CN211281081U - Hanging material carrying device for building construction - Google Patents

Hanging material carrying device for building construction Download PDF

Info

Publication number
CN211281081U
CN211281081U CN201921725782.XU CN201921725782U CN211281081U CN 211281081 U CN211281081 U CN 211281081U CN 201921725782 U CN201921725782 U CN 201921725782U CN 211281081 U CN211281081 U CN 211281081U
Authority
CN
China
Prior art keywords
fixedly connected
bottom plate
motor
rotating shaft
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921725782.XU
Other languages
Chinese (zh)
Inventor
赖金梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Huatuo Construction Machinery Installation Co ltd
Original Assignee
Shanghai Huatuo Construction Machinery Installation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Huatuo Construction Machinery Installation Co ltd filed Critical Shanghai Huatuo Construction Machinery Installation Co ltd
Priority to CN201921725782.XU priority Critical patent/CN211281081U/en
Application granted granted Critical
Publication of CN211281081U publication Critical patent/CN211281081U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Invalid Beds And Related Equipment (AREA)

Abstract

The utility model discloses a building construction is with hanging material handling device belongs to construction technical field, and it includes the bottom plate, the dead slot has been seted up in the left side of bottom plate lower surface, be provided with the motor in the dead slot, the first pivot of output shaft fixedly connected with of motor, the left and right sides face fixed connection of fixing device and dead slot inner wall is passed through on the surface of first pivot, the positive one end fixedly connected with take-up pulley of first pivot. This hanging material handling device for construction, through set up the adjustable shelf on the bottom plate, because the adjustable shelf can rotate on the bottom plate through second pivot and second bearing, people control the output shaft of motor and just reverse for the take-up pulley tightens up the cable wire or loosens the cable wire, and the control adjustable shelf that can be nimble is rotatory, can make things convenient for people to load like this and hang the material, has reduced the amount of labour of the manual material loading of workman, has improved the efficiency of carrying and hanging the material simultaneously, and then has guaranteed the whole efficiency of construction.

Description

Hanging material carrying device for building construction
Technical Field
The utility model belongs to the technical field of the construction, specifically be a material handling device hangs for construction.
Background
At the building construction place, the material majority that the high-rise needs is transported through hoist device, often the workman is in the same place the material of hanging, use hoist device whole handling to the high-rise, because some hang the material and can not place outdoors in the open air, need the workman to use handling device to transport the material outdoors like this, then use hoist device to lift by crane, but current handling device, most only adopt the small handcart, rely on the manual loading and unloading of workman, consequently cause and hang the material handling efficiency lower, and in the work progress, the efficiency of hanging the material handling is very important to the construction, it also directly influences the building efficiency of construction to hang the material handling.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In order to overcome prior art's above-mentioned defect, the utility model provides a building construction is with hanging material handling device has solved and has hung material handling device and load slower, and the amount of labour is too big, influences the problem of hanging material handling efficiency.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a hanging material handling device for construction, includes the bottom plate, the dead slot has been seted up in the left side of bottom plate lower surface, be provided with the motor in the dead slot, the first pivot of output shaft fixedly connected with of motor, the surface of first pivot is through fixing device and dead slot inner wall's left and right sides face fixed connection, the positive one end fixedly connected with take-up pulley of first pivot.
Fixedly connected with cable wire on the take-up reel, the other end fixedly connected with ring of cable wire, the right-hand member fixedly connected with adjustable shelf of ring, the back fixedly connected with second pivot of adjustable shelf, the second bearing has been cup jointed on the surface of second pivot, the second bearing joint is on the positive right side of bottom plate, torque spring has all been cup jointed to the front side and the rear side on second pivot surface, and the one end that two torque spring are close to mutually is fixed connection respectively at the front and the back of bottom plate, and the opposite face at two adjustable shelves is fixed connection respectively to the one end that two torque spring kept away from mutually.
The right angle department of adjustable shelf is provided with the reinforcing plate, the shape of reinforcing plate is triangle-shaped, the left side of bottom plate upper surface is provided with a plurality of and weighs the piece, the last fixed surface of bottom plate is connected with armrest apparatus, armrest apparatus is located the right side that a plurality of weighed the piece, the equal fixedly connected with universal wheel in four corners department of bottom plate lower surface.
As a further aspect of the present invention: the fixing device comprises a first bearing, the first bearing is sleeved on the surface of the first rotating shaft, and the left side surface and the right side surface of the first bearing are fixedly connected with the left side surface and the right side surface of the inner wall of the empty groove through fixing blocks.
As a further aspect of the present invention: the handrail device comprises two connecting rods, the two connecting rods are respectively positioned on the front side and the rear side of the upper surface of the bottom plate, and the top ends of the two connecting rods are fixedly connected to the lower surface of the cross rod.
As a further aspect of the present invention: the motor is a double-shaft motor, and the front side and the back side of the motor are output shafts.
As a further aspect of the present invention: the movable frame is L-shaped, and the right end of the movable frame is wedge-shaped.
As a further aspect of the present invention: the positive top of connecting rod is provided with the power, the front of power is provided with the switch, the output of power passes through the wire and is connected with the input electricity of switch, the output of switch passes through the wire and is connected with the input electricity of motor.
(III) advantageous effects
Compared with the prior art, the beneficial effects of the utility model reside in that:
1. this hanging material handling device for construction, through set up the adjustable shelf on the bottom plate, because the adjustable shelf can rotate on the bottom plate through second pivot and second bearing, people control the output shaft of motor and just reverse for the take-up pulley tightens up the cable wire or loosens the cable wire, and the control adjustable shelf that can be nimble is rotatory, can make things convenient for people to load like this and hang the material, has reduced the amount of labour of the manual material loading of workman, has improved the efficiency of carrying and hanging the material simultaneously, and then has guaranteed the whole efficiency of construction.
2. This material handling device hangs for construction through setting up torsion spring, when people control the wire reel and loosen the cable wire, torsion that torsion spring produced can drive the adjustable shelf rotation for a side of adjustable shelf can rotate to ground, has made things convenient for workman's use adjustable shelf work like this.
3. This hanging material handling device for construction through setting up the title pouring weight, utilizes the gravity of a plurality of title pouring weight, prevents that the movable frame from driving when hanging the material rotation, and the risk that the bottom plate takes place to turn over to make fixing subaerial that the bottom plate can be stable, guarantee to hang the loading that the material can be normal.
Drawings
Fig. 1 is a front view of the present invention;
fig. 2 is a schematic structural view of the present invention viewed from the bottom;
fig. 3 is a left-side view schematically illustrating the armrest apparatus of the present invention;
in the figure: the device comprises a base plate 1, a hollow groove 2, a motor 3, a first rotating shaft 4, a fixing device 5, a first bearing 51, a fixing block 52, a wire winding wheel 6, a steel cable 7, a ring 8, a movable frame 9, a second rotating shaft 10, a second bearing 11, a torsion spring 12, a reinforcing plate 13, a weighing block 14, a universal wheel 15, an armrest device 16, a connecting rod 161, a cross rod 162, a power supply 17 and a switch 18.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
As shown in fig. 1-3, the utility model provides a technical solution: a hanging material carrying device for building construction comprises a bottom plate 1, wherein a hollow groove 2 is formed in the left side of the lower surface of the bottom plate 1, a motor 3 is arranged in the hollow groove 2, the motor 3 is a double-shaft motor 3, the front side and the back side of the motor 3 are output shafts, the motor 3 is arranged, a first rotating shaft 4 and a winding wheel 6 are driven to rotate by the power of the motor 3, so that the winding wheel 6 finishes the work of winding and loosening a steel cable 7, the output shaft of the motor 3 is fixedly connected with the first rotating shaft 4, the surface of the first rotating shaft 4 is fixedly connected with the left side surface and the right side surface of the inner wall of the hollow groove 2 through a fixing device 5, the fixing device 5 comprises a first bearing 51, the first bearing 51 is sleeved on the surface of the first rotating shaft 4, the left side surface and the right side surface of the first bearing 51 are fixedly connected with the left side surface and the right side surface of the inner wall, the stability of reinforcing first pivot 4 can be played to the stability of reel 6 has been increased, the positive one end fixedly connected with reel 6 of first pivot 4.
The steel cable 7 is fixedly connected to the winding wheel 6, the other end of the steel cable 7 is fixedly connected with the circular ring 8, the right end of the circular ring 8 is fixedly connected with the movable frame 9, the movable frame 9 is L-shaped, the right end of the movable frame 9 is wedge-shaped, the movable frame 9 is used for loading the hanging material firstly and then controlling the movable frame 9 to rotate, so that the rapid loading process of the hanging material can be completed, the back surface of the movable frame 9 is fixedly connected with the second rotating shaft 10, the surface of the second rotating shaft 10 is sleeved with the second bearing 11, the second bearing 11 is clamped on the right side of the front surface of the bottom plate 1, the front side and the back side of the surface of the second rotating shaft 10 are both sleeved with the torsion springs 12, the ends, close to the two torsion springs 12, are respectively and fixedly connected to the front surface and the back surface of the bottom plate 1, the ends, far away from the two torsion springs 12, are respectively, when people control the wire winding wheel 6 to loosen the steel cable 7, the torsion generated by the torsion spring 12 can drive the movable frame 9 to rotate, so that one side surface of the movable frame 9 can rotate to the ground, and workers can conveniently use the movable frame 9 to work.
The right angle of the movable frame 9 is provided with a reinforcing plate 13, the reinforcing plate 13 is triangular, the left side of the upper surface of the bottom plate 1 is provided with a plurality of weighing blocks 14, the weighing blocks 14 are arranged, the gravity of the weighing blocks 14 is utilized to prevent the movable frame 9 from turning over the bottom plate 1 when the lifting material is driven to rotate by the movable frame 9, so that the bottom plate 1 can be stably fixed on the ground to ensure the normal loading of the lifting material, the upper surface of the bottom plate 1 is fixedly connected with an armrest device 16, the armrest device 16 is positioned at the right side of the weighing blocks 14, the armrest device 16 comprises two connecting rods 161, the two connecting rods 161 are respectively positioned at the front side and the rear side of the upper surface of the bottom plate 1, the top ends of the two connecting rods 161 are fixedly connected to the lower surface of the cross rod 162, and by arranging the armrest device 16, people can conveniently push the bottom plate, thereby it is convenient to have brought for people to use, the positive top of connecting rod 161 is provided with power 17, through setting up power 17, can provide the electric energy for motor 3, power 17's front is provided with switch 18, power 17's output passes through the wire and is connected with switch 18's input electricity, switch 18's output passes through the wire and is connected with motor 3's input electricity, through setting up switch 18, can make people through the normal work of the more convenient control motor 3 of switch 18, the equal fixedly connected with universal wheel 15 in four corners department of bottom plate 1 lower surface.
The utility model discloses a theory of operation does:
s1, when the lifting device is used, a worker pushes the bottom plate 1 to move to the position of a lifting material by using the handrail device 16, the motor 3 is controlled to be started through the switch 18, two output shafts of the motor 3 rotate to drive the two first rotating shafts 4 and the two first coiling wheels 6 to rotate, the two coiling wheels 6 loosen the wound steel cable 7, the torsion spring 12 drives the movable frame 9 to rotate to the ground, and the handrail device 16 is pushed to enable the movable frame 9 to load the lifting material;
s2, controlling two output shafts of the motor 3 to rotate by using the switch 18, driving the two first rotating shafts 4 and the two winding wheels 6 to rotate, enabling the two winding wheels 6 to wind the steel cable 7, and driving the movable frame 9 to rotate by the steel cable 7, thereby completing the loading of the hanging materials;
s3, finally, the handrail device 16 is used to move the hanging material on the base plate 1 to the required position.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
Although the preferred embodiments of the present patent have been described in detail, the present patent is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present patent within the knowledge of those skilled in the art.

Claims (6)

1. The utility model provides a hoist material handling device for construction, includes bottom plate (1), its characterized in that: an empty groove (2) is formed in the left side of the lower surface of the bottom plate (1), a motor (3) is arranged in the empty groove (2), an output shaft of the motor (3) is fixedly connected with a first rotating shaft (4), the surface of the first rotating shaft (4) is fixedly connected with the left side surface and the right side surface of the inner wall of the empty groove (2) through a fixing device (5), and one end of the front surface of the first rotating shaft (4) is fixedly connected with a winding wheel (6);
the wire winding wheel (6) is fixedly connected with a steel cable (7), the other end of the steel cable (7) is fixedly connected with a circular ring (8), the right end of the circular ring (8) is fixedly connected with a movable frame (9), the back of the movable frame (9) is fixedly connected with a second rotating shaft (10), the surface of the second rotating shaft (10) is sleeved with a second bearing (11), the second bearing (11) is clamped on the right side of the front face of the bottom plate (1), the front side and the back side of the surface of the second rotating shaft (10) are both sleeved with torsion springs (12), the close ends of the two torsion springs (12) are respectively and fixedly connected to the front face and the back face of the bottom plate (1), and the far ends of the two torsion springs (12) are respectively and fixedly connected to the opposite faces of the two movable frames (9);
the right angle department of adjustable shelf (9) is provided with reinforcing plate (13), the shape of reinforcing plate (13) is triangle-shaped, the left side of bottom plate (1) upper surface is provided with a plurality of and weighs heavy piece (14), the last fixed surface of bottom plate (1) is connected with armrest apparatus (16), armrest apparatus (16) are located the right side that a plurality of weighed piece (14), the equal fixedly connected with universal wheel (15) in four corners department of bottom plate (1) lower surface.
2. The hoist carrying device for building construction according to claim 1, characterized in that: the fixing device (5) comprises a first bearing (51), the first bearing (51) is sleeved on the surface of the first rotating shaft (4), and the left side surface and the right side surface of the first bearing (51) are fixedly connected with the left side surface and the right side surface of the inner wall of the empty groove (2) through fixing blocks (52).
3. The hoist carrying device for building construction according to claim 1, characterized in that: the armrest device (16) comprises two connecting rods (161), the two connecting rods (161) are respectively positioned on the front side and the rear side of the upper surface of the base plate (1), and the top ends of the two connecting rods (161) are fixedly connected to the lower surface of the cross rod (162).
4. The hoist carrying device for building construction according to claim 1, characterized in that: the motor (3) is a double-shaft motor (3), and the front side and the back side of the motor (3) are output shafts.
5. The hoist carrying device for building construction according to claim 1, characterized in that: the movable frame (9) is L-shaped, and the right end of the movable frame (9) is wedge-shaped.
6. The hoist carrying device for building construction according to claim 3, characterized in that: the positive top of connecting rod (161) is provided with power (17), the front of power (17) is provided with switch (18), the output of power (17) is connected through the wire and the input of switch (18) is electric, the output of switch (18) is connected through the wire and the input of motor (3) is electric.
CN201921725782.XU 2019-10-15 2019-10-15 Hanging material carrying device for building construction Expired - Fee Related CN211281081U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921725782.XU CN211281081U (en) 2019-10-15 2019-10-15 Hanging material carrying device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921725782.XU CN211281081U (en) 2019-10-15 2019-10-15 Hanging material carrying device for building construction

Publications (1)

Publication Number Publication Date
CN211281081U true CN211281081U (en) 2020-08-18

Family

ID=72011193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921725782.XU Expired - Fee Related CN211281081U (en) 2019-10-15 2019-10-15 Hanging material carrying device for building construction

Country Status (1)

Country Link
CN (1) CN211281081U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112046582A (en) * 2020-09-15 2020-12-08 湖北领驭建设有限公司 Municipal administration building construction is with hanging material handling device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112046582A (en) * 2020-09-15 2020-12-08 湖北领驭建设有限公司 Municipal administration building construction is with hanging material handling device

Similar Documents

Publication Publication Date Title
CN211281081U (en) Hanging material carrying device for building construction
CN220033777U (en) Hoisting equipment for prefabricated parts of building engineering
CN216005069U (en) Indoor lifting machine for decoration
CN211770158U (en) Labor-saving tool
CN210242934U (en) Weighbridge for rectangular tube
CN207524909U (en) Based on chaindriven Multifunctional swing machine
CN210653185U (en) Building site is with handcart of being convenient for to take up
CN216155355U (en) Telescopic hoisting device for container
CN212740590U (en) Material lifting device for artificial charcoal processing
CN220223324U (en) Assembled building hoisting accessory
CN220642342U (en) Hoisting device for spinning
CN216072349U (en) Raise auxiliary device for cloth roller
CN212334470U (en) Civil engineering is with dismantled and assembled small-size machinery hoisting accessory
CN112744718A (en) Small-sized gantry crane for mechanical equipment transportation
CN219138479U (en) Building demolishing device for demolishing recycled brick wall
CN216336256U (en) Plate carrying device for engineering machinery
CN215798067U (en) Small crane convenient to load
CN217000745U (en) Working platform for architectural decoration
CN219277551U (en) Workshop steel sheet transports frame
CN220723386U (en) Lifting device for building construction
CN212581363U (en) Goods overhead hoist in commodity circulation warehouse that stability is good
CN214879800U (en) Building construction material lifting device
CN217780598U (en) Energy-concerving and environment-protective type is hanger for construction
CN218754667U (en) Movable portal frame for electromechanical installation
CN214569151U (en) Quick transfer device that puts things in good order of rock wool purification board production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200818

Termination date: 20201015