CN211289101U - Sewage pipe connection structure - Google Patents

Sewage pipe connection structure Download PDF

Info

Publication number
CN211289101U
CN211289101U CN201922196791.0U CN201922196791U CN211289101U CN 211289101 U CN211289101 U CN 211289101U CN 201922196791 U CN201922196791 U CN 201922196791U CN 211289101 U CN211289101 U CN 211289101U
Authority
CN
China
Prior art keywords
clamp
link
connecting frame
face
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922196791.0U
Other languages
Chinese (zh)
Inventor
胡怀平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huzhuang Repair Factory Of Pingyin County
Original Assignee
Huzhuang Repair Factory Of Pingyin County
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huzhuang Repair Factory Of Pingyin County filed Critical Huzhuang Repair Factory Of Pingyin County
Priority to CN201922196791.0U priority Critical patent/CN211289101U/en
Application granted granted Critical
Publication of CN211289101U publication Critical patent/CN211289101U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model discloses a sewage pipe connecting structure, which comprises a first fixing frame, a first pipe body, a second fixing frame and a second pipe body, a second flange plate is arranged on the side end surface of the first pipe body, a first flange plate is arranged on the side end surface of the second pipe body, the first flange plate is connected with the second flange plate through a first bolt, the top end surface of the first fixing frame is welded with a first connecting frame and a second connecting frame, a second hoop on the top end surface of the second connecting frame and a first hoop on the bottom end surface of the third connecting frame are both sheathed on the first pipe body in a sliding way, and the second hoop and the first hoop are rotatably provided with a second bolt, the top end surfaces of the first connecting frame and the second connecting frame are both welded with the second hoop, the bottom face welding of second mount has third link and fourth link, the bottom face welding of third link and fourth link has first clamp. The utility model discloses possess the simple operation, fixed more firm and the better advantage of practicality.

Description

Sewage pipe connection structure
Technical Field
The utility model relates to a pipe connection technical field specifically is a sewage pipe connection structure.
Background
The sewage pipe connection structure is as follows: sewage is the effluent from life and production that is contaminated to some extent. The water which loses the original use function is called sewage for short. Mainly used water in life, which contains more organic matters and is easy to treat.
Pipeline connection is needed to be carried out when sewage is discharged, but only flange connection is adopted when the existing sewage pipe is connected, and the connection part is easy to deform and loosen due to internal water pressure and gravity when the sewage pipe is used for a long time, so that multiple times of maintenance is needed, and the actual use is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a sewage pipe connection structure possesses the simple operation, and fixed more firm and better advantage of practicality have only adopted flange joint when having solved current sewage union coupling, and because inside water pressure and gravity, the junction is out of order easily during long time use, causes and needs a lot of maintenance, influences the problem of in-service use.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a sewage pipe connection structure, includes first mount, first body, second mount and second body, the second ring flange is installed to the side end face of first body, first ring flange is installed to the side end face of second body, and first ring flange is connected with the second ring flange through first bolt, the welding of the top face of first mount has first link and second link, the second clamp has all been welded to the top face of first link and second link, the welding of the bottom face of second mount has third link and fourth link, the welding of the bottom face of third link and fourth link has first clamp.
Preferably, a first screw rod is rotatably mounted in the first connecting frame, and the first screw rod limits the first flange plate.
Preferably, a second screw rod is rotatably mounted in the second connecting frame, and the second flange plate is limited by the second screw rod.
Preferably, a third screw rod is rotatably mounted in the third connecting frame, and the third screw rod limits the second flange plate.
Preferably, a fourth screw is rotatably mounted in the fourth connecting frame, and the fourth screw limits the first flange.
Preferably, the second clamp of second link top end face and the first clamp of third link bottom end face all slide to cup joint on first body, and rotate on second clamp and the first clamp and install the second bolt, and second clamp and first clamp pass through the spacing fixing of second bolt on first body.
Preferably, the first clamp of fourth link terminal surface and the second clamp of first link top terminal surface all slide to cup joint on the second body, and rotate on first clamp and the second clamp and install the second bolt, and first clamp and second clamp pass through the spacing fixing of second bolt on the second body.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model is provided with a first fixing frame and a second fixing frame, after an operator connects and fixes a first pipe body and a second pipe body by a first flange and a second flange, the operator slidingly sleeves the second fixing frame on the top end surfaces of the first pipe body and the second pipe body by a first clamping hoop of the bottom end surface of a third connecting frame and a fourth connecting frame, simultaneously, the operator slidingly sleeves the first fixing frame on the bottom end surface of the second pipe body by a second clamping hoop of the top end of the first connecting frame and the second connecting frame, after sleeve joint, the operator rotationally installs a second bolt in the first clamping hoop and the second clamping hoop, the second clamping hoop and the first clamping hoop are limited and fixed on the first pipe body and the second pipe body, after fixation, the operator rotates the first screw to limit the first flange, rotates the second screw to limit the second flange, rotate the third screw and carry on spacingly to the second ring flange, rotate the fourth screw and carry on spacingly to first ring flange, carry out the spacing connection of secondary to first ring flange and second ring flange, prevent that the easy deformation of junction is not hard up because inside water pressure and gravity when using for a long time, make the practicality better, reduce the waste that the later stage needs a lot of maintenance.
Drawings
Fig. 1 is a schematic view of the structure of the present invention;
fig. 2 is a left side view structure diagram of the present invention;
fig. 3 is a schematic view of the structure of the right side of the present invention.
In the figure: 1. a first connecting frame; 2. a first screw; 3. a first fixing frame; 4. a first flange plate; 5. a first bolt; 6. a second flange plate; 7. a second screw; 8. a second link frame; 9. a third connecting frame; 10. a third screw; 11. a first pipe body; 12. a fourth screw; 13. a second fixing frame; 14. a second tube body; 15. a fourth link frame; 16. a first clamp; 17. a second bolt; 18. and a second clamp.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1 to fig. 3, the present invention provides an embodiment: a sewage pipe connecting structure comprises a first fixing frame 3, a first pipe body 11, a second fixing frame 13 and a second pipe body 14, wherein a second flange 6 is installed on the side end face of the first pipe body 11, a first flange 4 is installed on the side end face of the second pipe body 14, the first flange 4 is connected with the second flange 6 through a first bolt 5, a first connecting frame 1 and a second connecting frame 8 are welded on the top end face of the first fixing frame 3, a first screw 2 is rotatably installed on the first connecting frame 1, the first screw 2 limits the first flange 4, a second clamp 18 is welded on the top end faces of the first connecting frame 1 and the second connecting frame 8, a second screw 7 is rotatably installed on the second connecting frame 8, the second screw 7 limits the second flange 6, a third connecting frame 9 and a fourth connecting frame 15 are welded on the bottom end face of the second fixing frame 13, a third screw 10 is rotatably installed on the third connecting frame 9, the third screw 10 limits the second flange 6, the fourth screw 12 is rotatably mounted in the fourth connecting frame 15, the fourth screw 12 limits the first flange 4, the first clamp 16 is welded on the bottom end faces of the third connecting frame 9 and the fourth connecting frame 15, the second clamp 18 on the top end face of the second connecting frame 8 and the first clamp 16 on the bottom end face of the third connecting frame 9 are slidably sleeved on the first pipe 11, the second bolt 17 is rotatably mounted on the second clamp 18 and the first clamp 16, the second clamp 18 and the first clamp 16 are limited and fixed on the first pipe 11 through the second bolt 17, the first clamp 16 on the bottom end face of the fourth connecting frame 15 and the second clamp 18 on the top end face of the first connecting frame 1 are slidably sleeved on the second pipe 14, the second bolt 17 is rotatably mounted on the first clamp 16 and the second clamp 18, the first clamp 16 and the second limiting clamp 18 are fixed on the second pipe 14 through the second bolt 17, through setting up first mount 3 and second mount 13, operating personnel connects and fixes first body 11 and second body 14 with first ring flange 4 and second ring flange 6, operating personnel cup joints second mount 13 in the top face of first body 11 and second body 14 through the first clamp 16 of third link 9 and fourth link 15 bottom face in a sliding manner, operating personnel cup joints first mount 3 in the bottom face of second body 14 through the second clamp 18 of first link 1 and the 8 tops of second link simultaneously, operating personnel rotates second bolt 17 after cup jointing and installs in first clamp 16 and second clamp 18, with second clamp 18 and the spacing first clamp 16 of fixing on first body 11 and second body 14, carry out the secondary connection with first body 11 and second body 14 and fix.
Fixed back operating personnel rotates first screw rod 2 and carries on spacingly to first ring flange 4, it is spacing to rotate second screw rod 7 and carry out second ring flange 6, it is spacing to rotate third screw rod 10 and carry out second ring flange 6, it is spacing to rotate fourth screw rod 12 and carry out first ring flange 4, carry out the spacing connection of secondary to first ring flange 4 and second ring flange 6, because inside water pressure and gravity when preventing long time use, the junction is out of step easily, it is better to use the practicality, reduce the waste that the later stage needs a lot of maintenance.
The working principle is as follows: after an operator connects and fixes the first pipe body 11 and the second pipe body 14 by the first flange plate 4 and the second flange plate 6, the operator slidingly sleeves the second fixing frame 13 on the top end surfaces of the first pipe body 11 and the second pipe body 14 through the first hoop 16 on the bottom end surfaces of the third connecting frame 9 and the fourth connecting frame 15, meanwhile, the operator slidingly sleeves the first fixing frame 3 on the bottom end surface of the second pipe body 14 through the second hoop 18 on the top ends of the first connecting frame 1 and the second connecting frame 8, after the sleeve connection, the operator rotatably installs the second bolt 17 in the first hoop 16 and the second hoop 18, the second hoop 18 and the first hoop 16 are limited and fixed on the first pipe body 11 and the second pipe body 14, the first pipe body 11 and the second pipe body 14 are secondarily connected and fixed, after the fixation, the operator rotates the first screw rod 2 to limit the first flange plate 4, rotates the second screw rod 7 to limit the second flange plate 6, rotate third screw rod 10 and carry on spacingly to second ring flange 6, rotate fourth screw rod 12 and carry on spacingly to first ring flange 4, carry out secondary spacing connection to first ring flange 4 and second ring flange 6, prevent to warp to become flexible easily because inside water pressure and gravity when using for a long time, the junction.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. The utility model provides a sewage pipe connection structure, includes first mount (3), first body (11), second mount (13) and second body (14), its characterized in that: second ring flange (6) are installed to the side end face of first body (11), first ring flange (4) are installed to the side end face of second body (14), and first ring flange (4) are connected with second ring flange (6) through first bolt (5), the welding of the top face of first mount (3) has first link (1) and second link (8), second clamp (18) have all been welded to the top face of first link (1) and second link (8), the welding of the bottom face of second mount (13) has third link (9) and fourth link (15), first clamp (16) have all been welded to the bottom face of third link (9) and fourth link (15).
2. The sewage pipe connection structure according to claim 1, wherein: first screw rod (2) are installed to first link (1) internal rotation, and first screw rod (2) carry on spacingly to first ring flange (4).
3. The sewage pipe connection structure according to claim 1, wherein: and a second screw rod (7) is rotatably arranged in the second connecting frame (8), and the second flange plate (6) is limited by the second screw rod (7).
4. The sewage pipe connection structure according to claim 1, wherein: and a third screw rod (10) is rotatably arranged in the third connecting frame (9), and the second flange plate (6) is limited by the third screw rod (10).
5. The sewage pipe connection structure according to claim 1, wherein: and a fourth screw rod (12) is rotatably installed in the fourth connecting frame (15), and the first flange plate (4) is limited by the fourth screw rod (12).
6. The sewage pipe connection structure according to claim 1, wherein: second clamp (18) of second link (8) top end face and first clamp (16) of third link (9) bottom end face all slide to cup joint on first body (11), and rotate on second clamp (18) and first clamp (16) and install second bolt (17), and second clamp (18) and first clamp (16) are fixed on first body (11) through second bolt (17) are spacing.
7. The sewage pipe connection structure according to claim 1, wherein: first clamp (16) of fourth link (15) bottom face and second clamp (18) of first link (1) top face all slide to cup joint on second body (14), and rotate on first clamp (16) and second clamp (18) and install second bolt (17), and first clamp (16) and second clamp (18) are fixed on second body (14) through second bolt (17) are spacing.
CN201922196791.0U 2019-12-10 2019-12-10 Sewage pipe connection structure Expired - Fee Related CN211289101U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922196791.0U CN211289101U (en) 2019-12-10 2019-12-10 Sewage pipe connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922196791.0U CN211289101U (en) 2019-12-10 2019-12-10 Sewage pipe connection structure

Publications (1)

Publication Number Publication Date
CN211289101U true CN211289101U (en) 2020-08-18

Family

ID=72034256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922196791.0U Expired - Fee Related CN211289101U (en) 2019-12-10 2019-12-10 Sewage pipe connection structure

Country Status (1)

Country Link
CN (1) CN211289101U (en)

Similar Documents

Publication Publication Date Title
CN211289101U (en) Sewage pipe connection structure
CN213629301U (en) Water supply and drainage pipeline sealing connector
CN207454988U (en) A kind of pipeline connection device
CN216307023U (en) Hydraulic pipeline connecting device for hydraulic engineering
CN215000013U (en) Anticorrosion chemical industry high pressure line connects
CN109084105A (en) Armored concrete propulsion tube ring-groove-type joint connecting structure
CN210978930U (en) Sand blocking type corrugated pipe expansion joint for hydropower station
CN210398027U (en) Heater pipeline connecting device convenient to location
CN210770771U (en) Water supply and drainage pipeline connecting device
CN211203220U (en) Internal locking type flange joint pipe
CN219588329U (en) Low-nickel super duplex stainless steel seamless steel pipe
CN210182993U (en) Urban line pipeline
CN214699591U (en) Pipeline connecting device is used in city water supply system construction
CN212407788U (en) Pipe fitting convenient to maintain
CN217177854U (en) Double-high-rib reinforced polyethylene winding pipe
CN210196607U (en) Mounting and connecting structure for electric valve
CN220797726U (en) Electric power pipeline sealing connection device
CN218592120U (en) Welding device for pipeline installation
CN214064138U (en) Novel water supply and drainage pipe connecting device
CN216643494U (en) Thermal power pipeline repairing device
CN216242781U (en) Drainage pipe for municipal works
CN104466825B (en) Cable support device
CN216046184U (en) PE electric smelting sleeve protection device
CN215445461U (en) Pipeline connecting device for non-negative pressure water supply equipment
CN216520117U (en) Pipeline with small joint volume

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200818

Termination date: 20201210