CN211368765U - 预制拼装式钢筋混凝土变电站基础 - Google Patents
预制拼装式钢筋混凝土变电站基础 Download PDFInfo
- Publication number
- CN211368765U CN211368765U CN201921625434.5U CN201921625434U CN211368765U CN 211368765 U CN211368765 U CN 211368765U CN 201921625434 U CN201921625434 U CN 201921625434U CN 211368765 U CN211368765 U CN 211368765U
- Authority
- CN
- China
- Prior art keywords
- reinforced concrete
- prefabricated
- transformer substation
- substation foundation
- prefabricated assembled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Housings And Mounting Of Transformers (AREA)
Abstract
预制拼装式钢筋混凝土变电站基础其各个部件均通过在生产加工车间内浇筑出的各种预制钢筋混凝土板构件构成,到达施工现场后将各预制构件拼接在一起使其形成一个整体,通过密封胶条将各拼接缝隙填充,内部对接空隙灌注水泥砂浆填实达到密封闭水的效果,从而保证其整体结构结构强度高及使用寿命,同时具备安装简单方便的特点。
Description
技术领域:
本实用新型涉及一种预制拼装式钢筋混凝土变电站基础,特别适用于城市 配电网中各种变电站基础。
背景技术:
目前,修建变电站基础时绝大多数都采用现浇式施工方法,现浇式的变电 站基础存在以下的缺点:工期长,现浇式变电站基础需要现场绑扎钢筋、现场 支模、现场浇筑混凝土、后期拆模等,工期长;费用高,从地基开挖、绑扎钢 筋、制作模具、混凝土浇筑、混凝土养护、模板拆除就需要花费较多费用;对 环境影响大,变电站基础往往修建在城市,地基土的开挖不可避免会影响城市 环境,影响城市形象,现浇变电站基础的施工周期往往需要一个月或者更多时 间,对于城市环境影响较大,影响正常出行。
发明内容:
本实用新型的目的在于:设计一种预制拼装式钢筋混凝土变电站基础,能 够方便运输,并使其能够在保证工程质量的前提下,提高结构强度,使安装更 加方便提高工作效率。
基于此目的,经过反复的设计与研究,我们开发出一种预制拼装式钢筋混 凝土变电站基础,它的基本原理是通过在生产加工车间内浇筑出各种预制的钢 筋混凝土板构件,到达施工现场后将各预制构件拼接在一起使其形成一个整体, 通过密封胶条将各拼接缝隙填充,内部对接空隙灌注水泥砂浆填实达到密封闭 水的效果。
预制拼装式钢筋混凝土变电站基础其各个部件均通过在生产加工车间内浇筑出的各种预制钢筋混凝土板构件构成,到达施工现场后将各预制构件拼接在一起使其形成一个整体,通过密封胶条将各拼接缝隙填充,内部对接空隙灌注水泥砂浆填实达到密封闭水的效果,从而保证其整体结构结构强度高及使用寿命,同时具备安装简单方便的特点。
预制拼装式钢筋混凝土变电站基础的基本结构由底板(1)、中框(2)、顶 板(3)组成,均为工厂内生产的钢筋混凝土预制板,通过预先埋置在预制板内 的连接盒及旋紧螺母等锚件在经过连接螺栓的作用下而成一个整体,裸露连接 螺栓部位通过灌注防腐材料进行保护,各钢筋混凝土预制板上还设有胶圈槽, 板板之间可通过密封胶条进行填充,达到闭水效果,底板(1)、中框(2)、顶 板(3)分别预留有穿线孔。所有对接后的拼接缝,均进行砂浆灌注以达到密封 闭水形成统一整体的目的。
本实用新型的使用能够较好的解决现浇基础的施工工期长、费用高、对环 境影响大等问题,并且通过在工厂预制的形式来保证混凝土质量,提高混凝土 强度,增加变电站基础的使用寿命,安装简便,在减少人工投入的情况下,大 大的提高了安装效率。
附图说明:
附图1为本实用新型结构示意图,由底板(1)、中框(2)、顶板(3)组成。
附图2为本实用新型顶板(3)示意图。
附图3为本实用新型中框(2)示意图。
附图4为本实用新型底板(1)示意图。
具体实施方式:
首先绑扎钢筋笼,然后将连接盒、旋紧螺栓等锚固件预埋在已绑扎好的钢筋笼指定位置,最后将钢筋笼放置在成型模具中浇筑混凝土,生产各钢筋混凝土预制板。
在实际使用过程中,首先将各钢筋混凝土预制板运送至所需的施工现场, 在开挖完成的基础上,将底板(1)安装到位,然后中框(2)安装在底板(1) 上并通过连接螺栓进行连接形成一个整体,可根据实际高度通过调节中框(2) 层数来调节整体基础高度,并完成穿线作业。将顶板(3)安装在中框(2)上 通过连接螺栓进行连接形成一个整体,各拼接缝隙均通过密封胶条进行填充, 然后再灌注水泥砂浆填实,从而达到密封闭水的效果。
当需要将变电站基础移动位置时,只需将预制拼装式钢筋混凝土变电站基础拆卸下来并搬运至指定地点重新按照上述步骤进行安装即可。
Claims (1)
1.预制拼装式钢筋混凝土变电站基础,其特征在于:由底板(1)、中框(2)、顶板(3)组成,均为工厂内生产的钢筋混凝土预制板,通过预先埋置在预制板内的连接盒及旋紧螺母锚件在经过连接螺栓的作用下而成一个整体,裸露连接螺栓部位通过灌注防腐材料进行保护,各钢筋混凝土预制板上还设有胶圈槽,板板之间可通过密封胶条进行填充,底板(1)、中框(2)、顶板(3)分别预留有穿线孔。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921625434.5U CN211368765U (zh) | 2019-09-25 | 2019-09-25 | 预制拼装式钢筋混凝土变电站基础 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921625434.5U CN211368765U (zh) | 2019-09-25 | 2019-09-25 | 预制拼装式钢筋混凝土变电站基础 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211368765U true CN211368765U (zh) | 2020-08-28 |
Family
ID=72172618
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921625434.5U Expired - Fee Related CN211368765U (zh) | 2019-09-25 | 2019-09-25 | 预制拼装式钢筋混凝土变电站基础 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211368765U (zh) |
-
2019
- 2019-09-25 CN CN201921625434.5U patent/CN211368765U/zh not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107313517B (zh) | 叠合墙与中间层叠合楼板连接节点 | |
CN102154992B (zh) | 波形钢腹板错位安装方法 | |
CN104805866A (zh) | 预制的综合管廊及施工方法 | |
CN106284655B (zh) | 预制混凝土梁柱栓接连接节点及连接方法 | |
CN108301545A (zh) | 一种带立体桁架临时支撑的装配式大模块叠合梁板结构 | |
CN109610311A (zh) | 预制装配l型桥面板接缝构造及实施方法 | |
CN106958259B (zh) | 一种混凝土塔柱基础及其施工方法 | |
CN113622464A (zh) | 一种地下室外墙后浇带抗裂防水施工工艺 | |
CN106088320A (zh) | 一种楼盖梁柱体系的叠合装配整体式地下室 | |
CN109267585B (zh) | 装配式棱台型基础和柱结构及装配方法 | |
CN208039265U (zh) | 一种预制装配式组合结构支撑 | |
CN210421568U (zh) | 一种装配式梁、板结构 | |
CN112813794A (zh) | 采用uhpc预制波纹板节段拼装的实腹式拱桥体系及施工方法 | |
CN210127857U (zh) | 一种适用于公路隧道的钢梁-混凝土组合装配式隧道构件 | |
CN210713517U (zh) | 一种装配式叠合梁结构 | |
CN211368765U (zh) | 预制拼装式钢筋混凝土变电站基础 | |
CN111074767A (zh) | 一种双块式预制拼装防撞护栏及施工方法 | |
CN207032308U (zh) | 新型预制板拼接式检查井 | |
CN110847239A (zh) | 装配式大型钢筋混凝土预制检查井及其施工方法 | |
CN207244961U (zh) | 一种用于降板区域的带侧翻边的预制叠合楼板 | |
CN207392238U (zh) | 一种装配式下穿隧道 | |
CN109972657A (zh) | 桩涵整体装配式钢骨混凝土综合管廊 | |
CN211200460U (zh) | 装配整体式地下空间基础构件 | |
CN210163936U (zh) | 桩涵整体装配式钢骨混凝土综合管廊 | |
CN210288797U (zh) | 一种装配式混凝土剪力墙结构竖向设置夹层橡胶垫连接节点 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200828 Termination date: 20210925 |