CN211358298U - Spray tower with complete desulfurization effect for industrial desulfurization - Google Patents

Spray tower with complete desulfurization effect for industrial desulfurization Download PDF

Info

Publication number
CN211358298U
CN211358298U CN201921083419.2U CN201921083419U CN211358298U CN 211358298 U CN211358298 U CN 211358298U CN 201921083419 U CN201921083419 U CN 201921083419U CN 211358298 U CN211358298 U CN 211358298U
Authority
CN
China
Prior art keywords
cylinder
spray
liquid seal
thick bamboo
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921083419.2U
Other languages
Chinese (zh)
Inventor
邓建利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baotou Horizon Environmental Protection Technology Co ltd
Original Assignee
Baotou Horizon Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baotou Horizon Environmental Protection Technology Co ltd filed Critical Baotou Horizon Environmental Protection Technology Co ltd
Priority to CN201921083419.2U priority Critical patent/CN211358298U/en
Application granted granted Critical
Publication of CN211358298U publication Critical patent/CN211358298U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a complete spray column of desulfurization effect for industrial desulfurization belongs to spray column technical field, including a spray cylinder, conveyer pipe, liquid seal section of thick bamboo, an air inlet cylinder, go out a gas section of thick bamboo, support plate, water pump, inlet tube, outlet pipe, reel, waterproof bearing, sleeve, well core rod, helical blade, shower nozzle, ring plate, inner tube, urceolus and sponge ring, the top embedding welding of a spray cylinder has the conveyer pipe, the bottom embedding welding of conveyer pipe is at the top of liquid seal section of thick bamboo, the left side embedding welding of a spray cylinder has an air inlet cylinder, the right side embedding welding of a liquid seal section of thick bamboo has a gas outlet cylinder. The utility model provides a reel gathers together the flue gas, makes the quick process shower nozzle spun water of flue gas, can enough make the flue gas quick and water contact, can make flue gas and water fully contact again, accomplishes first sulphur removal work, and the flue gas gets into the aquatic between inner tube and the urceolus, accomplishes the second time and drops, hydroenergy enough abundant with the flue gas contact, have the sulphur removal completely, advantages such as sulphur removal efficiency height.

