CN211403211U - Electrical control system of aircraft engine test bed - Google Patents

Electrical control system of aircraft engine test bed Download PDF

Info

Publication number
CN211403211U
CN211403211U CN201922244931.7U CN201922244931U CN211403211U CN 211403211 U CN211403211 U CN 211403211U CN 201922244931 U CN201922244931 U CN 201922244931U CN 211403211 U CN211403211 U CN 211403211U
Authority
CN
China
Prior art keywords
control system
control
plc
electrical
electrical control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922244931.7U
Other languages
Chinese (zh)
Inventor
廖利华
郭斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Hanneng Technology Co ltd
Original Assignee
Hunan Hanneng Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Hanneng Technology Co ltd filed Critical Hunan Hanneng Technology Co ltd
Priority to CN201922244931.7U priority Critical patent/CN211403211U/en
Application granted granted Critical
Publication of CN211403211U publication Critical patent/CN211403211U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing And Monitoring For Control Systems (AREA)

Abstract

Aeroengine test bench electrical control system belongs to industrial equipment electrical control field, go up host computer PLC system as control core, host computer PLC system control connects main air flow fan control system, compressed air source control system, auxiliary assembly control system, the operation panel, auxiliary assembly control system connects UPS power and other auxiliary assembly, UPS power connects data acquisition system and host computer PLC system, main air flow fan control system, compressed air source control system, auxiliary assembly control system all sets up the distribution equipment power supply. The novel electric control system adopts a control mode combining an independent system and centralized control, takes an S7-1500 type PLC as a control core and an industrial personal computer as a visual control interface, and can realize automatic control and regulation of a rotation measuring mechanism, main airflow, anti-icing pressure and the like through a soft start/servo control/variable frequency speed regulation technology, an industrial Ethernet and RS485 communication technology and a pressure/flow closed-loop control technology.

