CN211361942U - A frock clamp for steel construction production - Google Patents
A frock clamp for steel construction production Download PDFInfo
- Publication number
- CN211361942U CN211361942U CN201921714013.XU CN201921714013U CN211361942U CN 211361942 U CN211361942 U CN 211361942U CN 201921714013 U CN201921714013 U CN 201921714013U CN 211361942 U CN211361942 U CN 211361942U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- steel construction
- motor
- base
- push rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 55
- 239000010959 steel Substances 0.000 title claims abstract description 55
- 238000010276 construction Methods 0.000 title claims abstract description 27
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 20
- 230000000694 effects Effects 0.000 abstract description 2
- 239000007858 starting material Substances 0.000 abstract description 2
- 238000005299 abrasion Methods 0.000 description 6
- PWHULOQIROXLJO-UHFFFAOYSA-N Manganese Chemical compound [Mn] PWHULOQIROXLJO-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000001035 drying Methods 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 229910052748 manganese Inorganic materials 0.000 description 1
- 239000011572 manganese Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000002444 silanisation Methods 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a frock clamp for steel construction production belongs to steel construction production technical field. A tool clamp for steel structure production comprises a base, wherein a supporting column is fixedly connected to the top of the base, a bearing is sleeved at one end, away from the base, of the supporting column, a connecting block is sleeved on the outer wall of the bearing, a rotating table is fixedly connected to the top of the connecting block, a motor support is fixedly connected to the upper surface of the base, a motor is arranged at the top of the motor support, and a gear is fixedly connected to the output end of the motor; the utility model discloses, through setting up support column, bearing, rack, motor and gear, add man-hour to the steel construction, if the fixed direction of steel construction needs to be adjusted, only need the starter motor, under the effect through gear and rack, drive the revolving stage and rotate to accomplish turning to the steel construction, not only convenient operation has saved the time moreover, has improved the work efficiency of processing steel construction.
Description
Technical Field
The utility model relates to a steel construction production technical field especially relates to a frock clamp for steel construction production.
Background
The steel structure is a structure formed by steel materials, is one of main building structure types, mainly comprises beam steel, steel columns, steel trusses and other members made of section steel, steel plates and the like, and adopts rust removing and preventing processes of silanization, pure manganese phosphating, washing drying, galvanization and the like, and all the members or parts are usually connected by welding seams, bolts or rivets. Because of its dead weight is lighter, and the construction is simple and convenient, the wide application in fields such as large-scale factory building, venue, super high-rise, needs to use steel construction frock clamp when processing steel construction production.
The steel processing usually needs to go on from a plurality of directions, and the frock clamp of current steel construction production can not make fixed steel construction rotate, often needs to follow new fixation to the steel construction, and on the other hand, frock clamp among the prior art, when fixed needs manual operation usually, not only expends time, influences work efficiency moreover.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the use is inconvenient and work efficiency is lower among the prior art, and the frock clamp who is used for steel construction production who proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a frock clamp for steel construction production, includes the base, the top fixedly connected with support column of base, the bearing has been cup jointed to the one end that the base was kept away from to the support column, the connecting block has been cup jointed to the outer wall of bearing, the top fixedly connected with revolving stage of connecting block, the last fixed surface of base is connected with the motor support, the top of motor support is provided with the motor, the output fixedly connected with gear of motor.
Preferably, the bottom of the rotating platform is fixedly connected with a rack, and the rack is meshed with the gear.
Preferably, an anti-abrasion pad is fixedly connected to the upper surface of the rotating table.
Preferably, the top of the wear-resistant pad is fixedly connected with a first hydraulic push rod, and the output end of the first hydraulic push rod is fixedly connected with a left pressure plate.
Preferably, the top of the wear-resistant pad is fixedly connected with a second hydraulic push rod, and the output end of the second hydraulic push rod is fixedly connected with a right pressure plate.
Preferably, one side of the left pressure plate and one side of the right pressure plate are fixedly connected with anti-slip pads.
Compared with the prior art, the utility model provides a frock clamp for steel construction production possesses following beneficial effect:
1. the utility model discloses, through setting up support column, bearing, rack, motor and gear, add man-hour to the steel construction, if the fixed direction of steel construction needs to be adjusted, only need the starter motor, under the effect through gear and rack, drive the revolving stage and rotate to accomplish turning to the steel construction, not only convenient operation has saved the time moreover, has improved the work efficiency of processing steel construction.
2. The utility model discloses, through setting up first hydraulic pressure push rod, left pressure disk, second hydraulic pressure push rod and right pressure disk, when treating that the processing steel construction is fixed, only need start first hydraulic pressure push rod and second hydraulic pressure push rod, first hydraulic pressure push rod and second hydraulic pressure push rod drive left pressure disk and right pressure disk respectively and remove, accomplish the fixed of treating the processing steel construction, saved artifical fixed loaded down with trivial details, practiced thrift a large amount of times.
The part that does not relate to in the device all is the same with prior art or can adopt prior art to realize, the utility model discloses convenient operation and the characteristics that improve work efficiency.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the bearing of the present invention;
fig. 3 is a schematic structural view of the rack of the present invention;
fig. 4 is a schematic top view of the rotary table of the present invention.
In the figure: 1. a base; 2. a support pillar; 3. a bearing; 4. connecting blocks; 5. a rotating table; 6. a motor bracket; 7. a motor; 8. a gear; 9. a rack; 10. an anti-wear pad; 11. a first hydraulic push rod; 12. a left platen; 13. a second hydraulic push rod; 14. a right platen; 15. a non-slip mat.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-4, a tooling fixture for steel structure production, comprising a base 1, a support column 2 is fixedly connected to the top of the base 1, a bearing 3 is sleeved on one end of the support column 2 far away from the base 1, a connecting block 4 is sleeved on the outer wall of the bearing 3, a rotating table 5 is fixedly connected to the top of the connecting block 4, a motor support 6 is fixedly connected to the upper surface of the base 1, a motor 7 is arranged at the top of the motor support 6, a gear 8 is fixedly connected to the output end of the motor 7, a rack 9 is fixedly connected to the bottom of the rotating table 5, the rack 9 is meshed with the gear 8, by arranging the support column 2, the bearing 3, the rack 9, the motor 7 and the gear 8, when the steel structure is processed, if the fixing direction of the steel structure needs to be adjusted, only the motor 7 needs to be started, the rotating, the operation is convenient, the time is saved, the working efficiency of processing the steel structure is improved, the upper surface of the rotating platform 5 is fixedly connected with the anti-abrasion pad 10, the anti-abrasion pad 10 is arranged on the rotating platform 5, when the steel structure is processed, the anti-abrasion pad 10 can play a role in protecting the rotating platform 5 and prevent the rotating platform 5 from being abraded, the top of the anti-abrasion pad 10 is fixedly connected with a first hydraulic push rod 11, the output end of the first hydraulic push rod 11 is fixedly connected with a left pressure plate 12, the top of the anti-abrasion pad 10 is fixedly connected with a second hydraulic push rod 13, the output end of the second hydraulic push rod 13 is fixedly connected with a right pressure plate 14, when the steel structure to be processed is fixed, only the first hydraulic push rod 11 and the second hydraulic push rod 13 are needed to be started, the first hydraulic push rod 11 and the second hydraulic push rod 13 respectively drive the left pressure plate 12 and the right pressure plate 14 to move, the completion is treated the fixed of processing steel construction, has saved the loaded down with trivial details of artifical fixed, has practiced thrift a large amount of times, and the equal fixedly connected with slipmat 15 in one side of left side pressure disk 12 and right pressure disk 14 through setting up slipmat 15, can effectual reinforcing left side pressure disk 12 and right pressure disk 14 and the frictional force between the steel, make steel by fixed more stable.
In the utility model, through arranging the support column 2, the bearing 3, the rack 9, the motor 7 and the gear 8, when the steel structure is processed, if the fixing direction of the steel structure needs to be adjusted, only the motor 7 needs to be started, the rotating platform 5 is driven to rotate under the action of the gear 8 and the rack 9, thereby completing the steering of the steel structure, not only being convenient to operate, but also saving time, improving the working efficiency of processing the steel structure, by arranging the first hydraulic push rod 11, the left pressure plate 12, the second hydraulic push rod 13 and the right pressure plate 14, when the steel structure to be processed is fixed, only the first hydraulic push rod 11 and the second hydraulic push rod 13 need to be started, the first hydraulic push rod 11 and the second hydraulic push rod 13 respectively drive the left pressure plate 12 and the right pressure plate 14 to move, the fixation of the steel structure to be processed is completed, the manual fixation is omitted, and a large amount of time is saved.
Above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the design of the present invention, equivalent replacement or change should be covered within the protection scope of the present invention.
Claims (7)
1. The utility model provides a frock clamp for steel construction production, includes base (1), its characterized in that, top fixedly connected with support column (2) of base (1), bearing (3) have been cup jointed to the one end that base (1) were kept away from in support column (2), connecting block (4) have been cup jointed to the outer wall of bearing (3), top fixedly connected with revolving stage (5) of connecting block (4), the last fixed surface of base (1) is connected with motor support (6), the top of motor support (6) is provided with motor (7), the output fixedly connected with gear (8) of motor (7).
2. A tool clamp for steel structure production according to claim 1, wherein a rack (9) is fixedly connected to the bottom of the rotating table (5), and the rack (9) is meshed with the gear (8).
3. A tooling clamp for steel structure production according to claim 1, wherein an anti-wear pad (10) is fixedly connected to the upper surface of the rotating table (5).
4. A tool clamp for steel structure production according to claim 3, wherein a first hydraulic push rod (11) is fixedly connected to the top of the wear pad (10), and a left pressing plate (12) is fixedly connected to the output end of the first hydraulic push rod (11).
5. A tool clamp for steel structure production according to claim 3, wherein a second hydraulic push rod (13) is fixedly connected to the top of the wear pad (10), and a right pressing plate (14) is fixedly connected to the output end of the second hydraulic push rod (13).
6. A tool clamp for steel structure production according to claim 4, characterized in that a non-slip pad (15) is fixedly connected to one side of the left pressing plate (12).
7. A tool clamp for steel structure production according to claim 5, characterized in that a non-slip pad (15) is fixedly connected to one side of the right platen (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921714013.XU CN211361942U (en) | 2019-10-14 | 2019-10-14 | A frock clamp for steel construction production |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921714013.XU CN211361942U (en) | 2019-10-14 | 2019-10-14 | A frock clamp for steel construction production |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211361942U true CN211361942U (en) | 2020-08-28 |
Family
ID=72162355
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921714013.XU Expired - Fee Related CN211361942U (en) | 2019-10-14 | 2019-10-14 | A frock clamp for steel construction production |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211361942U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113770934A (en) * | 2020-10-15 | 2021-12-10 | 湖南大鼎钢构科技发展有限责任公司 | Clamping device is used in steel construction production |
-
2019
- 2019-10-14 CN CN201921714013.XU patent/CN211361942U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113770934A (en) * | 2020-10-15 | 2021-12-10 | 湖南大鼎钢构科技发展有限责任公司 | Clamping device is used in steel construction production |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103008948B (en) | Multifunctional welding clamp | |
CN211361942U (en) | A frock clamp for steel construction production | |
CN111037422A (en) | Grinding device is used in stone material processing | |
CN108747767A (en) | A kind of multi-function steel structure processing equipment | |
CN210333482U (en) | Cleaning device for building steel structure | |
CN112223072A (en) | Polishing and rust removing device for construction steel bars | |
CN216462786U (en) | Welding positioning support for vehicle machining chassis | |
CN212169930U (en) | High-efficient grinding machanism of steel structure processing usefulness | |
CN205217567U (en) | Blade disc upset car | |
CN213258526U (en) | Surface grinding device for sheet production and processing | |
CN212264731U (en) | Cutting device is used in steel construction processing | |
CN209698345U (en) | Fast fixture is used in a kind of crane girder web and partition welding | |
CN210451897U (en) | Machining clamp for forearm support of combine harvester | |
CN211414641U (en) | Grinding device is used in processing of steel construction manganese steel | |
CN211522785U (en) | Automatic cutting equipment is used in asphalt concrete road construction | |
CN210209812U (en) | Polishing device is used in production of ornament jade | |
CN212287305U (en) | Turning device based on intelligent manufacturing and processing | |
CN208601291U (en) | A kind of multi-function steel structure processing equipment | |
CN216265224U (en) | Outer surface polishing equipment for forging processing | |
CN219310152U (en) | Alloy structural steel production equipment | |
CN218114895U (en) | Hoisting device is used in building structure construction | |
CN218597832U (en) | Steel construction reinforced structure | |
CN215746496U (en) | Steel construction surface drilling equipment in building field | |
CN218835441U (en) | A rust cleaning subassembly for angle steel hot dip galvanizing is handled | |
CN215037206U (en) | Portable building decoration material's processing platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Sun Lei Inventor before: Sun Lei |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200828 |