CN211419184U - Building engineering pay-off - Google Patents

Building engineering pay-off Download PDF

Info

Publication number
CN211419184U
CN211419184U CN201922091057.8U CN201922091057U CN211419184U CN 211419184 U CN211419184 U CN 211419184U CN 201922091057 U CN201922091057 U CN 201922091057U CN 211419184 U CN211419184 U CN 211419184U
Authority
CN
China
Prior art keywords
frame
frame main
main part
side ear
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922091057.8U
Other languages
Chinese (zh)
Inventor
陈磊
朱高收
陶媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922091057.8U priority Critical patent/CN211419184U/en
Application granted granted Critical
Publication of CN211419184U publication Critical patent/CN211419184U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a building engineering pay-off, including the frame main part, the top mid-mounting of frame main part has portable handle, the both sides of frame main part are leaned on upper position department and are installed the buckle, the sucking disc is installed to the one end of buckle, the inboard of frame main part is leaned on upper position department and is installed the take-up pulley, the rocker is installed to the one end of take-up pulley, the side ear frame is installed to the one end of frame main part, the unwrapping wire auxiliary wheel is installed to the inboard of side ear frame, the support frame is installed to the both sides of side ear frame. The utility model discloses a structural design is small and exquisite, installs portable handle at the top of frame main part, carries through its convenience is portable, and is provided with the side ear frame of a body structure in the one end of frame main part, installs the unwrapping wire auxiliary wheel in the inboard of side ear frame, through its cooperation take-up reel, makes receiving and releasing of cable more laborsaving, and can make the unwrapping wire position carry on spacingly, avoids appearing the winding confusion problem and appears.

Description

Building engineering pay-off
Technical Field
The utility model relates to a pay-off field specifically is a building engineering pay-off.
Background
The construction engineering pay-off device is convenient for construction engineering pay-off treatment, and the pay-off pulleys comprise ground cable pulleys, upward pulleys, nylon pulleys, cable wire pay-off pulleys, large-diameter pay-off pulleys, dual-purpose hanging pay-off pulleys, ground wire pay-off pulleys and hoisting pulleys. The large-diameter paying-off tackle is used for leading and paying off single conductors, double split conductors and four split conductors (the middle wheel can be a cast steel wheel or a nylon wheel), and is suitable for tension paying-off.
The pay-off device at the present stage has the disadvantages of large stress in the pay-off process, easy generation of wire breakage, poor wire arrangement effect, high manufacturing cost and inconvenience in carrying and retracting for large-scale pay-off equipment.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering pay-off to the unwrapping wire process atress of solving among the prior art is great, produces the broken string problem easily, and the reason line effect is poor, and to large-scale unwrapping wire equipment, not only the cost is expensive, and inconvenient carrying and receive and release the problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building engineering pay-off, includes the frame main part, the top mid-mounting of frame main part has portable handle, the both sides of frame main part are leaned on position department to install the buckle, the sucking disc is installed to the one end of buckle, the inboard of frame main part is leaned on position department to install the reel, the rocker is installed to the one end of reel, the side ear frame is installed to the one end of frame main part, the unwrapping wire auxiliary wheel is installed to the inboard of side ear frame, the support frame is installed to the both sides of side ear frame.
Preferably, the frame main body and the side ear frames are of an integral structure, and the frame main body and the side ear frames are combined into an L-shaped structure.
Preferably, the winding wheel and the paying-off auxiliary wheel are installed oppositely, and the cable is wound between the winding wheel and the paying-off auxiliary wheel.
Preferably, one end of the supporting frame is hinged with the outer side of the side ear frame through a hinge, and the supporting frame is of a double-L-shaped structure.
Preferably, the buckle is rotatably connected with two sides of the frame body, and the buckle is arranged to be of an elastic structure.
Preferably, a beam structure is installed in the middle of the top end of the frame main body, and the carrying handle is installed and fixed through bolts.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a structural design is small and exquisite, install portable handle at the top of frame main part, carry through it makes things convenient for the hand, and be provided with the side ear frame of a body structure in the one end of frame main part, install the unwrapping wire auxiliary wheel in the inboard of side ear frame, through its cooperation take-up reel, make receiving and releasing of cable more laborsaving, and can make the unwrapping wire position carry on spacingly, avoid appearing the winding confusion problem, and install the support frame through articulated mode in the below of frame main part, can stabilize the support to the frame main part through the support frame, and facilitate the device draw in, conveniently carry and receive and release.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a side view of the present invention.
Fig. 3 is a schematic structural view of the frame body of the present invention in a folded state.
In the figure: 1. a carrying handle; 2. buckling; 3. a suction cup; 4. a winding wheel; 5. a frame body; 6. a support frame; 7. a side ear frame; 8. paying off an auxiliary wheel; 9. a rocker.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, in an embodiment of the present invention, a construction work wire releasing device includes a frame main body 5, a carrying handle 1 is installed at a top middle portion of the frame main body 5, the carrying handle 1 facilitates carrying the device, buckles 2 are installed at upper positions of both sides of the frame main body 5, the buckles 2 facilitate reinforcing an outer side of a support frame 6 through a suction cup 3 at one end thereof, the buckles 2 are rotatably connected to both sides of the frame main body 5, the buckles 2 are configured to be elastic structures, the frame main body 5 and side ear frames 7 are configured to be an integral structure, the frame main body 5 and the side ear frames 7 are combined to form an L-shaped structure, a beam structure is installed at the top middle portion of the frame main body 5, the carrying handle 1 is installed and fixed through a bolt, the suction cup 3 is installed at one end of the buckles 2, a wire winding wheel 4 is installed at an, 4 convenience of take-up reel are rolled up the cable, take-up reel 4 and unwrapping wire auxiliary wheel 8 are just to the installation, and the cable winding is between take-up reel 4 and unwrapping wire auxiliary wheel 8, rocker 9 is installed to the one end of take-up reel 4, rocker 9 conveniently controls 4 rotations of take-up reel, side earmuff 7 is installed to the one end of frame main part 5, side earmuff 7 makes things convenient for the installation of unwrapping wire auxiliary wheel 8, unwrapping wire auxiliary wheel 8 is installed to the inboard of side earmuff 7, unwrapping wire auxiliary wheel 8 is used for cooperating take-up reel 4 to carry out unwrapping wire control, support frame 6 is installed to the both sides of side earmuff 7, the one end of support frame 6 is passed through hinged joint with the outside of.
The utility model discloses a theory of operation is: this equipment is when using, expandes support frame 6, makes support frame 6 support frame main part 5, conveniently controls reel 4 through rocker 9 and rotates, makes reel 4 receive and release the cable, and makes things convenient for the cable to be more stable at the unwrapping wire process through unwrapping wire auxiliary wheel 8, draws in the back when support frame 6 draws in, rotates to sucking disc 3 down through buckle 2, makes buckle 2 fix in the outside of support frame 6 through sucking disc 3, makes things convenient for the hand-held device to carry through portable handle 1.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The construction engineering pay-off device comprises a frame main body (5) and is characterized in that a portable handle (1) is installed in the middle of the top end of the frame main body (5), buckles (2) are installed at positions, close to the upper portion, of the two sides of the frame main body (5), a sucker (3) is installed at one end of each buckle (2), a winding wheel (4) is installed at the position, close to the upper portion, of the inner side of the frame main body (5), a rocker (9) is installed at one end of the winding wheel (4), a side lug frame (7) is installed at one end of the frame main body (5), a pay-off auxiliary wheel (8) is installed at the inner side of the side lug frame (7), and supporting frames (6) are installed at the two sides of.
2. A construction work payoff device according to claim 1, wherein: the frame body (5) and the side ear frames (7) are arranged into an integral structure, and the frame body (5) and the side ear frames (7) are combined into an L-shaped structure.
3. A construction work payoff device according to claim 1, wherein: the winding wheel (4) and the paying-off auxiliary wheel (8) are installed in a right-to-right mode, and cables are wound between the winding wheel (4) and the paying-off auxiliary wheel (8).
4. A construction work payoff device according to claim 1, wherein: one end of the support frame (6) is hinged with the outer side of the side ear frame (7) through a hinge, and the support frame (6) is of a double-L-shaped structure.
5. A construction work payoff device according to claim 1, wherein: the buckle (2) is rotatably connected with two sides of the frame body (5), and the buckle (2) is of an elastic structure.
6. A construction work payoff device according to claim 1, wherein: the middle part of the top end of the frame main body (5) is provided with a beam structure, and the portable handle (1) is fixedly installed through bolts.
CN201922091057.8U 2019-11-28 2019-11-28 Building engineering pay-off Expired - Fee Related CN211419184U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922091057.8U CN211419184U (en) 2019-11-28 2019-11-28 Building engineering pay-off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922091057.8U CN211419184U (en) 2019-11-28 2019-11-28 Building engineering pay-off

Publications (1)

Publication Number Publication Date
CN211419184U true CN211419184U (en) 2020-09-04

Family

ID=72286650

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922091057.8U Expired - Fee Related CN211419184U (en) 2019-11-28 2019-11-28 Building engineering pay-off

Country Status (1)

Country Link
CN (1) CN211419184U (en)

Similar Documents

Publication Publication Date Title
CN209554495U (en) A kind of power ampere puts line apparatus
CN102040166A (en) Hoisting tool for equipment on pillar
CN212532128U (en) Sling fixing structure for repairing building outer wall
CN201517022U (en) Hoisting tool for apparatus on column
CN211419184U (en) Building engineering pay-off
CN211110454U (en) Movable cable winding and unwinding device with lifting function
CN215581658U (en) Prevent wired bluetooth headset that buncher drops
CN211004265U (en) Work piece lifting arm for welding lifter
CN109346996A (en) A kind of power construction wire tensioning device and line tightening method
JPH0833169A (en) Suspension support and wiring work method for the suspension support
CN209758695U (en) Portable electric cable reel
CN212475891U (en) Garden engineering construction hoist device
CN213738059U (en) Cable winding and unwinding devices is used in road and bridge construction
CN209193362U (en) A kind of cradle for constructional engineering being convenient for material transportation
CN219194023U (en) Novel power traction device for unfolding additional wire
CN218041148U (en) Motor installation auxiliary device
CN219708696U (en) Pay-off device for engineering measurement technology
CN213751795U (en) Broadcasting device for ecological civilization education
CN212292325U (en) Circuit coiling mechanism for electrical engineering with protect function
CN217708414U (en) Automatic winding and unwinding device for ultrahigh current output cable
CN214570143U (en) Crane main arm device for lifting blowout preventer and crane device
CN216785351U (en) Cable construction draw gear for power engineering
CN219009600U (en) Construction moving frame for power engineering construction
CN219620606U (en) Temporary winding and unwinding device for cable drum
CN213242212U (en) Mounting and positioning structure of transformer bushing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200904

Termination date: 20211128