Description

Electrical control system of aircraft engine test bed
Technical Field
The utility model relates to an industrial equipment electrical control field, more specifically relates to aeroengine test bench electrical control system.
Background
The test bed is mainly used for the total pressure loss and total pressure distortion of the particle separator and the air flow measurement test of the anti-icing air guide pipeline so as to determine whether the measurement parameters meet the design requirements.
According to the practical requirements of an aircraft engine test bed, the operation of a main airflow fan is controlled, the flow of the fan is automatically adjusted, a main airflow valve, an anti-icing air inlet adjusting valve and the like are adjusted, a rotation measuring mechanism is controlled, the test bed has the functions of operation control, monitoring, interlocking, protection, sound and light alarm and the like, and the test bed can realize the safety alarm and automatic protection parking functions of overload, phase loss, overcurrent and the like of the main airflow fan.
Therefore, it is desirable to design an electrical control system which meets the requirements of an aircraft engine test bed and is stable and reliable in operation.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model discloses an aeroengine test bench electrical control system to control main air flow fan/rotatory measuring mechanism operation, adjust fan flow, adjust main air flow valve, anti-icing air inlet regulating valve etc. and have functions such as test bench operation control, supervision, interlocking, protection, audible and visual alarm, can realize that main air flow fan transships, lacks the looks, overflows safety alarm and automatic protection parking function such as overcurrent.
In order to realize the technical purpose, the technical scheme is as follows:
the electrical control system of the aircraft engine test bed takes an upper computer PLC system as a control core, the upper computer PLC system is in control connection with a main airflow fan control system, a compressed air source control system, an operation system, an auxiliary equipment control system and an operation panel, the auxiliary equipment control system is connected with a UPS power supply and other auxiliary equipment, the UPS power supply is connected with a data acquisition system and the upper computer PLC system, and the main airflow fan control system, the compressed air source control system and the auxiliary equipment control system are all provided with power distribution equipment for power supply.
Furthermore, the upper computer PLC system is a PLC control cabinet, and comprises a switch, a PLC controller, a circuit breaker, a power module and a relay, so that the functions of signal acquisition, signal processing, logic/linkage/closed-loop control, alarm, parking protection and communication are realized.
Furthermore, the upper computer PLC system switch supports an Ethernet wired network transmission mode, and the PLC controller supports an RS485 communication mode and protocol.
Furthermore, the main air flow fan control system comprises a main air flow fan, a first electric regulating valve, a second electric regulating valve, a cooling water pump, a cooling fan and a frequency converter, wherein the opening degree of the first electric regulating valve/the second electric regulating valve is controlled by an upper computer PLC system to regulate the air flow of the main air flow fan, the frequency converter selects an ACS880-07-0725A-3 type variable frequency speed regulating cabinet to control the rotating speed of the main air flow fan, and the main air flow fan, the cooling water pump and the cooling fan are controlled by the upper computer PLC system or an auxiliary equipment control system through one key on/off control to ensure the safe operation of equipment; the data acquisition system acquires and calculates an airflow flow value, the electric control system acquires an actual airflow flow value in an Ethernet communication mode, and the flow control precision and the response time are guaranteed through closed-loop control.
Furthermore, the compressed air source control system mainly comprises an adsorption dryer, a screw compressor and a third electric regulating valve, the adsorption dryer and the screw compressor can be controlled on site, a remote control interface is reserved, start/stop control, working state indication and/or real-time monitoring operation parameters can be realized through signal transmission, and the third electric regulating valve is used for controlling and regulating the air supply pressure of the anti-icing air entraining by an upper computer PLC system.
Further, the control system comprises an industrial personal computer, a display and a button, the industrial personal computer is used for state monitoring and control and PLC programming, the display is used for test bed equipment control and electrical parameter display, and the button is used for power supply control and emergency stop control.
Furthermore, auxiliary assembly control system mainly includes the AC control cabinet, comprises circuit breaker, contactor, relay, servo drive system, provides the power for test bench electric regulating valve, cooling water pump, cooling blower, servo drive, UPS, TV monitored control system to have overload, short circuit, decompression protect function.
Furthermore, the servo driving system drives the small gear of the test bed rotation measuring mechanism, and then drives the large gear and the measuring ring to rotate so as to control the rotation measuring mechanism.
Furthermore, the control console adopts a piano type structure, is made of carbon steel, is sprayed with plastic on the surface, and is provided with 5 working table positions, including 2 electric control system displays, 2 testing system displays and 1 television monitoring system display.
Furthermore, the electrical control system further comprises a cable and an electrical accessory, wherein the cable is used for connecting all the devices, the electrical accessory comprises a bridge, and the bridge is an aluminum alloy groove type bridge.
This novel electric control system adopts the control mode that independent system and centralized control combined together, use S7-1500 type PLC as control core, the industrial computer is visual control interface, through soft start/servo control/variable frequency speed governing technique, industrial ethernet and RS485 communication technology, pressure/flow closed loop control technique, realize the automatic control and the regulation to rotation measurement mechanism, the main air flow, anti-icing pressure etc. in order to satisfy the requirement of test bench to flow and pressure, and have test bench operation control, keep watch on/save/share in real time, chain/warning/automatic protection/emergency stop function such as, ensure test equipment safe operation.
Drawings
FIG. 1 is a schematic diagram of the electrical control system principle framework of the present invention;
fig. 2 is a schematic diagram of a test bench controlled by the novel electrical control system.
1. A main air flow fan; 2. a first electric regulating valve; 3. a second electric regulating valve; 4. an electric regulating valve III; 5. an adsorption dryer; 6. a screw compressor.
Detailed Description
The invention is further illustrated by the following specific examples. The starting materials and methods employed in the novel examples are those conventionally commercially available in the art and those conventionally used, unless otherwise specified.
Example 1
As shown in fig. 1, the electrical control system of the test bed of the aircraft engine mainly comprises an upper computer PLC system, a main airflow fan control system, a compressed air source control system, an operation system, an auxiliary device control system and an operation console, wherein the auxiliary device control system is connected with a UPS power supply and other auxiliary devices, the UPS power supply is connected with a data acquisition system and the upper computer PLC system, and the main airflow fan control system, the compressed air source control system and the auxiliary device control system are all provided with power distribution equipment for power supply.
