CN211276640U - Simple and easy furred ceiling jib drilling equipment - Google Patents
Simple and easy furred ceiling jib drilling equipment Download PDFInfo
- Publication number
- CN211276640U CN211276640U CN201922125325.3U CN201922125325U CN211276640U CN 211276640 U CN211276640 U CN 211276640U CN 201922125325 U CN201922125325 U CN 201922125325U CN 211276640 U CN211276640 U CN 211276640U
- Authority
- CN
- China
- Prior art keywords
- electric drill
- drill fixing
- steel pipe
- jib
- main body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a simple suspended ceiling suspender drilling device, which comprises an electric drill fixing cage, wherein an extension steel pipe is arranged below the electric drill fixing cage, and an operating rod is arranged below the extension steel pipe; the three components are connected in sequence through threads; and an electric drill fixing ring for fixedly clamping the electric drill is arranged on the electric drill fixing cage. This furred ceiling jib drilling equipment easy operation, construction convenience, draw materials easily, convenient to carry, field operation flexibility are big, and reuse rate reaches more than 100%, has guaranteed construction quality and progress when guaranteeing operation personnel safety, does not need more operation scaffold frame can accomplish jib drilling installation operation. Reducing the related equipment investment cost and the safe operation risk.
Description
Technical Field
The utility model relates to a simple and easy furred ceiling jib drilling equipment belongs to construction technical field.
Background
Among the decoration and finishing engineering construction operation process, during furred ceiling jib drilling construction, because need set up scaffold frame or full operation frame construction in the work progress, simple and easy operation frame potential safety hazard is big in the work progress, and full operation frame construction cost is high, so for reducing construction cost as far as possible when furred ceiling jib drilling construction, accelerate the construction progress under assurance construction quality, the safe prerequisite.
However, in the construction of indoor finish decoration furred ceiling, the jib drilling operation is time great because of the jib interval, and average jib interval is 800 x 800, and if the simple and easy handling frame stability of adoption during the jib drilling operation is relatively poor, the difficult power consumption of operation personnel, jib position can not better control, if operation personnel can be under construction on ground, guarantees operation personnel's safety when reducing relevant support body and drops into, can be better in the aspect of construction quality, progress etc. simultaneously obtain controlling.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a jib drilling construction operation device convenient simple, safe again promptly guarantees field operation personnel's safety, in construction quality and time limit for a project to increase furred ceiling jib operation flexibility, reduce the purpose of relevant scaffold frame and equipment use expense.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes:
a simple suspended ceiling suspender drilling device comprises an electric drill fixing cage, wherein an elongated steel pipe is arranged below the electric drill fixing cage, and an operating rod is arranged below the elongated steel pipe; the three components are connected in sequence through threads; and an electric drill fixing ring for fixedly clamping the electric drill is arranged on the electric drill fixing cage.
The electric drill fixing cage comprises a forked main body, and the lower part of the main body is connected with the lengthened steel pipe through a threaded section; an electric drill bracket is welded on the main body, and an electric drill fixing ring is arranged above the electric drill bracket.
Furthermore, a depth positioning piece extending upwards is arranged at the top of the main body and connected with the main body through a first screw rod.
Furthermore, the electric drill fixing ring is composed of a fixed semi-arc ring and a detachable movable arc ring, and the fixed semi-arc ring and the detachable movable arc ring are connected through a screw rod II to form a complete arc.
Compared with the similar products in the prior art, the ceiling suspender drilling device is simple in operation, convenient to construct, easy to obtain materials, convenient to carry, large in field operation flexibility, high in repeated utilization rate and capable of ensuring the safety of operating personnel, ensuring the construction quality and progress, and capable of completing suspender drilling installation operation without more operation scaffolds. Reducing the related equipment investment cost and the safe operation risk.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of a structure of an electric drill fixing cage;
FIG. 3 is a schematic view of the structure of an elongated steel pipe;
FIG. 4 is a schematic view of the structure of the operating lever;
fig. 5 is a schematic view of a fixed semi-arc ring structure.
Description of reference numerals: the method comprises the following steps of 1-electric drill fixing cage, 2-extension steel pipe, 3-operating rod, 4-electric drill fixing ring, 5-electric drill bracket, 6-depth positioning piece, 7-screw rod I, 8-fixed semi-arc ring, 9-detachable movable arc ring, 10-screw rod II and 11-electric drill.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, the device of the utility model comprises an electric drill fixing cage 1, an elongated steel pipe 2 (shown in fig. 3) is arranged below the electric drill fixing cage 1, and an operating rod 3 (shown in fig. 4) is arranged below the elongated steel pipe 2; the three components are connected in sequence through threads; as shown in fig. 2, the drill fixing cage 1 is provided with a drill fixing ring 4 for fixing and holding the drill 11.
In addition, as can be seen from fig. 2, the electric drill fixing cage 1 comprises a bifurcated main body, and the lower part of the main body is connected with the lengthened steel pipe 2 through a threaded section; the welding is equipped with an electric drill bracket 5 in the main part, and electric drill bracket 5 is the frame construction that the level of welding in the main part was placed, and electric drill solid fixed ring 4 is established in electric drill bracket 5 top.
