CN211323730U - Archives management cabinet for engineering cost - Google Patents

Archives management cabinet for engineering cost Download PDF

Info

Publication number
CN211323730U
CN211323730U CN201921867551.2U CN201921867551U CN211323730U CN 211323730 U CN211323730 U CN 211323730U CN 201921867551 U CN201921867551 U CN 201921867551U CN 211323730 U CN211323730 U CN 211323730U
Authority
CN
China
Prior art keywords
rod
concatenation
cabinet
thick bamboo
diapire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921867551.2U
Other languages
Chinese (zh)
Inventor
辛玉川
温勇
何斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kaiyuan Digital Intelligence Engineering Consulting Group Co ltd
Original Assignee
Sichuan Kaiyuan Engineering Project Management Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Kaiyuan Engineering Project Management Consulting Co Ltd filed Critical Sichuan Kaiyuan Engineering Project Management Consulting Co Ltd
Priority to CN201921867551.2U priority Critical patent/CN211323730U/en
Application granted granted Critical
Publication of CN211323730U publication Critical patent/CN211323730U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Assembled Shelves (AREA)

Abstract

The utility model relates to a file management cabinet for engineering cost, including a plurality of concatenation cabinets that form along vertical direction mutual concatenation, the face that adjacent concatenation cabinet is relative sets up respectively into roof and diapire, the diapire is located the roof top, the diapire is provided with the body of rod perpendicular to the diapire on the face towards the roof, set up the through-hole that is used for supplying the body of rod to pass on the roof, be provided with the anticreep spare that is used for preventing the body of rod from breaking away from in the through-hole on the body of rod, when needs fix adjacent concatenation cabinet to one, pass the through-hole on the concatenation cabinet roof of lower part through driving the body of rod on the concatenation cabinet diapire of upper portion, prevent the skew that the position appears between the adjacent concatenation cabinet, thereby prevent the concatenation cabinet of upper portion from moving on the concatenation cabinet; the setting of anticreep piece can be fixed the body of rod to the through-hole in to further prevent that the concatenation cabinet from dropping, improved the fixed effect between the adjacent concatenation cabinet.

Description

Archives management cabinet for engineering cost
Technical Field
The utility model belongs to the technical field of the cost appurtenance technique and specifically relates to a archives management cabinet for engineering cost is related to.
Background
The construction cost directly means the construction price of the project. The three elements of project pricing are volume, price and fee. In a broad sense, the construction cost covers construction engineering cost (civil engineering major and installation major), highway engineering cost, water transportation engineering cost, railway engineering cost, hydraulic engineering cost, electric power engineering cost, communication engineering cost, aerospace engineering cost and the like. The construction cost is the total cost for some construction, and the core content is investment estimation, design approximate calculation, correction approximate calculation, construction drawing budget, construction settlement, completion settlement and the like.
The Chinese patent with the publication number of CN209031482U discloses a file management cabinet for engineering cost, which comprises a first file cabinet and a second file cabinet arranged on the ground, wherein the first file cabinet is formed by fixedly connecting a plurality of cabinet body units in a transverse and vertical manner; the second file cabinet is formed by detachably connecting a plurality of cabinet body units through detachable components; the detachable assembly comprises a plurality of rectangular convex blocks fixedly connected to one end, close to the ground, of the cabinet body unit on the upper layer and a plurality of inserting grooves for the convex blocks to be inserted into.
But its weak point lies in, can dismantle through rectangle lug and slot with adjacent cabinet body and be connected to together, runs through cabinet body unit setting because of the both ends of slot, when getting when putting archives, can drive the lug on the cabinet body unit of upper portion and remove in the slot on the cabinet body unit of lower part to the concatenation cabinet that leads to upper portion moves on the concatenation cabinet of lower part and causes and drops, has reduced the connection effect between the adjacent cabinet body unit.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a prevent that the cabinet body from empting and can improve the engineering of the connection effect between the adjacent cabinet body and make archives management cabinet for cost.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
the utility model provides a file management cabinet for engineering cost, includes a plurality of concatenation cabinets that form along vertical direction each other concatenation, every the cavity has all been seted up towards in the concatenation cabinet to the one side of concatenation cabinet, every the concatenation is all articulated to be provided with and is used for cavity confined baffle, every the concatenation is cashier's office in a shop all be provided with the hasp that is used for fixing the baffle to the confined cavity state, and is adjacent the face that the concatenation cabinet is relative sets up respectively to roof and diapire, the diapire is located the roof top, the diapire is provided with the body of rod towards perpendicular to diapire on the face of roof, set up the through-hole that is used for supplying the body of rod to pass on the roof, be provided with on the body of rod and be used for preventing the body of.
By adopting the technical scheme, when the adjacent splicing cabinets need to be fixed together, the rod body on the bottom wall of the upper splicing cabinet is driven to pass through the through hole on the top wall of the lower splicing cabinet, so that the adjacent splicing cabinets are prevented from being shifted, the splicing cabinet on the upper part is prevented from moving on the splicing cabinet on the lower part, and the splicing cabinet on the upper part is prevented from falling; the setting of anticreep piece can be fixed the body of rod to the through-hole in to further prevent that the concatenation cabinet from dropping, improved the fixed effect between the adjacent concatenation cabinet.
The utility model discloses further set up to: the anticreep piece is established and sliding connection just is used for deviating from the barrel of the face butt of diapire with the roof including the cover on the body of rod, the barrel includes two first concatenation section of thick bamboos and the second concatenation section of thick bamboos that splice each other and form, be provided with between first concatenation section of thick bamboo and the second concatenation section of thick bamboo and be used for fixing the mounting to the body of rod with the barrel.
Through adopting above-mentioned technical scheme, establish to the body of rod through splicing a section of thick bamboo and second concatenation section of thick bamboo cover, drive first concatenation section of thick bamboo and second concatenation section of thick bamboo butt joint to the roof on deviating from the face of diapire, it is fixed to the body of rod to splice a section of thick bamboo and second through the mounting with first concatenation section of thick bamboo, when the body of rod moves towards the direction of keeping away from the through-hole, first concatenation section of thick bamboo and second concatenation section of thick bamboo can play the effect that blocks to the breaking away from of the body of rod and through-hole, prevent that the body of rod breaks away from in the through-hole, thereby further improved the fixed effect between the adjacent concatenation cabinet, prevent that the position between the adjacent concatenation cabinet from appearing the deviation.
The utility model discloses further set up to: the direction that a first concatenation section of thick bamboo was kept away from to the both sides edge orientation of a first concatenation section of thick bamboo extends and is provided with first fixed plate, the direction that a second concatenation section of thick bamboo was kept away from to the both sides edge orientation of a second concatenation section of thick bamboo extends and is provided with the second fixed plate, first fixed plate and second fixed plate are relative and are mutual parallel arrangement, the mounting is including setting up the spring between first fixed plate and second fixed plate, the one end of spring is connected to on the first fixed plate, and the other end is connected to on the second fixed plate.
Through adopting above-mentioned technical scheme, when establishing first concatenation section of thick bamboo and second concatenation section of thick bamboo cover to the body of rod on, first concatenation section of thick bamboo and second concatenation section of thick bamboo can drive the spring and be in tensile state, thereby make first concatenation section of thick bamboo and second concatenation section of thick bamboo resist the elasticity butt joint of spring to the body of rod on, thereby make first concatenation section of thick bamboo and second concatenation section of thick bamboo fix to the body of rod on, drive first concatenation section of thick bamboo and second concatenation section of thick bamboo cover through the elasticity that resists the spring and establish to the body of rod on can be fixed the body of rod to the through-hole in, fixed and dismantlement mode mean square just simple, installer's installation and dismantlement efficiency have been improved.
The utility model discloses further set up to: the spring fixing device is characterized in that a guide rod is arranged between the first fixing plate and the second fixing plate and at the position where the spring is located, one end of the guide rod is connected to the first fixing plate, the other end of the guide rod penetrates through the first fixing plate and is connected to the second fixing plate in a sliding mode, and the spring is sleeved on the guide rod.
Through adopting above-mentioned technical scheme, the guide bar can play the effect of direction to the extension and the compression of spring, prevents that the spring from inclining when extension and compression to prevent that the spring from driving first concatenation section of thick bamboo and the slope of second concatenation section of thick bamboo, improved the butt effect between first concatenation section of thick bamboo and the second concatenation section of thick bamboo and the body of rod, thereby improved the fixed effect of first concatenation section of thick bamboo and second concatenation section of thick bamboo on being fixed to the body of rod.
The utility model discloses further set up to: the connecting structure is characterized in that a clamping groove used for allowing the first splicing barrel and the second splicing barrel on two sides to move in is formed in the rod body along the length direction of the rod body, and the clamping groove is formed in the rod body along the circumferential position hoop of the rod body.
Through adopting above-mentioned technical scheme, move into first concatenation section of thick bamboo and second concatenation section of thick bamboo to the joint inslot, prevent that first concatenation section of thick bamboo and second concatenation section of thick bamboo from removing along the length direction of the body of rod on the body of rod, can drive barrel butt to joint inslot when the direction of height of the cabinet body is removed along to adjacent concatenation section of thick bamboo to further prevent to break away from between the body of rod and the through-hole, improved the fixed effect of first concatenation section of thick bamboo and second concatenation section of thick bamboo fixed to on the body of rod.
The utility model discloses further set up to: the end portion of the rod body close to the bottom wall is perpendicular to the rod body and is provided with a connecting plate, a bolt in threaded connection with the bottom wall penetrates through the connecting plate, and the rod body is detachably connected to the bottom wall through the bolt on the connecting plate.
Through adopting above-mentioned technical scheme, pass through the bolt with the body of rod and can dismantle and be connected to on the diapire, conveniently when assembling the cabinet body with the body of rod fixed to the diapire on, accord with actual installation and application, adopt setting up of bolt convenient to fix the body of rod to can be so that the body of rod has better fastness on the diapire.
The utility model discloses further set up to: the connecting plate is characterized in that a groove for the connecting plate to move in is formed in the position, where the connecting plate is located, of the bottom wall, the surface, facing the top wall, of the connecting plate and the surface, facing the top wall, of the bottom wall are located on the same surface, and counter bores for the heads of the bolts to move in are formed in the position, located at the positions, of the bolts, of the connecting plate.
Through adopting above-mentioned technical scheme, the setting of recess and counter bore can make and laminate to together between roof and the diapire for connecting plate and bolt are all hidden to the recess in, prevent that connecting plate and bolt from causing the influence to the concatenation between the adjacent concatenation cabinet, thereby have improved the concatenation effect between the adjacent concatenation cabinet.
To sum up, the utility model discloses a beneficial technological effect does:
when needs are fixed to together adjacent concatenation cabinet, pass the through-hole on the roof through the body of rod that drives on the diapire, with first concatenation section of thick bamboo and second concatenation section of thick bamboo alternate segregation and cover establish on the body of rod, make first concatenation section of thick bamboo and second concatenation section of thick bamboo resist the elasticity joint to the joint inslot of spring, thereby make the body of rod fixed to the through-hole in, prevent to appear squinting between the adjacent concatenation cabinet, thereby prevent that the concatenation cabinet on upper portion from dropping on the concatenation cabinet of lower part, the concatenation effect between the adjacent concatenation cabinet has been improved.
Drawings
Fig. 1 is a schematic structural view of the whole of the present invention;
fig. 2 is an explosion structure diagram of the rod body and the adjacent splicing cabinet of the utility model;
fig. 3 is an explosion structure diagram of the rod body and the barrel of the present invention.
In the figure, 1, a splicing cabinet; 11. a cavity; 111. a baffle plate; 112. a hasp; 12. a top wall; 121. a through hole; 122. a connecting plate; 123. a bolt; 124. a groove; 125. a counter bore; 13. a bottom wall; 131. a rod body; 132. a first splicing sleeve; 133. a second splicing barrel; 134. a first fixing plate; 135. a second fixing plate; 136. a spring; 137. a guide bar; 138. a clamping groove; 139. the handle is pulled.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses a file management cabinet for engineering cost, including a plurality of concatenation cabinets 1 that form along vertical direction each other, cavity 11 has all been seted up towards concatenation cabinet 1 in to the one side of every concatenation cabinet 1, all articulates on every concatenation cabinet 1 to be provided with and is used for 11 confined baffles 111 with cavity, all is provided with on every concatenation cabinet 1 to be used for fixing the hasp 112 to the closed cavity 11 state with baffle 111.
With reference to fig. 1 and 2, the opposite surfaces of adjacent splicing cabinets 1 are respectively provided as a top wall 12 and a bottom wall 13, the bottom wall 13 is located above the top wall 12, a rod body 131 is arranged on the surface of the bottom wall 13 facing the top wall 12, the surface being perpendicular to the bottom wall 13, and the top wall 12 is provided with a through hole 121 for the rod body 131 to pass through; after the rod body 131 on the bottom wall 13 of the upper splicing cabinet 1 penetrates through the through hole 121 on the top wall 12 of the lower splicing cabinet 1, the position deviation between the adjacent splicing cabinets 1 along the horizontal direction can be prevented, and therefore the splicing cabinet 1 on the upper portion is prevented from falling on the splicing cabinet 1 on the lower portion.
With reference to fig. 2 and fig. 3, in order to prevent the rod 131 from separating from the through hole 121, a barrel body sleeved on the rod 131 and slidably connected to the barrel body for abutting against the surface of the top wall 12 deviating from the bottom wall 13 is provided, the barrel body includes two first splicing barrels 132 and second splicing barrels 133 spliced with each other, two side edges of the first splicing barrels 132 extend towards the direction away from the first splicing barrels 132 to be provided with first fixing plates 134, two side edges of the second splicing barrels 133 extend towards the direction away from the second splicing barrels 133 to be provided with second fixing plates 135, and the first fixing plates 134 and the second fixing plates 135 are arranged in parallel relatively.
As shown in fig. 3, in order to fix the first and second split cylinders 132 and 133 to the rod 131, so that the first and second split cylinders 132 and 133 block the rod 131 from being separated from the through hole 121, a spring 136 is disposed between the first and second fixing plates 134 and 135, and one end of the spring 136 is connected to the first fixing plate 134, and the other end is connected to the second fixing plate 135.
When the rod body 131 is fixed in the through hole 121, the first splicing barrel 132 and the second splicing barrel 133 are driven to be away from each other so that the spring 136 is in a stretching state, the first splicing barrel 132 and the second splicing barrel 133 are sleeved on the rod body 131, the first splicing barrel 132 and the second splicing barrel 133 resist the elastic force of the spring 136 to abut against the rod body 131, the first splicing barrel 132 and the second splicing barrel 133 are fixed on the rod body 131, when the adjacent splicing cabinets 1 move along the vertical direction, the barrel abutting on the rod body 131 can be driven to abut against the surface of the top wall 12 deviating from the bottom wall 13, and the adjacent splicing cabinets 1 are prevented from being separated from each other along the vertical direction.
Referring to fig. 2 and 3, in order to prevent the spring 136 from tilting during stretching and compressing, so that the first splicing sleeve 132 and the second splicing sleeve 133 can better abut against the rod 131 against the elastic force of the spring 136, a guide rod 137 is disposed between the first fixing plate 134 and the second fixing plate 135 and at the position where the spring 136 is located, one end of the guide rod 137 is connected to the first fixing plate 134, the other end of the guide rod 137 is inserted into and slidably connected to the second fixing plate 135, and the spring 136 is sleeved on the guide rod 137.
With reference to fig. 2 and fig. 3, in order to facilitate driving the second splicing cylinder 133 to move on the guide bar 137, a pulling handle 139 for pulling the second splicing cylinder 133 to move is disposed on a surface of the second splicing cylinder 133 away from the first splicing cylinder 132.
As shown in fig. 3, in order to prevent the barrel from moving on the rod 131 due to insufficient elasticity, a clamping groove 138 for the first splicing tube 132 and the second splicing tube 133 at two sides to move in is formed in the rod 131 along the length direction of the rod 131, and the clamping groove 138 is circumferentially formed in the rod 131 along the circumferential position of the rod 131.
Referring to fig. 2 and 3, in order to detachably connect the rod 131 to the bottom wall 13, a connecting plate 122 is disposed at an end of the rod 131 close to the bottom wall 13 and perpendicular to the rod 131, a bolt 123 threaded into the bottom wall 13 is disposed on the connecting plate 122, and the rod 131 is detachably connected to the bottom wall 13 through the bolt 123 on the connecting plate 122.
With reference to fig. 2 and 3, in order to prevent the connection between the bottom wall 13 and the top wall 12 from being affected by the connecting plate 122 and the bolt 123, a groove 124 for the connecting plate 122 to move in is formed in the bottom wall 13 at a position where the connecting plate 122 is located, a surface of the connecting plate 122 facing the top wall 12 and a surface of the bottom wall 13 facing the top wall 12 are located on the same surface, and a counter bore 125 for the head of the bolt 123 to move in is formed in the connecting plate 122 at a position where the bolt 123 is located.
The implementation principle of the embodiment is as follows: when adjacent splicing cabinets 1 need to be fixed together, the rod body 131 is driven by the rod body 131 to move into the connecting groove, the connecting plate 122 is fixed into the groove 124 through the bolt 123, at the moment, the rod body 131 on the bottom wall 13 is driven to penetrate through the through hole 121 in the top wall 12, the first splicing barrel 132 and the second splicing barrel 133 are separated from each other and sleeved on the rod body 131, the first splicing barrel 132 and the second splicing barrel 133 resist the elastic force of the spring 136 and are clamped into the clamping groove 138, the rod body 131 is fixed into the through hole 121, the adjacent splicing cabinets 1 are prevented from offsetting along the horizontal direction and the vertical direction, the splicing cabinet 1 on the upper portion is prevented from dropping on the splicing cabinet 1 on the lower portion, and the splicing effect between the adjacent splicing cabinets 1 is improved.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides a archives management cabinet for engineering cost, includes a plurality of concatenation cabinets (1) that form along vertical direction each other, every cavity (11), every have all been seted up towards in the concatenation cabinet (1) to the one side of concatenation cabinet (1) all articulated being provided with on concatenation cabinet (1) and being used for cavity (11) confined baffle (111), every all be provided with hasp (112) that are used for fixing baffle (111) to confined cavity (11) state on concatenation cabinet (1), its characterized in that: it is adjacent the relative face of concatenation cabinet (1) sets up respectively to roof (12) and diapire (13), diapire (13) are located roof (12) top, diapire (13) are provided with body of rod (131) towards perpendicular to diapire (13) on the face of roof (12), offer through-hole (121) that are used for supplying body of rod (131) to pass on roof (12), be provided with on the body of rod (131) and be used for preventing the anti-escape piece that body of rod (131) breaks away from in through-hole (121).
2. The archive management cabinet for construction cost according to claim 1, characterized in that: the anticreep piece is established and sliding connection just is used for deviating from the barrel of the face butt of diapire (13) with roof (12) on the body of rod (131) including the cover, the barrel includes two first concatenation section of thick bamboos (132) and the second concatenation section of thick bamboos (133) that splice each other and form, be provided with between first concatenation section of thick bamboo (132) and the second concatenation section of thick bamboo (133) and be used for fixing the mounting on the body of rod (131) with the barrel.
3. The archive management cabinet for construction cost according to claim 2, characterized in that: the direction that first concatenation section of thick bamboo (132) was kept away from to the both sides edge orientation of first concatenation section of thick bamboo (132) extends and is provided with first fixed plate (134), the direction that the second concatenation section of thick bamboo (133) was kept away from to the both sides edge orientation of second concatenation section of thick bamboo (133) extends and is provided with second fixed plate (135), first fixed plate (134) and second fixed plate (135) are relative and be mutual parallel arrangement, the mounting is including setting up spring (136) between first fixed plate (134) and second fixed plate (135), the one end of spring (136) is connected to on first fixed plate (134), and the other end is connected to on second fixed plate (135).
4. A project cost file management cabinet according to claim 3, wherein: a guide rod (137) is arranged between the first fixing plate (134) and the second fixing plate (135) and located at the position where the spring (136) is located, one end of the guide rod (137) is connected to the first fixing plate (134), the other end of the guide rod (137) penetrates through the first fixing plate (134) and is connected to the second fixing plate (135) in a sliding mode, and the spring (136) is sleeved on the guide rod (137).
5. The archive management cabinet for construction cost according to claim 4, characterized in that: the clamping groove (138) used for allowing the first splicing barrel (132) and the second splicing barrel (133) on two sides to move in is arranged on the rod body (131) along the length direction of the rod body (131), and the clamping groove (138) is annularly arranged on the rod body (131) along the circumferential position of the rod body (131).
6. The archive management cabinet for construction cost according to claim 1, characterized in that: the end part of the rod body (131) close to the bottom wall (13) is provided with a connecting plate (122) perpendicular to the rod body (131), a bolt (123) in the bottom wall (13) is connected to the connecting plate (122) in a threaded mode in a penetrating mode, and the rod body (131) is detachably connected to the bottom wall (13) through the bolt (123) on the connecting plate (122).
7. The archive management cabinet for construction cost according to claim 6, characterized in that: the connecting plate is characterized in that a groove (124) for moving the connecting plate (122) into is formed in the position, where the connecting plate (122) is located, of the bottom wall (13), the surface, facing the top wall (12), of the connecting plate (122) and the surface, facing the top wall (12), of the bottom wall (13) are located on the same surface, and a counter bore (125) for moving the head of the bolt (123) into is formed in the position, where the bolt (123) is located, of the connecting plate (122).
8. The archive management cabinet for construction cost according to claim 2, characterized in that: and a pulling handle (139) for pulling the second splicing barrel (133) to move is arranged on the surface of the second splicing barrel (133) departing from the first splicing barrel (132).
CN201921867551.2U 2019-10-31 2019-10-31 Archives management cabinet for engineering cost Active CN211323730U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921867551.2U CN211323730U (en) 2019-10-31 2019-10-31 Archives management cabinet for engineering cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921867551.2U CN211323730U (en) 2019-10-31 2019-10-31 Archives management cabinet for engineering cost

Publications (1)

Publication Number Publication Date
CN211323730U true CN211323730U (en) 2020-08-25

Family

ID=72089180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921867551.2U Active CN211323730U (en) 2019-10-31 2019-10-31 Archives management cabinet for engineering cost

Country Status (1)

Country Link
CN (1) CN211323730U (en)

Similar Documents

Publication Publication Date Title
CN218969757U (en) Novel bridge expansion joint with high sealing performance
CN217270218U (en) Shield tunnel segment lining structure
CN211323730U (en) Archives management cabinet for engineering cost
CN214658813U (en) Template reinforced structure for construction
CN207903875U (en) Opening device for sealing cylinder cover
CN210459646U (en) Steel construction assembled wallboard node
CN204590599U (en) A kind of corner internal corner formwork for aluminum alloy mould plate system
CN211396605U (en) Adjustable template reinforcing apparatus
CN215518822U (en) Recyclable steel sheet pile supporting structure
CN210300383U (en) Show cupboard convenient to equipment of dismantling
CN214301771U (en) Foundation pit supporting structure
CN214146144U (en) Diagonal connecting piece structure for aluminum profile
CN211073419U (en) Ejector pin device for parts
CN211897635U (en) Rail cementing insulation joint clamping plate detacher
CN211815813U (en) Install swift wave form guardrail for road
CN211079905U (en) Construction protective fence for building bridge
CN210190103U (en) Assembled underground garage channel-shaped plate mould
CN113089501A (en) Self-locking type profile steel support frame for large cantilever bent cap construction
CN203834831U (en) Guardrail corner connecting structure
CN214576264U (en) Practical prefabricated wall body
CN214884865U (en) Building structure design wall column base quick connecting device
CN211342117U (en) Conveniently dismantle bounding wall for engineering construction of concatenation
CN220979056U (en) Safety protection device for construction of large-span swivel bridge adjacent business line
CN217233026U (en) Protective guard structure
CN215292074U (en) Safety protection door is used in construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Room 901, 9th Floor, Unit 2, Building 1, No. 233 Jiaozi Avenue, Chengdu High tech Zone, China (Sichuan) Pilot Free Trade Zone, Chengdu City, Sichuan Province, 610000

Patentee after: Kaiyuan Digital Intelligence Engineering Consulting Group Co.,Ltd.

Address before: 610094 No. 901, 9th Floor, Unit 2, Building 1, No. 233, Jiaozi Avenue, Chengdu High-tech Zone, China (Sichuan) Free Trade Pilot Zone, Chengdu, Sichuan Province

Patentee before: Sichuan Kaiyuan Engineering Project Management Consulting Co.,Ltd.

CP03 Change of name, title or address