the supporting block 8, and a plurality of water inlet holes 812 are arranged at, a liquid storage cavity 813 is arranged in the supporting block 8, and the water inlet hole 812 is communicated with the liquid storage cavity 813; a central channel 211 is arranged in the limiting column 2, a connecting column 9 is inserted into the central channel 211, a storage cavity 912 is arranged in the connecting column 9, and colored particles 11 are stored in the storage 912.
Wherein, be equipped with a connecting channel 611 in connecting rope 6, connecting channel 611 switches on with liquid storage cavity 813 mutually, connects rope 6 and adopts rubber to make, connects rope 6, spacing block 5, the structure of supporting shoe 8 formula as an organic whole.
Wherein, the diameter of the isolation block 5 is larger than that of the mesh, and the isolation block is limited.
Wherein, be fixed with magnet 13 through waterproof super glue on the supporting shoe 8, waterproof super glue polylith metal block 12 is passed through to construction work platform 1's bottom, magnet 13 adsorbs to be fixed on metal block 12, strong magnet is used to magnet, it is firm to adsorb, the layer 15 that absorbs water that the sponge was made is equipped with in the opening 811 department of supporting shoe 8, the layer 15 that absorbs water does not cover inlet opening 812, the layer that absorbs water is convenient for absorb water, water accessible opening is intake, the log raft is to the stock solution chamber, among the interface channel, store up water, and when falling into water, the log raft is to when these positions, can play a buffering effect, the damage to operation construction platform has been reduced.
The isolation net 3 is made of stainless steel and is not prone to rusting, a plurality of aligned screw holes are formed between the isolation net 3 and the limiting columns 2, and fixing screws are inserted into the screw holes.
Wherein, spliced pole 9 adopts rubber to make, the come-up of being convenient for has promoted the structural strength of support column simultaneously, and the top of spliced pole 9 is equipped with inlet 911, and the bottom of spliced pole 9 is equipped with apopore 16, and the diameter of apopore 16 is greater than the diameter of inlet 911, falls into water the back, and the apopore of being convenient for drains off water fast, and granule 11 is lime.
The working principle is as follows: when the device is used, the bottom of the construction operation platform is provided with a common lifting device, the isolation net and the support column on the construction operation platform play a role in protecting constructors, and the constructors can operate, transport articles and the like on the construction operation platform.
When the device is used, the connecting rope forms an anti-collision protection to the side face, and the stability is improved.
If the water falling condition occurs, the connecting column can float upwards, lime in the connecting column can burn after meeting water, a reaction is generated on the water surface, attention is attracted, the water falling position can be rapidly determined after the lime falls into the water, and rescue can be timely carried out. Meanwhile, the connecting column and the supporting block are convenient to float on the water surface, and personnel falling into the water can save oneself through the connecting column, the supporting block and the connecting rope.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that are not thought of through the creative work should be covered within the scope of the present invention. Therefore, the protection scope of the present invention should be subject to the protection scope defined by the claims.

Claims (6)

1. The utility model provides a theme park construction platform which characterized in that: comprises a construction work platform (1), limiting columns (2) and an isolation net (3), wherein the limiting columns (2) are vertically fixed on the construction work platform (1), the isolation net (3) is fixed between two adjacent limiting columns (2), the isolation net (3) is provided with a plurality of meshes, the inner side of the isolation net (3) is provided with a plurality of isolation blocks (5), cavities (511) are arranged in the isolation blocks (5), floating bodies (7) are stored in the cavities (511), the isolation blocks (5) are respectively connected with a connecting rope (6), one end of the connecting rope (6) penetrates through the meshes of the isolation net (3) and extends to the lower part of the construction work platform (1), a supporting block (8) is fixed at the end of the connecting rope (6), the supporting block (8) is adsorbed and fixed below the construction work platform (1), the bottom of the supporting block (8) is provided with an opening (811), a plurality of water inlet holes (812) are arranged at the opening (811), a liquid storage cavity (813) is arranged in the supporting block (8), and the water inlet hole (812) is communicated with the liquid storage cavity (813); a central channel (211) is arranged in the limiting column (2), a connecting column (9) is inserted into the central channel (211), a cavity (511) is arranged in the connecting column (9), and colored particles (11) are stored in the cavity (511).
2. The theme park construction platform of claim 1, wherein; be equipped with a connecting channel (611) in connecting rope (6), connecting channel (611) and stock solution chamber (813) switch on mutually, connect rope (6) and adopt rubber to make, connect rope (6), spacing block (5), supporting shoe (8) structure as an organic whole.
3. The theme park construction platform of claim 1, wherein: the diameter of the isolation block (5) is larger than that of the mesh.
4. The theme park construction platform of claim 1, wherein: the magnet (13) is fixed on the supporting block (8), the plurality of metal blocks (12) are arranged at the bottom of the construction operation platform (1), the magnet (13) is adsorbed and fixed on the metal blocks (12), the water absorption layer (15) made of sponge is arranged at the opening (811) of the supporting block (8), and the water absorption layer (15) does not cover the water inlet hole (812).
5. The theme park construction platform of claim 1, wherein: the isolation net (3) is made of stainless steel, a plurality of aligned screw holes are formed between the isolation net (3) and the limiting columns (2), and fixing screws are inserted into the screw holes.
6. The theme park construction platform of claim 1, wherein: the connecting column (9) is made of rubber, the top of the connecting column (9) is provided with a hole (911), the bottom of the connecting column (9) is provided with a water outlet hole (16), the diameter of the water outlet hole (16) is larger than that of the hole (911), and the particles (11) are lime.
CN201921897807.4U 2019-11-06 2019-11-06 Theme park construction platform Expired - Fee Related CN211446859U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921897807.4U CN211446859U (en) 2019-11-06 2019-11-06 Theme park construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921897807.4U CN211446859U (en) 2019-11-06 2019-11-06 Theme park construction platform

Publications (1)

Publication Number Publication Date
CN211446859U true CN211446859U (en) 2020-09-08

Family

ID=72319852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921897807.4U Expired - Fee Related CN211446859U (en) 2019-11-06 2019-11-06 Theme park construction platform

Country Status (1)

Country Link
CN (1) CN211446859U (en)

Similar Documents

Publication Publication Date Title
CN102561741A (en) Semi-submersible play platform
CN109398610A (en) A kind of easy-to-dismount ship cable fixing device
CN211446859U (en) Theme park construction platform
CN202483242U (en) Portable inflatable tent
CN205615678U (en) Novel building on water
CN202104575U (en) Anti-seismic flood-proofing multipurpose bed
CN2820698Y (en) Float
CN204822018U (en) Amusement yacht
CN210841172U (en) Culture net cage integrating commercial culture and leisure entertainment
CN210562606U (en) Playground modeling truss structure
CN206885290U (en) The leisure booth waterborne of the convenient moving belt camel of energy
CN200948875Y (en) Transportable waterborne leisure swimming pool
CN203291500U (en) Inflatable slide
CN203345177U (en) Rotational molding buoy
CN207466900U (en) A kind of New-type pleasure-boat with multi-functional lookout terrace
CN112298473A (en) Tourism leisure platform that wind resistance can be strong and be applicable to marine vacation fishing
CN206492198U (en) A kind of amusement of children boat paradise
CN109721165A (en) A kind of bilayer of purifying eutrophic sewage is plant floating bed
CN204674774U (en) A kind of fence pillar for Overwater-floating floating platform
CN209142343U (en) A kind of inflatable is gone fishing novel on-hook plate peculiar to vessel
CN201929502U (en) Safe swing
CN206968944U (en) A kind of leisure fishing wayside pavilion waterborne
CN103332273A (en) Rotational moulding float bowl
CN201799050U (en) Climbing frame
CN211173342U (en) Children play tent

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200908

Termination date: 20211106

CF01 Termination of patent right due to non-payment of annual fee