And a depth positioning piece 6 extending upwards is arranged at the top of the main body, and the depth positioning piece 6 is connected with the main body through a first screw 7. The depth locator 6 is oriented vertically upwards and the depth of penetration of the drill 11 can be determined by viewing the depth locator 6.
As shown in fig. 5, the electric drill fixing ring 4 is composed of a fixed semi-arc ring 8 and a detachable movable arc ring 9, and the fixed semi-arc ring and the detachable movable arc ring are connected through a screw rod II 10 to form a complete arc.
The utility model discloses when specifically implementing, use 3 parts equipment in single figure 2-4, when furred ceiling drilling installation, 3 parts equipment in figure 2-4 to obtain the structure that figure 1 demonstrates after the electric drill 11 is fixed by the big appearance in figure 2 and carry out jib drilling installation operation. The device equipment after easy operation, drilling personnel can be at ground drilling installation operation, can accurately drill after cooperating the jib drilling position through ground projection again.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.
Claims (4)
1. The utility model provides a simple and easy furred ceiling jib drilling equipment which characterized in that: the electric drill fixing device comprises an electric drill fixing cage (1), wherein an elongated steel pipe (2) is arranged below the electric drill fixing cage (1), and an operating rod (3) is arranged below the elongated steel pipe (2); the three components are connected in sequence through threads; and an electric drill fixing ring (4) for fixedly clamping the electric drill (11) is arranged on the electric drill fixing cage (1).
2. The simplified ceiling boom drill apparatus of claim 1, wherein: the electric drill fixing cage (1) comprises a forked main body, and the lower part of the main body is connected with the lengthened steel pipe (2) through a threaded section; an electric drill bracket (5) is welded on the main body, and an electric drill fixing ring (4) is arranged above the electric drill bracket (5).
3. The simplified ceiling boom drill apparatus of claim 2, wherein: the top of the main body is provided with a depth positioning piece (6) which extends upwards, and the depth positioning piece (6) is connected with the main body through a first screw (7).
4. The simplified ceiling boom drill apparatus of claim 2, wherein: the electric drill fixing ring (4) is composed of a fixed semi-arc ring (8) and a detachable movable arc ring (9), and the fixed semi-arc ring and the detachable movable arc ring are connected through a screw rod II (10) to form a complete arc.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922125325.3U CN211276640U (en) | 2019-12-02 | 2019-12-02 | Simple and easy furred ceiling jib drilling equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922125325.3U CN211276640U (en) | 2019-12-02 | 2019-12-02 | Simple and easy furred ceiling jib drilling equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211276640U true CN211276640U (en) | 2020-08-18 |
Family
ID=72026514
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922125325.3U Active CN211276640U (en) | 2019-12-02 | 2019-12-02 | Simple and easy furred ceiling jib drilling equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211276640U (en) |
-
2019
- 2019-12-02 CN CN201922125325.3U patent/CN211276640U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204096996U (en) | Electric hoisting device | |
CN211276640U (en) | Simple and easy furred ceiling jib drilling equipment | |
CN111962855A (en) | Aerial working hanging basket for building construction | |
CN204826593U (en) | A portable supplementary operation platform for steel construction support body | |
CN204224128U (en) | A kind of safe tower crane | |
CN204261630U (en) | A kind of water paint stirs carries material blanking machine structure automatically | |
CN203755638U (en) | Suspending slippage type high-altitude inverted oblique plane operation hanging basket | |
CN102294517B (en) | Anode aluminum guide rod and steel claw separating method and device | |
CN211589002U (en) | Welding device of water tank heating plate for water conservancy construction | |
CN205132976U (en) | Auxiliary device is used in introduction of standard festival | |
CN212634878U (en) | Waterproof sleeve welding device | |
CN203471176U (en) | Automatic hoisting workpiece circular seam welder | |
CN212562406U (en) | Overhanging scaffold | |
CN204760871U (en) | Cable trench cover hoisting accessory | |
CN204435882U (en) | Concrete construction joint side dabbing device | |
CN104047418B (en) | The construction method of the exterior coaster of high-rise building roofing truss | |
CN202954551U (en) | Simple steel reinforcement cage for high-altitude welding | |
CN207710123U (en) | A kind of automatic soldering device for building-site | |
CN207633737U (en) | A kind of safety suspension structure for building high-altitude construction for room | |
CN208879898U (en) | A kind of auxiliary device for realizing standing arc stud welding | |
CN202448220U (en) | Demoulding device for fireproof foaming cement insulation board | |
CN204826704U (en) | A horizontal lifeline system for steel construction factory building | |
CN211473339U (en) | High-rise scaffold pipe concatenation auxiliary device | |
CN212679888U (en) | Safety device for industrial electric power | |
CN205764382U (en) | A kind of automatic soldering device for cross-shaped steel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |