CN211396711U - Building engineering arresting net - Google Patents
Building engineering arresting net Download PDFInfo
- Publication number
- CN211396711U CN211396711U CN201922411223.8U CN201922411223U CN211396711U CN 211396711 U CN211396711 U CN 211396711U CN 201922411223 U CN201922411223 U CN 201922411223U CN 211396711 U CN211396711 U CN 211396711U
- Authority
- CN
- China
- Prior art keywords
- frame
- spring
- barrier net
- bracing piece
- fixing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 claims abstract description 11
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims abstract description 6
- 235000017491 Bambusa tulda Nutrition 0.000 claims abstract description 6
- 241001330002 Bambuseae Species 0.000 claims abstract description 6
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims abstract description 6
- 239000011425 bamboo Substances 0.000 claims abstract description 6
- 230000004888 barrier function Effects 0.000 claims description 27
- 238000010276 construction Methods 0.000 claims description 5
- 238000010586 diagram Methods 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000013016 damping Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
Images
Landscapes
- Building Environments (AREA)
Abstract
The utility model discloses a building engineering arresting net, including frame and bracing piece, the frame bottom is equipped with the bottom plate, the inboard sliding connection of frame arresting net fixing device, arresting net fixing device bottom butt spring two, two bottom fixed connection of spring are on the bottom plate, a plurality of arresting net units of connecting through bolt fixed on the arresting net fixing device, bracing piece top fixed connection is in the frame bottom, the installation section of thick bamboo is worn to establish by the bracing piece bottom, the inboard bottom fixed connection spring one of installation section of thick bamboo, the spring is one set to be established in the bracing piece bottom, the fixed baffle of establishing on the bracing piece of the fixed cover of a spring top butt. Compared with the prior art, the utility model the advantage lie in: the utility model discloses not only have outstanding buffer capacity, still make things convenient for the dismantlement and the change of arresting net.
Description
Technical Field
The utility model relates to a building engineering field specifically is a building engineering arresting net.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. The house building is characterized by comprising a top cover, a beam column, a wall, a foundation and a project which can form an internal space and meet the requirements of people on production, living, study and public activities. In the building site, can use a large amount of building arresting nets, these arresting nets mainly prevent in the work progress, thereby have the heavy object to fall from the eminence and injure the people by a crashing object, also can alleviate the injury that someone accident fell building and received.
The existing building engineering arresting net is mostly provided with a plurality of supporting rods, the arresting net is tied at the top ends of the supporting rods, the damping capacity of the arresting net is too poor, the impact force generated by falling cannot be counteracted, in addition, the arresting nets are used as positive pieces, once a gap is formed in a certain position, the whole arresting net needs to be completely replaced, and a large amount of money can be wasted.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome above technical defect, provide a building engineering arresting net that buffer capacity is outstanding, convenient change.
In order to solve the above problem, the technical scheme of the utility model is that: the utility model provides a building engineering blocks net, includes frame and bracing piece, the frame bottom is equipped with the bottom plate, the inboard sliding connection of frame blocks net fixing device, block net fixing device bottom butt spring two, two bottom fixed connection of spring are on the bottom plate, block and go up through a plurality of block net units of bolt fixed connection on the net fixing device, bracing piece top fixed connection is in the frame bottom, an installation section of thick bamboo is worn to establish by the bracing piece bottom, the inboard bottom fixed connection spring one of an installation section of thick bamboo, the spring is one set and is established in the bracing piece bottom, the fixed baffle of establishing on the bracing piece of the top butt of spring.
As an improvement, the arresting net fixing device is formed by connecting a plurality of fixing units, the fixing units are of square structures, the middle parts of the fixing units are communicated, the peripheries of the tops of the fixing units are hinged with cover plates, first threaded holes are formed in the cover plates, and sliding blocks are arranged on the outer sides of the fixing units.
As an improvement, the barrier net unit comprises a square frame, a plurality of threaded holes II are formed in the frame, and a plurality of elastic ropes which are vertically crossed are arranged in the frame.
As an improvement, the frame is provided with a plurality of sliding grooves, and the sliding grooves are matched with the sliding blocks.
As an improvement, the cover plate is covered with a rubber pad.
Compared with the prior art, the utility model the advantage lie in:
impact force when falling can be relieved through the first spring and the second spring, equipment below the arresting net can be protected, personnel falling accidentally can also be protected, and the arresting net unit can be conveniently detached and replaced through the cover plate and the bolts. The utility model discloses not only have outstanding buffer capacity, still make things convenient for the dismantlement and the change of arresting net.
Drawings
Fig. 1 is a plan view of the present invention.
Fig. 2 is a front view of the present invention.
Fig. 3 is a structural view of the frame of the present invention.
Fig. 4 is a structural view of the fixing unit of the present invention.
Fig. 5 is a block diagram of the barrier net unit of the present invention.
Fig. 6 is a partial installation state diagram of the present invention.
As shown in the figure: 1. the device comprises a frame, 2, a fixing unit, 3, a barrier net fixing device, 4, a cover plate, 4.1, a first threaded hole, 5, a barrier net unit, 5.1, a frame, 5.2, an elastic rope, 5.3, a second threaded hole, 6, a bolt, 7, a sliding block, 8, a sliding groove, 9, a supporting rod, 10, a first spring, 11, a baffle, 12, an installation cylinder, 13, a bottom plate, 14 and a second spring.
Detailed Description
The following describes the present invention with reference to the accompanying drawings. In which like parts are designated by like reference numerals.
It should be noted that the terms "front," "back," "left," "right," "upper" and "lower" used in the following description refer to directions in the drawings, and the terms "inner" and "outer" refer to directions toward and away from, respectively, the geometric center of a particular component.
In order to make the content of the present invention more clearly understood, the technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the attached drawings in the embodiment of the present invention.
As shown in fig. 1 to 6, a building engineering barrier net comprises a frame 1 and a support rod 9, wherein a bottom plate 13 is arranged at the bottom of the frame 1, the inner side of the frame 1 is connected with a barrier net fixing device 3 in a sliding manner, a second spring 14 is abutted to the bottom of the barrier net fixing device 3, the bottom end of the second spring 14 is fixedly connected to the bottom plate 13, the barrier net fixing device 3 is fixedly connected with a plurality of barrier net units 5 through bolts 6, the top end of the support rod 9 is fixedly connected to the bottom of the frame 1, an installation cylinder 12 is arranged at the bottom end of the support rod 9 in a penetrating manner, a first spring 10 is fixedly connected to the inner bottom of the installation cylinder 12, the first spring 10 is sleeved at the bottom end of the support rod 9, and a baffle 11 fixedly arranged on.
The barrier net fixing device 3 is formed by connecting a plurality of fixing units 2, the fixing units 2 are of a square structure, the middle of each fixing unit 2 is communicated, the cover plate 4 is hinged to the periphery of the top of each fixing unit 2, a threaded hole I4.1 is formed in the cover plate 4, a sliding block 7 is arranged on the outer side of each fixing unit 2, each barrier net unit 5 comprises a square frame 5.1, a plurality of threaded holes II 5.3 are formed in the frame 5.1, a plurality of perpendicularly crossed elastic ropes 5.2 are arranged in the frame 5.1, a plurality of sliding grooves 8 are formed in the frame 1, the sliding grooves 8 are matched with the sliding blocks 7, and a rubber pad covers the cover plate 4.
In a specific use, the mounting cylinder 12 is buried in the ground, the cover plate 4 is opened, the threaded hole two 5.3 and the threaded hole one 4.1 in the barrier net unit 5 are aligned, the barrier net unit 5 is fixedly connected to the barrier net fixing device 3 through the bolt 6, the sliding block 7 on the barrier net fixing device 3 is mounted in the sliding groove 8, the top end of the spring two 14 is fixedly connected to the bottom of the barrier net fixing device 3, and the device is erected and moved to equipment needing to be protected or a designated position.
When a heavy object falls on the device, the first spring 10 is pressed downwards by the support rod 9 to deform so as to offset a part of impact force, and the second spring 14 also deforms so as to offset a part of impact force.
When the arresting net is damaged, the arresting net unit 5 at the damaged position is taken down from the arresting net fixing device 3 in a whole block according to the damaged position, namely the bolt 6 is screwed out, the cover plate 4 is opened, and the arresting net unit 5 is taken out and replaced.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.
Claims (5)
1. A building engineering arresting net, includes frame (1) and bracing piece (9), its characterized in that: the utility model discloses a barrier net, including frame (1), inboard sliding connection barrier net fixing device (3), barrier net fixing device (3) bottom butt spring two (14), spring two (14) bottom fixed connection is on bottom plate (13), go up through a plurality of barrier net units of bolt (6) fixed connection (5) on barrier net fixing device (3), bracing piece (9) top fixed connection is in frame (1) bottom, installation section of thick bamboo (12) are worn to establish in bracing piece (9) bottom, installation section of thick bamboo (12) inboard bottom fixed connection spring (10), spring (10) cover is established in bracing piece (9) bottom, baffle (11) on bracing piece (9) are established to spring (10) top butt fixed cover.
2. A construction barrier net according to claim 1, wherein: the barrier net fixing device (3) is formed by connecting a plurality of fixing units (2), each fixing unit (2) is of a square structure, the middle of each fixing unit is communicated with the corresponding middle of each fixing unit, the periphery of the top of each fixing unit (2) is hinged to the corresponding cover plate (4), each cover plate (4) is provided with a first threaded hole (4.1), and the outer side of each fixing unit (2) is provided with a sliding block (7).
3. A construction barrier net according to claim 1, wherein: the barrier net unit (5) comprises a square frame (5.1), a plurality of threaded holes II (5.3) are formed in the frame (5.1), and a plurality of elastic ropes (5.2) which are vertically crossed are arranged in the frame (5.1).
4. A construction barrier net according to claim 1 or claim 2, wherein: a plurality of sliding grooves (8) are formed in the frame (1), and the sliding grooves (8) are matched with the sliding blocks (7).
5. A construction barrier net according to claim 2, wherein: the cover plate (4) is covered with a rubber pad.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922411223.8U CN211396711U (en) | 2019-12-28 | 2019-12-28 | Building engineering arresting net |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922411223.8U CN211396711U (en) | 2019-12-28 | 2019-12-28 | Building engineering arresting net |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211396711U true CN211396711U (en) | 2020-09-01 |
Family
ID=72229911
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922411223.8U Active CN211396711U (en) | 2019-12-28 | 2019-12-28 | Building engineering arresting net |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211396711U (en) |
-
2019
- 2019-12-28 CN CN201922411223.8U patent/CN211396711U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103696498B (en) | Easily steel hetermorphiscal column-center support is repaired after a kind of shake | |
CN103711215B (en) | Easily steel shaped pile frame-accentric support frame is repaired after a kind of shake | |
CN103140150A (en) | Impact resistant structure | |
CN103669567B (en) | Easily steel hetermorphiscal column-prestressing force accentric support frame is repaired after a kind of shake | |
CN109778898A (en) | A kind of novel tower crane pile foundation cushion cap | |
CN103498515A (en) | Mild steel damper for included angle position or column foot position of beam column node | |
CN111911205A (en) | Coal mining roadway supporting device with damping and buffering effects | |
CN202809885U (en) | Energy dissipation wall structure | |
CN203626278U (en) | Protective structure for construction of internal core tube of high-rise building | |
CN105178509A (en) | Damage controllable and seismic damage repairable steel column | |
CN211396711U (en) | Building engineering arresting net | |
CN211449511U (en) | Transmission tower damping device | |
CN209837869U (en) | Construction guardrail | |
CN214144658U (en) | Elevator protector for building engineering | |
CN103669722B (en) | Steel Framed Structure with Special-Shaped Columns suspension column is easily repaired after a kind of shake | |
CN113699875A (en) | Super high shock attenuation pier structure of nearly fault railway | |
CN213358929U (en) | Novel steel construction building convenient to connect | |
CN204663099U (en) | Deck, Novel helicopter apron | |
CN205330195U (en) | Safety device of outer wall scaffold | |
CN203684075U (en) | Box-shaped steel bridge pier with root portion provided with stiffening energy dissipation wall plates | |
CN202990386U (en) | Externally-suspended scaffold | |
CN206279844U (en) | A kind of antidetonation formed steel construction | |
CN204898509U (en) | Box steel bridge mound of bucking power consumption structure is prevented in root setting | |
CN213330133U (en) | House building engineering protection device | |
CN215057266U (en) | Portable undercarriage of standing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: No. 220, No. 9 Yingbin Road, Huiji District, Zhengzhou City, Henan Province, 450000 Patentee after: Henan Shangjin Construction and Development Co.,Ltd. Address before: No. 220, No. 9 Yingbin Road, Huiji District, Zhengzhou City, Henan Province, 450000 Patentee before: Henan Shangjin Greening Engineering Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |