CN211285684U - Invisible equipment foundation - Google Patents
Invisible equipment foundation Download PDFInfo
- Publication number
- CN211285684U CN211285684U CN201921857511.XU CN201921857511U CN211285684U CN 211285684 U CN211285684 U CN 211285684U CN 201921857511 U CN201921857511 U CN 201921857511U CN 211285684 U CN211285684 U CN 211285684U
- Authority
- CN
- China
- Prior art keywords
- terrace
- equipment foundation
- equipment
- foundation
- stake
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Foundations (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921857511.XU CN211285684U (en) | 2019-10-31 | 2019-10-31 | Invisible equipment foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921857511.XU CN211285684U (en) | 2019-10-31 | 2019-10-31 | Invisible equipment foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211285684U true CN211285684U (en) | 2020-08-18 |
Family
ID=72035532
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921857511.XU Active CN211285684U (en) | 2019-10-31 | 2019-10-31 | Invisible equipment foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211285684U (en) |
-
2019
- 2019-10-31 CN CN201921857511.XU patent/CN211285684U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105113389B (en) | Assembled type bridge pier column member with steel-concrete composite structure | |
CN104294753B (en) | A kind of hollow pier stud syndeton of bridge prefabrication and construction | |
CN201534978U (en) | Steel platform foundation of tower crane | |
CN108035376B (en) | Anti-deformation rectification foundation applicable to goaf site wind turbine generator and construction method thereof | |
CN106245670B (en) | Exposed steel column base construction method | |
CN102031756A (en) | Support assembly and construction method of cast-in-place box girder | |
CN106759434B (en) | A kind of groined type precast concrete king-post basis and its construction method | |
CN108442239A (en) | A kind of full assembled light abutment and its construction method | |
CN109811782A (en) | A kind of soft soil foundation reinforcing method and its ruggedized construction | |
CN208701729U (en) | A kind of offshore wind farm High-Rise Pile Cap Foundation using prefabricated cushion cap | |
CN201770942U (en) | Support for soft soil foundation cast-in-place concrete continuous beam bridge | |
CN207513051U (en) | Precast stair bench and the connection fixed structure of terraced beam | |
CN113005926A (en) | Construction method of mountain area abrupt slope pier reinforcing device | |
CN106958259B (en) | A kind of concrete towers column foundation and its construction method | |
CN101418574B (en) | Construction method for reinforcing grade beam | |
CN204780979U (en) | Install steel -pipe pile basis of anti horizontal force of iron tower fast | |
CN201942994U (en) | Bridge bearing pad | |
CN116856932B (en) | Large-diameter prestress assembly vertical shaft structure containing glass fiber rib part and construction method | |
CN105821962A (en) | Assembled integrated connection structure for prefabricated prestressed reinforced concrete beam and frame columns | |
CN203475289U (en) | Pile type continuous rigid frame bridge | |
CN103510458B (en) | Pile type continuous rigid frame bridge and construction method thereof | |
CN103233537A (en) | Heavy-load superimposed overhead terrace and construction method | |
CN211285684U (en) | Invisible equipment foundation | |
CN110206020B (en) | Prefabricated snowflake type concrete steel sheet pile and construction method thereof | |
CN111197319A (en) | Multidirectional prestress prefabricated assembled beam slab foundation of wind power generation tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province Patentee after: China Construction Sixth Engineering Bureau Northwest Construction Co.,Ltd. Patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd. Address before: No. 72 Hangzhou Road, Tianjin Binhai New Area, 300451 Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING BUREAU INSTALLATION ENGINEERING Co.,Ltd. Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd. |
|
CP03 | Change of name, title or address | ||
CP01 | Change in the name or title of a patent holder |
Address after: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province Patentee after: The First Construction Co.,Ltd. of China Construction Sixth Engineering Bureau Patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd. Address before: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province Patentee before: China Construction Sixth Engineering Bureau Northwest Construction Co.,Ltd. Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |