CN211260233U - Building construction supervision device based on BIM - Google Patents

Building construction supervision device based on BIM Download PDF

Info

Publication number
CN211260233U
CN211260233U CN201921587793.6U CN201921587793U CN211260233U CN 211260233 U CN211260233 U CN 211260233U CN 201921587793 U CN201921587793 U CN 201921587793U CN 211260233 U CN211260233 U CN 211260233U
Authority
CN
China
Prior art keywords
adjusting
cavity
bim
plate
box body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921587793.6U
Other languages
Chinese (zh)
Inventor
曹海坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Zhongchang Architectural Planning And Design Institute Co ltd
Jiangxi Zhongchang Engineering Pile Foundation Testing Co ltd
Jiangxi Bimu Engineering Technology Co ltd
Original Assignee
Jiangxi Zhongchang Architectural Planning And Design Institute Co ltd
Jiangxi Zhongchang Engineering Pile Foundation Testing Co ltd
Jiangxi Bimu Engineering Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Zhongchang Architectural Planning And Design Institute Co ltd, Jiangxi Zhongchang Engineering Pile Foundation Testing Co ltd, Jiangxi Bimu Engineering Technology Co ltd filed Critical Jiangxi Zhongchang Architectural Planning And Design Institute Co ltd
Priority to CN201921587793.6U priority Critical patent/CN211260233U/en
Application granted granted Critical
Publication of CN211260233U publication Critical patent/CN211260233U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Burglar Alarm Systems (AREA)

Abstract

The utility model discloses a building construction supervision device based on BIM, which comprises a box body, a supervision platform and a grab foot, wherein the box body is rectangular and is internally provided with a closed cavity, and the four corners of the bottom of the box body are provided with the grab foot; a moving device is arranged in the cavity and comprises an electric push rod, an adjusting plate and an adjusting cylinder, the adjusting cylinder is fixed in the cavity and corresponds to the grab foot, and an adjusting groove is arranged in the adjusting cylinder; the two sides of the top of the cavity are provided with sliding grooves, the electric push rod is fixed in the middle of the top of the cavity, the output end of the electric push rod is connected with an adjusting plate, and the adjusting plate is in sliding connection with the sliding grooves; the adjusting groove is internally provided with a sliding plate, the top end of the sliding plate is provided with an adjusting rod, and one end of the adjusting rod, which is far away from the sliding plate, penetrates through the adjusting groove and is connected with the adjusting plate. The utility model discloses can all-round record construction conditions, the supervision is effectual, and is fixed effectual simultaneously.

Description

Building construction supervision device based on BIM
Technical Field
The utility model relates to a construction technical field specifically is a construction supervision device based on BIM.
Background
BIM is a building information model or building information management is that various relevant information data of a building engineering project are used as a basis to establish a three-dimensional building model, and real information of a building is simulated through digital information. The project visualization and the fine construction are facilitated.
In the building construction process, in order to ensure the construction safety and the smooth construction, a corresponding construction supervision device is often arranged on a construction site for monitoring the construction process in real time; the ground where the construction site is located is mostly uneven and hollow, so that the construction supervision device is not fixed conveniently.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction supervision device based on BIM to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a building construction supervision device based on BIM comprises a box body, a supervision platform and a grab foot, wherein the box body is rectangular and is internally provided with a closed cavity, and the grab foot is arranged at four corners of the bottom of the box body; a moving device is arranged in the cavity and comprises an electric push rod, an adjusting plate and an adjusting cylinder, the adjusting cylinder is fixed in the cavity and corresponds to the grab foot, and an adjusting groove is arranged in the adjusting cylinder; the two sides of the top of the cavity are provided with sliding grooves, the electric push rod is fixed in the middle of the top of the cavity, the output end of the electric push rod is connected with an adjusting plate, and the adjusting plate is in sliding connection with the sliding grooves; a sliding plate is arranged in the adjusting groove, an adjusting rod is arranged at the top end of the sliding plate, and one end of the adjusting rod, which is far away from the sliding plate, penetrates through the adjusting groove and is connected with the adjusting plate; the monitoring platform is T-shaped and is arranged at the top of the box body, the top of the monitoring platform is provided with a fixed support, and two sides of the fixed support are obliquely provided with solar panels.
Preferably, the sensor support is installed in the middle of the fixed support, and the particulate matter detection sensor is installed at the top of the sensor support.
Preferably, noise monitors are arranged on two sides of the bottom of the monitoring platform, and monitoring cameras are arranged on two sides of the top of the monitoring platform.
Preferably, the bottom end of the sliding plate is connected with a support rod, and the bottom end of the support rod penetrates through the adjusting cylinder and is connected with a moving wheel.
Preferably, solar cell panel electricity is connected with the battery, and electric putter, supervision camera, noise appearance and particulate matter detection sensor are connected to the battery output.
Preferably, supervision camera, noise appearance and particulate matter detection sensor still are connected with data transmission module, and data transmission module is 4G communication module or WIFI communication device, and data transmission module and BIM platform wireless connection in coordination.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses can all-round record construction conditions, supervise effectually, the mobile device of setting accessible stretch out on the one hand and remove the wheel and make the device move on flat ground or cement, and on the other hand, the mobile device can be accomodate and fix fixed effectual in the box subaerial of hole hollow through grabbing the lower margin. The solar cell panel accessible solar energy that sets up charges to the battery, guarantee the supervision camera, the noise appearance, electric putter and particulate matter detection sensor's normal work, wherein supervise the camera, the noise appearance, particulate matter detection sensor is used for gathering the peripheral image of construction respectively, noise and dust particulate matter information, and upload to BIM cooperation platform through data transmission module, BIM cooperation platform can be based on the image, noise and dust particulate matter information carry out the analysis, and remind the contractor to take the concentration that relevant measure reduces inhalable particle, noise and construction operation standard.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
In the figure: 1. a box body; 101. a chute; 2. grabbing ground feet; 3. an electric push rod; 4. an adjusting plate; 5. an adjusting cylinder; 51. an adjustment groove; 52. a sliding plate; 53. adjusting a rod; 54. a moving wheel; 6. a monitoring station; 7. Fixing a bracket; 8. a solar panel; 9. a sensor holder; 91. a particulate matter detection sensor; 10. A noise meter; 11. supervision camera.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "vertical", "upper", "lower", "horizontal", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Referring to fig. 1, the present invention provides a technical solution: a building construction supervision device based on BIM comprises a box body 1, a supervision platform 6 and a grab foot 2, wherein the box body 1 is rectangular and is internally provided with a closed cavity, and the four corners of the bottom of the box body are provided with the grab foot 2; a moving device is arranged in the cavity and comprises an electric push rod 3, an adjusting plate 4 and a plurality of adjusting cylinders 5, the adjusting cylinders 5 are fixed in the cavity and correspond to the ground grabbing feet 2, and adjusting grooves 51 are arranged in the adjusting cylinders 5; the two sides of the top of the cavity are provided with sliding grooves 101, the electric push rod 3 is fixed in the middle of the top of the cavity, the output end of the electric push rod 3 is connected with an adjusting plate 4, and the adjusting plate 4 is in sliding connection with the sliding grooves 101; a sliding plate 52 is arranged in the adjusting groove 51, an adjusting rod 53 is arranged at the top end of the sliding plate 52, and one end of the adjusting rod 53, which is far away from the sliding plate 52, penetrates through the adjusting groove 51 and is connected with the adjusting plate 4; the monitoring platform 6 is T-shaped and is arranged at the top of the box body 1, the top of the monitoring platform 6 is provided with a fixed support 7, and two sides of the fixed support 7 are obliquely provided with solar panels 8.
Specifically, the middle of the fixed support 7 is provided with a sensor support 9, and the top of the sensor support 9 is provided with a particulate matter detection sensor 91.
Specifically, noise meters 10 are arranged on two sides of the bottom of the supervision platform 6, and supervision cameras 11 are arranged on two sides of the top of the supervision platform 6.
Specifically, the bottom end of the sliding plate 52 is connected with a support rod, the bottom end of the support rod passes through the adjusting cylinder 5 and is connected with a moving wheel 54, and the moving wheel 54 is a moving wheel with a brake.
Specifically, solar cell panel 8 electricity is connected with the battery, and electric putter 3, supervision camera 11, noise meter 10 and particulate matter detection sensor 91 are connected to the battery output.
The working principle is as follows:
the utility model discloses the mobile device that sets up on the one hand accessible stretches out to remove wheel 54 and makes the device move on flat ground or cement, and on the other hand, the mobile device can be accomodate and fix on hollow subaerial through grabbing lower margin 2 in box 1. That is, when needing to move, start electric putter 3, electric putter 3 drives regulating plate 4 and moves down along spout 101, regulating plate 4 drives adjusting lever 53 and moves down and makes sliding plate 52 move down along adjusting groove 51, thereby sliding plate 52 drives branch and removes wheel 54 and move down and make the device possess the removal function, thereby the removal wheel 54 of a plurality of regulation section of thick bamboo 5 bottoms moves along with the removal of regulating plate 4 simultaneously, avoids appearing removing the condition that wheel 54 is highly differs.
And 8 accessible solar energy of solar cell panel charges to the battery, guarantee supervision camera 11, noise meter 10, electric putter 3 and particulate matter detection sensor 91's normal work, wherein supervision camera 11, noise meter 10, particulate matter detection sensor 91 is used for gathering the peripheral image of construction respectively, noise and dust particulate matter information, and upload to BIM cooperation platform through data transmission module, BIM cooperation platform can be based on the image, noise and dust particulate matter information carry out the analysis, and remind the contractor to take the concentration that relevant measure reduces inhalable particle thing, noise and construction operation standard, can all-round record construction conditions, supervision effect is good.
It is worth noting that: the whole device is controlled by the master control button, and the equipment matched with the control button is common equipment, so that the device belongs to the existing well-known technology, and the electrical connection relation and the specific circuit structure of the device are not repeated.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. A building construction supervision device based on BIM is characterized by comprising a box body (1), a supervision platform (6) and a grabbing foot (2), wherein the box body (1) is rectangular and is internally provided with a closed cavity, and the grabbing foot (2) is arranged at four corners of the bottom of the box body; a moving device is arranged in the cavity and comprises an electric push rod (3), an adjusting plate (4) and an adjusting cylinder (5), the adjusting cylinder (5) is fixed in the cavity and corresponds to the grab foot (2), and an adjusting groove (51) is arranged in the adjusting cylinder (5); sliding grooves (101) are formed in two sides of the top of the cavity, the electric push rod (3) is fixed in the middle of the top of the cavity, the output end of the electric push rod (3) is connected with an adjusting plate (4), and the adjusting plate (4) is connected with the sliding grooves (101) in a sliding mode; a sliding plate (52) is arranged in the adjusting groove (51), an adjusting rod (53) is installed at the top end of the sliding plate (52), and one end, far away from the sliding plate (52), of the adjusting rod (53) penetrates through the adjusting groove (51) and is connected with the adjusting plate (4); the monitoring platform (6) is T-shaped and is arranged at the top of the box body (1), the top of the monitoring platform (6) is provided with a fixed support (7), and two sides of the fixed support (7) are obliquely provided with solar panels (8).
2. The BIM-based construction supervision device according to claim 1, characterized in that: fixed bolster (7) mid-mounting has sensor support (9), and particulate matter detection sensor (91) are installed at sensor support (9) top.
3. The BIM-based construction supervision device according to claim 1, characterized in that: the monitoring platform is characterized in that noise instruments (10) are arranged on two sides of the bottom of the monitoring platform (6), and monitoring cameras (11) are arranged on two sides of the top of the monitoring platform (6).
4. The BIM-based construction supervision device according to claim 1, characterized in that: the bottom end of the sliding plate (52) is connected with a support rod, and the bottom end of the support rod penetrates through the adjusting cylinder (5) and is connected with a moving wheel (54).
5. The BIM-based construction supervision device according to claim 1, characterized in that: solar cell panel (8) electricity is connected with the battery, and electric putter (3), supervision camera (11), noise meter (10) and particulate matter detection sensor (91) are connected to the battery output.
CN201921587793.6U 2019-09-23 2019-09-23 Building construction supervision device based on BIM Expired - Fee Related CN211260233U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921587793.6U CN211260233U (en) 2019-09-23 2019-09-23 Building construction supervision device based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921587793.6U CN211260233U (en) 2019-09-23 2019-09-23 Building construction supervision device based on BIM

Publications (1)

Publication Number Publication Date
CN211260233U true CN211260233U (en) 2020-08-14

Family

ID=71981609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921587793.6U Expired - Fee Related CN211260233U (en) 2019-09-23 2019-09-23 Building construction supervision device based on BIM

Country Status (1)

Country Link
CN (1) CN211260233U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112082458A (en) * 2020-09-26 2020-12-15 杨桂英 Building engineering construction monitor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112082458A (en) * 2020-09-26 2020-12-15 杨桂英 Building engineering construction monitor
CN112082458B (en) * 2020-09-26 2021-12-17 中南电力项目管理咨询(湖北)有限公司 Building engineering construction monitor

Similar Documents

Publication Publication Date Title
CN101709954B (en) Overhead wire icing on-line monitoring device based on machine vision
CN211260233U (en) Building construction supervision device based on BIM
CN202696798U (en) Intelligent remote measuring device for dual-channel ultrahigh-definition power transmission line
CN206281883U (en) A kind of electric instrument with shock-absorbing function
CN203312911U (en) Monitoring robot for photovoltaic power station
CN210742724U (en) Building engineering environment monitoring device
CN209764004U (en) Icing thickness measuring device based on variable-medium capacitive sensor
CN208314954U (en) The forest fire province of cloud platform, city, county's three-level integration monitoring and warning system
CN207799064U (en) A kind of architectural design special measurement device
CN214478587U (en) Intelligent electrical cabinet based on GSM/GPRS module
CN207782753U (en) A kind of system for monitoring photovoltaic generation
CN104460699B (en) Infrared mobile monitoring vehicle control
CN104316884A (en) Oil engine electricity generation monitoring terminal based on FFT spectral analysis
CN114302104A (en) Monitoring alarm equipment for building construction safety management and system thereof
CN212103741U (en) Multifunctional warning board for communication construction
CN103267717A (en) Environment-friendly type PM2.5 monitoring device based on solar power supply mode
CN114486130A (en) Device based on artificial intelligence detects tunnel inner wall infiltration
CN208227191U (en) A kind of intelligent building monitoring device
CN208752055U (en) A kind of monitoring device for environmental protection
CN207132863U (en) A kind of track based on 3 D laser scanning equipment invades limit intelligent detecting instrument
CN207269147U (en) Micro-capacitance sensor voltage protective device
CN216016407U (en) Multifunctional intelligent cover plate for cable duct
CN209901779U (en) Computer remote monitoring device
CN221553369U (en) Three-dimensional scanning quality inspection device for construction site
CN215264865U (en) Station passenger flow statistics device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200814

CF01 Termination of patent right due to non-payment of annual fee