CN211402058U - Building site intelligent monitoring box - Google Patents
Building site intelligent monitoring box Download PDFInfo
- Publication number
- CN211402058U CN211402058U CN202020068606.XU CN202020068606U CN211402058U CN 211402058 U CN211402058 U CN 211402058U CN 202020068606 U CN202020068606 U CN 202020068606U CN 211402058 U CN211402058 U CN 211402058U
- Authority
- CN
- China
- Prior art keywords
- box
- plate
- monitoring box
- cover
- size
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The utility model provides a building site intelligent monitoring box, relates to the building field, including lower box, the box middle part is equipped with a median septum under the place, the median septum will be lower box and divide into upper strata and lower floor, a water pump has been placed to the lower floor, the median septum middle part is equipped with a heavy groove, and the upper strata of lower box is equipped with the upper cover, the upper cover is including the apron, the apron middle part is equipped with central guiding hole, it has plugging cover or flexible nest of tubes to peg graft in the central guiding hole, apron bottom surface both sides respectively are equipped with the backup pad of a rubber material, the backup pad both sides respectively are equipped with an outer tube jack and inner tube jack. The utility model discloses with raise dust monitoring, automatic watering control of raise dust department, crime discernment and safety warning combine together, reduce the cost of labor, combine together with the wisdom building site, comprehensive management efficiency is higher.
Description
Technical Field
The utility model belongs to the technical field of the building and specifically relates to a building site intelligent monitoring box.
Background
The intelligent construction site is realized in the industry of the intelligent earth concept in the engineering field, and is a brand-new engineering full life cycle management concept. The wisdom building site is planted more high-tech technologies such as artificial wisdom, sensing technology, virtual reality in all kinds of objects such as building, machinery, personnel's wearing facility, place business turn over gateway to being generally interconnected, forming "thing networking", be in the same place with "internet" integration again, realize the integration of engineering management system people and engineering job site.
In the aspect of environmental monitoring, dust emission at construction sites is an important source of inhalable particulate pollution in urban areas, and is also one of important problems for common people to reflect air pollution. Many areas have been put forward detailed environmental protection standard to the particulate matter concentration of building site raise dust at present stage, also have proposed more strict monitoring requirement to the granule monitoring of building site raise dust simultaneously. At present building site raise dust detects the generally simple particulate matter that carries on and detects, and the manual work that removes dust also is simple is sprinkled water and is removed dust, and safe control etc. all are simple settings, can't follow scientific and technological progress and wisdom building site and combine together, and the technique is old, leads to manpower and materials administrative cost can't obtain effectual decline.
SUMMERY OF THE UTILITY MODEL
The isolated problem that has the unable development demand at present of adaptation to the present existence of various equipment on present site, the utility model provides a building site intelligent monitoring box can combine multiple equipment, reduces manpower and materials cost.
The utility model provides a technical scheme that its technical problem adopted is:
the utility model provides a building site intelligent monitoring box, includes box down, is equipped with a median septum in the middle part of the box under the place, the median septum will be box down and divide into upper strata and lower floor, a water pump has been placed to the lower floor, the median septum middle part is equipped with a heavy groove, and the upper strata of box down is equipped with the upper cover, the upper cover is including the apron, the apron middle part is equipped with central guiding hole, it has plugging cover or flexible nest of tubes to peg graft in the central guiding hole, apron bottom surface both sides respectively are equipped with the backup pad of a rubber material, the backup pad both sides respectively are equipped with an outer tube jack and inner tube jack.
Furthermore, the plugging cover comprises an upper plate, a middle plate and a lower plate, wherein the upper plate and the lower plate are connected to two sides of the middle plate respectively, and a plugging hole matched with the outer pipe in size is formed in the plugging cover.
Further, the size of well board matches with the size of central guiding hole, and well board size is less than the size of upper plate and lower plate, the size of upper plate matches with the size of sink.
Further, the telescopic tube set comprises an outer tube, an inner tube and an adjusting knob, wherein the adjusting knob can enable the inner tube to slide along the outer tube and be positioned at one position on the outer tube.
Furthermore, a camera is arranged on the telescopic pipe group and connected with a control panel.
Furthermore, a support rod is arranged on the ground of the isolation area, a proximity switch is mounted on the support rod, and the proximity switch is connected with the control panel.
Further, the lower box downside is equipped with inlet tube and a plurality of apopore, and wherein the inlet tube is connected with the water pump, and the water pump is connected with the apopore through many branch pipes.
Further, when the lower box is assembled with the upper cover, the sinking groove is positioned right below the central guide hole of the upper cover.
Furthermore, the middle partition board is a hollow board, and a control board, various control wires and power wires are placed in the middle partition board.
Furthermore, a gap is arranged among the outer tube insertion hole, the inner tube insertion hole and the cover plate.
The utility model has the advantages that: the utility model discloses with raise dust monitoring, automatic watering control of raise dust department, crime discernment and safety warning combine together, reduce the cost of labor, combine together with the wisdom building site, comprehensive management efficiency is higher.
Drawings
Fig. 1 is a schematic three-dimensional structure of the present invention;
FIG. 2 is a schematic three-dimensional view of a closure cap;
fig. 3 is an exploded view of the present invention;
FIG. 4 is a front view of the upper cover;
FIG. 5 is a schematic view of the usage state of the present invention;
FIG. 6 is a partial cross-sectional view of the present invention in use;
fig. 7 is a schematic view of the safety warning mechanism.
In the figure: 1 lower box, 11 lower box body, 12 water inlet pipe, 13 water outlet hole, 14 middle partition board, 15 sink groove, 2 monitor, 3 upper cover, 31 cover board, 32 center guide hole, 33 support board, 34 outer pipe jack, 35 inner pipe jack, 36 gap,
4 plugging covers, 41 upper plates, 42 middle plates, 43 lower plates, 44 plug holes,
5 telescopic pipe group, 51 outer pipe, 52 inner pipe,
6 isolation area ground, 61 support pole, 62 proximity switch.
Detailed Description
As shown in figures 1 to 7, a building site intelligent monitoring box, including lower box 1, the box middle part is equipped with a median septum under the place, the median septum will be lower box 1 and divide into upper strata and lower floor, and wherein the upper strata is used for placing various accessories, and flexible nest of tubes 5 and monitor 2 etc. have placed a water pump on the lower floor, and the water pump is used for spraying water the use to the raise dust.
The lower box downside is equipped with inlet tube 12 and a plurality of apopore 13, and wherein the water intake connection has the water pump, and the water pump is connected with the apopore through many minutes pipe, and the apopore can connect the branch pipe and lead to dust department.
The scheme is refined, the middle partition board is a hollow board, and a control board, various control wires, power wires and the like are placed in the middle partition board.
In at least one embodiment, the middle partition plate is provided with a sink groove 15 in the middle, and the sink groove is positioned right below the central guide hole 32 of the upper cover 3 when the lower box and the upper cover are assembled together.
In at least one embodiment, the upper cover 3 includes a cover plate 32, a central guide hole 32 is formed in the middle of the cover plate, a plugging cover 4 or a telescopic pipe set 5 can be inserted into the central guide hole, support plates 33 made of rubber are respectively disposed on two sides of the bottom surface of the cover plate, an outer pipe insertion hole 34 and an inner pipe insertion hole 35 are respectively disposed on two sides of the support plates 33, and a gap 36 is formed between the outer pipe insertion hole, the inner pipe insertion hole and the cover plate to facilitate insertion of the pipe set.
In some embodiments, the blocking cover comprises an upper plate 41, a middle plate 42 and a lower plate 43, the middle plate is connected to the upper plate and the lower plate, and the blocking cover is provided with a plug hole 44 matching with the outer tube in size. Wherein the size of the middle plate is matched with the size of the central guide hole, and the size of the middle plate is smaller than the sizes of the upper plate and the lower plate.
The scheme refines, the size of the upper plate matches with the size of the sink.
The telescoping tube set 5 includes an outer tube 51, an inner tube 52, and an adjustment knob that allows the inner tube to slide along the outer tube and be positioned at a location on the outer tube.
Working method, when we need monitor the raise dust, place this building site intelligent monitoring box in the place back that needs the monitoring, take off the upper cover, the back reverse installation is in the heavy groove down after pulling down the capping that covers on, make upper plate and heavy groove cooperate, then it has outer tube 51 to peg graft in the spliced eye, then the pipe passes the center guiding hole of upper cover, make the vertical setting of outer tube, then assemble flexible nest of tubes, install monitor 2 directly over flexible nest of tubes. Meanwhile, the water inlet pipe is connected with a water faucet, and the water outlet hole is connected with a place needing to clean the flying dust through a water distribution pipe. When the monitor detects too many particles, the control panel control water pump makes the distributive pipe go out water and spray. Wherein the distributive pipe end connection has the automatic sprinkler in meadow, and this automatic sprinkler in meadow 360 rotatory is by the wide application, can adopt the brand for the fruit Ru for this kind of sprinkler of goods number 156413480344574, can be equipped with wireless output and wireless receiving module on wherein the control panel for the transmission signal gives remote control ware, realizes thing networking communication. Wherein the remote controller is a computer.
Furthermore, a camera is arranged on the telescopic pipe set. The camera is connected with a control panel. The camera is used for monitoring people at the position, and criminals are prevented from working on the site through face recognition.
The scheme is optimized, a support rod 61 is arranged on the ground 6 of the isolation area, a proximity switch 62 is installed on the support rod, and the proximity switch is connected with the control panel. If someone is close to the danger area, until being close to proximity switch, proximity switch signals for the control panel, and control panel control loudspeaker remind personnel to keep away from the isolation region.
The isolation zones may be large machinery work sites that are in operation or high-rise building window edges and other hazardous areas.
In addition to the technical features described in the specification, the technology is known to those skilled in the art.
Claims (10)
1. The utility model provides a building site intelligent monitoring box, its characterized in that, includes box down, is equipped with a median septum at the box middle part under the place, the median septum will be box down and divide into upper strata and lower floor, a water pump has been placed to the lower floor, the median septum middle part is equipped with a heavy groove, and the upper strata of box down is equipped with the upper cover, the upper cover is including the apron, the apron middle part is equipped with central guiding hole, it has plugging cover or flexible nest of tubes to peg graft in the central guiding hole, apron bottom surface both sides respectively are equipped with the backup pad of a rubber material, the backup pad both sides respectively are equipped with an outer tube jack and inner tube jack.
2. The intelligent monitoring box for construction site according to claim 1, wherein the blocking cover comprises an upper plate, a middle plate and a lower plate, the upper plate and the lower plate are connected to two sides of the middle plate respectively, and the blocking cover is provided with a plug hole matched with the size of the outer pipe.
3. The intelligent monitoring box for construction site according to claim 2, wherein the size of the middle plate is matched with the size of the central guide hole, the size of the middle plate is smaller than the sizes of the upper plate and the lower plate, and the size of the upper plate is matched with the size of the sink.
4. The worksite smart monitoring cartridge of claim 1, wherein the telescoping tube set comprises an outer tube, an inner tube, and an adjustment knob that enables the inner tube to slide along the outer tube and be positioned at a location on the outer tube.
5. The intelligent building site monitoring box according to claim 4, wherein a camera is arranged on the telescopic pipe group, and a control panel is connected with the camera.
6. The intelligent monitoring box for construction sites according to claim 5, wherein a support rod is arranged on the ground of the isolation area, a proximity switch is mounted on the support rod, and the proximity switch is connected with the control panel.
7. The intelligent monitoring box for construction sites according to claim 1, wherein a water inlet pipe and a plurality of water outlet holes are arranged on the lower side of the lower box, wherein the water inlet pipe is connected with a water pump, and the water pump is connected with the water outlet holes through a plurality of branch pipes.
8. The intelligent worksite monitoring box of claim 1, wherein the sink is positioned directly below a central guide hole of the upper cover when the lower box and the upper cover are assembled together.
9. The intelligent monitoring box for construction sites according to claim 1, wherein the middle partition board is a hollow board, and a control board and various control lines and power lines are placed in the middle partition board.
10. The intelligent worksite monitoring box according to claim 1, wherein a gap is formed among the outer tube insertion hole, the inner tube insertion hole and the cover plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020068606.XU CN211402058U (en) | 2020-01-13 | 2020-01-13 | Building site intelligent monitoring box |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020068606.XU CN211402058U (en) | 2020-01-13 | 2020-01-13 | Building site intelligent monitoring box |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211402058U true CN211402058U (en) | 2020-09-01 |
Family
ID=72209244
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020068606.XU Active CN211402058U (en) | 2020-01-13 | 2020-01-13 | Building site intelligent monitoring box |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211402058U (en) |
-
2020
- 2020-01-13 CN CN202020068606.XU patent/CN211402058U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102166681B1 (en) | Clean load system with remote control function | |
CN103775099A (en) | 3+X urban main pipe network system | |
CN108636641A (en) | A kind of system and its construction method for removing haze to construction site depositing dust | |
CN210145725U (en) | Automatic spraying and dust falling system for construction site | |
CN211402058U (en) | Building site intelligent monitoring box | |
CN208294555U (en) | A kind of Tunnel Engineering dust-extraction unit | |
CN215675014U (en) | Dust removal and purification device of high-pressure water spraying street lamp system | |
CN207011403U (en) | A kind of farmland cycles, economized irrigation system of remote control | |
CN208991303U (en) | A kind of property information Show board cleaning plant | |
CN213872482U (en) | Wisdom street lamp with environment monitoring function | |
CN207571542U (en) | A kind of underground coal mine exploiting field disperses draining Automatic monitoring systems | |
CN205922279U (en) | Energy -conserving long -range irrigation system | |
CN218757715U (en) | Ecological city green building structure of building engineering | |
CN207516798U (en) | Intelligent pumping station control system | |
CN205816374U (en) | A kind of purging system | |
CN211091089U (en) | Prevent pipe blockage intelligence irrigation system | |
CN211312387U (en) | Watering lorry with pedestrian protection function | |
CN211646215U (en) | Cleaning device for outdoor street lane, high-rise outer wall or glass curtain wall | |
CN214680765U (en) | Public space disinfection and epidemic prevention's haze dust fall system that removes | |
CN218295628U (en) | Water conservancy construction is with illumination fixing device that is under construction night | |
CN216088065U (en) | Afforestation engineering's curing means | |
CN210076026U (en) | Three-dimensional computer lab of liquid manure medicine integration | |
CN211403229U (en) | Intelligent building automatic control system | |
CN212985295U (en) | Mining fire early warning monitoring system | |
CN216050039U (en) | Movable low-energy-consumption temporary monitoring system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder |
Address after: Room 201, East Tower, 2nd floor, building 8, Shuntai Plaza, 2000 Shunhua Road, Jinan City, Shandong Province Patentee after: Shandong Renke measurement and Control Technology Co.,Ltd. Address before: 2-301, building 1, Gaoxin business port, 67-1 Huayang Road, Lixia District, Jinan City, Shandong Province Patentee before: Shandong Renke measurement and Control Technology Co.,Ltd. |
|
CP02 | Change in the address of a patent holder |