CN211259228U - Torrent barrier - Google Patents
Torrent barrier Download PDFInfo
- Publication number
- CN211259228U CN211259228U CN201921510377.6U CN201921510377U CN211259228U CN 211259228 U CN211259228 U CN 211259228U CN 201921510377 U CN201921510377 U CN 201921510377U CN 211259228 U CN211259228 U CN 211259228U
- Authority
- CN
- China
- Prior art keywords
- barrier
- obstacle
- obstacles
- screw
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model provides a torrent barrier, its characterized in that: including ground track, obstacle system and coupling assembling, ground track top is equipped with the obstacle system, the obstacle system with the ground track passes through coupling assembling to be connected, the inside coupling assembling that passes through of obstacle system connects. Compared with the prior art, the utility model provides a pair of torrent barrier, it is rational in infrastructure, through with the ground track pre-buried in cement ground to pass through coupling assembling installation barrier system in the top, also connect through coupling assembling between the barrier of barrier system inside, have multiple combination of assembling between the barrier in the barrier system, can carry out random adjustment and equipment according to the demand, thereby can realize the flexibility of barrier.
Description
[ technical field ] A method for producing a semiconductor device
The utility model relates to a water sports technical field, in particular to torrent barrier.
[ background of the invention ]
The kayak torrent cyclotron competition is used as a conventional Olympic game, has higher requirements on competition fields, ensures the safety, and can adjust the water flow size and direction at any time to meet the requirements of different training and competition.
[ Utility model ] content
An object of the utility model is to overcome above-mentioned prior art not enough, provide a torrent barrier, it aims at solving among the prior art that construction cost is great, adjust the comparatively complicated problem of rivers.
In order to achieve the above object, the utility model provides a torrent barrier, its characterized in that: including ground track, obstacle system and coupling assembling, ground track top is equipped with the obstacle system, the obstacle system with the ground track passes through coupling assembling to be connected, the inside coupling assembling that passes through of obstacle system connects.
Preferably, the barrier system comprises a plurality of barriers A, a plurality of barriers B, a plurality of barriers C, a plurality of barriers D, a plurality of barriers E and a plurality of barriers F, the connecting assembly comprises a circular gasket, a nut, a screw I, a screw II, a screw III, a screw IV and a gasket, the barriers A and the barriers B are located at the middle lower part of the barrier system, the barriers C and the barriers D are located at the top of the barrier system, the barriers E are located on the side surface of the barrier system, the barriers F are directly connected with the ground track, reinforcing ribs or concave-convex blocks for increasing the strength of the barriers are arranged on the barriers A, the barriers B, the barriers C, the barriers D, the barriers E and the barriers F, and the screw I, the screw II, the screw III and the screw IV are consistent in size and different in length.
Preferably, the length of the obstacle a is 2 times that of the obstacle B, the width and height of the obstacle C are the same as those of the obstacle D, the length of the obstacle C is 2 times that of the obstacle D, the height of the obstacle E is 3 times that of the obstacle a and the obstacle B, and the widths of the obstacle a, the obstacle B, the obstacle C, and the obstacle D are the same.
Preferably, a plurality of hemispherical protrusions are arranged on the upper surfaces of the barrier A, the barrier B and the barrier E, a plurality of hemispherical grooves are arranged on the lower surfaces of the barrier A, the barrier B, the barrier C and the barrier D, the hemispherical protrusions and the hemispherical grooves are matched in structure, and anti-skid surfaces are arranged on the upper surfaces of the barrier C and the barrier D.
Preferably, the top surfaces of the barrier A, the barrier B and the barrier E are provided with tracks for connection, the barrier A, the barrier B, the barrier C, the barrier D, the barrier E and the barrier F are provided with through holes for through holes, and the bottoms of the screw I, the screw II, the screw III and the screw IV are provided with lugs for connecting the tracks.
Preferably, a gasket is arranged above the barrier C and the barrier D, and the connecting assembly is connected through matching of a nut, a circular gasket and a screw rod.
Preferably, the ground track is embedded in the cement ground, and angle irons are arranged on the ground track.
The utility model has the advantages that: compared with the prior art, the utility model provides a pair of torrent barrier, it is rational in infrastructure, through with the ground track pre-buried in cement ground to pass through coupling assembling installation barrier system in the top, also connect through coupling assembling between the barrier of barrier system inside, have multiple combination of assembling between the barrier in the barrier system, can carry out random adjustment and equipment according to the demand, thereby can realize the flexibility of barrier.
The features and advantages of the present invention will be described in detail by embodiments with reference to the accompanying drawings.
[ description of the drawings ]
Fig. 1 is a schematic view illustrating a connection mode and a position of a torrent obstacle according to an embodiment of the present invention;
fig. 2 is a schematic structural view of a combination of barrier systems according to embodiments of the present invention;
fig. 3 is a schematic structural diagram of an obstacle a according to an embodiment of the present invention;
fig. 4 is a schematic view of the structure and connection of an obstacle F according to an embodiment of the present invention;
fig. 5 is a schematic structural diagram of a screw i according to an embodiment of the present invention.
In the figure: 1-barrier A, 11-track, 12-concave-convex block, 13-hemispherical protrusion, 14-reinforcing rib, 15-hemispherical groove, 2-barrier B, 3-barrier C, 31-antiskid surface, 4-barrier D, 5-barrier E, 6-barrier F, 7-barrier system, 8-ground track, 81-angle iron, 9-connecting component, 91-nut, 92-circular gasket, 93-gasket, 94-screw II, 95-screw I, 96-screw III, 97-screw IV and 98-lug.
[ detailed description ] embodiments
In order to make the objects, technical solutions and advantages of the present invention more clear, the present invention is further described in detail through the accompanying drawings and embodiments. It should be understood, however, that the description herein of specific embodiments is only intended to illustrate the invention and not to limit the scope of the invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
Referring to fig. 1 to 5, an embodiment of the present invention provides a torrent barrier, which is characterized in that: including ground track 8, obstacle system 7 and coupling assembling 9, ground track 8 top is equipped with obstacle system 7, obstacle system 7 with ground track 8 passes through coupling assembling 9 to be connected, obstacle system 7 is inside to be connected through coupling assembling 9.
The barrier system 7 comprises a plurality of barriers A1, B2, C3, D4, E5 and F6, the connecting component 9 comprises a circular gasket 92, a nut 91, a screw I95, a screw II 94, a screw III 96, a screw IV 97 and a gasket 93, the obstacle A1 and the obstacle B2 are located at the middle-lower part of the obstacle system 7, the obstacle C3 and the obstacle D4 are located at the top of the obstacle system 7, the obstacle E5 is located at the side of the obstacle system 7, the obstacle F6 is directly connected with the ground rail 8, the obstacle A1, the obstacle B2, the obstacle C3, the obstacle D4, the obstacle E5 and the obstacle F6 are all provided with reinforcing ribs 14 or concave-convex blocks 12 for increasing the strength of the obstacles, the screw I95, the screw II 94, the screw III 96 and the screw IV 97 have the same thread size and different lengths.
The length of the obstacle A1 is 2 times of that of the obstacle B2, the width and height of the obstacle C3 are the same as those of the obstacle D4, the length of the obstacle C3 is 2 times of that of the obstacle D4, the height of the obstacle E5 is 3 times of that of the obstacle A1 and the obstacle B2, and the widths of the obstacle A1, the obstacle B2, the obstacle C3 and the obstacle D4 are the same.
A plurality of hemispherical protrusions 13 are arranged on the upper surfaces of the obstacle A1, the obstacle B2 and the obstacle E5, a plurality of hemispherical grooves 15 are arranged on the lower surfaces of the obstacle A1, the obstacle B2, the obstacle C3 and the obstacle D4, the hemispherical protrusions 13 and the hemispherical grooves 15 are matched in structure, and anti-skid surfaces 31 are arranged on the upper surfaces of the obstacle C3 and the obstacle D4.
The top surfaces of the barrier A1, the barrier B2 and the barrier E5 are provided with tracks 11 for connection, through holes are formed in the barrier A1, the barrier B2, the barrier C3, the barrier D4, the barrier E5 and the barrier F6, and lugs 98 for connecting the tracks 11 are arranged at the bottoms of the screw I95, the screw II 94, the screw III 96 and the screw IV 97.
And a gasket 93 is arranged above the barrier C3 and the barrier D4, and the connecting assembly 7 is connected by matching a nut 91, a circular gasket 92 and a screw rod.
The ground rail 8 is pre-buried in the cement ground, and angle iron 81 is arranged on the ground rail 8.
The utility model discloses the working process:
the utility model relates to a torrent barrier is at the working process, and ground track 8 is pre-buried in cement ground for fix barrier system 7 on the bottom surface, barrier system 7 can remove from the bottom surface. The angle iron 81 is arranged on the ground rail 8, so that the ground rail 8 is more firmly embedded in the cement bottom surface. Each obstacle is provided with a reinforcing rib 14 or a concave-convex block 12 for increasing the strength of the obstacle. Each barrier is provided with a through hole for a bolt to pass through. The hemispherical protrusions 13 and the hemispherical grooves 15 enable the obstacle to be installed more smoothly and easily. The upper surfaces of the barrier C3 and the barrier D4 are provided with the anti-skidding surfaces 31, so that the walking of people is safer. The obstacle a1, the obstacle B2, and the obstacle E5 are provided with a rail 11. The rail 11 is used for connecting the obstacle a1 and the obstacle B2 with the ground rail 8 and the obstacle E5, and the obstacle a1 and the obstacle B2 can be connected with each other. The width of the upper opening of the track 11 is slightly larger than the width of the bottom of the screw rod, the inner width of the track is slightly smaller than the length of the bottom of the screw rod, the screw rod is placed into the track, and the lug 98 at the bottom of the screw rod can be clamped in the track after the screw rod is rotated. The barrier has a variety of modes of construction.
The screw I95 is used for connecting the obstacle A1 with the ground track 8, the obstacle A1 with the obstacle B2, the obstacle A1 with the obstacle A1, the obstacle B2 with the ground track 8, the obstacle B2 with the obstacle B2, the obstacle A1 with the obstacle E5 and the obstacle B2 with the obstacle E5; the screw II 94 is used for connecting the obstacle C3 with the obstacle A1, the obstacle C3 with the obstacle B2, the obstacle C3 with the obstacle E5, the obstacle C3 with the ground track 8, the obstacle D4 with the obstacle A1, the obstacle D4 with the obstacle B2, the obstacle D4 with the obstacle E5 and the obstacle D4 with the ground track 8; and the screw III 96 and the screw IV 97 are used for connecting the barrier F6 with the ground track 8. The gasket 93 is arranged on the barrier C3 and the barrier D4 and is used for dispersing the pressure generated by the tightening of the screw on the barrier C3 and the barrier D4, so that the connection is firmer, and the barrier is made of plastic and glass fiber reinforced plastic, but not limited to plastic and glass fiber reinforced plastic.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modification, equivalent replacement or improvement made within the spirit and principle of the present invention should be included in the present invention.
Claims (7)
1. A rip current barrier, characterized by: including ground track (8), obstacle system (7) and coupling assembling (9), ground track (8) top is equipped with obstacle system (7), obstacle system (7) with ground track (8) are connected through coupling assembling (9), obstacle system (7) are inside to be connected through coupling assembling (9).
2. A rip fence according to claim 1, wherein: the obstacle system (7) comprises a plurality of obstacles A (1), obstacles B (2), obstacles C (3), obstacles D (4), obstacles E (5) and obstacles F (6), the connecting assembly (9) comprises a circular gasket (92), a nut (91), a screw I (95), a screw II (94), a screw III (96), a screw IV (97) and a gasket (93), the obstacles A (1) and the obstacles B (2) are positioned at the middle lower part of the obstacle system (7), the obstacles C (3) and the obstacles D (4) are positioned at the top of the obstacle system (7), the obstacles E (5) are positioned at the side surface of the obstacle system (7), the obstacles F (6) are directly connected with the ground rail (8), the obstacles A (1), the obstacles B (2) and the obstacles F (6), And reinforcing ribs (14) or concave-convex blocks (12) for increasing the strength of the barriers are arranged on the barriers C (3), D (4), E (5) and F (6), and the screw threads of the screw I (95), II (94), III (96) and IV (97) are consistent in size and different in length.
3. A rip fence according to claim 2, wherein: the length of the obstacle A (1) is 2 times that of the obstacle B (2), the width and the height of the obstacle C (3) are the same as those of the obstacle D (4), the length of the obstacle C (3) is 2 times that of the obstacle D (4), the height of the obstacle E (5) is 3 times that of the obstacle A (1) and the obstacle B (2), and the widths of the obstacle A (1), the obstacle B (2), the obstacle C (3) and the obstacle D (4) are the same.
4. A rip fence according to claim 2, wherein: be equipped with a plurality of hemisphere arch (13) on the upper surface of barrier A (1), barrier B (2), barrier E (5), barrier A (1), barrier B (2), barrier C (3) and be equipped with a plurality of hemisphere recess (15) on the lower surface of barrier D (4), hemisphere arch (13) with the structure agrees with each other between hemisphere recess (15), be equipped with non-skid surface (31) on the upper surface of barrier C (3) and barrier D (4).
5. A rip fence according to claim 2, wherein: the top surface of barrier A (1), barrier B (2) and barrier E (5) is equipped with track (11) that are used for connecting, be equipped with on barrier A (1), barrier B (2), barrier C (3), barrier D (4), barrier E (5) and barrier F (6) and be used for the through-hole, the bottom of screw rod I (95), screw rod II (94), screw rod III (96), screw rod IV (97) all is provided with auricle (98) that are used for connecting track (11).
6. A rip fence according to claim 2, wherein: and a gasket (93) is arranged above the barrier C (3) and the barrier D (4), and the connecting assembly (9) is connected through the matching among the nut (91), the circular gasket (92) and the screw rod.
7. A rip fence according to claim 1, wherein: the ground track (8) is pre-buried in the cement ground, and angle bars (81) are arranged on the ground track (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921510377.6U CN211259228U (en) | 2019-09-11 | 2019-09-11 | Torrent barrier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921510377.6U CN211259228U (en) | 2019-09-11 | 2019-09-11 | Torrent barrier |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211259228U true CN211259228U (en) | 2020-08-14 |
Family
ID=71985585
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921510377.6U Active CN211259228U (en) | 2019-09-11 | 2019-09-11 | Torrent barrier |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211259228U (en) |
-
2019
- 2019-09-11 CN CN201921510377.6U patent/CN211259228U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103912073B (en) | A kind of built-in profile steel steel pipe concrete frame low yield point steel plate shear wall structure | |
CN203174871U (en) | Connecting member for concrete sandwich boards | |
CN211259228U (en) | Torrent barrier | |
CN107419655B (en) | Bridge-falling-preventing telescopic device for straddle type monorail traffic track beam | |
CN205604213U (en) | But height -adjusting's sand barrier | |
CN208605024U (en) | A kind of construction site protective fence with dust reduction capability | |
CN205637555U (en) | A fixing device for coiling detain external safety net of formula scaffold frame | |
CN210536254U (en) | Anti-drop socket hanging plate | |
CN208792866U (en) | A kind of concrete wire pole that non-skid property is good | |
CN219180329U (en) | Clamping device for transformer core | |
CN203113868U (en) | Gantry tower for construction cableway | |
CN205531612U (en) | Electric power iron tower installation base | |
CN207016306U (en) | A kind of outer elevator hoistways and wall body fixing device | |
CN209723302U (en) | A kind of prefabricated column wall reinforcing joint structure | |
CN103485567A (en) | Anti-climbing cabin of power transmission tower | |
CN110205882B (en) | Medium-low speed magnetic levitation track structure | |
US8647165B1 (en) | Play panel installation | |
CN204418061U (en) | The tiltable modular railing of a kind of transverse tube | |
CN210659478U (en) | Rod body with sliding groove | |
CN105625476A (en) | High-strength wellhead covering plate | |
CN208890292U (en) | Pre-buried muscle of wearing integrates wire box in a kind of cast-in-place structural | |
CN220565853U (en) | Height-adjustable's peripheral rail guard of medium-sized irrigated area | |
CN211486469U (en) | Polygonal torrent barrier | |
CN215631547U (en) | Section bar for walkway plate and walkway plate | |
CN210397389U (en) | Insulating nylon threaded pin for bridge tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |