CN211262206U - Engineering level settlement measuring instrument - Google Patents

Engineering level settlement measuring instrument Download PDF

Info

Publication number
CN211262206U
CN211262206U CN202020109627.1U CN202020109627U CN211262206U CN 211262206 U CN211262206 U CN 211262206U CN 202020109627 U CN202020109627 U CN 202020109627U CN 211262206 U CN211262206 U CN 211262206U
Authority
CN
China
Prior art keywords
fixedly connected
locking
spring
wall
level body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020109627.1U
Other languages
Chinese (zh)
Inventor
滕庆义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020109627.1U priority Critical patent/CN211262206U/en
Application granted granted Critical
Publication of CN211262206U publication Critical patent/CN211262206U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Length-Measuring Instruments Using Mechanical Means (AREA)

Abstract

The utility model discloses an engineering level settlement measuring instrument, which comprises a hydrostatic level body and a mounting seat, wherein an exhaust valve is arranged at the top of the hydrostatic level body in a penetrating manner, two opposite side walls of the hydrostatic level body are symmetrically provided with a cable joint, a water pipe joint and a gas pipe joint in a penetrating manner, a T-shaped block is fixedly connected to the bottom of the hydrostatic level body, and locking grooves are symmetrically arranged on two opposite side walls of the T-shaped block; the utility model discloses a set up T type piece, T type groove, second spring, slide, connecting block, locking piece, locking groove etc. only need align to insert T type piece in the T type groove alright lock T type piece through the effect of fillet and inclined plane end cooperation and spring down automatically, need not to use the bolt alright carry out effectual fixed connection with the mount pad to the surveyor's level body, easy operation is swift, labour saving and time saving, and can effectively avoid phenomenons such as bolt corrosion, smooth silk to cause inconvenience to follow-up maintenance change.

Description

Engineering level settlement measuring instrument
Technical Field
The utility model relates to a hydrostatic level, specifically an engineering level settlement measuring apparatu.
Background
A level settlement measuring instrument and a static level are precise instruments for measuring height difference and change thereof. The device is mainly used for monitoring vertical displacement and inclination of pipe galleries, dams, nuclear power stations, high-rise buildings, foundation pits, tunnels, bridges, subways and the like. The static force level gauge is generally installed on a measuring pier with the same height as a measured object or on the same height line as the wall of the measured object, automatic data acquisition is generally realized through single-computer version acquisition software arranged in a field acquisition box and stored in a field acquisition system, and then the static force level gauge is connected with the internet through wired or wireless communication and further transmitted to background network version software, so that automatic observation is realized.
Need install a large amount of hydrostatic levels in large-scale engineering such as dam, railway, bridge, however current hydrostatic level measuring apparatu adopts base and stationary plane to fix usually, and the rethread bolt carries out fixed connection to measuring apparatu and base, and not only waste time and energy, and the bolt is easy to appear phenomenons such as corrosion, smooth silk after using for a long time, has caused very big inconvenience for subsequent maintenance change.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an engineering level settlement measuring apparatu to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
an engineering level settlement measuring instrument comprises a static level body and a mounting seat, wherein an exhaust valve is arranged at the top of the static level body in a penetrating way, two opposite side walls of the static level body are symmetrically provided with a cable joint, a water pipe joint and an air pipe joint in a penetrating way, the bottom of the static level body is fixedly connected with a T-shaped block, two opposite side walls of the T-shaped block are symmetrically provided with locking grooves, a T-shaped groove is arranged at the center of the top of the mounting seat, an unlocking hole is arranged on the front wall of the mounting seat under the T-shaped groove, four limit plates are symmetrically and fixedly connected inside the mounting seat, two locking mechanisms are symmetrically arranged inside the mounting seat, every two limit plates are respectively positioned at two sides of the corresponding locking mechanism, the bilateral symmetry fixedly connected with first fixed plate of mount pad, a plurality of first fixed orificess have evenly been seted up to the outer wall of first fixed plate.
As a further aspect of the present invention: locking mechanical system includes the slide, the one end fixedly connected with second spring of slide, the one end of second spring offsets with the inner wall of mount pad, the top fixedly connected with connecting block of slide, the top fixedly connected with locking block of connecting block, the one end of locking block is the inclined plane end, the inclined plane end is located T type inslot after running through the inner wall of mount pad.
As a further aspect of the present invention: and one end of the T-shaped block is symmetrically provided with a round angle.
As a further aspect of the present invention: the outer wall of the sliding plate facing the unlocking hole is an inclined plane.
As a further aspect of the present invention: the inner wall fixedly connected with first spring in T type groove, the one end fixedly connected with push pedal of first spring.
As a further aspect of the present invention: the outward appearance of push pedal is the T type, the size looks adaptation in push pedal and T type groove.
As a further aspect of the present invention: the rear wall fixedly connected with second fixed plate of mount pad, a plurality of second fixed orificess have evenly been seted up to the outer wall of second fixed plate.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a set up T type piece, T type groove, the second spring, the slide, the connecting block, the locking piece, locking groove etc. when needing to carry out fixed mounting to the hydrostatic level appearance, only need with T type piece aim at insert in T type groove alright through fillet and inclined plane end under the cooperation and the effect of spring automatically to T type piece lock, need not to use the bolt alright carry out effectual fixed connection with the mount pad with the spirit level body, easy operation is swift, time saving and labor saving, and can effectively avoid bolt corrosion, phenomenons such as smooth silk cause inconvenience to follow-up maintenance change.
2. The utility model discloses a set up the unlocking hole, the slide, the push pedal, first spring etc, when needing to overhaul the hydrostatic level appearance and change, only need use screwdriver etc. to insert the unlocking hole, alright promote two slides through the inclined plane and drive connecting block and locking block removal and compress the second spring, then make the inclined plane end of locking hole break away from the locking groove, realize the unblock to T type piece, after carrying out the unblock to T type piece, first spring resets, promote T type piece through the push pedal, make the locking groove form the dislocation with the locking block, so that take off the hydrostatic level body, and is simple in operation, excellent in use effect.
Drawings
Fig. 1 is a schematic structural diagram of an engineering level settlement measuring instrument.
Fig. 2 is a schematic structural diagram of a first spring in an engineering level settlement gauge.
Fig. 3 is a schematic structural diagram of a second spring in the engineering level settlement gauge.
Fig. 4 is a schematic structural diagram of a T-shaped block in an engineering level settlement gauge.
Wherein, static level body 1, discharge valve 2, cable joint 3, water pipe head 4, air pipe head 5, T type piece 6, locking groove 7, mount pad 8, T type groove 9, first spring 10, push pedal 11, unlocking hole 12, limiting plate 13, second spring 14, slide 15, connecting block 16, locking block 17, first fixed plate 18, first fixed orifices 19, second fixed plate 20, second fixed orifices 21.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, in an embodiment of the present invention, an engineering level settlement measuring instrument, an exhaust valve 2 is disposed through the top of a static level body 1, a cable connector 3, a water pipe connector 4, and a gas pipe connector 5 are symmetrically disposed through two opposite side walls of the static level body 1, a T-shaped block 6 is fixedly connected to the bottom of the static level body 1, locking grooves 7 are symmetrically disposed on two opposite side walls of the T-shaped block 6, a T-shaped groove 9 is disposed at the center of the top of a mounting seat 8, an unlocking hole 12 is disposed on the front wall of the mounting seat 8 under the T-shaped groove 9, four limiting plates 13 are symmetrically and fixedly connected to the inside of the mounting seat 8, two locking mechanisms are symmetrically disposed on the inside of the mounting seat 8, each two limiting plates 13 are respectively disposed on two sides of the corresponding locking mechanism, first fixing plates 18 are symmetrically and fixedly connected to, a plurality of first fixing holes 19 are uniformly formed in the outer wall of the first fixing plate 18.
The locking mechanism comprises a sliding plate 15, one end of the sliding plate 15 is fixedly connected with a second spring 14, one end of the second spring 14 is abutted against the inner wall of the mounting seat 8, the top of the sliding plate 15 is fixedly connected with a connecting block 16, the top of the connecting block 16 is fixedly connected with a locking block 17, one end of the locking block 17 is a bevel end, the bevel end penetrates through the inner wall of the mounting seat 8 and is positioned in a T-shaped groove 9, when the end part of the T-shaped block 6 is inserted into the T-shaped groove 9 and is contacted with the bevel end of the locking block 17, the locking block 17 is pushed by the bevel end, the locking hole 17 is contracted towards the inside of the mounting seat 8, the connecting block 16 and the sliding plate 15 are driven to move and compress the second spring 14, until the locking groove 7 on the outer wall of the T-shaped block 6 is opposite to the bevel end of the locking block 17, the connecting block 16 and the sliding plate 15 are reset, and the T-shaped block 6 is locked, so that the fixed connection between the static level body 1 and the mounting seat 8 is ensured.
One end of the T-shaped block 6 is symmetrically provided with a round angle, and the arrangement of the round angle enables the end part of the T-shaped block 6 to push the inclined plane end more easily.
Slide 15 is the inclined plane setting towards the outer wall of unlocking hole 12, and through the inclined plane setting of slide 15, only need use screwdriver etc. to insert in unlocking hole 12, alright promote two slides 15 through the inclined plane and drive connecting block 16 and locking block 17 and remove and compress second spring 14, make the inclined plane end of locking hole 17 break away from locking groove 7 then, realize the unblock to T type piece 6.
The inner wall fixedly connected with first spring 10 of T type groove 9, the one end fixedly connected with push pedal 11 of first spring 10, insert T type groove 9 and be in the lock-out state when T type piece 6, the tip of T type piece 6 can promote push pedal 11 and make first spring 10 be in the compression state, after carrying out the unblock to T type piece 6, first spring 10 resets, promote T type piece 6 through push pedal 11, make locking groove 7 and locking block 17 form the dislocation, so that take off hydrostatic level body 1.
In order to ensure the stability of the push plate 11 moving in the T-shaped groove 9, the appearance of the push plate 11 is T-shaped, and the push plate 11 is matched with the size of the T-shaped groove 9.
The back wall fixedly connected with second fixed plate 20 of mount pad 8, a plurality of second fixed orificess 21 have evenly been seted up to the outer wall of second fixed plate 20, can be convenient for install mount pad 8 in the top of wall surface or surveyed mound through selectively using second fixed orificess 21 or first fixed orifices 18 to guarantee hydrostatic level body 1 installation angle.
The utility model discloses a theory of operation is:
when the static level body 1 needs to be fixedly installed, the installation seat 8 can be conveniently installed on the wall surface or the top of a pier to be tested by selectively using the second fixing hole 21 or the first fixing hole 18 to match with an expansion bolt and the like, so as to ensure the installation angle of the static level body 1, then one end of the T-shaped block 6 with a round angle is aligned with the T-shaped groove 9 to be inserted, when the end part of the T-shaped block 6 is inserted into the T-shaped groove 9 and is contacted with the inclined plane end of the locking block 17, the locking block 17 is pushed by the inclined plane end, the locking hole 17 is contracted towards the inside of the installation seat 8, the connecting block 16 and the sliding plate 15 are driven to move and compress the second spring 14, until the locking groove 7 on the outer wall of the T-shaped block 6 is opposite to the inclined plane end of the locking block 17, under the action of the second spring 14, the locking block 17, the connecting block 16 and the sliding plate 15 are reset, and the T-shaped block 6 is locked, so that the fixed connection between the static level body 1 and the mounting seat 8 is ensured.
The rounded corners make it easier for the end of the T-block 6 to push the beveled end, and when the T-block 6 is inserted into the T-slot 9 and in the locked position, the end of the T-block 6 pushes the push plate 11 and puts the first spring 10 in the compressed position.
Need dismantle hydrostatic level body 1, only need use screwdriver etc. to insert in the unlocking hole 12, alright promote two slides 15 through the inclined plane and drive connecting block 16 and locking block 17 and remove and compress second spring 14, then make the inclined plane end of locking hole 17 break away from locking groove 7, realize the unblock to T type piece 6, after unblock T type piece 6, first spring 10 resets, promote T type piece 6 through push pedal 11, make locking groove 7 and locking block 17 form the dislocation, so that take off hydrostatic level body 1.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (7)

1. The utility model provides an engineering level settlement measuring apparatu, includes hydrostatic level body (1) and mount pad (8), its characterized in that: the top of the static level body (1) is provided with an exhaust valve (2) in a penetrating manner, two opposite side walls of the static level body (1) are symmetrically provided with a cable connector (3), a water pipe connector (4) and a gas pipe connector (5) in a penetrating manner, the bottom of the static level body (1) is fixedly connected with a T-shaped block (6), two opposite side walls of the T-shaped block (6) are symmetrically provided with locking grooves (7), the top center of the mounting seat (8) is provided with a T-shaped groove (9), the front wall of the mounting seat (8) is positioned under the T-shaped groove (9) and is provided with an unlocking hole (12), the inside of the mounting seat (8) is symmetrically and fixedly connected with four limiting plates (13), the inside of the mounting seat (8) is symmetrically provided with two locking mechanisms, and every two limiting plates (13) are respectively positioned at two sides of the corresponding locking, the two sides of the mounting seat (8) are symmetrically and fixedly connected with first fixing plates (18), and a plurality of first fixing holes (19) are uniformly formed in the outer walls of the first fixing plates (18).
2. An engineering level settlement gauge as claimed in claim 1, wherein: locking mechanical system includes slide (15), the one end fixedly connected with second spring (14) of slide (15), the one end of second spring (14) offsets with the inner wall of mount pad (8), the top fixedly connected with connecting block (16) of slide (15), the top fixedly connected with locking block (17) of connecting block (16), the one end of locking block (17) is the inclined plane end, the inclined plane end is located T type groove (9) after running through the inner wall of mount pad (8).
3. An engineering level settlement gauge as claimed in claim 1, wherein: and one end of the T-shaped block (6) is symmetrically provided with a round angle.
4. An engineering level settlement gauge as claimed in claim 2, wherein: the outer wall of the sliding plate (15) facing the unlocking hole (12) is an inclined plane.
5. An engineering level settlement gauge as claimed in claim 1, wherein: the inner wall fixedly connected with first spring (10) of T type groove (9), the one end fixedly connected with push pedal (11) of first spring (10).
6. An engineering level settlement gauge as claimed in claim 5, wherein: the appearance of push pedal (11) is the T type, push pedal (11) and the size looks adaptation of T type groove (9).
7. An engineering level settlement gauge as claimed in claim 1, wherein: the rear wall of mount pad (8) fixedly connected with second fixed plate (20), a plurality of second fixed orificess (21) have evenly been seted up to the outer wall of second fixed plate (20).
CN202020109627.1U 2020-01-18 2020-01-18 Engineering level settlement measuring instrument Expired - Fee Related CN211262206U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020109627.1U CN211262206U (en) 2020-01-18 2020-01-18 Engineering level settlement measuring instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020109627.1U CN211262206U (en) 2020-01-18 2020-01-18 Engineering level settlement measuring instrument

Publications (1)

Publication Number Publication Date
CN211262206U true CN211262206U (en) 2020-08-14

Family

ID=71953407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020109627.1U Expired - Fee Related CN211262206U (en) 2020-01-18 2020-01-18 Engineering level settlement measuring instrument

Country Status (1)

Country Link
CN (1) CN211262206U (en)

Similar Documents

Publication Publication Date Title
CN211312538U (en) Novel deep foundation pit supporting structure
CN1215276C (en) Earth pressure balancing technology for laying rectangular top pipe
CN211262206U (en) Engineering level settlement measuring instrument
CN209412843U (en) A kind of self balance combined water-retaining cofferdam
CN220649471U (en) Foundation settlement detection device for building construction
CN210127502U (en) Monitoring facilities for building foundation ditch
CN218236612U (en) Reinforced concrete pipeline repairing device
CN114152291B (en) Device and method for monitoring stability of tower and filling soil cavern in karst development area
CN209820441U (en) Corner monitoring device for pipe-jacking electric power tunnel
CN111593763B (en) Fixing device for mounting underground pipe gallery and using method thereof
CN212129494U (en) Detachable pre-buried channel
CN221001088U (en) Concrete prefabricated form structure
CN212868773U (en) Novel communication engineering is with piping lane support device
CN215331012U (en) Waterproof treatment structure for joint of steel structure engineering roof and parapet wall
CN220747165U (en) Pipe culvert repairing device
CN111472390A (en) Prefabricated well of pin-connected panel cable
CN220498967U (en) Tool for fastening concrete pipeline
CN215371539U (en) Large buried water supply pipeline inspection drainage device
CN213654843U (en) Underground continuous wall of shield tunnel
CN217128212U (en) Anchor rod and anchor cable combined supporting structure
CN217501702U (en) A waterproof construction for ground crack area underground construction
CN220953486U (en) Water conservancy construction cofferdam device
CN218031748U (en) Jacking pipe is with thrustor in work well
CN215332996U (en) TBM tunnel construction measuring instrument hanging and fixing device
CN213233492U (en) Safety protection device for excavation of building deep foundation pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200814

Termination date: 20220118

CF01 Termination of patent right due to non-payment of annual fee