Description

Spray tower with complete desulfurization effect for industrial desulfurization
Technical Field
The utility model relates to a spray column technical field, it is concrete, relate to a spray column that the sulphur removal effect is complete.
Background
The desulfurization generally refers to the process of removing sulfur in fuel before combustion and the process of removing sulfur before emission of flue gas, and is one of important technical measures for preventing and treating atmospheric pollution. Therefore, it is necessary to provide a spray tower having a complete desulfurization effect for industrial desulfurization by further research based on the spray tower.
SUMMERY OF THE UTILITY MODEL
This kind of complete spray column of sulphur removal effect for industrial desulfurization solves the above-mentioned sulphur removal effect that proposes completely, the problem of sulphur removal inefficiency, the spray column that provides a complete sulphur removal effect for industrial desulfurization, the reel in this spray column gathers together the flue gas, make the quick process shower nozzle spun water of flue gas, can enough make the flue gas quick and water contact, can make flue gas and water fully contact again, accomplish the first work of sulphur removal, the flue gas gets into the aquatic between inner tube and the urceolus, accomplish the second and drop, hydroenergy enough abundant and flue gas contact, it is complete to have the sulphur removal, advantages such as sulphur removal efficiency height.
The utility model provides a following technical scheme: a spray tower with complete desulfurization effect for industrial desulfurization comprises a spray cylinder, a conveying pipe, a liquid seal cylinder, an air inlet cylinder, an air outlet cylinder, a support plate, a water pump, an inlet pipe, an outlet pipe, a winding drum, a waterproof bearing, a sleeve, a central rod, helical blades, a spray head, a circular plate, an inner cylinder, an outer cylinder and a sponge ring, wherein the conveying pipe is embedded and welded at the top of the spray cylinder, the bottom of the conveying pipe is embedded and welded at the top of the liquid seal cylinder, the air inlet cylinder is embedded and welded at the left side of the spray cylinder, the air outlet cylinder is embedded and welded at the right side of the liquid seal cylinder, the support plate is welded between the spray cylinder and the liquid seal cylinder, the water pump is fixedly connected at the top of the support plate through screws, the inlet pipe is embedded and welded at the left side of the water pump, the outlet pipe is embedded and welded at the top of the, waterproof bearing embedded weld is at telescopic top, telescopic inner wall is provided with well core rod through the branch welding, well core rod's surface welding is provided with helical blade, telescopic bottom embedded weld has the shower nozzle, the top welding of liquid seal section of thick bamboo inner wall is provided with the ring board, the bottom welding of ring board is provided with the inner tube, the bottom of liquid seal section of thick bamboo inner wall is provided with the urceolus through the branch welding, the nested bonding of inner wall of liquid seal section of thick bamboo has the sponge ring, the embedding is provided with the water pipe between a spray cylinder and the liquid seal section of thick bamboo.
Further preferred embodiments: the winding drum is located under the spray head, the top of the winding drum is provided with an opening, and the included angle between the winding drum and the inner wall of the spray drum is 60 degrees.
Further preferred embodiments: the spiral blade is positioned right below the water outlet pipe and surrounds the surface of the central rod.
Further preferred embodiments: the inner cylinder is sleeved between the outer cylinders, the outer cylinders are in a concave shape, and the sponge rings are sleeved with the outer cylinders together.
Further preferred embodiments: the water inlet pipe is positioned at the bottom of the inner wall of the spraying cylinder, and the water outlet pipe is in a T shape.
Further preferred embodiments: the top electric connection of water pump has the electric wire.
Has the advantages that: the reel gathers together the flue gas, make the quick process shower nozzle spun water of flue gas, can enough make the flue gas contact with water fast, can make flue gas and water fully contact again, accomplish the first sulphur removal work, the flue gas gets into the aquatic between inner tube and the urceolus, accomplish the second time and drop, hydroenergy enough abundant and flue gas contact, it is complete to have the sulphur removal, advantages such as efficient sulphur removal, when the water impact helical blade, helical blade can drive sleeve and the high-speed rotation of shower nozzle, the shower nozzle rotates at a high speed, thereby make the shower nozzle spray evenly, and then improve the effect of spraying of shower nozzle, the flue gas can be filtered to the sponge ring, and after the sponge ring absorbs water, can make the flue gas carry out the third desulfurization, thereby further improvement desulfurization effect.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is an enlarged schematic view of a point a in fig. 1 according to the present invention.
In FIGS. 1-2: the device comprises a spraying cylinder 1, a conveying pipe 2, a liquid seal cylinder 3, an air inlet cylinder 4, an air outlet cylinder 5, a support plate 6, a water pump 7, an water inlet pipe 8, a water outlet pipe 9, a winding drum 10, a waterproof bearing 11, a sleeve 12, a central rod 13, a helical blade 14, a spray head 15, a circular ring plate 16, an inner cylinder 17, an outer cylinder 18 and a sponge ring 19.
Detailed Description
Referring to fig. 1 to 2, in an embodiment of the present invention, a spray tower with complete sulfur removal effect for industrial desulfurization includes a spray cylinder 1, a delivery pipe 2, a liquid seal cylinder 3, an air inlet cylinder 4, an air outlet cylinder 5, a support plate 6, a water pump 7, an air inlet pipe 8, an air outlet pipe 9, a winding drum 10, a waterproof bearing 11, a sleeve 12, a central rod 13, a helical blade 14, a nozzle 15, a circular plate 16, an inner cylinder 17, an outer cylinder 18, and a sponge ring 19, wherein the top of the spray cylinder 1 is welded with the delivery pipe 2, the bottom of the delivery pipe 2 is welded with the top of the liquid seal cylinder 3, the left side of the spray cylinder 1 is welded with the air inlet cylinder 4, the right side of the liquid seal cylinder 3 is welded with the air outlet cylinder 5, the support plate 6 is welded between the spray cylinder 1 and the liquid seal cylinder 3, the top of the support plate 6 is fixedly connected, the top embedded welding of water pump 7 has outlet pipe 9, the top of outlet pipe 9 is embedded in respectively welding in spray cylinder 1 and liquid seal section of thick bamboo 3, the nested welding in left side of outlet pipe 9 has waterproof bearing 11, waterproof bearing 11 embedded in welds the top at sleeve 12, the inner wall of sleeve 12 is provided with well core rod 13 through the branch welding, the surface welding of well core rod 13 is provided with helical blade 14, the bottom embedded welding of sleeve 12 has shower nozzle 15, the top welding of liquid seal section of thick bamboo 3 inner wall is provided with ring board 16, the bottom welding of ring board 16 is provided with inner tube 17, the bottom of liquid seal section of thick bamboo 3 inner wall is provided with urceolus 18 through the branch welding, the nested bonding of inner wall of liquid seal section of thick bamboo 3 has sponge ring 19, the embedding is provided with the.
Preferably, the winding drum 10 is located under the spray nozzle 15, the top of the winding drum 10 is provided with a hole, the included angle between the winding drum 10 and the inner wall of the spray drum 1 is 60 degrees, the winding drum 10 gathers the flue gas, the flue gas rapidly passes through the water sprayed by the spray nozzle 15, the flue gas can be rapidly contacted with the water and can be fully contacted with the water, the first desulphurization work is completed, the flue gas enters the water between the inner drum 17 and the outer drum 18 to be separated for the second time, the water can be fully contacted with the flue gas, the advantages of complete desulphurization, high desulphurization efficiency and the like are achieved, the spiral blade 14 is located under the water outlet pipe 9, the spiral blade 14 surrounds the surface of the central rod 13, when the water impacts the spiral blade 14, the spiral blade 14 can drive the sleeve 12 and the spray nozzle 15 to rotate at a high speed, so that the spray nozzle 15 sprays uniformly, and the spraying effect of the spray nozzle 15 is improved, the 17 covers of inner tube between urceolus 18, and urceolus 18 is character cut in bas-relief form to sponge ring 19 is in the same place with urceolus 18 cover, and sponge ring 19 can filter the flue gas, and 19 postwater absorptions of sponge ring can make the flue gas carry out the desulfurization for the third time, thereby further improvement desulfurization effect, inlet tube 8 are located the bottom of 1 inner wall of a spray tube, and outlet pipe 9 is the T word form, and the top electric connection of water pump 7 has the electric wire.
The working principle is as follows:
when the spray tower with complete desulphurization effect for industrial desulphurization is used, firstly, a proper amount of water is injected into the spray cylinder 1 through the air inlet pipe 4, then the power supply of the water pump 7 is connected through an electric wire, the water pump 7 conveys the water at the bottom of the spray cylinder 1 to the sleeve 12 and the liquid seal cylinder 3, when the water flushes the helical blade 14, the helical blades 14 drive the sleeve 12 and the nozzle 15 to rotate at a high speed, at which time water flows into the inner cylinder 17 on the circular ring plate 16 and then accumulates on the inner wall of the outer cylinder 18, the water forms a liquid seal between the inner cylinder 17 and the outer cylinder 18, and then the water flows through the sponge ring 19, the flue gas returns to the spraying cylinder 1 through the water pipe and is sucked by the water inlet pipe 8, then the flue gas is injected through the air inlet pipe 4, the flue gas passes through the spraying cylinder 1, the conveying pipe 2, the liquid sealing cylinder 3, the inner cylinder 17, the outer cylinder 18 and the sponge ring 19 to complete the desulphurization work, and finally the flue gas is discharged through the air outlet pipe 5.

Claims (6)

1. The utility model provides a complete spray column of desulfurization effect for industrial desulfurization, includes spray cylinder (1), conveyer pipe (2), liquid seal section of thick bamboo (3), an air inlet section of thick bamboo (4), a gas outlet section of thick bamboo (5), support plate (6), water pump (7), inlet tube (8), outlet pipe (9), reel (10), waterproof bearing (11), sleeve (12), well core rod (13), helical blade (14), shower nozzle (15), ring board (16), inner tube (17), urceolus (18) and sponge ring (19), its characterized in that: the top of the spray cylinder (1) is embedded and welded with the conveying pipe (2), the bottom of the conveying pipe (2) is embedded and welded at the top of the liquid seal cylinder (3), the left side of the spray cylinder (1) is embedded and welded with the air inlet cylinder (4), the right side of the liquid seal cylinder (3) is embedded and welded with the air outlet cylinder (5), a carrier plate (6) is welded between the spray cylinder (1) and the liquid seal cylinder (3), the top of the carrier plate (6) is fixedly connected with a water pump (7) through a screw, the left side of the water pump (7) is embedded and welded with an water inlet pipe (8), the top of the water pump (7) is embedded and welded with an outlet pipe (9), the top of the outlet pipe (9) is embedded and welded in the spray cylinder (1) and the liquid seal cylinder (3) respectively, the left side of the outlet pipe (9) is embedded and welded with a waterproof bearing (11), the inner wall of sleeve (12) is provided with well core rod (13) through the branch welding, the surface welding of well core rod (13) is provided with helical blade (14), the bottom embedding welding of sleeve (12) has shower nozzle (15), the top welding of liquid seal section of thick bamboo (3) inner wall is provided with ring plate (16), the bottom welding of ring plate (16) is provided with inner tube (17), the bottom of liquid seal section of thick bamboo (3) inner wall is provided with urceolus (18) through the branch welding, the nested bonding of inner wall of liquid seal section of thick bamboo (3) has sponge ring (19), the embedding is provided with the water pipe between spray cylinder (1) and liquid seal section of thick bamboo (3).
2. The spray tower with complete sulfur removal effect for industrial desulfurization according to claim 1, characterized in that: the winding drum (10) is located under the spray head (15), the top of the winding drum (10) is provided with an opening, and the included angle between the winding drum (10) and the inner wall of the spray cylinder (1) is 60 degrees.
3. The spray tower with complete sulfur removal effect for industrial desulfurization according to claim 1, characterized in that: the helical blade (14) is positioned right below the water outlet pipe (9), and the helical blade (14) is surrounded on the surface of the central rod (13).
4. The spray tower with complete sulfur removal effect for industrial desulfurization according to claim 1, characterized in that: the inner cylinder (17) is sleeved between the outer cylinders (18), the outer cylinders (18) are in a concave shape, and the sponge rings (19) are sleeved with the outer cylinders (18).
5. The spray tower with complete sulfur removal effect for industrial desulfurization according to claim 1, characterized in that: the water inlet pipe (8) is positioned at the bottom of the inner wall of the spray cylinder (1), and the water outlet pipe (9) is T-shaped.
6. The spray tower with complete sulfur removal effect for industrial desulfurization according to claim 1, characterized in that: the top of the water pump (7) is electrically connected with an electric wire.
CN201921083419.2U 2019-07-11 2019-07-11 Spray tower with complete desulfurization effect for industrial desulfurization Active CN211358298U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921083419.2U CN211358298U (en) 2019-07-11 2019-07-11 Spray tower with complete desulfurization effect for industrial desulfurization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921083419.2U CN211358298U (en) 2019-07-11 2019-07-11 Spray tower with complete desulfurization effect for industrial desulfurization

Publications (1)

Publication Number Publication Date
CN211358298U true CN211358298U (en) 2020-08-28

Family

ID=72160390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921083419.2U Active CN211358298U (en) 2019-07-11 2019-07-11 Spray tower with complete desulfurization effect for industrial desulfurization

Country Status (1)

Country Link
CN (1) CN211358298U (en)

Similar Documents

Publication Publication Date Title
CN108581650A (en) A kind of ultrasound longitrorse vibration grinding device
CN211358298U (en) Spray tower with complete desulfurization effect for industrial desulfurization
CN106218826A (en) Floating on water waste cleaning device
CN204657655U (en) Tubing string inner burr scraper
CN110404836B (en) Tail gas probe cleaning equipment capable of automatically working by utilizing wind power
CN211133407U (en) Dust absorbing device for workshop production
CN106818412A (en) A kind of buffer zone of the municipal administration with spray irrigation function
CN206713662U (en) A kind of buffer zone of the municipal administration with spray irrigation function
CN206265258U (en) Floating on water waste cleaning device
CN211309606U (en) Petrochemical storage tank fire water spraying cooling device
CN204634550U (en) Automatic tree whitening machine
CN208627949U (en) A kind of axial workpiece cleaning device
CN102771400A (en) Motor-driven scavenging machine
CN207227054U (en) A kind of air floatation machine slag-scraper
CN208029777U (en) A kind of mining area improved spraying device
CN218740954U (en) Environment-friendly petrochemical tail gas treatment device
CN214552140U (en) Take environmental protection dust collecting equipment of building engineering construction
CN201092868Y (en) Dedusting desalination injection mechanism for turbine rotor vane
CN205833706U (en) A kind of facility are safeguarded and are used jet-propelled cleaning plant
CN212347808U (en) High-efficient strip tower convenient to clearance
CN217613763U (en) Spray type dust material recovery device
CN211822392U (en) A incineration device for agricultural
CN219168113U (en) Reaction tower for flue gas desulfurization
CN213362515U (en) Ash treatment device for thermal power plant
CN212830541U (en) Accumulator tank for petrochemical convenient to clearance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant