CN211369451U - Bearing frame for building construction - Google Patents

Bearing frame for building construction Download PDF

Info

Publication number
CN211369451U
CN211369451U CN201921660919.8U CN201921660919U CN211369451U CN 211369451 U CN211369451 U CN 211369451U CN 201921660919 U CN201921660919 U CN 201921660919U CN 211369451 U CN211369451 U CN 211369451U
Authority
CN
China
Prior art keywords
bracing piece
rod
pull rod
supporting
supporting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921660919.8U
Other languages
Chinese (zh)
Inventor
姚亚鹏
张良
王鑫
郑家欢
王彦辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921660919.8U priority Critical patent/CN211369451U/en
Application granted granted Critical
Publication of CN211369451U publication Critical patent/CN211369451U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a bear frame for construction, including first bracing piece, first pull rod, second bracing piece, under bracing dish, be provided with the go-between on the first bracing piece, the go-between is the disc, the circumference equipartition has the ring channel on the go-between. The utility model discloses pass through the screw thread with the under bracing dish and install on the bottom plate, the inserted block through both ends on the first pull rod is connected two adjacent first bracing pieces, extend to the outside in proper order as required, first bracing piece upper end is through connecting pipe installation second bracing piece, connect fixedly through the second pull rod between two adjacent second bracing pieces, upwards extend in proper order as required, when satisfying need, connect fixed last supporting disk on the second bracing piece of top, it is fixed to support the building, the standardization level that makes the installation improves, spare part can be classified and store, improve the convenience of storing, be convenient for move, can adjust as required, high durability and convenient use.

Description

Bearing frame for building construction
Technical Field
The utility model relates to a building tool field especially relates to a bear frame for construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. Need support the shaping to building subject in construction earlier stage, it is fixed to use the pipe strap to connect at present more, and stay tube length is longer, and the transport is inconvenient, supports the adjustment and fixed inconvenient to some positions, has brought the trouble for the construction.
SUMMERY OF THE UTILITY MODEL
The utility model discloses an aim at just lies in providing the bearing frame that is used for building construction in order to solve above-mentioned problem, the utility model discloses make the standardization level of installation improve, spare part can be classified and store, improves the convenience that stores, is convenient for move, can adjust convenient to use as required.
The utility model discloses a following technical scheme realizes above-mentioned purpose:
the bearing frame for building construction comprises a first support rod, a first pull rod, a second support rod and a lower support plate, wherein a connecting ring is arranged on the first support rod, the connecting ring is in a disc shape, annular grooves are uniformly distributed on the circumference of the connecting ring, an external thread is arranged at the upper end of the first support rod, an upper fixing plate is welded at the inner side of the first support rod, which is close to the external thread, a lower fixing plate is welded at the position far away from the upper fixing plate in the first support rod, the lower fixing plate is connected with the lower support plate, a connecting pipe is connected at the upper end of the first support rod, a round hole is arranged on the connecting pipe, penetrates through the connecting pipe, an internal thread is arranged in the connecting pipe, the second support rod is connected with the connecting pipe, the second support rod is in the same structure as the first support rod, and an, the first support rod and the second support rod are arranged at four positions, the first pull rod is connected between the connecting rings on the first support rod, the second pull rod is connected between the connecting rings on the second support rod, and the two ends of the first pull rod and the two ends of the second pull rod are provided with inserting blocks.
Further setting: the first support rod and the second support rod are in a circular tube shape, and the connecting ring is welded with the first support rod and the second support rod.
According to the arrangement, the weight of the first supporting rod and the weight of the second supporting rod are reduced in a circular tube shape, the carrying and the installation are convenient, and the welding strength is improved.
Further setting: the insert block is welded with the first pull rod and the second pull rod.
So set up, the welding improves the inserted block is in first pull rod, the fastness on the second pull rod.
Further setting: the insert block is 15-degree draft angle, and the shape of the insert block is the same as that of the annular groove.
So set up, be convenient for the inserted block with the ring channel is connected, makes first pull rod the installation of second pull rod is convenient.
Further setting: the first supporting rod is connected with the connecting pipe through the external thread and the internal thread.
So set up, through the connecting pipe is connected conveniently the support of not co-altitude building is satisfied in the extension of first bracing piece.
Further setting: the upper supporting disc is in threaded connection with the second supporting rod.
So set up, threaded connection is convenient for go up the supporting disk and carry out height control.
Compared with the prior art, the beneficial effects of the utility model are as follows:
install the bottom suspension dish on the bottom suspension board through the screw thread, the inserted block through both ends on the first pull rod is connected two adjacent first bracing pieces, extend to the outside in proper order as required, first bracing piece upper end is through connecting pipe installation second bracing piece, connect fixedly through the second pull rod between two adjacent second bracing pieces, upwards extend in proper order as required, when satisfying the needs, connect fixed last supporting disk on the second bracing piece of top, it is fixed to support the building, the standardization level that makes the installation improves, spare part can classify and store, improve the convenience of storing, be convenient for move, can adjust as required, high durability and convenient use.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
Fig. 1 is an isometric view of a carrier for use in construction according to the present invention;
fig. 2 is an isometric view of a first support bar of the carrier for construction of the present invention;
fig. 3 is a schematic front view of a first supporting rod of the bearing frame for building construction according to the present invention;
fig. 4 is a schematic view of the connecting pipe of the bearing frame for building construction of the present invention.
The reference numerals are explained below:
1. a first support bar; 2. a first pull rod; 3. inserting a block; 4. a connecting pipe; 5. a second support bar; 6. an upper support tray; 7. a second pull rod; 8. a lower support disc; 9. a connecting ring; 10. an annular groove; 11. an external thread; 12. a circular hole; 13. an internal thread; 14. a lower fixing plate; 15. and an upper fixing plate.
Detailed Description
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are used merely for convenience of description and for simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention. Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
The present invention will be further explained with reference to the accompanying drawings:
example 1
As shown in fig. 1-4, the bearing frame for building construction includes a first support rod 1, a first pull rod 2, a second support rod 5, and a lower support plate 8, wherein the first support rod 1 is provided with a connection ring 9, the connection ring 9 is disc-shaped, the connection ring 9 is provided with an annular groove 10 uniformly distributed on the circumference for inserting an insert 3, the upper end of the first support rod 1 is provided with an external thread 11, the inner side of the first support rod 1 is welded with an upper fixing plate 15 near the external thread 11, the first support rod 1 is welded with a lower fixing plate 14 far from the upper fixing plate 15, the lower support plate 8 is connected and fixed, the lower fixing plate 14 is connected with the lower support plate 8 for supporting the whole body, the upper end of the first support rod 1 is connected with a connection pipe 4, the connection pipe 4 is provided with a circular hole 12, the connection pipe 4 is conveniently rotated and adjusted, the circular hole, The connecting pipe 4 is internally provided with an internal thread 13, the connecting pipe 4 is connected with a second supporting rod 5, the second supporting rod 5 has the same structure as the first supporting rod 1, the upper end of the second supporting rod 5 is fixed with an upper supporting disc 6, the first supporting rod 1 and the second supporting rod 5 are arranged at four positions, a first pull rod 2 is connected between connecting rings 9 on the first supporting rod 1, a second pull rod 7 is connected between the connecting rings 9 on the second supporting rod 5, and inserting blocks 3 are arranged at two ends of the first pull rod 2 and the second pull rod 7.
The working principle is as follows: install bottom suspension dish 8 on bottom plate 14 through the screw thread, plug block 3 through both ends on first pull rod 2 connects two adjacent first bracing pieces 1, extend to the outside in proper order as required, first bracing piece 1 upper end is through connecting pipe 4 installation second bracing piece 5, connect fixedly through second pull rod 7 between two adjacent second bracing pieces 5, upwards extend in proper order as required, when satisfying the needs, connect fixed last bracing piece 6 on the second bracing piece 5 of top, it is fixed to support the building, make the standardization level of installation improve, spare part can be classified and stored, improve the convenience that stores, be convenient for move, can adjust as required, high durability and convenient use.
Example 2
This example differs from example 1 in that:
the first supporting rod 1 and the second supporting rod 5 are in a circular tube shape, the connecting ring 9 is welded with the first supporting rod 1 and the second supporting rod 5, the weight of the first supporting rod 1 and the weight of the second supporting rod 5 are reduced in the circular tube shape, the carrying and the installation are convenient, and the connecting strength of the connecting ring 9 and the connecting strength of the first supporting rod 1 and the connecting strength of the second supporting rod 5 are improved in the welding process.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention.

Claims (6)

1. A bear frame for construction, its characterized in that: comprises a first supporting rod (1), a first pull rod (2), a second supporting rod (5) and a lower supporting disk (8), wherein a connecting ring (9) is arranged on the first supporting rod (1), the connecting ring (9) is disc-shaped, an annular groove (10) is uniformly distributed on the connecting ring (9) at the upper circumference, an external thread (11) is arranged at the upper end of the first supporting rod (1), an upper fixing plate (15) is welded at the position, close to the external thread (11), of the inner side of the first supporting rod (1), a lower fixing plate (14) is welded at the position, far away from the upper fixing plate (15), of the first supporting rod (1), the lower supporting disk (8) is connected onto the lower fixing plate (14), a connecting pipe (4) is connected to the upper end of the first supporting rod (1), a round hole (12) is arranged on the connecting pipe (4), and the round hole (12), be provided with internal thread (13) in connecting pipe (4), be connected with on connecting pipe (4) second bracing piece (5), second bracing piece (5) with first bracing piece (1) structure is the same, second bracing piece (5) upper end is fixed with supporting disk (6), first bracing piece (1) second bracing piece (5) are provided with the four places, on first bracing piece (1) be connected with between go-between (9) first pull rod (2), on second bracing piece (5) be connected with second pull rod (7) between go-between (9), first pull rod (2) second pull rod (7) both ends are provided with inserted block (3).
2. The carrier for use in building construction of claim 1, wherein: the first support rod (1) and the second support rod (5) are in a circular tube shape, and the connecting ring (9) is welded with the first support rod (1) and the second support rod (5).
3. The carrier for use in building construction of claim 1, wherein: the insert block (3) is welded with the first pull rod (2) and the second pull rod (7).
4. The carrier for use in building construction of claim 1, wherein: the insert block (3) is in a 15-degree draft angle, and the shape of the insert block (3) is the same as that of the annular groove (10).
5. The carrier for use in building construction of claim 1, wherein: the first supporting rod (1) is connected with the connecting pipe (4) through the external thread (11) and the internal thread (13).
6. The carrier for use in building construction of claim 1, wherein: the upper supporting disc (6) is in threaded connection with the second supporting rod (5).
CN201921660919.8U 2019-10-06 2019-10-06 Bearing frame for building construction Expired - Fee Related CN211369451U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921660919.8U CN211369451U (en) 2019-10-06 2019-10-06 Bearing frame for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921660919.8U CN211369451U (en) 2019-10-06 2019-10-06 Bearing frame for building construction

Publications (1)

Publication Number Publication Date
CN211369451U true CN211369451U (en) 2020-08-28

Family

ID=72170084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921660919.8U Expired - Fee Related CN211369451U (en) 2019-10-06 2019-10-06 Bearing frame for building construction

Country Status (1)

Country Link
CN (1) CN211369451U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112663993A (en) * 2020-12-07 2021-04-16 中建五局华东建设有限公司 Residential floor supporting structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112663993A (en) * 2020-12-07 2021-04-16 中建五局华东建设有限公司 Residential floor supporting structure

Similar Documents

Publication Publication Date Title
CN211369451U (en) Bearing frame for building construction
CN208565819U (en) A kind of adjustable suspension and support
CN212116483U (en) Tree supporting device for greening planting
CN211046382U (en) Cable conduit supporting hanger
CN209834667U (en) Tubular product rack for construction
CN205309834U (en) Clamping jig of board -like ring flange
CN208450930U (en) A kind of air-conditioning gas collecting tube welding tooling
CN210968842U (en) Multifunctional bearing-shaped steel part placing frame
CN212129301U (en) Adjustable excavator support
CN211728135U (en) Auxiliary alignment device for welding large-diameter steel pipe
CN210833596U (en) Sensor fixing device for intelligent management of greenhouse
CN211396851U (en) Cement bin support frame mounting structure
CN210202666U (en) Single greenhouse
CN208657538U (en) A kind of loading shovel hoisting mechanism convenient for planting tree
CN221345583U (en) Pile foundation steel reinforcement cage installation fixing device
CN218302588U (en) Forestry removes plants tree frame
CN210677667U (en) Total installation mechanism of 6MW rotor support
CN212876902U (en) Portable gardening flower stand
CN202493416U (en) Manifold support structure for use in drilling pump
CN219826310U (en) A concrete steel construction post support for construction
CN215301801U (en) Keel hook hanging basket
CN217726679U (en) Wire take-up thimble for water tank wire drawing machine
CN213332779U (en) Heating pipeline antidetonation support
CN216442492U (en) Many sizes pipe installation cooperation frame with adjustable
CN219410842U (en) Pile foundation reinforcement cage butt joint positioner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200828

Termination date: 20211006