CN211368435U - Appurtenance of municipal administration bridge hoist and mount construction - Google Patents

Appurtenance of municipal administration bridge hoist and mount construction Download PDF

Info

Publication number
CN211368435U
CN211368435U CN201921314254.5U CN201921314254U CN211368435U CN 211368435 U CN211368435 U CN 211368435U CN 201921314254 U CN201921314254 U CN 201921314254U CN 211368435 U CN211368435 U CN 211368435U
Authority
CN
China
Prior art keywords
plate
groove
bridge
wire rope
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921314254.5U
Other languages
Chinese (zh)
Inventor
乐发长
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinghai Traffic Control Construction Engineering Group Co Ltd
Original Assignee
Qinghai Traffic Control Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinghai Traffic Control Construction Engineering Group Co Ltd filed Critical Qinghai Traffic Control Construction Engineering Group Co Ltd
Priority to CN201921314254.5U priority Critical patent/CN211368435U/en
Application granted granted Critical
Publication of CN211368435U publication Critical patent/CN211368435U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses an auxiliary tool for municipal bridge hoisting construction, the structure of which comprises a connecting plate, a bearing plate and a bridge, the connecting plate is provided with a connecting block and a protective plate, the connecting block is embedded inside the connecting plate and is provided with a clamping groove, a through hole, a screw groove, a supporting column and a hanging ring, the protective plate is provided with a protective cavity, a sponge groove and a damping spring, an adjusting cavity is provided with a power plate, a supporting plate, a fixed plate, a tension spring and a bottom plate, the hanging ring is internally provided with a hanging hole and a steel wire rope, the steel wire rope passes through the clamping groove, the center of the bottom plate is provided with a hanging groove, the steel wire rope bypasses the bearing plate through the through hole to enable the bridge to be hoisted, the clamping groove is rotated to enable the steel wire rope to be locked at the through hole, the bearing plate, the occurrence of accidents caused by the position deviation of the steel wire rope is avoided.

Description

Appurtenance of municipal administration bridge hoist and mount construction
Technical Field
The utility model belongs to the technical field of the bridge construction and specifically relates to an appurtenance of municipal administration bridge hoist and mount construction is related to.
Background
With the development of science and technology, our lives are greatly changed, cars replace our walks, the distance between areas is reduced, the feelings among people in each area are improved, but the cars cannot run in a special area, the special area needs to be communicated through the construction of a bridge, and an auxiliary tool for municipal bridge hoisting construction needs to be used in the construction process of the bridge.
But the in-process of buildding of current bridge can't guarantee building material's stability for building material falls from hoist device, causes unnecessary casualties and economic loss, brings unnecessary trouble for the engineering.
SUMMERY OF THE UTILITY MODEL
The in-process of buildding to current bridge can't guarantee building material's stability for building material falls from hoist device, causes unnecessary casualties and economic loss, brings the troublesome not enough of unnecessary for the engineering, the utility model provides an appurtenance of municipal administration bridge hoist and mount construction solves above-mentioned problem.
The utility model discloses a realize through following technical scheme: the utility model provides an appurtenance of municipal administration bridge hoist and mount construction, its structure includes connecting plate, loading board, bridge, the bridge top is located to the connecting plate, the loading board is installed around the bridge top, the connecting plate is equipped with connecting block, guard plate, the connecting block inlays locates inside the connecting plate, the guard plate inlays admittedly around the connecting plate, the inside regulation chamber that is equipped with of loading board.
Further say, the connecting block is equipped with draw-in groove, through-hole, spiral shell groove, support column, rings, the draw-in groove passes through bolted mounting in the connecting block upper surface, the through-hole is located inside the draw-in groove and is inlayed inside locating the connecting plate, the spiral shell groove passes through welded connection inside the connecting plate center, the support column cooperation is installed on the spiral shell groove, rings pass through welded connection in support column top.
Further say that, the guard plate is equipped with protection chamber, sponge groove, damping spring, inside the guard plate was arranged in to the protection chamber, the sponge groove is installed at protection intracavity wall, damping spring one end is through welded connection in protection intracavity wall, the damping spring other end is through welded connection in sponge groove both sides.
Furthermore, the adjusting cavity is provided with a power plate, a supporting plate, a fixing plate, a tension spring and a bottom plate, the power plate is fixedly embedded in the inner side of the bearing plate, the supporting plate is connected to the tail end of the power plate through welding, the fixing plate is connected to the inner wall of the adjusting cavity through welding, the tension spring is connected with the supporting plate and the fixing plate, and the bottom plate is fixedly embedded in the bottom of the bearing plate.
Furthermore, a lifting hole and a steel wire rope are arranged in the lifting ring, the steel wire rope penetrates through the clamping groove to connect the lifting ring and the bottom plate, and a lifting groove is formed in the center of the bottom plate.
Advantageous effects
The utility model relates to an appurtenance of municipal administration bridge hoist and mount construction compares with prior art and has following advantage:
1. the utility model has the advantages that the hoisting ring is screwed into the spiral groove through the support column, so that the position of the hoisting ring is fixed, the steel wire rope bypasses the bearing plate through the through hole on the connecting plate, so that the bridge can be hoisted, and the clamping groove is rotated to lock the steel wire rope at the through hole;
2. the utility model discloses before hoisting the bridge, arrange the bridge on the loading board, the bridge promotes the loading board, and the tension spring on the regulation chamber inside the loading board cooperates with the fixed plate, makes the loading board can be tightly fixed with the bridge, avoids the bridge to rock, improves building material's stability;
3. the utility model discloses wire rope passes through the hanging groove fixed position on the bottom plate, avoids wire rope to take place the emergence that the skew leads to the accident.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
FIG. 1 is the utility model relates to a appurtenance's of municipal bridge hoist and mount construction structural schematic.
Fig. 2 is a schematic view of the overlooking enlarged structure of the connecting plate of the present invention.
Fig. 3 is an internal enlarged structure diagram of the protection plate of the present invention.
Figure 4 is a schematic side view of the cross-sectional structure of the loading plate of the present invention.
Fig. 5 is a schematic view of the enlarged front view of the loading plate of the present invention.
In the figure: the device comprises a connecting plate 1, a bearing plate 2, a bridge 3, a connecting block a, a protective plate b, an adjusting cavity c, a clamping groove a1, a through hole a2, a spiral groove a3, a supporting column a4, a hanging ring a5, a protective cavity b1, a sponge groove b2, a damping spring b3, a power plate c1, a supporting plate c2, a fixing plate c3, a tension spring c4, a bottom plate c5, a hanging hole m, a steel wire rope n and a hanging groove g.
Detailed Description
In order to make the technical means, the creation features, the achievement purposes and the functions of the present invention easy to understand, the following description is combined with the detailed description and the accompanying drawings to further explain the preferred embodiments of the present invention.
Examples
Please refer to fig. 1-5, the utility model provides an appurtenance of municipal bridge hoist and mount construction, its structure includes connecting plate 1, loading board 2, bridge 3 top is located to connecting plate 1, loading board 2 is installed around 3 tops of bridge, connecting plate 1 is equipped with connecting block a, guard plate b, connecting block a inlays and locates inside connecting plate 1, guard plate b inlays and fixes around connecting plate 1, the inside regulation chamber c that is equipped with of loading board 2.
The connecting block a is provided with a clamping groove a1, a through hole a2, a thread groove a3, a supporting column a4 and a hanging ring a5, the clamping groove a1 is mounted on the upper surface of the connecting block a through bolts, the through hole a2 is arranged inside the clamping groove a1 and embedded inside the connecting plate 1, the thread groove a3 is connected inside the center of the connecting plate 1 through welding, the supporting column a4 is mounted on the thread groove a3 in a matching mode, and the hanging ring a5 is connected above the supporting column a4 through welding.
Protection plate b is equipped with protection chamber b1, sponge groove b2, damping spring b3, protection chamber b1 is arranged in inside protection plate b, sponge groove b2 installs at protection chamber b1 inner wall, damping spring b3 one end is through welded connection in protection chamber b1 inner wall, the damping spring b3 other end is through welded connection in sponge groove b2 both sides.
The adjusting cavity c is provided with a power plate c1, a supporting plate c2, a fixing plate c3, a tension spring c4 and a bottom plate c5, the power plate c1 is embedded and fixed on the inner side of the bearing plate 2, the supporting plate c2 is connected to the tail end of the power plate c1 through welding, the fixing plate c3 is connected to the inner wall of the adjusting cavity c through welding, the tension spring c4 is connected with the supporting plate c2 and the fixing plate c3, and the bottom plate c5 is embedded and fixed on the bottom of the bearing plate 2.
The hanging ring a5 is internally provided with a hanging hole m and a steel wire rope n, the steel wire rope n penetrates through the clamping groove a1 to connect the hanging ring a5 with the bottom plate c5, and the center of the bottom plate c5 is provided with a hanging groove g.
The principle of the utility model is as follows: before the bridge 3 is lifted, the bridge 3 is arranged on the bearing plate 2, the bearing plate 2 is pushed by the bridge 3, a tension spring c4 on an adjusting cavity c in the bearing plate 2 is matched with a fixing plate c3, so that the bearing plate 2 can tightly fix the bridge 3, avoid the bridge 3 from shaking, improve the stability of the building material, then the supporting column a4 is screwed into the thread groove a3 to fix the position of the hanging ring a5, the steel wire rope n passes through the through hole a2 on the connecting plate 1, bypasses the bearing plate 2, the bridge 3 can be lifted, the clamping groove a1 is rotated to lock the steel wire rope n at the through hole a2, the steel wire rope n is tied and tensioned at the hanging ring a5, the loosening and sliding are avoided, and the steel wire rope n is fixed by the hanging groove g on the bottom plate c5, so that the accident caused by the position deviation of the steel wire rope n can be avoided, the protection plate b arranged around the connecting plate 1 can avoid equipment collision and damage in the hoisting construction.
The technical features of the embodiments described above may be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the embodiments described above are not described, but should be considered as being within the scope of the present specification as long as there is no contradiction between the combinations of the technical features.

Claims (5)

1. The utility model provides an appurtenance of municipal administration bridge hoist and mount construction, its structure includes connecting plate (1), loading board (2), bridge (3), its characterized in that:
bridge (3) top is located in connecting plate (1), install around bridge (3) top loading board (2), connecting plate (1) is equipped with connecting block (a), guard plate (b), inside connecting block (a) inlays and locates connecting plate (1), guard plate (b) inlays admittedly around connecting plate (1), inside regulation chamber (c) that is equipped with of loading board (2).
2. The auxiliary tool for municipal bridge hoisting construction according to claim 1, wherein: connecting block (a) is equipped with draw-in groove (a1), through-hole (a2), thread groove (a3), support column (a4), rings (a5), install in connecting block (a) upper surface through the bolt draw-in groove (a1), inside and the embedding of locating connecting plate (1) of draw-in groove (a1) are located in through-hole (a2), thread groove (a3) is inside through welded connection in connecting plate (1) center, support column (a4) cooperation is installed on thread groove (a3), rings (a5) are through welded connection in support column (a4) top.
3. The auxiliary tool for municipal bridge hoisting construction according to claim 1, wherein: protection plate (b) are equipped with protection chamber (b1), sponge groove (b2), damping spring (b3), protection chamber (b1) are arranged in inside protection plate (b), sponge groove (b2) are installed at protection chamber (b1) inner wall, damping spring (b3) one end is passed through welded connection in protection chamber (b1) inner wall, damping spring (b3) other end passes through welded connection in sponge groove (b2) both sides.
4. The auxiliary tool for municipal bridge hoisting construction according to claim 1, wherein: adjust chamber (c) and be equipped with power board (c1), backup pad (c2), fixed plate (c3), tension spring (c4), bottom plate (c5), power board (c1) are inlayed in loading board (2) inboard, backup pad (c2) are connected in power board (c1) end through the welding, fixed plate (c3) are connected in adjusting chamber (c) inner wall through the welding, tension spring (c4) are connected backup pad (c2) and fixed plate (c3), bottom plate (c5) are inlayed in loading board (2) bottom.
5. The auxiliary tool for municipal bridge hoisting construction according to claim 2, wherein: the hanging ring is characterized in that a hanging hole (m) and a steel wire rope (n) are arranged inside the hanging ring (a5), the steel wire rope (n) penetrates through the clamping groove (a1) to be connected with the hanging ring (a5) and the bottom plate (c5), and a hanging groove (g) is formed in the center of the bottom plate (c 5).
CN201921314254.5U 2019-08-13 2019-08-13 Appurtenance of municipal administration bridge hoist and mount construction Expired - Fee Related CN211368435U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921314254.5U CN211368435U (en) 2019-08-13 2019-08-13 Appurtenance of municipal administration bridge hoist and mount construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921314254.5U CN211368435U (en) 2019-08-13 2019-08-13 Appurtenance of municipal administration bridge hoist and mount construction

Publications (1)

Publication Number Publication Date
CN211368435U true CN211368435U (en) 2020-08-28

Family

ID=72165977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921314254.5U Expired - Fee Related CN211368435U (en) 2019-08-13 2019-08-13 Appurtenance of municipal administration bridge hoist and mount construction

Country Status (1)

Country Link
CN (1) CN211368435U (en)

Similar Documents

Publication Publication Date Title
CN101880010B (en) Telescopic crane with self-fittable slackening device and fitting method for a slackening device
CN105149965A (en) General assembling technology for crane
CN211368435U (en) Appurtenance of municipal administration bridge hoist and mount construction
CN102040165B (en) Temporary supporting piece for installation of ropeway of cabling machine
CN210723784U (en) Power distribution cabinet convenient to assemble
CN204751902U (en) Hoist device of steel pipe stiffening ring crown plate
CN218595955U (en) Cab for bridge-gate crane
CN107130576A (en) A kind of dismountable hydraulic bolt jacking system
CN203333197U (en) Fixed device of variable amplitude pull plate, variable amplitude auxiliary arm and crane
CN204211393U (en) A kind of wind-powered electricity generation lifts special arm head
CN106586801B (en) A kind of inner stator hoisting and overturning structure
CN209815490U (en) Hoisting device for rotor magnetic pole in hydraulic generator pit
CN212529468U (en) Multifunctional loading frame combination tool of blowout preventer
CN207685684U (en) A kind of bridge supporting frame
CN201923793U (en) Temporary support for mounting cable crane ropeway
CN206834540U (en) A kind of switch cabinet assembly stand
CN206928669U (en) A kind of support meanss of vertical prefabricated components
CN213445752U (en) Box girder template hoisting device
CN104555713A (en) Movable elevator
CN208150780U (en) A kind of track hoisting mechanism of municipal works
CN205367453U (en) Wind generating set main frame upset hoist
CN109295860B (en) Support arrangement for construction of cable-stay bridge cable
CN215595045U (en) Steel construction safety arrangement that is under construction
CN110816713B (en) Positioning device for suspension system of power transmission device of special vehicle
CN210194564U (en) Hydraulic hoist overhead hoist

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200828

CF01 Termination of patent right due to non-payment of annual fee