CN211373940U - Wall body infiltration detection device for project supervision - Google Patents

Wall body infiltration detection device for project supervision Download PDF

Info

Publication number
CN211373940U
CN211373940U CN202020033446.5U CN202020033446U CN211373940U CN 211373940 U CN211373940 U CN 211373940U CN 202020033446 U CN202020033446 U CN 202020033446U CN 211373940 U CN211373940 U CN 211373940U
Authority
CN
China
Prior art keywords
sucking disc
spray
vacuum
pipe
disc subassembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020033446.5U
Other languages
Chinese (zh)
Inventor
王帅
王震
胡永超
李军业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020033446.5U priority Critical patent/CN211373940U/en
Application granted granted Critical
Publication of CN211373940U publication Critical patent/CN211373940U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

Engineering is managed and is used wall body infiltration detection device, including left sucking disc subassembly, right sucking disc subassembly, the vacuum pump, spray pump and spray pipe, left side sucking disc subassembly and right sucking disc subassembly front side are adsorbed at the wall body surface and are located same height, spray pipe both ends upper portion all fixes and is equipped with a bridging piece, two bridging pieces articulate respectively on left sucking disc subassembly and right sucking disc subassembly, the spray pipe is along controlling the direction level setting, the spray pipe front side evenly is equipped with a plurality of shower nozzle along length direction, the direction of shower nozzle water spray is all inclined downwards towards the wall body surface, the shutoff of spray pipe both ends, spray pipe rear side middle part is equipped with water pipe head, the export of spray pump passes through high-pressure hose and water pipe head is connected, the vacuum pump passes through gas hose and is connected with the rear end of left sucking disc subassembly and right. The utility model relates to a novelty, the principle science, simple structure is convenient for realize, convenient operation, and fail safe nature is strong, and the cover face that detects is big, and the infiltration testing result is accurate.

Description

Wall body infiltration detection device for project supervision
Technical Field
The utility model belongs to the technical field of building engineering detects, concretely relates to engineering is managed and is used wall body infiltration detection device.
Background
The important index of the quality of the building during the waterproof performance of the outer wall of the building plays an important role in the construction process of the quality of the building engineering for supervision personnel, and after the construction of the building is completed, the outer wall of the building is subjected to water seepage detection. The prior art often detects when the outer wall detects the infiltration with the help of raining, has great contingency like this, and first of all, sometimes during the rainy wind sometimes there is not wind or breeze, and the rainwater is also big or small, and the wind direction is also indefinite, consequently leans on the rain to carry out comprehensive, thorough detection to the building outer wall. Also adopt the water pipe to spray water and detect the outer wall, see whether the inner wall of outer wall has the infiltration condition, nevertheless because the outer wall generally adopts the aluminum mould board to pour, relatively smooth, difficult fixed to the water pipe, adopt one or several water pipes to spray water to the wall body in addition, the water spray is also uneven, extravagant more water resource.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a solve the weak point among the prior art, provide one kind and can fix on the outer wall surface, be convenient for get put, the even engineering of water spray is managed and is used wall body infiltration detection device.
In order to solve the technical problem, the utility model adopts the following technical scheme: engineering is managed and is used wall body infiltration detection device, including left sucking disc subassembly, right sucking disc subassembly, the vacuum pump, spray pump and spray pipe, left side sucking disc subassembly and right sucking disc subassembly front side are adsorbed at the wall body surface and are located same height, spray pipe both ends upper portion all fixes and is equipped with a bridging piece, two bridging pieces articulate respectively on left sucking disc subassembly and right sucking disc subassembly, the spray pipe is along controlling the direction level setting, the spray pipe front side evenly is equipped with a plurality of shower nozzle along length direction, the direction of shower nozzle water spray is all inclined downwards towards the wall body surface, the shutoff of spray pipe both ends, spray pipe rear side middle part is equipped with water pipe head, the export of spray pump passes through high-pressure hose and water pipe head is connected, the vacuum pump passes through gas hose and is connected with the rear end of left sucking disc subassembly and right.
The left sucker component and the right sucker component have the same structure; the left sucker component comprises a vacuum sucker, a connecting pipe, a sealing ring, a nut and a baffle plate, the front side of the vacuum sucker is open, the central part of the rear side of the vacuum sucker is provided with an internal thread hole, the left end of the connecting pipe is integrally provided with a retaining ring, the front side part of the excircle of the connecting pipe is provided with an external thread, the internal thread hole of the vacuum sucker and the nut are in threaded connection with the excircle of the connecting pipe, the central front side wall of the vacuum sucker is in top pressure contact with the retaining ring, the sealing ring is sleeved on the connecting pipe and is positioned between the vacuum sucker and the nut, the nut is in pressure connection with the rear end of the vacuum sucker through the sealing ring, the baffle plate is fixedly; the suction port of the vacuum pump is connected with a three-way pipe, and the air pipe joint of the left sucker assembly and the air pipe joint of the right sucker assembly are respectively connected with two interfaces of the three-way pipe through an air hose.
The vacuum chuck is made by rubber, and the vacuum chuck is circular cone tubular structure, and vacuum chuck's anterior uncovered limit is bent and is formed ring structure, and vacuum chuck's inner wall is equipped with a plurality of and is the interior reinforcing bar of annular along the circumferencial direction, and vacuum chuck's outer wall is equipped with a plurality of outer reinforcing bars along the generating line direction interval.
The hanging piece comprises a hanging rod, the upper end of the hanging rod is bent to form a hook, the opening of the hook is hinged and is provided with an anti-falling rod through a torsional spring, the anti-falling rod is inclined and arranged, the upper end of the anti-falling rod is matched with the inner side wall of the end part of the hook in a compression joint mode, and the lower end of the hanging rod is connected with the upper portion of the spray pipe through.
The upper part of the baffle is connected with a safety rope.
Adopt above-mentioned technical scheme, the utility model discloses when the work is used, on will hanging two union pieces respectively to two connecting pipes earlier, the operator adsorbs two vacuum chuck to the upper portion of wall body outer wall, opens the vacuum pump simultaneously, and the vacuum pump carries out the evacuation through three-way pipe, two gas hose and connecting pipe to the closed chamber that forms between two vacuum chuck and the wall body outer wall, and under the effect of atmospheric pressure, two vacuum chuck are firmly adsorbed on the wall body outer wall. And then starting a water spray pump, pumping clear water of a construction site by the water spray pump to supply water for the water spray pipe through a high-pressure hose, spraying water to the outer wall of the wall body by a spray head arranged on the water spray pipe, uniformly covering the outer wall of the wall body by the sprayed water and flowing downwards, after the water spray operation is carried out for a period of time, checking a water spraying area of the inner wall of the wall body indoors by a manager, recording the condition of water seepage at a certain position, and requesting a construction party to carry out waterproof treatment, wherein if the condition of water seepage is not found indoors, the construction quality of the construction party is qualified.
When the detection operation is carried out, the spray pipes with different lengths can be replaced, and preferably, the length of the spray pipes is basically consistent with the width of the wall body, so that the vacuum suction cups can be installed at one time. If the length of the water spraying pipe is smaller than the width of the wall body, after the water seepage of one breadth is detected, the vacuum pump and the water spraying pump are closed, the two vacuum suction cups are horizontally moved, and the water spraying detection is carried out on the next breadth according to the working process.
The spray pipe is positioned below the left sucker component and the right sucker component, so that water sprayed by the spray head cannot be sprayed onto the vacuum sucker.
The vacuum pump is continuously operated to ensure that the air pressure inside the vacuum chuck is stabilized within a range, thus ensuring the stability of the spray pipe.
The baffle plays the position of injecing the couple, avoids the couple unhook in front and back direction. The anti-drop pole is under the effect of torsional spring, with the opening shutoff of couple, avoids the couple to unhook in upper and lower direction like this.
The vacuum chuck of left sucking disc subassembly and right sucking disc subassembly adopts threaded connection's mode with the connecting pipe, the equipment of being convenient for like this, and vacuum chuck damages the back, can change vacuum chuck alone. The nut compresses tightly the rear end of the vacuum chuck through the sealing ring, so that the sealing performance of the vacuum chuck is improved.
The vacuum chuck is made of rubber and has good flexibility, which helps to form negative pressure inside the vacuum chuck. The inner reinforcing strip and the outer reinforcing strip play a role in the strength of the vacuum chuck, and the vacuum chuck is prevented from being sucked flat by negative pressure.
In order to ensure the safety of wall body water seepage detection operation, a safety rope is connected to each baffle, so that the vacuum sucker falls off in case of failure of the vacuum pump, and the water spray pipe can be prevented from falling to the ground and being damaged, and even people or other objects below the water spray pipe are hit.
To sum up, the utility model relates to a novelty, the principle science, simple structure is convenient for realize, convenient operation, and fail safe nature is strong, and the cover area that detects is big, and the infiltration testing result is accurate.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a cross-sectional view A-A of FIG. 1;
fig. 3 is a side view of the hanger of fig. 2.
Detailed Description
As shown in figure 1, figure 2 and figure 3, the wall seepage detection device for engineering supervision of the utility model comprises a left sucker component 1, a right sucker component 2, a vacuum pump, a water spray pump and a water spray pipe 3, wherein the front sides of the left sucker component 1 and the right sucker component 2 are adsorbed on the outer surface of the wall and are positioned at the same height, the upper parts of the two ends of the water spray pipe 3 are respectively fixedly provided with a hanging piece 4, the two hanging pieces 4 are respectively hung on the left sucker component 1 and the right sucker component 2, the water spray pipe 3 is horizontally arranged along the left and right direction, the front side of the water spray pipe 3 is uniformly provided with a plurality of spray heads 5 along the length direction, the water spray direction of the spray heads 5 is uniformly inclined downwards towards the outer surface of the wall (so as to avoid vertical impact on the surface of the wall and improve the downward flowing speed of the water spray), the two ends of the water spray pipe 3 are blocked, the middle part of the rear side of, the vacuum pump is connected with the rear ends of the left sucker component 1 and the right sucker component 2 through the gas hose 7. The vacuum pump and the water spray pump are conventional in the art, and the detailed construction is not described and not shown.
The left sucker component 1 and the right sucker component 2 have the same structure; the left sucker component 1 comprises a vacuum sucker 8, a connecting pipe 9, a sealing ring 10, a nut 11 and a baffle 12, the front side of the vacuum sucker 8 is open, the central part of the rear side of the vacuum sucker 8 is provided with an internal thread hole, the left end of the connecting pipe 9 is integrally provided with a retaining ring 13, the front side part of the excircle of the connecting pipe 9 is provided with an external thread, the internal thread hole of the vacuum sucker 8 and the nut 11 are in threaded connection with the excircle of the connecting pipe 9, the central front side wall of the vacuum sucker 8 is in jacking contact with the retaining ring 13, the sealing ring 10 is sleeved on the connecting pipe 9 and is positioned between the vacuum sucker 8 and the nut 11, the nut 11 is in compression connection with the rear end of the vacuum sucker 8 through the sealing ring 10, the baffle 12 is fixedly arranged at the upper part of the rear; the suction port of the vacuum pump is connected with a three-way pipe, and the air pipe joint of the left sucker component 1 and the air pipe joint of the right sucker component 2 are respectively connected with two interfaces of the three-way pipe through an air hose 7.
Vacuum chuck 8 is made by rubber, and vacuum chuck 8 is circular cone tubular structure, and vacuum chuck 8's anterior uncovered limit is bent and is formed the ring shaped structure, and vacuum chuck 8's inner wall is equipped with a plurality of and is annular interior reinforcing bar 14 along the circumferencial direction, and vacuum chuck 8's outer wall is equipped with a plurality of outer reinforcing bars 15 along the generating line direction interval.
The hanging piece 4 comprises a hanging rod 16, the upper end of the hanging rod 16 is bent to form a hook 17, an opening of the hook 17 is hinged and is provided with an anti-falling rod 18 through a torsion spring, the anti-falling rod 18 is obliquely arranged, the upper end of the anti-falling rod 18 is in compression joint with the inner side wall of the end part of the hook 17, and the lower end of the hanging rod 16 is connected with the upper part of the spray pipe 3 through a hinge.
The upper part of the baffle 12 is connected with a safety rope 19.
The utility model discloses when the work is used, on will hanging two link joint spare 4 respectively to two connecting pipes 9 earlier, the operator adsorbs two vacuum chuck 8 to the upper portion of wall body outer wall, opens the vacuum pump simultaneously, and the vacuum pump carries out the evacuation through the closed chamber that three-way pipe, two gas hose 7 and connecting pipe 9 formed between to two vacuum chuck 8 and the wall body outer wall, and under the effect of atmospheric pressure, two vacuum chuck 8 are adsorbed firmly on the wall body outer wall. And then starting a water spray pump, pumping clear water of a construction site by the water spray pump to supply water for a water spray pipe 3 through a high-pressure hose, spraying water to the outer wall of the wall body by a spray head 5 arranged on the water spray pipe 3, uniformly covering the outer wall of the wall body by the sprayed water and flowing downwards, after the water spray operation is carried out for a period of time, checking a water spraying area of the inner wall of the wall body indoors by a manager, recording to ask a construction party to carry out waterproof treatment if a water seepage condition is found at a certain position, and indicating that the construction quality of the construction party is qualified if water seepage is not found indoors.
When the detection operation is carried out, the spray pipes 3 with different lengths can be replaced, and preferably, the length of the spray pipes 3 is basically consistent with the width of the wall, so that the vacuum suction cups 8 can be installed at one time. If the length of the spray pipe 3 is smaller than the width of the wall body, after the water seepage of one breadth is detected, the vacuum pump and the spray pump are closed, the two vacuum suction cups 8 are horizontally moved, and the water spray detection is carried out on the next breadth according to the working process.
The water spray pipe is positioned below the left sucker component 1 and the right sucker component 2, so that water sprayed by the spray head 5 cannot be sprayed onto the vacuum sucker 8.
The vacuum pump is continuously operated to ensure that the air pressure inside the vacuum chuck 8 is stabilized within a range, thus ensuring the stability of the spout 3.
The baffle 12 serves to define the position of the hook 17 to prevent the hook 17 from unhooking in the front-rear direction. The anti-drop rod 18 plugs the opening of the hook 17 under the action of the torsion spring, so that the hook 17 is prevented from being unhooked in the vertical direction.
The vacuum chuck 8 of the left sucker component 1 and the right sucker component 2 and the connecting pipe 9 are in threaded connection, so that the vacuum chuck 8 can be replaced independently after the vacuum chuck 8 is damaged. The nut 11 compresses tightly the rear end of the vacuum chuck 8 through the sealing ring 10, and the sealing performance of the vacuum chuck 8 is improved.
The vacuum cup 8 is made of rubber and has a good flexibility, which helps to create a negative pressure inside the vacuum cup 8. The inner reinforcing strips 14 and the outer reinforcing strips 15 play a role in the strength of the vacuum chuck 8, and the vacuum chuck 8 is prevented from being sucked to be flat by negative pressure.
In order to ensure the safety of wall water seepage detection operation, each baffle 12 is connected with a safety rope 19, so that the vacuum sucker 8 can be prevented from falling off in case of failure of the vacuum pump, and the water spray pipe 3 can be prevented from falling to the ground to be damaged or even smashing people or other objects below.
The present embodiment is not intended to limit the shape, material, structure, etc. of the present invention in any form, and all of the technical matters of the present invention belong to the protection scope of the present invention to any simple modification, equivalent change and modification made by the above embodiments.

Claims (5)

1. Project is managed with wall body infiltration detection device, its characterized in that: including left sucking disc subassembly, right sucking disc subassembly, the vacuum pump, spray pump and spray pipe, left side sucking disc subassembly and right sucking disc subassembly front side are adsorbed and are being located same height at the wall body surface, spray pipe both ends upper portion all fixes and is equipped with a bridging piece, two bridging pieces articulate respectively on left sucking disc subassembly and right sucking disc subassembly, the spray pipe is along controlling the direction level setting, the spray pipe front side evenly is equipped with a plurality of shower nozzle along length direction, the equal oblique downward towards wall body surface of direction of shower nozzle water spray, the shutoff in spray pipe both ends, spray pipe rear side middle part is equipped with water pipe head, the export of spray pump passes through high-pressure hose and is connected with water pipe head, the vacuum pump passes through gas hose and is connected with the rear end of left sucking disc subassembly and right sucking disc.
2. The wall seepage detection device for the project supervision according to claim 1, characterized in that: the left sucker component and the right sucker component have the same structure; the left sucker component comprises a vacuum sucker, a connecting pipe, a sealing ring, a nut and a baffle plate, the front side of the vacuum sucker is open, the central part of the rear side of the vacuum sucker is provided with an internal thread hole, the left end of the connecting pipe is integrally provided with a retaining ring, the front side part of the excircle of the connecting pipe is provided with an external thread, the internal thread hole of the vacuum sucker and the nut are in threaded connection with the excircle of the connecting pipe, the central front side wall of the vacuum sucker is in top pressure contact with the retaining ring, the sealing ring is sleeved on the connecting pipe and is positioned between the vacuum sucker and the nut, the nut is in pressure connection with the rear end of the vacuum sucker through the sealing ring, the baffle plate is fixedly; the suction port of the vacuum pump is connected with a three-way pipe, and the air pipe joint of the left sucker assembly and the air pipe joint of the right sucker assembly are respectively connected with two interfaces of the three-way pipe through an air hose.
3. The wall seepage detection device for the project supervision according to claim 2, characterized in that: the vacuum chuck is made by rubber, and the vacuum chuck is circular cone tubular structure, and vacuum chuck's anterior uncovered limit is bent and is formed ring structure, and vacuum chuck's inner wall is equipped with a plurality of and is the interior reinforcing bar of annular along the circumferencial direction, and vacuum chuck's outer wall is equipped with a plurality of outer reinforcing bars along the generating line direction interval.
4. The wall seepage detection device for project supervision according to claim 1, 2 or 3, characterized in that: the hanging piece comprises a hanging rod, the upper end of the hanging rod is bent to form a hook, the opening of the hook is hinged and is provided with an anti-falling rod through a torsional spring, the anti-falling rod is inclined and arranged, the upper end of the anti-falling rod is matched with the inner side wall of the end part of the hook in a compression joint mode, and the lower end of the hanging rod is connected with the upper portion of the spray pipe through.
5. The wall seepage detection device for the project supervision according to claim 2 or 3, characterized in that: the upper part of the baffle is connected with a safety rope.
CN202020033446.5U 2020-01-08 2020-01-08 Wall body infiltration detection device for project supervision Expired - Fee Related CN211373940U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020033446.5U CN211373940U (en) 2020-01-08 2020-01-08 Wall body infiltration detection device for project supervision

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020033446.5U CN211373940U (en) 2020-01-08 2020-01-08 Wall body infiltration detection device for project supervision

Publications (1)

Publication Number Publication Date
CN211373940U true CN211373940U (en) 2020-08-28

Family

ID=72157207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020033446.5U Expired - Fee Related CN211373940U (en) 2020-01-08 2020-01-08 Wall body infiltration detection device for project supervision

Country Status (1)

Country Link
CN (1) CN211373940U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113959639A (en) * 2021-10-08 2022-01-21 上海豪米建设工程技术服务有限公司 Ultralow-energy-consumption building air tightness test method
CN115326678A (en) * 2022-08-31 2022-11-11 浙江一诚工程咨询有限公司 Building outer wall and window edge water seepage testing device for project supervision and control method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113959639A (en) * 2021-10-08 2022-01-21 上海豪米建设工程技术服务有限公司 Ultralow-energy-consumption building air tightness test method
CN113959639B (en) * 2021-10-08 2024-04-02 上海豪米建设工程技术服务有限公司 Ultra-low energy consumption building air tightness test method
CN115326678A (en) * 2022-08-31 2022-11-11 浙江一诚工程咨询有限公司 Building outer wall and window edge water seepage testing device for project supervision and control method

Similar Documents

Publication Publication Date Title
CN211373940U (en) Wall body infiltration detection device for project supervision
CN104688133B (en) A kind of glass cleaning device and its operation control method
CN209442451U (en) A kind of fire extinguisher canvas hose winding device
CN113686755A (en) Building outer wall and window limit infiltration testing arrangement for engineering supervision
CN209576132U (en) A kind of pulse environmental protection deduster
CN206108460U (en) Bag wraps dust collector of unloading
CN211144563U (en) Air dust collector for coal mining
CN208984293U (en) A kind of hydrostatic test outside measurement tower that can dry gas cylinder
CN209338863U (en) A kind of hoisting clothes-horse with clamping plate
CN208039287U (en) Multi-functional water conservancy construction drainage arrangement
CN208152513U (en) Leveling device is caught up in a kind of bottom surface for building
CN208457214U (en) PE efficient water-saving valve
CN210978646U (en) Self-cleaning self-balancing panel turnover explosion-proof valve
CN208950318U (en) A kind of new mobile type air pressure grouter
CN221609457U (en) Hanging basket for building construction
CN206676568U (en) A kind of agricultural sprinkling irrigation equipment
CN206716642U (en) A kind of fume ducts inwall cleaner
CN220468936U (en) Well lid real-time monitoring early warning three-proofing equipment
CN215165303U (en) Rural hydraulic engineering dykes and dams curing device
CN221432015U (en) Fire hydrant detection structure for building fire fighting
CN220230847U (en) Gas cylinder gas tightness detects frock
CN220034243U (en) Water distribution device for constructed wetland
CN217930704U (en) Butyronitrile gloves capability test device
CN218028760U (en) Efficient irregular wall plastering tool
CN221350370U (en) Water spray terminal water test joint

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200828

Termination date: 20220108

CF01 Termination of patent right due to non-payment of annual fee