CN211293113U - Test tool of battery management system - Google Patents

Test tool of battery management system Download PDF

Info

Publication number
CN211293113U
CN211293113U CN201922118308.7U CN201922118308U CN211293113U CN 211293113 U CN211293113 U CN 211293113U CN 201922118308 U CN201922118308 U CN 201922118308U CN 211293113 U CN211293113 U CN 211293113U
Authority
CN
China
Prior art keywords
simulation unit
management system
battery management
test
voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922118308.7U
Other languages
Chinese (zh)
Inventor
王中照
施敏捷
姚帅
杨宝顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Jingkong Energy Technology Co ltd
Original Assignee
Suzhou Jk Energy Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Jk Energy Technology Co ltd filed Critical Suzhou Jk Energy Technology Co ltd
Priority to CN201922118308.7U priority Critical patent/CN211293113U/en
Application granted granted Critical
Publication of CN211293113U publication Critical patent/CN211293113U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Secondary Cells (AREA)

Abstract

The utility model relates to a battery management system technical field, concretely relates to battery management system's test fixture, test fixture with battery management system's test equipment connects, include: a target circuit board; the parameter simulation units are arranged on the target circuit board; the parameter simulation unit is used for simulating the operation parameters of the battery management system; the operating parameters include voltage, temperature, and current; and one end of the communication simulation unit is connected with each parameter simulation unit, and the other end of the communication simulation unit is connected with the test equipment. The utility model discloses a set up a plurality of parameter simulation units on the target line board, and will a plurality of parameter simulation units are connected with test equipment and host computer to establish communication connection. The functions to be realized by the master control and the slave control for testing the battery management system in the prior art are integrated on the target circuit board, so that the testing tool has universality.

Description

Test tool of battery management system
Technical Field
The utility model relates to a battery management system technical field, concretely relates to battery management system's test fixture.
Background
In a Battery Management System (Battery Management System, BMS for short), the models designed and produced by BMS manufacturers at the present stage are mainly classified into: BMS master control, BMS slave control. The BMS has the main control functions of high and low level simulation, load simulation, high voltage simulation and the like; the slave control function of the BMS comprises voltage simulation, temperature simulation and the like. For the two types of machines, a third-party professional Hardware-In-the-Loop (HIL) testing technology is usually adopted to establish a "virtual BMS" testing platform to implement the above functions, which may also be referred to as BMS HIL. However, the test platform is in one-to-one correspondence with the three test machine types. This is due to the functional fixity and incompatibility of the HIL test technology itself, i.e., the above-described BMS HIL has no commonality to various tester models of BMS. In the BMS master-slave all-in-one machine in the prior art, the BMS master control and the BMS slave control are connected in a wiring mode, so that all functions of the BMS master-slave all-in-one machine are achieved, and the BMS master-slave all-in-one machine is complex in wiring and large in equipment size.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model provides a battery management system's test fixture to the test system who solves current battery management is difficult to general problem.
The embodiment of the utility model provides an aspect provides a battery management system's test fixture, test fixture with battery management system's test equipment connects, include: a target circuit board; the parameter simulation units are arranged on the target circuit board; the parameter simulation unit is used for simulating the operation parameters of the battery management system; the operating parameters include voltage, temperature, and current; and one end of the communication simulation unit is connected with each parameter simulation unit, and the other end of the communication simulation unit is connected with the test equipment.
Optionally, the parameter simulation unit comprises a cell voltage simulation unit; the single voltage simulation unit is provided with a plurality of resistors which are connected in series, the resistors which are connected in series are connected with a first output voltage of a power output unit of the test tool, and two ends of each resistor are connected to the test equipment; and the voltage at two ends of the resistor is used for simulating the voltage of each battery string in the battery management system.
Optionally, the parameter simulation unit includes a temperature simulation unit, the temperature simulation unit has a temperature sensor, and an output end of the temperature sensor is connected to the test equipment.
Optionally, the parameter simulation unit includes a current simulation unit, the current simulation unit has a plurality of resistors connected in series, the resistors connected in series are connected with the second output voltage of the power output unit of the test fixture, and two ends of each resistor are connected to the test equipment; and the voltage at two ends of the resistor is used for simulating the current of each battery string in the battery management system.
Optionally, the parameter simulation unit comprises a high-voltage acquisition simulation unit, and the high-voltage acquisition simulation unit is connected with the power output unit of the test tool to simulate the high-voltage acquisition voltage of the battery management system.
Optionally, the parameter simulation unit includes an insulation resistance acquisition simulation unit, and the insulation resistance acquisition simulation unit has a test resistance for simulating an insulation resistance of the battery management system.
Optionally, the parameter simulation unit includes an IO driving simulation unit, and the IO driving simulation unit has a power resistor and is configured to simulate a load of the battery management system.
Optionally, the parameter simulation unit includes an IO detection simulation unit, and the IO detection simulation unit is connected to a preset voltage or grounded and used for simulating a high-low level test.
Optionally, the communication simulation unit is further connected to an upper computer for simulating a communication test.
Optionally, the communication simulation unit includes multiple interface channels, and the interface channels are connected to each other to simulate mutual testing of the interface channels.
The utility model discloses a set up a plurality of parameter simulation units on the target line board, and will a plurality of parameter simulation units are connected with test equipment and host computer to establish communication connection. The parameter simulation units can basically meet parameter functions required by testing of the battery management system on the current market, so that the testing tool can basically meet testing requirements of the battery management system on the current market, and the universality of the testing tool can be further demonstrated.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural diagram of a test fixture of a battery management system provided by the present invention.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. To those of ordinary skill in the art, the specific meanings of the above terms in the present invention may be understood in specific instances, and furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the term "connected" is to be interpreted broadly, for example, as a fixed connection, a detachable connection, or an integral connection; can be mechanically or electrically connected; the two elements may be directly connected or indirectly connected through an intermediate medium, or may be communicated with each other inside the two elements, or may be wirelessly connected or wired connected.
Furthermore, the technical features mentioned in the different embodiments of the invention described below can be combined with each other as long as they do not conflict with each other.
The utility model provides a battery management system's test fixture, as shown in FIG. 1, test fixture includes: a target circuit board 1; a plurality of parameter simulation units 2 arranged on the target circuit board; the parameter simulation unit is used for simulating the operation parameters of the battery management system; the operating parameters include voltage, temperature, and current; and one end of the communication simulation unit 3 is connected with each parameter simulation unit, and the other end of the communication simulation unit is connected with the test equipment.
Optionally, the parameter simulation unit 2 includes a cell voltage simulation unit 21; the single voltage simulation unit 21 is provided with a plurality of resistors connected in series, the resistors connected in series are connected with the first output voltage of the power output unit 4 of the test tool, and two ends of each resistor are connected to the test equipment; and the voltage at two ends of the resistor is used for simulating the voltage of each battery string in the battery management system.
In a specific embodiment, the number of the battery strings in the battery management system is 12, and the test equipment measures that the cell voltages of the battery strings are all 4V. In order to meet the requirement, the first output voltage is set to be 48V, the series resistors are 12 ohmic resistors with equal resistance values and are connected in series, and the voltage at two ends of each series resistor is 4V, that is, the single voltage of each battery string in the battery management system is 4V. In a specific embodiment, the resistors with the resistance value of 40 ohms can be formed by connecting 3 resistors with the resistance value of 120 ohms in parallel, and then the resistors connected in parallel are connected in series to form the 12 resistors with the resistance value of 40 ohms in series.
Optionally, the parameter simulation unit includes a temperature simulation unit 22, the temperature simulation unit 22 has a temperature sensor, and an output end of the temperature sensor is connected to the test equipment.
In a specific embodiment, the input terminals of the temperature sensors may be respectively connected to the 12 ntc thermistors to simulate the cell temperatures of the 12 battery strings. Optionally, the input end of the temperature sensor may be further connected with other objects to simulate the corresponding temperature according to the temperature measured by the testing equipment based on different testing requirements of the battery management system.
Optionally, the parameter simulation unit includes a current simulation unit 23, the current simulation unit 23 has a plurality of resistors connected in series, the resistors connected in series are connected to the second output voltage of the power output unit 4 of the test fixture, and two ends of each resistor are connected to the test equipment; and the voltage at two ends of the resistor is used for simulating the total current required by the current acquisition function in the battery management system.
In a specific embodiment, the current simulation unit 23 includes: the 2 variable resistors are connected in series and then connected with a second output voltage of the power output unit 4, wherein the second output voltage is 5V, the resistance values of the 2 variable resistors are adjusted to obtain different voltage values, and the voltage value is converted into a current value by the tested battery management system according to preset Hall current sensor parameters so as to simulate current signals of two channels of the two-channel Hall current sensor.
Optionally, the parameter simulation unit includes a high voltage acquisition simulation unit 24, and the high voltage acquisition simulation unit 24 is connected to the power output unit 4 of the test fixture to simulate the high voltage acquisition voltage of the battery management system.
In a specific embodiment, the power output unit 4 provides a high-voltage collection voltage of the battery management system.
Optionally, the parameter simulation unit includes an insulation resistance acquisition simulation unit 25, and the insulation resistance acquisition unit 25 has a test resistance for simulating an insulation resistance of the battery management system.
In a specific embodiment, the test resistor is an adjustable resistor switch matrix, the adjustable resistor switch matrix is an array formed by a plurality of adjustable resistors, and the resistors are selectively connected through a control switch.
Optionally, the parameter simulation unit includes an IO driving simulation unit 26, and the IO driving simulation unit 26 has a power resistor and is configured to simulate a load of the battery management system.
In one embodiment, the power resistor has a power of 10W and a resistance of 25 ohms.
Optionally, the parameter simulation unit includes an IO detection simulation unit 27, and the IO detection simulation unit 27 is connected to a preset voltage or grounded and used for simulating a high-low level test.
In one embodiment, the predetermined voltage is 12V. Optionally, the preset voltage may be provided by the power output unit 4, or may be provided by connecting to an external power source.
Optionally, the communication simulation unit 3 is further connected to an upper computer, and is configured to simulate a communication test.
Optionally, the communication simulation unit 3 includes multiple interface channels, and the interface channels are connected to each other to simulate mutual testing of the interface channels.
In an optional embodiment, the communication simulation unit 3 has 3 interface channels, which are a channel 1, a channel 2 and a channel 3, respectively, and the channel 1 is connected with an upper computer and used for sending a test result to the upper computer; the channel 2 is connected with the parameter simulation units, and the channel 3 is connected with the test equipment. During testing, each parameter simulation unit receives parameter information of the testing equipment through a channel 3, then processes the parameter information through a processor in the tool to obtain simulation parameters of each parameter simulation unit, and sends the simulation parameters to each parameter simulation unit through a channel 2, and each parameter simulation unit carries out corresponding simulation according to the simulation parameters. And, the channel 1 and the channel 2 can perform mutual testing, that is, the testing device and the plurality of parameter simulators can perform mutual testing for mutual control and parameter adjustment.
Optionally, as shown in fig. 1, the test fixture further includes a connector for fixing the test fixture.
The utility model discloses a set up a plurality of parameter simulation units on the target line board, and will a plurality of parameter simulation units are connected with test equipment and host computer to establish communication connection. The parameter simulation units can basically meet parameter functions required by testing of the battery management system on the current market, so that the testing tool can basically meet testing requirements of the battery management system on the current market, and the universality of the testing tool can be further demonstrated.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious variations or modifications of this invention are intended to be covered by the present application.

Claims (10)

1. The test tool for the battery management system is characterized in that the test tool is connected with test equipment of the battery management system; wherein, test fixture includes:
a target circuit board;
the parameter simulation units are arranged on the target circuit board; the parameter simulation unit is used for simulating the operation parameters of the battery management system; the operating parameters include voltage, temperature, and current;
and one end of the communication simulation unit is connected with each parameter simulation unit, and the other end of the communication simulation unit is connected with the test equipment.
2. The test tool according to claim 1, wherein the parameter simulation unit comprises a cell voltage simulation unit; the single voltage simulation unit is provided with a plurality of resistors which are connected in series, the resistors which are connected in series are connected with a first output voltage of a power output unit of the test tool, and two ends of each resistor are connected to the test equipment; and the voltage at two ends of the resistor is used for simulating the voltage of each battery string in the battery management system.
3. The test tool according to claim 1, wherein the parameter simulation unit comprises a temperature simulation unit, the temperature simulation unit is provided with a temperature sensor, and an output end of the temperature sensor is connected with the test equipment.
4. The test tool according to claim 1, wherein the parameter simulation unit comprises a current simulation unit, the current simulation unit is provided with a plurality of resistors connected in series, the resistors connected in series are connected with a second output voltage of a power output unit of the test tool, and two ends of each resistor are connected to the test equipment; and the voltage at two ends of the resistor is used for simulating the total current of each battery string in the battery management system.
5. The test tool according to claim 1, wherein the parameter simulation unit comprises a high voltage acquisition simulation unit, and the high voltage acquisition simulation unit is connected with a power output unit of the test tool to simulate a high voltage acquisition voltage of the battery management system.
6. The test tool according to claim 1, wherein the parameter simulation unit comprises an insulation resistance acquisition simulation unit, and the insulation resistance acquisition simulation unit is provided with a test resistor and used for simulating the insulation resistance of the battery management system.
7. The test tool according to claim 1, wherein the parameter simulation unit comprises an IO driving simulation unit, and the IO driving simulation unit is provided with a power resistor and used for simulating a load of the battery management system.
8. The test tool according to claim 1, wherein the parameter simulation unit comprises an IO detection simulation unit, and the IO detection simulation unit is connected to a preset voltage or grounded and used for simulating high and low level tests.
9. The test tool according to any one of claims 1 to 8, wherein the communication simulation unit is further connected with an upper computer and used for simulating a communication test.
10. The test tool according to claim 9, wherein the communication simulation unit comprises a plurality of interface channels, and the interface channels are connected with each other to simulate mutual testing of the interface channels.
CN201922118308.7U 2019-11-29 2019-11-29 Test tool of battery management system Active CN211293113U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922118308.7U CN211293113U (en) 2019-11-29 2019-11-29 Test tool of battery management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922118308.7U CN211293113U (en) 2019-11-29 2019-11-29 Test tool of battery management system

Publications (1)

Publication Number Publication Date
CN211293113U true CN211293113U (en) 2020-08-18

Family

ID=72022317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922118308.7U Active CN211293113U (en) 2019-11-29 2019-11-29 Test tool of battery management system

Country Status (1)

Country Link
CN (1) CN211293113U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117110742A (en) * 2023-08-22 2023-11-24 南通国轩新能源科技有限公司 Quality detection method and system for battery management unit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117110742A (en) * 2023-08-22 2023-11-24 南通国轩新能源科技有限公司 Quality detection method and system for battery management unit

Similar Documents

Publication Publication Date Title
CN108398611B (en) Function test system based on minimum battery management system and test method thereof
CN109143033B (en) Automatic testing system for whole satellite interface
US20120022811A1 (en) Electric vehicle simulator and analyzer (evsa) for electric vehicle supply equipment
US20130346010A1 (en) Electric vehicle charger testing systems
CN110187299B (en) General calibration system for electrical parameters of aviation support equipment
CN111142008B (en) Circuit board power parameter testing system and method
CN104932962B (en) A kind of USB plugs test system and its method
CN111337869B (en) BMS board testing device, testing system and testing method
CN107766187A (en) It is a kind of to support the reliability of multi-USB interface equipment is same to survey device and method
CN211318636U (en) Integrated automatic test equipment suitable for environmental endurance test
CN211293113U (en) Test tool of battery management system
CN211878121U (en) Circuit board power parameter testing equipment and system
TWM616011U (en) Programmable burn-in system
CN209813763U (en) Detection system of battery management system
CN207516987U (en) It is a kind of to support the reliability of multi-USB interface equipment is same to survey device
CN116068428A (en) Detection method, system, device, medium and equipment for lithium battery acquisition board
CN211123230U (en) Portable automatic debugging system for calibrator
CN211717670U (en) Automatic calibrator for temperature transmitter
CN210427690U (en) Transformer overload test system
CN107894545B (en) Intelligent detection method for portable equipment wiring and locomotive signal sensor
CN218886002U (en) Battery management system testing device and testing system
CN218647070U (en) Earphone charging bin testing arrangement
CN215641726U (en) Simple test tool for battery management system
CN219143048U (en) Tool test board and battery test equipment
CN213689901U (en) Automobile fault simulator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 215129 West of Building 28, No. 2, Mount Taishan Road, Suzhou High tech Zone, Suzhou, Jiangsu Province

Patentee after: Suzhou Jingkong Energy Technology Co.,Ltd.

Address before: 215129 West, building 28, Hefeng Industrial Park, No.2, Taishan Road, high tech Zone, Suzhou City, Jiangsu Province

Patentee before: SUZHOU JK ENERGY Ltd.