CN211314150U - A high-pressure drilling and sealing device - Google Patents

A high-pressure drilling and sealing device Download PDF

Info

Publication number
CN211314150U
CN211314150U CN201921226381.XU CN201921226381U CN211314150U CN 211314150 U CN211314150 U CN 211314150U CN 201921226381 U CN201921226381 U CN 201921226381U CN 211314150 U CN211314150 U CN 211314150U
Authority
CN
China
Prior art keywords
steel pipe
section
flange
steel
pressure relief
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921226381.XU
Other languages
Chinese (zh)
Inventor
曹耀东
李木秋
杨洪波
和丽钢
易明雄
李应川
谢鸿辉
华世坤
李海福
刘文斌
王宁
刘长林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 14 Co Ltd
Original Assignee
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 14 Co Ltd filed Critical Sinohydro Bureau 14 Co Ltd
Priority to CN201921226381.XU priority Critical patent/CN211314150U/en
Application granted granted Critical
Publication of CN211314150U publication Critical patent/CN211314150U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

本实用新型涉及一种高压钻孔密封装置,其特征在于包括:卸压段、密封段和密封段紧固组件;使用时,将钻杆穿过密封段,在钻杆端部安装钻头,调整钻机位置,使钻杆方向与已埋设的孔口段的方向一致,将钻头藏入卸压段内,通过第一连接螺栓和第一连接螺母连接卸压段与密封段,打开已埋设的孔口段上的球阀,开始钻孔施工,钻孔过程中打开卸压段的卸压球阀进行排渣及卸压,如密封装置发生卸漏,可通过拧紧紧固螺栓压紧橡胶密封圈封堵渗漏。本实用新型结构简单、使用方便、易于推广,能有效防止高压工况下钻孔时孔口发生大量漏水和喷涌。

Figure 201921226381

The utility model relates to a high-pressure drilling sealing device, which is characterized by comprising: a pressure relief section, a sealing section and a sealing section fastening component; when in use, a drill rod is passed through the sealing section, a drill bit is installed at the end of the drill rod, and the adjustment Position the drilling rig so that the direction of the drill pipe is consistent with the direction of the buried orifice section, hide the drill bit in the pressure relief section, connect the pressure relief section and the sealing section through the first connecting bolt and the first connecting nut, and open the buried hole The ball valve on the mouth section starts drilling construction. During the drilling process, open the pressure relief ball valve in the pressure relief section for slag discharge and pressure relief. If the sealing device leaks, it can be blocked by tightening the fastening bolts and pressing the rubber sealing ring. leakage. The utility model has the advantages of simple structure, convenient use and easy popularization, and can effectively prevent a large amount of water leakage and gushing from the orifice when drilling under high pressure conditions.

Figure 201921226381

Description

一种高压钻孔密封装置A high-pressure drilling and sealing device

技术领域technical field

本实用新型属于地下钻孔与灌浆技术领域,具体涉及一种高压钻孔密封装置。The utility model belongs to the technical field of underground drilling and grouting, in particular to a high-pressure drilling sealing device.

背景技术Background technique

随着国家经济建设的发展和对地下空间的开发利用,大量的电力、地铁、公路、水工等隧道需要在江底或海底建设,由于江底或海底工程水文和工程地质条件复杂多变,施工过程中不可避免的要进行超前地质补堪钻孔和超前孔及注浆加固,这样就会涉及在高水压下复杂地质环境下的钻孔施工。由于在江底或海底钻孔,水压大,钻孔过程中不可避免的会发生孔口喷水或涌水,从而带来安全隐患。因此在钻孔过程中在孔口增设密封装置,防止钻孔过程中出现大量漏水和喷涌,具有极为重要的现实意义和价值。With the development of national economic construction and the development and utilization of underground space, a large number of tunnels such as electric power, subway, highway, and hydraulic engineering need to be constructed on the bottom of the river or on the seabed. During the construction process, it is inevitable to carry out advanced geological drilling, advanced drilling and grouting reinforcement, which will involve drilling construction in a complex geological environment under high water pressure. Due to the high water pressure when drilling on the bottom of the river or the seabed, water spray or gushing from the orifice will inevitably occur during the drilling process, which will bring security risks. Therefore, it is of extremely important practical significance and value to add a sealing device at the orifice during the drilling process to prevent a large amount of water leakage and gushing during the drilling process.

实用新型内容Utility model content

本实用新型所要解决的技术问题是:针对上述现有技术存在的不足,提供一种结构简单、使用方便、易于推广、成本低廉,可减少或避免施工过程中对周围人员及车辆造成危害,防止路面破除时碎块飞溅的装置。The technical problem to be solved by the present utility model is: aiming at the above-mentioned deficiencies of the prior art, to provide a simple structure, convenient use, easy promotion and low cost, which can reduce or avoid the harm to surrounding personnel and vehicles during the construction process, and prevent A device for splattering debris when the road is broken.

为解决以上技术问题,本实用新型通过以下技术方案实现:In order to solve the above technical problems, the utility model is realized through the following technical solutions:

一种高压钻孔密封装置,其特征在于包括:第一钢管、第一法兰盘、第二法兰盘、第二钢管、卸压球阀、配套使用的第一连接螺栓和第一连接螺母、第三钢管、第三法兰盘、第一钢板圆环、环形的橡胶密封垫圈、紧固螺母、第二钢板圆环、中部设有一个开孔且两侧设有两个圆孔的钢板条、与紧固螺母配套的紧固螺栓和第二连接螺栓;A high-pressure drilling and sealing device is characterized in that it comprises: a first steel pipe, a first flange, a second flange, a second steel pipe, a pressure relief ball valve, a first connecting bolt and a first connecting nut that are used together, The third steel pipe, the third flange, the first steel plate ring, the annular rubber sealing washer, the tightening nut, the second steel plate ring, the steel strip with one hole in the middle and two holes on both sides , the fastening bolt and the second connecting bolt matched with the fastening nut;

三个法兰盘的型号一致,法兰盘的内径与第一钢管和第三钢管的外径相同;在第一钢管的侧面上设有一个直径与第二钢管内径一致的圆孔,卸压球阀与第二钢管的尺寸匹配;第一钢板圆环、橡胶密封垫圈和第二钢板圆环的内外径相同,内径略大于钻孔设备的钻杆和钻头的外径,外径与第三钢管的内径一致,第一钢板圆环的厚度与橡胶密封垫圈的长度之和略小于第三钢管的长度;钢板条中部的开孔尺寸大于橡胶密封垫圈的内径,其两侧的圆孔内径与紧固螺母的内径相同,两个圆孔中心间距与焊接在第三钢管上的两个紧固螺母中心间距一致;紧固螺栓的长度大于第二钢板圆环厚度与钢板条厚度之和;The models of the three flanges are the same, and the inner diameter of the flange is the same as the outer diameter of the first steel pipe and the third steel pipe; a circular hole with the same diameter as the inner diameter of the second steel pipe is arranged on the side of the first steel pipe to relieve pressure. The ball valve matches the size of the second steel pipe; the inner and outer diameters of the first steel plate ring, rubber sealing gasket and the second steel plate ring are the same, and the inner diameter is slightly larger than the outer diameter of the drill pipe and drill bit of the drilling equipment, and the outer diameter is the same as that of the third steel pipe. The inner diameter of the steel plate is the same, the sum of the thickness of the first steel plate ring and the length of the rubber sealing washer is slightly smaller than the length of the third steel pipe; the size of the opening in the middle of the steel strip is larger than the inner diameter of the rubber sealing washer, and the inner diameter of the circular holes on both sides is the same as that of the tight The inner diameter of the fixing nut is the same, and the center spacing of the two circular holes is the same as the center spacing of the two tightening nuts welded on the third steel pipe; the length of the tightening bolt is greater than the sum of the thickness of the second steel plate ring and the thickness of the steel strip;

第一法兰盘和第二法兰盘分别焊接在第一钢管的两端,第二钢管的一端焊接在第一钢管上的圆孔周围,另一端的外表面车丝形成螺纹并与卸压球阀连接,组成卸压段;The first flange plate and the second flange plate are respectively welded on both ends of the first steel pipe, one end of the second steel pipe is welded around the round hole on the first steel pipe, and the outer surface of the other end is threaded to form a thread and is connected with the pressure relief. Ball valve connection to form a pressure relief section;

第三法兰盘和第一钢板圆环分别焊接在第三钢管同一端的内外侧,紧固螺母焊接在第三钢管另一端的外侧,橡胶密封垫圈插入第三钢管的内部,组成密封段;The third flange and the first steel plate ring are respectively welded on the inner and outer sides of the same end of the third steel pipe, the fastening nut is welded on the outer side of the other end of the third steel pipe, and the rubber sealing washer is inserted into the interior of the third steel pipe to form a sealing section;

第二钢板圆环中部的圆孔和钢板条中部的开孔对准接触后组成密封段紧固组件;The circular hole in the middle of the second steel plate ring and the opening in the middle of the steel strip are aligned and contacted to form a sealing section fastening assembly;

卸压段和密封段通过第一连接螺栓和第一连接螺母将第二法兰盘和第三法兰盘连接以完成组装;密封段和密封段紧固组件通过紧固螺栓和紧固螺母连接以完成组装,组装后橡胶密封垫圈和第二钢板圆环的一端卡入第三钢管内,第二钢板圆环的另一端与钢板条直接接触。The pressure relief section and the sealing section are connected by the first connecting bolt and the first connecting nut to the second flange and the third flange to complete the assembly; the sealing section and the sealing section fastening component are connected by the fastening bolt and the fastening nut To complete the assembly, after assembly, one end of the rubber sealing gasket and the second steel plate ring is clamped into the third steel pipe, and the other end of the second steel plate ring is in direct contact with the steel strip.

作为优选方案,所述的一种高压钻孔密封装置,所述第一法兰盘和第二法兰盘与第一钢管两端的连接方式、以及第三法兰盘和第三钢管的连接方式为螺纹连接。As a preferred solution, in the above-mentioned high-pressure drilling and sealing device, the connection mode of the first flange plate and the second flange plate and the two ends of the first steel pipe, and the connection mode of the third flange plate and the third steel pipe For threaded connection.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the present utility model are:

1、本实用新型主要由卸压段、密封段和密封段紧固组件组成,使用过程中,通过打开卸压段上的球阀,可以非常容易可以实现钻孔过程中的排渣和卸压,为防止密封装置发生卸漏,可通过拧紧紧固螺栓压紧橡胶密封圈封堵渗漏,既能防止钻孔过程中大量漏水和喷涌,又能方便地实现钻孔过程中的排渣和卸压。1. The utility model is mainly composed of a pressure relief section, a sealing section and a sealing section fastening component. During use, by opening the ball valve on the pressure relief section, the slag discharge and pressure relief in the drilling process can be easily realized, In order to prevent leakage of the sealing device, the leakage can be blocked by tightening the fastening bolts and pressing the rubber sealing ring. pressure.

2、本实用新型仅由卸压段、密封段和密封段紧固组件和简单的螺栓和螺母组成,结构简单非常简单,拆卸、安装和使用均非常方便,而且相关材料和部件价格低廉,容易获得,因而非常容易推广使用。2. The utility model is only composed of a pressure relief section, a sealing section, a sealing section fastening component and simple bolts and nuts, the structure is simple and very simple, the disassembly, installation and use are very convenient, and the relevant materials and components are cheap and easy to use. Obtained, so it is very easy to promote and use.

附图说明Description of drawings

下面对本说明书附图所表达的内容及图中的标记作简要说明:The following is a brief description of the content expressed in the drawings of this specification and the symbols in the drawings:

图1是高压钻孔密封装置剖面图。Fig. 1 is a sectional view of a high pressure drilling sealing device.

图2是高压钻孔密封装置安装使用状态示意图。Figure 2 is a schematic diagram of the installation and use state of the high-pressure drilling and sealing device.

图3是高压钻孔密封装置组成结构示意图。Figure 3 is a schematic diagram of the composition of the high-pressure drilling and sealing device.

图4是高压钻孔密封装置卸压段正视图。Figure 4 is a front view of the pressure relief section of the high pressure drilling sealing device.

图5是高压钻孔密封装置卸压段左视图。Figure 5 is the left side view of the pressure relief section of the high pressure drilling sealing device.

图6是高压钻孔密封装置密封段正视图。Figure 6 is a front view of the sealing section of the high pressure drilling sealing device.

图7是高压钻孔密封装置密封段左视图。Figure 7 is a left side view of the sealing section of the high pressure drilling sealing device.

图8是高压钻孔密封装置密封段右视图。Figure 8 is a right side view of the sealing section of the high pressure drilling sealing device.

图9是高压钻孔密封装置密封段紧固组件正视图。FIG. 9 is a front view of the sealing section fastening assembly of the high pressure drilling sealing device.

图10是高压钻孔密封装置密封段紧固组件左视图。Figure 10 is a left side view of the sealing section fastening assembly of the high pressure drilling sealing device.

图11是高压钻孔密封装置密封段紧固组件右视图。Figure 11 is a right side view of the sealing section fastening assembly of the high pressure drilling sealing device.

图中,1—第一钢管,2—第一法兰盘,3—第二法兰盘,4—第二钢管,5—卸压球阀,6—第一连接螺栓,7—第一连接螺母,8—第三钢管,9—第三法兰盘,10—第一钢板圆环,11—橡胶密封垫圈,12—紧固螺母,13—第二钢板圆环,14—钢板条,15—紧固螺栓,16—第二连接螺栓。In the figure, 1-first steel pipe, 2-first flange, 3-second flange, 4-second steel pipe, 5-pressure relief ball valve, 6-first connecting bolt, 7-first connecting nut , 8—third steel pipe, 9—third flange, 10—first steel plate ring, 11—rubber sealing washer, 12—fastening nut, 13—second steel plate ring, 14—steel strip, 15— Fastening bolts, 16—second connecting bolts.

具体实施方式Detailed ways

下面对照附图,通过实施例,对本实用新型作进一步详细的说明,以帮助本领域技术人员对本实用新型的实用新型构思、技术方案有更完整、准确和深入的理解。Below with reference to the accompanying drawings, the present utility model will be further described in detail through the embodiments, so as to help those skilled in the art to have a more complete, accurate and in-depth understanding of the utility model concept and technical solutions of the present utility model.

实施例1Example 1

如图1所示,一种高压钻孔密封装置,其特征在于包括第一钢管1、第一法兰盘2、第二法兰盘3、第二钢管4、卸压球阀5、配套使用的第一连接螺栓6和第一连接螺母7、第三钢管8、第三法兰盘9、第一钢板圆环10、环形的橡胶密封垫圈11、紧固螺母12、第二钢板圆环13、中部和两侧分别设有一个开孔和两个螺纹孔的钢板条14、与紧固螺母12配套的紧固螺栓15和第二连接螺栓16;As shown in Figure 1, a high-pressure drilling sealing device is characterized in that it includes a first steel pipe 1, a first flange 2, a second flange 3, a second steel pipe 4, a pressure relief ball valve 5, and a supporting The first connecting bolt 6 and the first connecting nut 7, the third steel pipe 8, the third flange 9, the first steel plate ring 10, the annular rubber sealing washer 11, the tightening nut 12, the second steel plate ring 13, The middle and both sides are respectively provided with a steel strip 14 with an opening and two threaded holes, a fastening bolt 15 and a second connecting bolt 16 matched with the fastening nut 12;

第一钢管1、第三钢管8均为DN100钢管;三个法兰盘2、3、9均为DN100法兰盘,厚度依次为18mm、12mm、12mm;在第一钢管1的侧面上设有一个直径50mm的圆孔,第二钢管4和卸压球阀5分别为DN50mm钢管和DN50mm球阀;第一钢板圆环10、橡胶密封垫圈11、第二钢板圆环13的内径均为46mm,外径均与DN100钢管的内径一致,钻孔设备的钻杆和钻头的外径略小于46mm;第一钢板圆环10的厚度为5mm,橡胶密封垫圈11的长度为120mm,第三钢管8的长度为135mm;钢板条14的长度、宽度和厚度分别为190mm、50mm和10mm,其中部的开孔为70×50mm的矩形,其两侧圆孔的内径与紧固螺母12的内径相同,两个螺纹孔的中心间距与焊接在第三钢管8上的两个紧固螺母12的中心间距一致,第二钢板圆环13的厚度为37mm;第一连接螺栓6为长度不小于40mm的M16螺栓,第一连接螺母7为M16螺母;紧固螺母12为M16螺母,紧固螺栓15为长度80mm的M16螺栓;The first steel pipe 1 and the third steel pipe 8 are all DN100 steel pipes; the three flanges 2, 3 and 9 are all DN100 flanges, and the thicknesses are 18mm, 12mm and 12mm in sequence; A circular hole with a diameter of 50mm, the second steel pipe 4 and the pressure relief ball valve 5 are respectively DN50mm steel pipe and DN50mm ball valve; the inner diameter of the first steel plate ring 10, the rubber sealing gasket 11 and the second steel plate ring 13 are all 46mm, and the outer diameter is 46mm. Both are consistent with the inner diameter of the DN100 steel pipe, the outer diameter of the drill pipe and drill bit of the drilling equipment is slightly less than 46mm; the thickness of the first steel plate ring 10 is 5mm, the length of the rubber sealing gasket 11 is 120mm, and the length of the third steel pipe 8 is 135mm; the length, width and thickness of the steel strip 14 are 190mm, 50mm and 10mm respectively, the opening in the middle is a rectangle of 70×50mm, the inner diameter of the round holes on both sides is the same as the inner diameter of the fastening nut 12, and the two threaded The center spacing of the holes is consistent with the center spacing of the two fastening nuts 12 welded on the third steel pipe 8, the thickness of the second steel plate ring 13 is 37mm; the first connecting bolt 6 is an M16 bolt with a length of not less than 40mm, A connecting nut 7 is an M16 nut; the tightening nut 12 is an M16 nut, and the tightening bolt 15 is an M16 bolt with a length of 80mm;

第一法兰盘2和第二法兰盘3分别焊接在第一钢管1的两端,第二钢管4的一端焊接在第一钢管1上的圆孔周围,另一端的外表面车丝形成螺纹并与卸压球阀5连接,组成图4~5所示的卸压段;The first flange 2 and the second flange 3 are respectively welded on both ends of the first steel pipe 1, one end of the second steel pipe 4 is welded around the round hole on the first steel pipe 1, and the outer surface of the other end is formed by threading. threaded and connected with the pressure relief ball valve 5 to form the pressure relief section shown in Figures 4 to 5;

第三法兰盘9和第一钢板圆环10分别焊接在第三钢管8同一端的内外侧,紧固螺母12焊接在第三钢管8另一端的外侧,橡胶密封垫圈11插入第三钢管8的内部,组成图6~8所示的密封段;The third flange 9 and the first steel plate ring 10 are respectively welded on the inner and outer sides of the same end of the third steel pipe 8 , the tightening nut 12 is welded on the outer side of the other end of the third steel pipe 8 , and the rubber sealing washer 11 is inserted into the third steel pipe 8 . Inside, the sealing section shown in Figures 6 to 8 is formed;

第二钢板圆环13中部的圆孔和钢板条14中部的开孔对准组成图9~11所示的密封段紧固组件;The circular hole in the middle of the second steel plate ring 13 and the opening in the middle of the steel strip 14 are aligned to form the sealing section fastening assembly shown in FIGS. 9 to 11 ;

卸压段和密封段通过第一连接螺栓6和第一连接螺母7将第二法兰盘3和第三法兰盘9连接以完成组装;密封段和密封段紧固组件通过紧固螺栓15和紧固螺母12连接以完成组装,组装后橡胶密封垫圈11和第二钢板圆环13的一端卡入第三钢管8内,第二钢板圆环13的另一端与钢板条14直接接触,组装后的高压钻孔密封装置结构示意图如图3所示。The pressure relief section and the sealing section are assembled by connecting the second flange 3 and the third flange 9 through the first connecting bolt 6 and the first connecting nut 7; Connect with the fastening nut 12 to complete the assembly. After assembly, one end of the rubber sealing washer 11 and the second steel plate ring 13 is clamped into the third steel pipe 8, and the other end of the second steel plate ring 13 is in direct contact with the steel strip 14. Assembly The schematic diagram of the structure of the high-pressure drilling and sealing device is shown in FIG. 3 .

本实用新型的工作原理是:The working principle of the utility model is:

第一步:通过第二连接螺栓16连接已埋设的孔口段和卸压段;The first step: connect the buried orifice section and the pressure relief section through the second connecting bolt 16;

第二步:将第二钢板圆环13卡入密封段的第三钢管8内部、橡胶密封垫圈11的右侧,再将钢板条14中部的开孔对准橡胶密封垫圈11中部的圆孔并压紧第二钢板圆环13,然后将紧固螺栓15插入钢板条14的螺纹孔内并拧入密封段上的紧固螺母中,密封段即组装完成;Step 2: Insert the second steel plate ring 13 into the inside of the third steel pipe 8 of the sealing section and on the right side of the rubber sealing gasket 11, and then align the opening in the middle of the steel strip 14 with the circular hole in the middle of the rubber sealing gasket 11 and Press the second steel plate ring 13, then insert the fastening bolt 15 into the threaded hole of the steel strip 14 and screw it into the fastening nut on the sealing section, and the sealing section is assembled;

第三步:将钻杆穿过密封段,在钻杆端部安装钻头;Step 3: Pass the drill pipe through the sealing section and install the drill bit at the end of the drill pipe;

第四步:调整钻机位置,使钻杆方向与已埋设的孔口段方向一致,并将钻头藏入卸压段内;Step 4: Adjust the position of the drilling rig so that the direction of the drill pipe is consistent with the direction of the buried orifice section, and hide the drill bit in the pressure relief section;

步骤五:通过第一连接螺栓6和第一连接螺母7连接卸压段与密封段,如图1所示;Step 5: Connect the pressure relief section and the sealing section through the first connecting bolt 6 and the first connecting nut 7, as shown in Figure 1;

步骤六:打开已埋设的孔口段上的球阀,开始钻孔施工;Step 6: Open the ball valve on the buried orifice section and start drilling construction;

步骤七:钻孔过程中打开卸压段的卸压球阀5进行排渣及卸压;Step 7: During the drilling process, open the pressure relief ball valve 5 of the pressure relief section for slag discharge and pressure relief;

步骤八:钻孔过程中如密封装置发生卸漏,可通过拧紧紧固螺栓15压紧橡胶密封圈11封堵渗漏。Step 8: If the sealing device leaks during the drilling process, the leakage can be blocked by tightening the fastening bolts 15 and pressing the rubber sealing ring 11.

实施例2Example 2

重复实施例1,但有以下不同,一种高压钻孔密封装置,所述第一法兰盘2和第二法兰盘3与第一钢管1两端的连接方式、以及第三法兰盘9和第三钢管8的连接方式均为螺纹连接。Repeat Example 1, but with the following differences, a high-pressure drilling sealing device, the connection method of the first flange 2 and the second flange 3 and the two ends of the first steel pipe 1, and the third flange 9 The connection with the third steel pipe 8 is threaded.

以上所述实施例仅为本实用新型的较佳实施例,并不用以限制本实用新型,凡在本实用新型的原理和设计原则之内所作的任何修改和等同替换,均应包含在本实用新型要求保护的范围之内。The above-mentioned embodiments are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications and equivalent replacements made within the principles and design principles of the present utility model shall be included in the present utility model. within the scope of the new claims.

Claims (2)

1.一种高压钻孔密封装置,其特征在于包括:第一钢管(1)、第一法兰盘(2)、第二法兰盘(3)、第二钢管(4)、卸压球阀(5)、配套使用的第一连接螺栓(6)和第一连接螺母(7)、第三钢管(8)、第三法兰盘(9)、第一钢板圆环(10)、环形的橡胶密封垫圈(11)、紧固螺母(12)、第二钢板圆环(13)、中部设有一个开孔且两侧设有两个圆孔的钢板条14、与紧固螺母(12)配套的紧固螺栓(15)和第二连接螺栓(16);1. A high-pressure drilling sealing device, characterized by comprising: a first steel pipe (1), a first flange (2), a second flange (3), a second steel pipe (4), a pressure relief ball valve (5), the first connecting bolt (6) and the first connecting nut (7), the third steel pipe (8), the third flange (9), the first steel plate ring (10), the annular A rubber sealing washer (11), a tightening nut (12), a second steel plate ring (13), a steel strip 14 with an opening in the middle and two round holes on both sides, and a tightening nut (12) Matching fastening bolts (15) and second connecting bolts (16); 三个法兰盘(2、3、9)的型号一致,法兰盘(2、3、9)的内径与第一钢管(1)和第三钢管(8)的外径相同;在第一钢管(1)的侧面上设有一个直径与第二钢管(4)内径一致的圆孔,卸压球阀(5)与第二钢管(4)的尺寸匹配;第一钢板圆环(10)、橡胶密封垫圈(11)和第二钢板圆环(13)的内外径相同,内径略大于钻孔设备的钻杆和钻头的外径,外径与第三钢管(8)的内径一致,第一钢板圆环(10)的厚度与橡胶密封垫圈(11)的长度之和略小于第三钢管(8)的长度;钢板条(14)中部的开孔尺寸大于橡胶密封垫圈(11)的内径,其两侧的圆孔内径与紧固螺母(12)的内径相同,两个圆孔中心间距与焊接在第三钢管(8)上的两个紧固螺母(12)中心间距一致;紧固螺栓(15)的长度大于第二钢板圆环(13)厚度与钢板条(14)厚度之和;The models of the three flanges (2, 3, 9) are the same, and the inner diameter of the flanges (2, 3, 9) is the same as the outer diameter of the first steel pipe (1) and the third steel pipe (8). The side surface of the steel pipe (1) is provided with a circular hole whose diameter is the same as the inner diameter of the second steel pipe (4). The pressure relief ball valve (5) matches the size of the second steel pipe (4). The first steel plate ring (10), The inner and outer diameters of the rubber sealing gasket (11) and the second steel plate ring (13) are the same, the inner diameter is slightly larger than the outer diameter of the drill pipe and the drill bit of the drilling equipment, and the outer diameter is consistent with the inner diameter of the third steel pipe (8). The sum of the thickness of the steel plate ring (10) and the length of the rubber sealing washer (11) is slightly smaller than the length of the third steel pipe (8); the size of the opening in the middle of the steel strip (14) is larger than the inner diameter of the rubber sealing washer (11), The inner diameter of the circular holes on both sides is the same as the inner diameter of the fastening nut (12), and the center spacing of the two circular holes is the same as the center spacing of the two fastening nuts (12) welded on the third steel pipe (8); the fastening bolts The length of (15) is greater than the sum of the thickness of the second steel plate ring (13) and the thickness of the steel strip (14); 第一法兰盘(2)和第二法兰盘(3)分别焊接在第一钢管(1)的两端,第二钢管(4)的一端焊接在第一钢管(1)上的圆孔周围,另一端的外表面车丝形成螺纹并与卸压球阀(5)连接,组成卸压段;The first flange (2) and the second flange (3) are respectively welded to both ends of the first steel pipe (1), and one end of the second steel pipe (4) is welded to the circular hole on the first steel pipe (1). Around, the outer surface of the other end is threaded and connected with the pressure relief ball valve (5) to form a pressure relief section; 第三法兰盘(9)和第一钢板圆环(10)分别焊接在第三钢管(8)同一端的内外侧,紧固螺母(12)焊接在第三钢管(8)另一端的外侧,橡胶密封垫圈(11)插入第三钢管(8)的内部,组成密封段;The third flange (9) and the first steel plate ring (10) are welded to the inner and outer sides of the same end of the third steel pipe (8), respectively, and the fastening nut (12) is welded to the outer side of the other end of the third steel pipe (8). The rubber sealing gasket (11) is inserted into the interior of the third steel pipe (8) to form a sealing section; 第二钢板圆环(13)中部的圆孔和钢板条(14)中部的开孔对准接触后组成密封段紧固组件;The circular hole in the middle of the second steel plate ring (13) and the opening in the middle of the steel strip (14) are aligned and contacted to form a sealing section fastening assembly; 卸压段和密封段通过第一连接螺栓(6)和第一连接螺母(7)将第二法兰盘(3)和第三法兰盘(9)连接以完成组装;密封段和密封段紧固组件通过紧固螺栓(15)和紧固螺母(12)连接以完成组装,组装后橡胶密封垫圈(11)和第二钢板圆环(13)的一端卡入第三钢管(8)内,第二钢板圆环(13)的另一端与钢板条(14)直接接触。The pressure relief section and the sealing section are connected by the first connecting bolt (6) and the first connecting nut (7) to the second flange (3) and the third flange (9) to complete the assembly; the sealing section and the sealing section The fastening components are connected by fastening bolts (15) and fastening nuts (12) to complete the assembly. After assembly, the rubber sealing washer (11) and one end of the second steel plate ring (13) are clamped into the third steel pipe (8). , the other end of the second steel plate ring (13) is in direct contact with the steel strip (14). 2.根据权利要求1所述的一种高压钻孔密封装置,其特征在于:所述第一法兰盘(2)和第二法兰盘(3)与第一钢管(1)两端的连接方式、以及第三法兰盘(9)和第三钢管(8)的连接方式为螺纹连接。2. A high-pressure drilling sealing device according to claim 1, characterized in that: the connection between the first flange (2) and the second flange (3) and the two ends of the first steel pipe (1) and the connection method of the third flange (9) and the third steel pipe (8) is threaded connection.
CN201921226381.XU 2019-07-31 2019-07-31 A high-pressure drilling and sealing device Expired - Fee Related CN211314150U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921226381.XU CN211314150U (en) 2019-07-31 2019-07-31 A high-pressure drilling and sealing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921226381.XU CN211314150U (en) 2019-07-31 2019-07-31 A high-pressure drilling and sealing device

Publications (1)

Publication Number Publication Date
CN211314150U true CN211314150U (en) 2020-08-21

Family

ID=72079319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921226381.XU Expired - Fee Related CN211314150U (en) 2019-07-31 2019-07-31 A high-pressure drilling and sealing device

Country Status (1)

Country Link
CN (1) CN211314150U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424918A (en) * 2019-07-31 2019-11-08 中国水利水电第十四工程局有限公司 A kind of high pressure borehole sealing device and application method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424918A (en) * 2019-07-31 2019-11-08 中国水利水电第十四工程局有限公司 A kind of high pressure borehole sealing device and application method

Similar Documents

Publication Publication Date Title
CN203240126U (en) Blocking system of wall bushing
CN113464754A (en) Clamp type tee joint for PVC-C fire-fighting plastic pipe
CN201739673U (en) Tray expansion bend
CN203052097U (en) Multifunctional big-head huff section
CN202065608U (en) High pressure pipe plugging device
CN105586986A (en) Urban underground intelligent comprehensive pipe rack quakeproof device
CN203907114U (en) Pipeline pressure-bearing leak-repairing device
CN212616918U (en) Expansion joint for connecting pump test pipeline
CN202327512U (en) Pipe fitting used for rapidly repairing water leakage of water feeding pipe
CN204201367U (en) A kind of small-bore pipeline on-line production send blocking device
CN110424918A (en) A kind of high pressure borehole sealing device and application method
CN204647621U (en) Reducing pipe flanged connecting structure
CN207455049U (en) A kind of portable repairs repairing leakage of pipeline device
CN209213250U (en) A quick connection device for medium and high pressure water pipes
CN110701400A (en) Quick self-sealing's pipe joint
CN207349636U (en) A connecting pipe on an automobile exhaust gas purification equipment
CN204533956U (en) A kind of pipeline leakage plugging device
CN215335121U (en) Clamp type tee joint for PVC-C fire-fighting plastic pipe
CN209638640U (en) Silt pipe joint
CN205278627U (en) Soft joint of rubber
CN202972369U (en) Rubber choke plug used for gas pipeline
CN202074166U (en) Saddle-shaped quick pipe joint
CN207514485U (en) Sludge pipe trapping device
CN203551400U (en) Device for testing hydraulic pressure of single joint of large-diameter pressure bearing pipeline
CN204320612U (en) A kind of HTHP pipeline leak sealing fixture

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200821

CF01 Termination of patent right due to non-payment of annual fee