Specifically, the host computer PLC system is the PLC switch board, including switch, PLC controller, circuit breaker, power module, relay, realizes signal acquisition, processing, logic/chain/closed-loop control, warning, protection parking, communication function. The PLC controller is Siemens latest generation S7-1500PLC, the analog input/output quantity is 16 bits, the signal processing speed is high-efficient and reliable, the storage capacity is large, a Profinet real-time communication interface and a self-tuning PID controller are integrated, an Ethernet wired network transmission mode and an RS485 communication mode and protocol are supported, the information transmission is more convenient, the control function is stronger, and accessories such as a cooling fan, a lighting lamp, a fan, a door control switch and the like are arranged in the PLC control cabinet.
The main air flow fan control system comprises a main air flow fan 1, a first electric regulating valve 2, a second electric regulating valve 3, a cooling water pump, a cooling fan and a frequency converter, wherein the opening degree of the first electric regulating valve/second electric regulating valve (2, 3) is controlled by a PLC (programmable logic controller), the opening degree setting and valve position feedback indication are arranged on a display screen of the control system, the frequency converter selects an ACS880-07-0725A-3 type variable frequency speed regulation cabinet, the main air flow fan uses a variable frequency motor, the rotating speed of the main air flow fan is controlled by the frequency converter, and the main air flow is cooperatively regulated by the rotating speed of the variable frequency motor and the opening degree of the first electric regulating valve/second electric regulating; the main air flow fan 1, the cooling water pump and the cooling fan are controlled by a host computer PLC system or an auxiliary equipment control system through one key to start/stop, so that the equipment operation safety is ensured (the cooling water pump and the cooling fan also have independent manual start/stop functions); the data acquisition system acquires and calculates an airflow flow value, the electric control system acquires an actual airflow flow value in an Ethernet communication mode, and the flow control precision and the response time are effectively guaranteed through closed-loop control.
The compressed air source control system mainly comprises an adsorption dryer 5, a screw compressor 6 and an electric regulating valve III 4, wherein the adsorption dryer 5 and the screw compressor 6 can be controlled on site, a remote control RS485 interface is reserved and connected with a PLC (programmable logic controller), the screw compressor 6 carries out signal transmission through RS485 communication to realize remote start/stop control, main parameters such as exhaust pressure, exhaust temperature and current and alarm protection signals are monitored in real time, the adsorption dryer 5 is provided with a remote control interface, and remote start/stop control and working state indication are realized through signal transmission; and the third electric regulating valve is used for controlling and regulating the air supply pressure of the anti-icing air entraining by a PLC controller, an air supply pressure signal is input into the PLC through a 16-bit analog quantity module, the pressure is accurately controlled through PID closed-loop control, and the pressure regulating precision can meet the requirements of +/-1% F.S.
The control system comprises an industrial personal computer, a display and a button, wherein the industrial personal computer is provided with 1 display for state monitoring and control and PLC programming, 2 displays (each touch screen/non-touch screen) are arranged for test bed equipment control and electrical parameter display, and the button is used for power supply control and emergency stop control and selects a Schneider product.
The auxiliary equipment control system mainly comprises an alternating current control cabinet, and is composed of a circuit breaker, a contactor, a relay and a servo drive system (the servo controller adopts a Siemens V90 type controller and is uniformly controlled by an S7-1500 type PLC controller through Ethernet communication), so that a power supply is provided for the electric adjusting valve, the cooling water pump, the cooling fan, the servo drive, the UPS and the television monitoring system of the test bed, and the auxiliary equipment control system has the functions of overload, short circuit and voltage loss protection.
A servo motor of the servo driving system drives a pinion of the test bed rotation measuring mechanism, and then drives a bull gear and a measuring ring to rotate so as to control the rotation measuring mechanism.
The control console adopts a piano type structure, is made of carbon steel, is sprayed with plastic on the surface, and is provided with 5 working stations, and comprises 2 electric control system displays, 2 testing system displays and 1 television monitoring system display.
The electric control system further comprises a cable and electric accessories, the cable is used for connecting all the devices, each electric accessory comprises a bridge, and the bridge is an aluminum alloy groove type bridge.
Example 2
As shown in fig. 2, when a test piece pneumatic performance measurement test is performed, ambient air enters the test piece through an air inlet channel, a temperature measuring point, a static pressure measuring point and a total pressure measuring point are arranged on the air inlet channel, and the temperature, the static pressure and the total pressure of the air entering the test piece are measured. Air flows into the rotary measuring device after flowing through the test piece, the rotary measuring device is provided with 3 sets of pressure measuring probes, each set of probe comprises 5 total pressure and 1 static pressure measuring point, 3 total pressure channels and 1 static pressure channel are reserved in the data acquisition system, the 3 sets of pressure measuring probes are uniformly distributed on the measuring section in 120 degrees, and the pressure measuring probes rotate under the driving of a servo motor to realize the measurement of the whole flow field pressure of the outlet of the test piece. Air at the outlet of the rotation measuring device enters the main airflow fan 1 after passing through the rectifier, the flowmeter Q1 and the electric control valves I2 and II 3, and the air exhausted by the main airflow fan 1 is discharged into the atmosphere after noise is eliminated through the exhaust muffler. The total pressure loss sigma can be calculated through the inlet pressure and the outlet pressure of the test piece, and the total pressure distortion index DC60 can be obtained through the measurement of the outlet pressure field of the test piece.
When an anti-icing air entraining flow test of a test piece is carried out, compressed air is supplied by a screw air compressor 6, the compressed air enters a test room after passing through an air storage tank, an air-water separator, an adsorption dryer 5 and an air filter, and the air supply pressure of the screw air compressor 6 is 1.0 MPa. Compressed air entering the test room is connected into the anti-icing air-entraining port of the test piece after passing through the electric regulating valve III 4 and the flowmeter Q2. The air supply pressure of the anti-icing bleed air is adjusted by an electric adjusting valve III 4. Whether the anti-icing bleed air flow meets the design requirements under the specified pressure can be judged by measuring the air flow passing through the anti-icing channel of the test piece under different pressures.
The cooling water system is used for supplying cooling water for the middle pivot of the main airflow fan.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention shall fall within the protection scope of the present invention.

Claims (10)

1. The electrical control system of the aircraft engine test bed is characterized in that the upper computer PLC system is in control connection with a main airflow fan control system, a compressed air source control system, an operation system, an auxiliary equipment control system and an operation platform, the auxiliary equipment control system is connected with a UPS power supply and auxiliary equipment, the UPS power supply is connected with a data acquisition system and the upper computer PLC system, and the main airflow fan control system, the compressed air source control system and the auxiliary equipment control system are all provided with power distribution equipment for power supply.
2. The electrical control system of claim 1, wherein the upper computer PLC system is a PLC control cabinet, and comprises an exchanger, a PLC controller, a circuit breaker, a power module and a relay, and the functions of signal acquisition, processing, logic/linkage/closed-loop control, alarming, parking protection and communication are realized.
3. The electrical control system of claim 2, wherein the host PLC system switch supports ethernet wired network transmission and the PLC controller supports RS485 communication and protocols.
4. The electrical control system of claim 1, wherein the main air flow fan control system comprises a main air flow fan, a first electric regulating valve, a second electric regulating valve, a cooling water pump, a cooling fan and a frequency converter, wherein the opening degree of the first/second electric regulating valve is controlled by an upper computer PLC system, the frequency converter is an ACS880-07-0725A-3 type variable frequency speed regulating cabinet, and the main air flow fan, the cooling water pump and the cooling fan are controlled by the upper computer PLC system or an auxiliary equipment control system through key start/stop; the data acquisition system acquires and calculates an airflow value, and the electric control system acquires an actual airflow value in an Ethernet communication mode.
5. The electrical control system of claim 1, wherein the compressed air source control system mainly comprises an adsorption dryer, a screw compressor and a third electric regulating valve, the adsorption dryer and the screw compressor can be controlled on site, a remote control interface is reserved, start/stop control, working state indication and/or real-time monitoring of operation parameters can be realized through signal transmission, and the third electric regulating valve is controlled by an upper computer PLC system to regulate the air supply pressure of the anti-icing bleed air.
6. The electrical control system of claim 1, wherein the control system comprises an industrial personal computer, a display and a button, the industrial personal computer is used for state monitoring and control and PLC programming, the display is used for test bed equipment control and electrical parameter display, and the button is used for power supply control and emergency stop control.
7. The electrical control system of claim 1, wherein the auxiliary equipment control system mainly comprises an ac control cabinet, which is composed of a circuit breaker, a contactor, a relay and a servo drive system, and provides power for the test bed electric regulating valve, the cooling water pump, the cooling fan, the servo drive, the UPS and the television monitoring system.
8. The electrical control system of claim 7, wherein the servo drive system drives the pinion of the test bed rotation measuring mechanism to drive the bull gear and the measuring ring to rotate so as to control the rotation measuring mechanism.
9. The electrical control system of claim 1, wherein the console is of a piano type structure, is made of carbon steel, is surface-sprayed with plastic, and is provided with 5 working positions comprising 2 electrical control system displays, 2 test system displays and 1 television monitoring system display.
10. The electrical control system of any one of claims 1-9, further comprising a cable and an electrical accessory, wherein the cable connects all of the devices, and wherein the electrical accessory comprises a bridge that is an aluminum alloy channel.
CN201922244931.7U 2019-12-13 2019-12-13 Electrical control system of aircraft engine test bed Active CN211403211U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922244931.7U CN211403211U (en) 2019-12-13 2019-12-13 Electrical control system of aircraft engine test bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922244931.7U CN211403211U (en) 2019-12-13 2019-12-13 Electrical control system of aircraft engine test bed

Publications (1)

Publication Number Publication Date
CN211403211U true CN211403211U (en) 2020-09-01

Family

ID=72208684

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922244931.7U Active CN211403211U (en) 2019-12-13 2019-12-13 Electrical control system of aircraft engine test bed

Country Status (1)

Country Link
CN (1) CN211403211U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110865603A (en) * 2019-12-13 2020-03-06 湖南汉能科技有限公司 Electrical control system of aircraft engine test bed
CN110865603B (en) * 2019-12-13 2024-06-21 湖南汉能科技有限公司 Electrical control system of aero-engine test bed

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110865603A (en) * 2019-12-13 2020-03-06 湖南汉能科技有限公司 Electrical control system of aircraft engine test bed
CN110865603B (en) * 2019-12-13 2024-06-21 湖南汉能科技有限公司 Electrical control system of aero-engine test bed

Similar Documents

Publication Publication Date Title
CN204961364U (en) Air suspension centrifugal fan control system
CN105240302B (en) Air compressor machine drives intelligent power saving all-in-one machine and its method
CN108374448A (en) A kind of industrial regeneration water constant pressure water supply system
CN103148007A (en) Mine ventilating fan control system capable of automatically adjusting air quantity
CN110822778A (en) Multi-path pressure flow constant water cooling system for test platform and application method thereof
CN112128107A (en) Intelligent control system and method for air compressor
CN201982343U (en) Energy-saving control cabinet for fan
CN211403211U (en) Electrical control system of aircraft engine test bed
CN213298277U (en) Intelligent control system of air compressor
CN110865603B (en) Electrical control system of aero-engine test bed
CN110865603A (en) Electrical control system of aircraft engine test bed
CN106020096A (en) Compressor frequency-converting control system for oxygen recovery
CN111426483A (en) Aeroengine combustion chamber test bench measurement and control system
CN211456280U (en) Explosion-proof electrical cabinet with insulation protection function
CN107272561A (en) Heat exchange station central heating equipment remote monitoring device
CN205475481U (en) Intelligent frequency -variable constant -pressure water supply system
CN102564240B (en) Intelligent control device for drying bright beads of fireworks and firecrackers
CN208172612U (en) A kind of multi-functional flow control system applied in fuel charger inspection
CN208618482U (en) A kind of industrial regeneration water constant pressure water supply system
CN106527300A (en) Building electrical equipment integrated management system
CN102880128A (en) Anchor machine frequency conversion control system equipment applied to offshore engineering
CN204436470U (en) A kind of mine ventilation control system based on PLC
CN202104214U (en) Closed-loop frequency-variable control device for shred supply part high-pressure ventilation fan of cigarette rolling and tipping unit
CN112576505A (en) Multi-pump-set vacuum control system and control method
CN208652819U (en) A kind of air exhausting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant