CN211311564U - Natural gas pipeline for flame spraying of casting and rolling mill roller - Google Patents

Natural gas pipeline for flame spraying of casting and rolling mill roller Download PDF

Info

Publication number
CN211311564U
CN211311564U CN202020048331.3U CN202020048331U CN211311564U CN 211311564 U CN211311564 U CN 211311564U CN 202020048331 U CN202020048331 U CN 202020048331U CN 211311564 U CN211311564 U CN 211311564U
Authority
CN
China
Prior art keywords
natural gas
connecting pipe
fixedly connected
pipe
ball valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020048331.3U
Other languages
Chinese (zh)
Inventor
李东旭
富震
王夫杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zouping Hongcheng Aluminum Technology Co ltd
Original Assignee
Zouping Hongcheng Aluminum Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zouping Hongcheng Aluminum Technology Co ltd filed Critical Zouping Hongcheng Aluminum Technology Co ltd
Priority to CN202020048331.3U priority Critical patent/CN211311564U/en
Application granted granted Critical
Publication of CN211311564U publication Critical patent/CN211311564U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model discloses a cast rolling mill roll flame spraying natural gas line, including the natural gas intake pipe, the one end fixedly connected with natural gas main valve of natural gas intake pipe, the first tee bend of other end fixedly connected with of natural gas main valve, the first ball valve of first tee bend one end fixedly connected with, the other end fixedly connected with second connecting pipe of first ball valve, the other end fixedly connected with second tee bend of second connecting pipe, the first takeover of the one end fixedly connected with of second tee bend is connected through being connected with natural gas line for maintain in the future and only need change the raw material area of joint department and the ball valve of damage. By using the natural gas as a new fuel, the cost of using the natural gas is far lower than that of liquefied gas, the cost is saved, the work of replacing the liquefied gas tank by operators is eliminated, the working strength is reduced, the operation of loading and transporting the liquefied gas tank is eliminated, the space is increased, and the safety of personnel is ensured.

Description

Natural gas pipeline for flame spraying of casting and rolling mill roller
Technical Field
The utility model relates to a natural gas technology reforms transform the field, especially relates to a cast rolling mill roll flame spraying natural gas line.
Background
In the existing workshop, the casting and rolling machine flame spraying gas is always filled with liquefied gas, and the cost of the liquefied gas is high. Because the liquefied gas tank needs to be replaced, the working labor intensity of operators is increased due to the use of liquefied gas, large hidden dangers exist in the loading, unloading and transporting processes of the liquefied gas tank, and the occupied space of the liquefied gas tank is large.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a flame spraying natural gas pipeline for a roll of a casting and rolling machine.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a cast rolling mill roll flame spraying natural gas line, includes the natural gas intake pipe, the one end fixedly connected with natural gas main valve of natural gas intake pipe, the first tee bend of other end fixedly connected with of natural gas main valve, the first ball valve of one end fixedly connected with of first tee bend, the other end fixedly connected with second connecting pipe of first ball valve, the other end fixedly connected with second tee bend of second connecting pipe, the first takeover of one end fixedly connected with of second tee bend, the other end fixedly connected with second takeover of second tee bend, the one end fixedly connected with second ball valve of second tee bend is kept away from to first takeover, the one end fixedly connected with third ball valve of second tee bend is kept away from to the second takeover.
As a further description of the above technical solution:
the internal diameter of the first connecting pipe is 20mm, the specification of the second connecting pipe is the same as that of the first connecting pipe, the specification of the first connecting pipe is the same as that of the first connecting pipe, and the specification of the second connecting pipe is the same as that of the first connecting pipe.
As a further description of the above technical solution:
a steel pipe is arranged between the first tee joints of the first ball valves, the first tee joints are in threaded connection with the steel pipe, and the first ball valves are in threaded connection with the steel pipe.
As a further description of the above technical solution:
the first connecting pipe is made of steel, the second connecting pipe is made of steel, the first connecting pipe is made of steel, and the second connecting pipe is made of steel.
As a further description of the above technical solution:
the second connecting pipe is in threaded connection with the first ball valve, the second connecting pipe is in threaded connection with the second tee, the second tee is in threaded connection with the first branch pipe, and the second tee is in threaded connection with the second branch pipe.
As a further description of the above technical solution:
the first connecting pipe is in threaded connection with the second ball valve, the second connecting pipe is in threaded connection with the third ball valve, and the first connecting pipe is in threaded connection with the natural gas main valve.
The utility model discloses following beneficial effect has:
1. the utility model discloses a be connected with natural gas line for the maintenance only needs the raw material area of change joint department and the ball valve of damage in the future.
2. The utility model discloses an use the natural gas as new fuel, the expense that uses the natural gas is far less than the expense of liquefied gas, has practiced thrift the cost, has removed the work that the operation personnel traded liquefied gas jar simultaneously, and the working strength who alleviates has removed the operation of shipment liquefied gas jar, has increased the space, has ensured personnel's safety.
Drawings
Fig. 1 is a schematic view of the overall structure of a natural gas pipeline for flame spraying of a roll of a casting and rolling machine according to the present invention;
fig. 2 is a schematic view of a ball valve of a flame spraying natural gas pipeline for a roll of a casting and rolling machine provided by the present invention;
fig. 3 is a schematic three-way diagram of a natural gas pipeline for flame spraying of a roll of a casting and rolling machine according to the present invention.
Illustration of the drawings:
1. a natural gas inlet pipe; 2. a natural gas main valve; 3. a first tee joint; 4. a first connecting pipe; 5. a first ball valve; 6. a second connecting pipe; 7. a second tee joint; 8. a first tap tube; 9. a second connection branch; 10. a second ball valve; 11. and a third ball valve.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-3, the present invention provides an embodiment: a natural gas pipeline for flame spraying of a roller of a casting and rolling machine comprises a natural gas inlet pipe 1 connected with a natural gas pipe, one end of the natural gas inlet pipe 1 is fixedly connected with a natural gas main valve 2 for generally controlling the on-off of natural gas, the other end of the natural gas main valve 2 is fixedly connected with a first tee joint 3 for switching the direction of a pipeline, one end of the first tee joint 3 is fixedly connected with a first ball valve 5 for controlling a first output node, the other end of the first ball valve 5 is fixedly connected with a second connecting pipe 6 for connecting the pipeline to the location of equipment, the other end of the second connecting pipe 6 is fixedly connected with a second tee joint 7 for dividing the pipeline into two sides for facilitating the up-down spraying, one end of the second tee joint 7 is fixedly connected with a first branch connecting pipe 8 for the up-spraying, the other end of the second tee joint 7 is fixedly connected with a second branch connecting pipe 9 for the down-spraying, one end, and one end of the second branch pipe 9, which is far away from the second tee joint 7, is fixedly connected with a third ball valve 11 for controlling the spraying on and off.
The inner diameter of the first connection pipe 4 is 20mm, the second connection pipe 6 has the same specification as the first connection pipe 4, the first connection branch pipe 8 has the same specification as the first connection pipe 4, and the second connection branch pipe 9 has the same specification as the first connection pipe 4. A steel pipe is arranged between the first tee joints 3 of the first ball valve 5, the first tee joints 3 are in threaded connection with the steel pipe, and the first ball valve 5 is in threaded connection with the steel pipe. The first connecting pipe 4 is made of steel, the second connecting pipe 6 is made of steel, the first connecting pipe 8 is made of steel, the second connecting pipe 9 is made of steel, and the pipes are all steel pipes with the model number DN 20. The second connecting pipe 6 is in threaded connection with the first ball valve 5, the second connecting pipe 6 is in threaded connection with the second tee joint 7, the second tee joint 7 is in threaded connection with the first branch connecting pipe 8, the second tee joint 7 is in threaded connection with the second branch connecting pipe 9, and the threaded connection is adopted, so that the maintenance and operation safety in the future are facilitated. The first connecting pipe 8 is in threaded connection with the second ball valve 10, the second connecting pipe 9 is in threaded connection with the third ball valve 11, and the first connecting pipe 4 is in threaded connection with the natural gas main valve 2.
The working principle is as follows: through being connected with natural gas line for the maintenance only needs to change the thread seal area and the first ball valve 5, the second ball valve 10, the third ball valve 11 that damage of joint department in the future. By using the natural gas as a new fuel, the cost of using the natural gas is far lower than that of liquefied gas, the cost is saved, the work of replacing the liquefied gas tank by operators is eliminated, the working strength is reduced, the operation of loading and transporting the liquefied gas tank is eliminated, the space is increased, and the safety of personnel is ensured.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (6)

1. The utility model provides a cast rolling mill roll flame spraying natural gas line, includes natural gas intake pipe (1), its characterized in that: one end of the natural gas inlet pipe (1) is fixedly connected with a natural gas main valve (2), the other end of the natural gas main valve (2) is fixedly connected with a first tee joint (3), one end of the first tee joint (3) is fixedly connected with a first ball valve (5), the other end of the first ball valve (5) is fixedly connected with a second connecting pipe (6), the other end of the second connecting pipe (6) is fixedly connected with a second tee joint (7), one end of the second tee joint (7) is fixedly connected with a first connecting pipe (8), the other end of the second tee joint (7) is fixedly connected with a second branch pipe (9), one end of the first connecting pipe (8) far away from the second tee joint (7) is fixedly connected with a second ball valve (10), and one end of the second branch pipe (9) far away from the second tee joint (7) is fixedly connected with a third ball valve (11).
2. The caster roll flame spray natural gas pipeline of claim 1, wherein: the inside diameter of second connecting pipe (6) is 20mm, second connecting pipe (6) is the same with the specification of first connecting pipe (4), first branch connecting pipe (8) is the same with the specification of first connecting pipe (4), second branch connecting pipe (9) is the same with the specification of first connecting pipe (4).
3. The caster roll flame spray natural gas pipeline of claim 1, wherein: a steel pipe is arranged between the first tee joints (3) of the first ball valve (5), the first tee joints (3) are in threaded connection with the steel pipe, and the first ball valve (5) is in threaded connection with the steel pipe.
4. The caster roll flame spray natural gas pipeline of claim 2, wherein: the first connecting pipe (4) is made of steel, the second connecting pipe (6) is made of steel, the first connecting pipe (8) is made of steel, and the second connecting pipe (9) is made of steel.
5. The caster roll flame spray natural gas pipeline of claim 1, wherein: the second connecting pipe (6) is in threaded connection with the first ball valve (5), the second connecting pipe (6) is in threaded connection with the second tee joint (7), the second tee joint (7) is in threaded connection with the first distributing pipe (8), and the second tee joint (7) is in threaded connection with the second distributing pipe (9).
6. The caster roll flame spray natural gas pipeline of claim 2, wherein: the first connecting pipe (8) is in threaded connection with the second ball valve (10), the second connecting pipe (9) is in threaded connection with the third ball valve (11), and the first connecting pipe (4) is in threaded connection with the natural gas main valve (2).
CN202020048331.3U 2020-01-10 2020-01-10 Natural gas pipeline for flame spraying of casting and rolling mill roller Active CN211311564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020048331.3U CN211311564U (en) 2020-01-10 2020-01-10 Natural gas pipeline for flame spraying of casting and rolling mill roller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020048331.3U CN211311564U (en) 2020-01-10 2020-01-10 Natural gas pipeline for flame spraying of casting and rolling mill roller

Publications (1)

Publication Number Publication Date
CN211311564U true CN211311564U (en) 2020-08-21

Family

ID=72066093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020048331.3U Active CN211311564U (en) 2020-01-10 2020-01-10 Natural gas pipeline for flame spraying of casting and rolling mill roller

Country Status (1)

Country Link
CN (1) CN211311564U (en)

Similar Documents

Publication Publication Date Title
CN211311564U (en) Natural gas pipeline for flame spraying of casting and rolling mill roller
CN205888331U (en) Open air chamber type pipeline welding argon filling device
CN112780877A (en) B-type sleeve for repairing circumferential weld defects between three-way branch pipe and butted steel pipe and installation method thereof
CN209706092U (en) A kind of cold apparatus for ash in biomass boiler convection pass
CN206268691U (en) A kind of low energy consumption heat supply network special steam direct-burried factory pipe bend
CN212316199U (en) Spraying pipeline system for gold ore dump leaching
CN210799257U (en) Liquid chlorine shielding pump system
CN211010776U (en) Argon and carbon dioxide gas mixture filling equipment
CN210462468U (en) Oxygen converging device with pressure display
CN209050105U (en) A kind of steel ladle fast cooling device
CN218720611U (en) Nitrogen gas replacement device suitable for gas transmission station is from main maintenance
CN112984378A (en) Industrial park natural gas safe conveying system
CN207147731U (en) A kind of frock of more TUBING pipes pressure testing simultaneously
CN214840125U (en) Centralized gas supply system for production workshop
CN201306557Y (en) Connection device of short distance hydraulic manifold block
CN220870614U (en) One inlet and one outlet gas bus bar
CN205315089U (en) Novel independent aftertreatment urea pump air feed of hoist device
CN217413017U (en) Hoop device for butt welding of large-diameter pipelines
CN211475505U (en) Seamless natural gas pipeline
CN211231554U (en) Novel split type heat preservation of cylindrical container device
CN213209398U (en) Pressure testing device for pipeline and equipment
CN218762707U (en) Single-parking-place CNG gas supply station uninterrupted gas supply and storage device
CN211503775U (en) Hydrogen heat exchanger seal structure
CN207036569U (en) A kind of pipe-line system gas pressure test system of petrochemical industry station project
CN212805233U (en) Air inlet pressure regulating panel with emptying function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant