CN211285720U - Novel basement waterproof construction - Google Patents

Novel basement waterproof construction Download PDF

Info

Publication number
CN211285720U
CN211285720U CN201920790703.7U CN201920790703U CN211285720U CN 211285720 U CN211285720 U CN 211285720U CN 201920790703 U CN201920790703 U CN 201920790703U CN 211285720 U CN211285720 U CN 211285720U
Authority
CN
China
Prior art keywords
waterproof
layer
basement
construction
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920790703.7U
Other languages
Chinese (zh)
Inventor
唐二波
王建英
孟令才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201920790703.7U priority Critical patent/CN211285720U/en
Application granted granted Critical
Publication of CN211285720U publication Critical patent/CN211285720U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model provides a novel basement waterproof construction, its characterized in that: including basement bottom concrete cushion, be located the bottom waterproof layer between concrete cushion and the basement and be located the waterproof layer of basement side wall outer wall, the bottom waterproof layer includes bed course waterproof mortar layer and cement base infiltration crystallization type dope layer from bottom to top, the waterproof layer that is located basement side wall outer wall includes cement base infiltration crystallization type dope layer and side wall waterproof mortar layer from interior to exterior. The utility model discloses waterproof construction compares the construction with traditional SBS waterproofing membrane simply, and construction quality controls easily, and waterproof time is long, is difficult to destroy, and water-proof effects is good.

Description

Novel basement waterproof construction
Technical Field
The utility model belongs to basement waterproofing field, concretely relates to novel basement waterproof construction.
Background
Basement waterproofing plays an increasingly important role in the current construction, and people have higher and higher requirements on basement waterproofing. Most of traditional basement waterproofing materials are formed by sticking one or two layers of SBS high polymer modified asphalt waterproof coiled materials on the outer side of an outer wall, and although good waterproof effects can be achieved, the waterproof coiled materials are greatly affected by construction. Common quality issues include: the coiled material bonds with the basic unit insecurely, and the hollowing, coiled material overlap joint are not conform to the requirement, and the seam is pasted not tight, and what appears most easily is that the coiled material bonds with the basic unit and does not reach 100%, because of waterproof layer local position is destroyed, makes the water scurry to other positions and leads to the basement seepage, and is difficult to look for the seepage point, makes the basement often appear the emergence of local infiltration or ground ponding phenomenon, brings a great deal of inconvenience for production life. Under such circumstances, a new waterproof structure for a basement is required to solve the problem. Through construction experience for many years, the traditional SBS coiled material pasting construction is changed into a construction method of adding an FS102 compacting agent and polypropylene short fibers into concrete, coating cement-based permeable crystalline waterproof coating on an outer wall and coating a waterproof mortar protective layer on the outer wall, so that a better waterproof effect can be obtained, the structure is simple and intuitive in construction, the quality of the construction process is easy to control, the construction quality is easy to guarantee, and the waterproof effect is guaranteed.
SUMMERY OF THE UTILITY MODEL
To the problem that prior art exists, the utility model discloses a solve the technical scheme that the problem that exists adopts among the prior art as follows:
the utility model provides a novel basement waterproof construction which characterized in that: including basement bottom concrete cushion, be located the bottom waterproof layer between concrete cushion and the basement and be located the waterproof layer of basement side wall outer wall, the bottom waterproof layer includes bed course waterproof mortar layer and cement base infiltration crystallization type dope layer from bottom to top, the waterproof layer that is located basement side wall outer wall includes cement base infiltration crystallization type dope layer and side wall waterproof mortar layer from interior to exterior.
And the waterproof mortar layer of the cushion layer above the concrete cushion layer is a 30 mm-thick FS 101-doped waterproof mortar layer.
The side wall waterproof mortar layer is a 20mm thick FS 101-doped waterproof mortar layer.
In the concrete construction of the bottom plate and the side wall of the basement, the concrete doped with the FS102 concrete compacting agent and the polypropylene short fibers is adopted, so that the compactness and the crack resistance of the concrete are improved.
The utility model has the advantages of as follows:
1. the concrete doped with the FS102 compacting agent and the polypropylene short fibers is used, and the compactness and the crack resistance of the concrete are improved by controlling the construction quality of the concrete;
2. cement-based capillary crystalline waterproof paint is coated on the cushion layer waterproof mortar and the concrete outer wall, and the waterproof paint fills capillary channels of the side wall and forms a whole with the base layer, so that the concrete is compact and waterproof;
3. an FS101 waterproof mortar protective layer is smeared on the outer wall, so that the waterproof performance is further enhanced;
4. compared with the traditional SBS waterproof coiled material, the construction is simple, the construction quality is easy to control, the waterproof time is long, the damage is not easy, and the waterproof effect is good.
Drawings
FIG. 1 is a construction drawing of a basement waterproof structure at a cushion layer construction stage;
FIG. 2 is a schematic diagram of a basement concrete construction stage;
FIG. 3 is a schematic view of the construction of a sidewall cement-based capillary crystalline waterproof coating;
FIG. 4 is a construction schematic diagram of side wall doped with FS101 waterproof mortar;
FIG. 5 is a view of the overall waterproof arrangement of the basement;
in the figure: 1-concrete basement, 2-cement-based infiltration crystallization type waterproof coating layer, 3-cushion waterproof mortar layer, 4-concrete cushion layer and 5-side wall waterproof mortar layer.
Detailed Description
Following through the embodiment, and combine the attached drawing, right the utility model discloses a technical scheme makes further specific explanation, as shown in fig. 1-5, a novel basement waterproof construction, including basement bottom concrete bed 4, be located the bottom waterproof layer between concrete bed 4 and the basement, and be located the waterproof layer of basement side wall outer wall, the bottom waterproof layer includes bed course waterproof mortar layer 3 and cement base infiltration crystallization type waterproof coating layer 2 from bottom to top, and the waterproof layer that is located basement side wall outer wall includes cement base infiltration crystallization type waterproof coating layer 2 and side wall waterproof mortar layer 5 from inside to outside.
The waterproof mortar layer 3 of the cushion layer above the concrete cushion layer 4 is a waterproof mortar layer mixed with FS101 with the thickness of 30 mm.
The side wall waterproof mortar layer 5 is a 20mm thick FS 101-doped waterproof mortar layer.
In the concrete construction of the bottom plate and the side wall of the concrete basement 1, the concrete doped with the FS102 concrete compacting agent and the polypropylene short fibers is adopted, so that the compactness and the crack resistance of the concrete are improved.
The utility model discloses basement waterproof construction's construction order does:
1. after the construction of the basement concrete cushion layer 4 is finished, waterproof cement mortar 3 mixed with FS101 and with the thickness of 30mm is smeared on the cushion layer, after the strength of the waterproof cement mortar meets the requirement, a layer of cement-based permeable crystalline waterproof coating 2 is smeared on the surface layer, so that a water seepage path is blocked, and then the construction of the basement concrete bottom plate is carried out on the surface layer;
2. the concrete construction of the side wall and the bottom plate of the basement is carried out strictly according to the optimized mixing ratio, an FS102 concrete compacting agent and polypropylene short fibers are added into the concrete, the compactness and the anti-cracking strength of the concrete are improved, the concrete construction is strictly controlled in the construction, the vibration is enhanced, the concrete maintenance is enhanced, and the like;
3. after the basement concrete side wall is constructed, a layer of cement-based capillary crystalline waterproof coating is smeared on the concrete surface layer of the side wall, and the waterproof coating is filled in capillary channels of the side wall to form a whole with the base layer, so that the concrete is compact and waterproof;
4, after the cement-based permeable crystalline waterproof coating is constructed, constructing waterproof mortar with the thickness of 20mm and added with FS101 on the outer side of the side wall, strictly controlling the construction quality of the waterproof mortar, and maintaining for not less than 7 days after the construction is finished;
5. and after the FS101 waterproof mortar is constructed, reinforcing the maintenance work of a mortar protective layer, maintaining for at least 7 days, strictly forbidding cracks and hollowing, and after the maintenance is finished for 14 days, comprehensively checking the waterproof mortar, and performing backfill construction after no cracks and hollowing are ensured.
The scope of the present invention is not limited to the above-described embodiments, and it is apparent that those skilled in the art can make various modifications and variations to the present invention without departing from the scope and spirit of the present invention. It is intended that the present invention cover the modifications and variations of this invention provided they come within the scope of the appended claims and their equivalents.

Claims (3)

1. The utility model provides a novel basement waterproof construction which characterized in that: including basement bottom concrete cushion, be located the bottom waterproof layer between concrete cushion and the basement and be located the waterproof layer of basement side wall outer wall, the bottom waterproof layer includes bed course waterproof mortar layer and cement base infiltration crystallization type dope layer from bottom to top, the waterproof layer that is located basement side wall outer wall includes cement base infiltration crystallization type dope layer and side wall waterproof mortar layer from interior to exterior.
2. A novel basement waterproofing structure as claimed in claim 1, wherein: and the waterproof mortar layer of the cushion layer above the concrete cushion layer is a 30 mm-thick FS 101-doped waterproof mortar layer.
3. A novel basement waterproofing structure as claimed in claim 1, wherein: the side wall waterproof mortar layer is a 20mm thick FS 101-doped waterproof mortar layer.
CN201920790703.7U 2019-05-29 2019-05-29 Novel basement waterproof construction Active CN211285720U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920790703.7U CN211285720U (en) 2019-05-29 2019-05-29 Novel basement waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920790703.7U CN211285720U (en) 2019-05-29 2019-05-29 Novel basement waterproof construction

Publications (1)

Publication Number Publication Date
CN211285720U true CN211285720U (en) 2020-08-18

Family

ID=72032846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920790703.7U Active CN211285720U (en) 2019-05-29 2019-05-29 Novel basement waterproof construction

Country Status (1)

Country Link
CN (1) CN211285720U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115075264A (en) * 2022-06-15 2022-09-20 中国五冶集团有限公司 Foundation pit basement fertilizer groove backfilling structure
CN115110769A (en) * 2022-05-13 2022-09-27 山西四建集团有限公司 Efficient composite closed waterproof construction method for fire pool

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115110769A (en) * 2022-05-13 2022-09-27 山西四建集团有限公司 Efficient composite closed waterproof construction method for fire pool
CN115075264A (en) * 2022-06-15 2022-09-20 中国五冶集团有限公司 Foundation pit basement fertilizer groove backfilling structure

Similar Documents

Publication Publication Date Title
CN211285720U (en) Novel basement waterproof construction
CN206917119U (en) One kind goes out roof pipeline waterproof construction
CN104153401A (en) Waterproof construction method for anti-floating anchor rods
CN201915399U (en) Rigid-flexible waterproof structure of head of prestressed pipe pile
CN103015721A (en) Leakage prevention construction method of reserved holes in kitchen and toilet
CN106948502A (en) A kind of water-proof top cover and its construction method
CN203320578U (en) Waterproof treatment structure of reinforced concrete cast-in-place pile head
CN106869304A (en) Outer wall of basement waterproof construction and construction method in a kind of confined space
CN110439016A (en) A kind of pile foundation waterproof construction method
CN106703302A (en) Foam-concrete roof structure
CN103628506B (en) Construction method for waterproof positions of foundation platform and pile head
CN1242126C (en) Channel joint leakage prevention construction method
CN210887330U (en) Waterproof structure for junction of basement top plate and enclosure wall in water-rich area
CN205875541U (en) Anti -drop's roof waterproof structure
CN212405025U (en) Rockfill dam with simplified construction partitions
CN209760313U (en) Underground totally-enclosed pile head waterproof structure
CN211421462U (en) Bathroom wall waterproof construction
CN106759308B (en) A kind of precast hollow pile head waterproof construction method
CN210562329U (en) Prevent outer method basement roof and wallboard corner waterproof construction that pastes outward
CN206233385U (en) A kind of basement high-low bay shears mine dam waterproof construction
CN217811664U (en) Anti-cracking waterproof structure for plugging screw hole of outer wall
CN215052902U (en) Novel prefabricated tubular pile
CN207032705U (en) A kind of roof cowl
CN207419841U (en) A kind of prefabricated panel
CN213329133U (en) Anti-floating anchor rod and waterproofing membrane's for building seal structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant