CN211338533U - Hoisting leg splitting plate - Google Patents

Hoisting leg splitting plate Download PDF

Info

Publication number
CN211338533U
CN211338533U CN201922395449.3U CN201922395449U CN211338533U CN 211338533 U CN211338533 U CN 211338533U CN 201922395449 U CN201922395449 U CN 201922395449U CN 211338533 U CN211338533 U CN 211338533U
Authority
CN
China
Prior art keywords
plate
hanging
hoisting
hanger
hanging plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922395449.3U
Other languages
Chinese (zh)
Inventor
于永杰
刘治国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Jianbangshi Metal Products Co ltd
Original Assignee
Qingdao Jianbangshi Metal Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Jianbangshi Metal Products Co ltd filed Critical Qingdao Jianbangshi Metal Products Co ltd
Priority to CN201922395449.3U priority Critical patent/CN211338533U/en
Application granted granted Critical
Publication of CN211338533U publication Critical patent/CN211338533U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a hoist and mount leg splitting board, including the hanger plate, the lower extreme split of hanger plate is two curved folded plates, and two curved folded plates tend to keep away from the direction each other respectively and buckle to being in same horizontal plane and perpendicular to hanger plate respectively, the upside rigid coupling that the hanger plate corresponds two curved folded plates is equipped with the stay tube of wearing to establish the hanger plate, the lewis hole has still been seted up to the upper end of hanger plate. The utility model discloses have the stability that can improve the hoist and mount, improve hoist and mount board and the inside area of contact of concrete member, reduce the effect of the probability that hoist and mount board breaks away from the concrete member.

Description

Hoisting leg splitting plate
Technical Field
The utility model belongs to the technical field of the technique of concrete hoist and mount and specifically relates to a hoist and mount split leg board is related to.
Background
At present, when a building material of a concrete material is hoisted, hoisting fixtures are generally adopted to clamp the building material and then connected to a crane, the crane hoists the building material to a proper position through the hoisting fixtures, and in the hoisting mode, the hoisting fixtures need to be clamped at the proper position of the building material, so that a large amount of time can be consumed in the process, and the working efficiency of hoisting the building material is reduced.
The current chinese utility model patent that can refer to the grant publication number for CN208279179U discloses a hoist and mount subassembly, and its technical scheme main points: the hanging plate comprises a hanging plate hanger and a plate-shaped hanging plate, wherein a hanging hole is formed in the hanging plate, the hanging plate hanger penetrates through the hanging hole to be connected with the hanging plate, the lower end of the hanging plate is in a herringbone shape, the hanging hole is located in the upper end of the hanging plate, and a through hole is formed in the hanging plate between the hanging hole and the herringbone lower end. The utility model discloses a solve the problem that consumes time when using stone tongs centre gripping building materials, improved the work efficiency of concrete building material hoist and mount.
When the hanging plate is used, although the reinforcing steel bars penetrate through the through holes of the hanging plate and the herringbone lower ends are arranged at the lower ends of the hanging plate, when a heavy cement member is hung, because the hanging plate is thin, the contact surface with the reinforcing steel bars in the concrete is few, the stress concentration is large, because the hanging plate breaks the reinforcing steel bars and breaks away from the concrete member when the hanging plate is hung, and because the lower ends of the hanging plate are obliquely arranged in the herringbone mode, once the reinforcing steel bars break, the lower ends of the guide plates are easy to slip from the concrete member, the hanging cannot be finished, and great danger is generated.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a hoist and mount leg cleavage board has the stability that can improve the hoist and mount, improves hoist and mount board and the inside area of contact of concrete member, reduces the effect that hoist and mount board breaks away from the probability from the concrete member.
The above object of the present invention is achieved by the following technical solutions:
the utility model provides a hoist and mount leg splitting board, includes the hanger plate, the lower extreme split of hanger plate is two curved folded plates, and two curved folded plates tend to keep away from the direction each other respectively and buckle to being in same horizontal plane and perpendicular to hanger plate respectively, the upside rigid coupling that the hanger plate corresponds two curved folded plates is equipped with the stay tube of wearing to establish the hanger plate, the lewis hole has still been seted up to the upper end of hanger plate.
By adopting the technical scheme, during use, the position below the hanging plate hanging hole can be directly embedded into the concrete member, and the steel bar in the concrete member directly penetrates through the supporting pipe, so that after the concrete is solidified, the steel part is fixed with the hanging plate, the supporting pipe is penetrated through by the steel bar after the supporting pipe is embedded in the concrete, two ends of the supporting pipe are both positioned in the concrete, stress concentration caused by the smaller contact position of the steel bar and the hanging plate when the hanging plate bears tensile force is avoided, and the probability of breaking the steel part is reduced.
The utility model discloses further set up to: the distance between the ends of the two bending plates far away from each other is larger than the height of the hanging plate, and the width of the hanging plate is larger than 1/2 of the width of the hanging plate.
Through adopting above-mentioned technical scheme, the two bent plates of adoption are kept away from the distance of one end each other and the size proportion of the width of hanger plate and the height of hanger plate, can improve the bulk strength of hoist and mount leg splitting board, improve the stability when concrete member hoists.
The utility model discloses further set up to: the positions of the two sides of the hanging plate corresponding to the hanging holes and the supporting pipes are provided with notches.
Through adopting above-mentioned technical scheme, bury the hanger plate in the concrete after, the breach position department of hanger plate both sides all can be filled with the concrete, the further probability that reduces the hanger plate and break away from in the concrete member.
The utility model discloses further set up to: and a plurality of ribbed plates are uniformly and fixedly connected between the peripheral surface of the supporting tube and the surface of the hanging plate.
Through adopting above-mentioned technical scheme, the intensity that the many floor that adopt can further carry stay tube and hanger plate avoids stay tube and hanger plate connecting portion to produce fracture or buckle.
The utility model discloses further set up to: and reinforcing plates are fixedly connected between the upper sides of the bending plates and the two sides of the hanging plate.
By adopting the technical scheme, the adopted reinforcing plate can increase the fixation of the relative position of the bending plate and the hanging plate and reduce the probability of deformation of the bending plate and the hanging plate,
the utility model discloses further set up to: and a bending resisting plate is fixedly connected between the lower sides of the two bending plates.
Through adopting above-mentioned technical scheme, the anti folded plate that adopts can further reduce the probability that two bent plates warp in the concrete member, guarantee the intensity of bent plate.
The utility model discloses further set up to: the anti folded plate is isosceles triangle, the bottom surface of anti folded plate and two bent folded plate rigid couplings, and the length direction of anti folded plate is the same with the length direction of two bent folded plates.
By adopting the technical scheme, the adopted isosceles triangle bending-resistant plate has high strength and strong bending resistance.
The utility model discloses further set up to: the thickness of the hanger plate is 1/9 the length of the hanger plate.
By adopting the technical scheme, the adopted hanging plate has the advantages that the thickness is proportional to the length of the guide plate, and the neat strength of the hanging plate is guaranteed.
To sum up, the utility model discloses a beneficial technological effect does:
1. when the concrete member is used, the position below the hanging hole of the hanging plate can be directly embedded into the concrete member, and the reinforcing steel bar in the concrete member directly penetrates through the supporting pipe, so that after the concrete is solidified, the steel piece is fixed with the hanging plate, the supporting pipe is embedded in the concrete, the reinforcing steel bar penetrates through the supporting pipe, and two ends of the supporting pipe are both positioned in the concrete, so that stress concentration caused by small contact position of the reinforcing steel bar and the hanging plate when the hanging plate bears tensile force is avoided, and the probability of breaking the steel piece is reduced;
2. the size proportion of the distance between the ends of the two bent plates far away from each other, the width of the hanging plate and the height of the hanging plate can improve the overall strength of the hoisting split leg plate and the stability of the concrete member during hoisting;
3. after the hanging plate is buried in the concrete, the gaps on the two sides of the hanging plate are filled with the concrete, and the probability that the hanging plate is separated from the concrete member is further reduced.
Drawings
Fig. 1 is a schematic structural diagram of a first embodiment of the present invention.
Fig. 2 is a schematic structural diagram of a second embodiment of the present invention.
In the figure, 1, a hanger plate; 11. perforating holes; 12. hoisting holes; 13. a notch; 14. supporting a tube; 141. a rib plate; 2. a bending plate; 3. a reinforcing plate; 4. resisting the folded plate.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
The first embodiment is as follows: referring to fig. 1, for the utility model discloses a hoist and mount leg cleavage board, including hanger plate 1, the lower extreme split of hanger plate 1 is two bending plate 2, and two bending plate 2 tend to keep away from the direction each other respectively and buckle to being in same horizontal plane and perpendicular to hanger plate 1 respectively, and the distance of bending plate 2 keeping away from each other between one end is greater than hanger plate 1's height, and hanger plate 1's width is greater than 1/2 of hanger plate 1 width, and hanger plate 1's thickness is 1/9 of hanger plate 1 length. More specifically, the height of the hanging plate 1 is 90mm, the width of the hanging plate 1 is 10mm, the width of the hanging plate 1 is 50mm, and the distance between the ends of the two bending plates 2 far away from each other is 94 mm.
The upper side of the hanging plate 1 corresponding to the two bent plates 2 is provided with a through hole 11 through which the hanging plate 1 passes, the upper end of the hanging plate 1 is also provided with a hanging hole 12, and the positions of the two sides of the hanging plate 1 corresponding to the hanging hole 12 and the through hole 11 are provided with a notch 13.
The implementation principle of the embodiment is as follows: when in use, the position below the hanging hole 12 of the hanging plate 1 can be directly embedded into a concrete member, and the steel bar in the concrete member directly passes through the through hole 11 of the hanging plate 1, so that after the concrete is solidified, the steel piece is fixed with the hanging plate 1, the steel bar can be fixedly connected with the hanging plate 1, the adopted bending plate 2 is horizontally arranged, after the concrete is solidified, the bending plate 2 is difficult to separate from the concrete member, the connecting strength of the hanging plate 1 and the concrete member is increased, the probability of separating the hanging split-leg plate from the concrete member is greatly reduced, after the hanging plate 1 is embedded into the concrete, the gaps 13 at the two sides of the hanging plate 1 are filled with the concrete, the probability of separating the hanging plate 1 from the concrete member is further reduced, the distance between the two bending plates 2 at one end away from each other, the width of the hanging plate 1, the size ratio of the height of the hanging plate 1, the thickness ratio of the hanging plate 1 and the length guide plate, the integral strength of the hoisting split leg plate can be improved, and the stability of the concrete member during hoisting is improved.
Example two: the utility model discloses a hoist and mount leg splitting board, including hanger plate 1, hanger plate 1's lower extreme splits and is two curved folded plates 2, and two curved folded plates 2 tend to keep away from the direction each other respectively and buckle to being in same horizontal plane and perpendicular to hanger plate 1 respectively, and equal rigid coupling has reinforcing plate 3 between two curved folded plate 2's the upside and hanger plate 1's the both sides, and the rigid coupling has anti folded plate 4 between two curved folded plate 2's the downside. The anti folded plate 4 is an isosceles triangle, the bottom surface of the anti folded plate 4 is fixedly connected with the two folded plates 2, and the length direction of the anti folded plate 4 is the same as that of the two folded plates 2. The distance between the ends of the bending plates 2 far away from each other is larger than the height of the hanging plate 1, the width of the hanging plate 1 is larger than 1/2 of the width of the hanging plate 1, and the thickness of the hanging plate 1 is 1/9 of the length of the hanging plate 1. More specifically: the height of hanger plate 1 is 90mm, and the width of hanger plate 1 is 10mm, and the width of hanger plate 1 is 50mm, and the distance that keeps away from each other between one end of two bent board 2 is 94 mm. During the use, can be directly with hanging plate 1 position below the lewis hole 12 pre-buried to the concrete component in, the bending plate 2 of adoption is the level setting, after the concrete solidifies, bending plate 2 also is difficult to break away from in the concrete component, further increase the joint strength of hanging plate 1 with the concrete component, the probability that hoist and mount split leg board breaks away from the concrete component has significantly reduced, in addition, reinforcing plate 3 and the anti folded plate 4 of adoption can increase the fixed of bending plate 2 and hanging plate 1's relative position, reduce bending plate 2 and hanging plate 1 and produce the probability of deformation, guarantee bending plate 2's intensity.
The upper side of the hanging plate 1 corresponding to the two bending plates 2 is fixedly connected with a supporting tube 14 which penetrates through the hanging plate 1. A plurality of ribs 141 are uniformly fixed between the outer peripheral surface of the support pipe 14 and the surface of the hanger plate 1. The upper end of the hanger plate 1 is also provided with a hanging hole 12, and the two sides of the hanger plate 1 corresponding to the position between the hanging hole 12 and the supporting tube 14 are provided with a gap 13. After the position below the hanging hole 12 of the hanging plate 1 is embedded into the concrete member, the steel bar in the concrete member directly penetrates through the supporting pipe 14, so that after the concrete is solidified, the steel piece is fixed with the hanging plate 1, the adopted supporting pipe 14 is embedded in the concrete, the steel bar penetrates through the supporting pipe 14, two ends of the supporting pipe 14 are both positioned in the concrete, stress concentration caused by small contact position of the steel bar and the hanging plate 1 when the hanging plate 1 bears tensile force is avoided, the probability of breaking of the steel piece is reduced, in addition, after the hanging plate 1 is embedded in the concrete, the positions of the notches 13 on two sides of the hanging plate 1 are filled with the concrete, and the probability of breaking the hanging plate 1 from the concrete member is further reduced.
The principle of the embodiment is as follows: when the concrete split leg plate is used, the position below a hanging hole 12 of the hanging plate 1 can be directly embedded into a concrete member, and a steel bar in the concrete member directly penetrates through the supporting pipe 14, so that after the concrete is solidified, the steel piece is fixed with the hanging plate 1, the adopted supporting pipe 14 is buried in the concrete, the steel bar penetrates through the supporting pipe 14, two ends of the supporting pipe 14 are both positioned in the concrete, stress concentration caused by small contact position of the steel bar and the hanging plate 1 when the hanging plate 1 bears tensile force is avoided, the probability of breaking of the steel piece is reduced, in addition, the adopted bending plate 2 is horizontally arranged, after the concrete is solidified, the bending plate 2 is difficult to break away from the concrete member, the connection strength of the hanging plate 1 and the concrete member is further increased, and the probability of breaking away from the concrete member during hoisting of the split leg plate is greatly reduced.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides a hoist and mount leg cleavage board, includes hanger plate (1), its characterized in that: the lower extreme split of hanger plate (1) is two bent plate (2), and two bent plate (2) tend to keep away from the direction each other respectively and buckle to being in same horizontal plane and perpendicular to hanger plate (1) respectively, the upside rigid coupling that hanger plate (1) corresponds two bent plate (2) is equipped with stay tube (14) of wearing to establish hanger plate (1), hanging hole (12) have still been seted up to the upper end of hanger plate (1).
2. The hoisting split leg plate according to claim 1, wherein: the distance between the ends, far away from each other, of the two bending plates (2) is greater than the height of the hanging plate (1), and the width of the hanging plate (1) is greater than 1/2 of the width of the hanging plate (1).
3. The hoisting split leg plate according to claim 1, wherein: gaps (13) are formed in the positions, corresponding to the positions between the lifting holes (12) and the supporting pipes (14), of the two sides of the lifting plate (1).
4. The hoisting split leg plate according to claim 1, wherein: a plurality of ribbed plates (141) are uniformly and fixedly connected between the peripheral surface of the supporting tube (14) and the surface of the hanging plate (1).
5. The hoisting split leg plate according to claim 1, wherein: and reinforcing plates (3) are fixedly connected between the upper sides of the bending plates (2) and the two sides of the hanging plate (1).
6. The hoisting split leg plate according to claim 1, wherein: and a bending resisting plate (4) is fixedly connected between the lower sides of the two bending plates (2).
7. The hoisting split leg plate according to claim 6, wherein: the anti-folding plate (4) is in an isosceles triangle shape, the bottom surface of the anti-folding plate (4) is fixedly connected with the two bending plates (2), and the length direction of the anti-folding plate (4) is the same as that of the two bending plates (2).
8. The hoisting split leg plate according to claim 1, wherein: the thickness of the hanging plate (1) is 1/9 of the length of the hanging plate (1).
CN201922395449.3U 2019-12-27 2019-12-27 Hoisting leg splitting plate Active CN211338533U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922395449.3U CN211338533U (en) 2019-12-27 2019-12-27 Hoisting leg splitting plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922395449.3U CN211338533U (en) 2019-12-27 2019-12-27 Hoisting leg splitting plate

Publications (1)

Publication Number Publication Date
CN211338533U true CN211338533U (en) 2020-08-25

Family

ID=72104761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922395449.3U Active CN211338533U (en) 2019-12-27 2019-12-27 Hoisting leg splitting plate

Country Status (1)

Country Link
CN (1) CN211338533U (en)

Similar Documents

Publication Publication Date Title
CN211338533U (en) Hoisting leg splitting plate
CN209957239U (en) Lifting appliance for portal crane
CN210313129U (en) Prefabricated floor hoisting structure
CN215331379U (en) Elevator shaft lifting operation platform
CN212222148U (en) Edge-collapse-preventing protection device for T-beam hoisting
CN211521325U (en) Special gallows of steel reinforcement cage
CN210594893U (en) Double-hook clamp for hoisting H-shaped steel beam
CN210217180U (en) Special pre-buried piece that hangs of prefabricated component
CN208948679U (en) Assembled hanger
CN208294090U (en) Plate installs crosshead
CN206872268U (en) T beams are revealed all the details suspender
CN205616430U (en) Railway T beam mold board dismouting hoist and hang and move device
CN212450248U (en) Steel reinforcement cage hoisting frame
CN209668657U (en) A kind of lifting device
CN215828159U (en) Lifting appliance for reinforced concrete pipe
CN215364389U (en) Overhanging type steel overlength wall-attached device
CN210857494U (en) Node reinforcing structure with secondary beam lower than main beam
CN214246628U (en) Clamp for quickly connecting steel templates
CN218619827U (en) Safety clamp for hoisting steel structure
CN217921004U (en) Quick hoist and mount system of superimposed sheet
CN217126692U (en) Device for hoisting overhanging I-shaped steel
CN215976879U (en) Bridge steel case roof beam antiskid hoisting structure
CN217128915U (en) Hanging flower basket equipment rack
CN215101505U (en) Municipal administration water supply and drainage pipeline lays and uses auxiliary device
CN219009694U (en) Hoisting device for box culvert