CN211256636U - Reinforced pier column for cement-based composite material - Google Patents
Reinforced pier column for cement-based composite material Download PDFInfo
- Publication number
- CN211256636U CN211256636U CN201921579480.6U CN201921579480U CN211256636U CN 211256636 U CN211256636 U CN 211256636U CN 201921579480 U CN201921579480 U CN 201921579480U CN 211256636 U CN211256636 U CN 211256636U
- Authority
- CN
- China
- Prior art keywords
- hoop
- installation
- reinforcing
- pier stud
- cement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model provides a cement base combined material is with consolidating pier stud, including pier stud body, installation mechanism and reinforcing mechanism, pier stud body bottom is buried underground in the subsurface, installation mechanism is including the installation hoop, the outside of pier stud body is located to installation hoop symmetric sleeve, the installation hoop vertically evenly is provided with the multiunit, vertically adjacent evenly be connected with the connecting block between the installation hoop, reinforcing mechanism includes two sets of reinforcement hoops, and is two sets of the one end of reinforcing hoop is rotated through the pivot and is connected, and is two sets of the engaging lug has all been welded to the other end of reinforcing hoop. The utility model discloses an installation hoop and connecting block cooperation anchor pin of connecting between install in the pier stud outside, recycle and consolidate the hoop cover cooperation reinforced structure and locate the outside of connecting block with its installation cover and accomplish holistic reinforcement installation, holistic reinforcement effect is better, the holistic dismantlement in later stage of being convenient for simultaneously and maintain.
Description
Technical Field
The utility model relates to a pier stud correlation field, concretely relates to cement base combined material is with consolidating pier stud.
Background
Pier stud, the lower bearing weight that is used for bearing superstructure in civil engineering. The pier stud is used as an important component of the bridge, and the appearance design and quality management of the pier stud have profound influence on the overall stability of the bridge. The management of the appearance construction quality of the reinforced bridge pier column is based on the management of raw materials, the management of constructors and the management of construction processes, and corresponding solutions are made for the phenomena of pitted surface, bubbles, honeycombs and watermarks, so that the appearance of the bridge pier column can meet basic requirements.
201420198404.1 discloses a reinforcing system for a concrete column in the prior art, which comprises a steel sleeve, an annular sealing element, an anchor bolt, a longitudinal steel bar, a stirrup and a connecting piece; the steel sleeve is arranged around the concrete column, the upper end and the lower end of the steel sleeve are respectively provided with an annular sealing piece, and anchor bolts are respectively arranged below the upper annular sealing piece and above the lower annular sealing piece; one end of the anchor bolt is anchored in the concrete column, and the other end of the anchor bolt is anchored on the outer wall of the steel sleeve by virtue of a nut; longitudinal steel bars are connected between the upper anchor bolt and the lower anchor bolt, stirrups are arranged along the height direction of the concrete column, and cement mortar is filled between the concrete column and the steel sleeve; the steel sleeve is provided with connectors at intervals in the longitudinal direction from top to bottom. But its pier stud reinforced structure overall structure is fixed, is not convenient for dismantle the installation and the dismantlement in later stage is maintained, uses very inconveniently.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a cement-based combined material is with consolidating pier stud, including pier stud body, installation mechanism and reinforcing mechanism, pier stud body bottom is buried underground in the subsurface, installation mechanism is including the installation hoop, the outside of pier stud body is located to installation hoop symmetry cover, the installation hoop vertically evenly is provided with the multiunit, vertically adjacent evenly be connected with the connecting block between the installation hoop, reinforcing mechanism includes two sets of reinforcement hoops, and is two sets of the one end of reinforcement hoop is rotated through the pivot and is connected, and is two sets of the engaging lug has all been welded to the other end of reinforcement hoop.
Preferably, a through hole is formed in the outer side of the mounting hoop, an anchoring pin is transversely inserted into the through hole, and the inner side end of the anchoring pin is inserted into the pier stud body.
Preferably, the contact surface between the upper end and the lower end of the mounting hoop and the pier stud body is provided with a sealing gasket.
Preferably, the upper end and the lower end of the connecting block are detachably connected to the mounting hoop through reinforcing bolt threads.
Preferably, the installation hoop and the reinforcement hoop are both arc-shaped structures, and the installation hoop and the reinforcement hoop are both sleeved with the outer side of the pier column body to be matched.
Preferably, adjacent the engaging lug all runs through and is provided with the connecting hole, and transversely peg graft in the connecting hole and have the bolt, and nut threaded connection is passed through to the bolt outside end, bolt and nut are industry high strength steel material.
Preferably, a reinforcing screw is transversely inserted in the middle of the reinforcing hoop, the reinforcing screw is transversely inserted in the inner cavity of the pier stud body, and butterfly nuts are screwed on the outer side ends of the reinforcing screw in a threaded manner.
Preferably, the reinforcing hoop is arranged on the outer side of the connecting block.
The utility model has the advantages that:
the utility model discloses the outside of establishing with the pier stud is embraced in the installation hoop cover that the symmetry set up, cooperation anchor pin creeps into the through-hole and installs the installation hoop in the pier stud outside, connects gradually the connecting block through the reinforcing bolt between the adjacent installation hoop, and the outside of connecting block is located through reinforcing hoop cover in the later stage, and the dedicated high strength bolt nut of cooperation industry realizes confining to run through between reinforcing hoop and be provided with reinforcing screw rod cooperation nut and carry out the degree of depth and consolidate. The utility model discloses compare current reinforcement pier stud, its holistic reinforcement effect is better to wholly adopt detachable construction to set up, the holistic dismantlement in later stage of being convenient for and maintenance, convenient to use is worth promoting.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic structural view of a reinforced pier stud for cement-based composite materials of the present invention;
FIG. 2 is a schematic view of the present invention taken along direction A of the installation mechanism of FIG. 1;
FIG. 3 is a schematic view of the mounting mechanism of FIG. 1 of the present invention taken along direction B;
fig. 4 is a schematic view of the reinforcement mechanism of fig. 1 along direction B according to the present invention.
In the figure: 1-pier column body, 2-installation mechanism, 21-installation hoop, 211-through hole, 212-sealing gasket, 22-connecting block, 221-reinforcing bolt, 3-reinforcing mechanism, 31-reinforcing hoop, 32-rotating shaft, 33-connecting lug, 331-bolt, 332-nut, 4-anchoring pin, 5-reinforcing screw rod and 6-butterfly nut.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Combine fig. 1 ~ 4, the utility model discloses a cement base combined material is with consolidating pier stud, including pier stud body 1, installation mechanism 2 and strengthening mechanism 3, pier stud body 1 mixes the mud earth post for cement base, and 1 bottoms of pier stud body are buried underground in the underground, and installation mechanism 2 includes installation hoop 21, and the outside of pier stud body 1 is located to installation hoop 21 symmetric sleeve, and installation hoop 21 vertically evenly is provided with the multiunit, and vertically adjacent installation hoop evenly is connected with connecting block 22 between 21, and connecting block 22 is last the lower extreme through reinforcing bolt 221 screw thread detachable connection on installation hoop 21. The reinforcing mechanism 3 comprises two groups of reinforcing hoops 31, one ends of the two groups of reinforcing hoops 31 are rotatably connected through a rotating shaft 32, and connecting lugs 32 are welded at the other ends of the two groups of reinforcing hoops 31.
Specifically, the outer side of the mounting hoop 21 is provided with a through hole 211, the through hole 211 is transversely inserted with an anchoring pin 4, and the inner side end of the anchoring pin 4 is inserted into the pier stud body 1. The contact surface of the upper end and the lower end of the mounting hoop 21 and the pier stud body 1 is provided with a sealing gasket 212.
Preferably, the installation hoop 21 and the reinforcement hoop 31 are both arc-shaped structures, and the installation hoop 21 and the reinforcement hoop 31 are both sleeved and matched with the outer side of the pier column body 1. The reinforcing hoop 31 is sleeved outside the connecting block 22.
Preferably, adjacent engaging lugs 33 are provided with connecting holes in a penetrating manner, bolts 331 are transversely inserted into the connecting holes, the outer ends of the bolts 331 are connected by nuts 332 in a threaded manner, and the bolts 331 and the nuts 332 are both made of industrial high-strength steel.
Preferably, the middle of the reinforcing hoop 31 is transversely inserted with a reinforcing screw rod 5, the reinforcing screw rod 5 is transversely inserted into the inner cavity of the pier stud body 1, and the outer side end of the reinforcing screw rod 5 is screwed with a butterfly nut 6.
With reference to the examples shown in fig. 1-4, the reinforced pier stud of the present invention is constructed by symmetrically sleeving two sets of installation hoops 21 on the outer side of the pier stud body 1, and the sealing gaskets 212 at the upper and lower ends of the installation hoops 21 increase the sealing performance of the overall installation, and the anchoring pins 4 are inserted into the through holes 211 at the outer side of the installation hoops 21 and then transversely drilled into the pier stud body 1, so as to arrange the connecting blocks 22 once and connect the connecting blocks between the adjacent installation hoops 21 through the reinforcing bolts 221.
Subsequently, the reinforcing hoop 31 is arranged on the outer side of the connecting block 22, the connecting lug 33 at the connecting end of the reinforcing hoop 31 is in threaded connection with the nut 332 through the bolt 331 so as to realize fixed installation of the reinforcing hoop 31, the high-strength bolt and nut increase the strength of the whole installation, the reinforcing screw rods 5 are arranged between the reinforcing hoops 31 in a penetrating manner, the reinforcing bolts 5 penetrate through the interior of the pier stud body 1, the butterfly nuts 6 are screwed on the extending end threads on the two sides of the reinforcing screw rods 5 so as to fixedly install the reinforcing screw rods 5, and the deep reinforcement of the reinforcing mechanism 3 on the installation mechanism 2 is completed.
Form through the above mode the utility model discloses a consolidate pier stud (cylinder pier stud) and connect reliably, material and construction process all can control, and the construction is simple, has good bearing capacity and anti-seismic performance, and ductility and intensity obtain promoting moreover, can be used to occasions such as the anticollision of highway, bridge mound, highway's building bottom layer post.
In the description of the present invention, it is to be understood that the terms indicating orientation or positional relationship are based on the orientation or positional relationship shown in the drawings, and are only for convenience of description and simplification of description, and do not indicate or imply that the equipment or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
Claims (7)
1. The utility model provides a cement base combined material is with consolidating pier stud which characterized in that: including pier stud body (1), installation mechanism (2) and strengthening mechanism (3), wherein:
the bottom of the pier stud body (1) is buried under the ground;
the installation mechanism (2) comprises installation hoops (21), the installation hoops (21) are symmetrically sleeved on the outer side of the pier column body (1), a plurality of groups of installation hoops (21) are uniformly arranged in the longitudinal direction, connecting blocks (22) are uniformly connected between the longitudinally adjacent installation hoops (21), and the upper end and the lower end of each connecting block (22) are detachably connected to the installation hoops (21) through reinforcing bolts (221) in a threaded mode;
reinforcing mechanism (3) are including two sets of reinforcement hoops (31), and are two sets of the one end of reinforcement hoop (31) is passed through pivot (32) and is rotated and connect, and is two sets of it has engaging lug (33) all to weld to consolidate the other end of hoop (31).
2. The reinforced pier column for cement-based composite materials according to claim 1, wherein: the outer side of the mounting hoop (21) is provided with a through hole (211), the through hole (211) is transversely inserted with an anchoring pin (4), and the inner side end of the anchoring pin (4) is inserted into the pier stud body (1).
3. The reinforced pier column for cement-based composite materials according to claim 1, wherein: the contact surface of the upper end and the lower end of the mounting hoop (21) and the pier column body (1) is provided with a sealing gasket (212).
4. The reinforced pier column for cement-based composite materials according to claim 1, wherein: installation hoop (21) and reinforcement hoop (31) are the arc structure, cooperation is established with the cover in pier stud body (1) outside to installation hoop (21) and reinforcement hoop (31) all.
5. The reinforced pier column for cement-based composite materials according to claim 1, wherein: and connecting holes are formed in the adjacent connecting lugs (33) in a penetrating mode, bolts (331) are transversely inserted into the connecting holes, the outer side ends of the bolts (331) are connected through nuts (332) in a threaded mode, and the bolts (331) and the nuts (332) are both made of industrial high-strength steel.
6. The reinforced pier column for cement-based composite materials according to claim 1, wherein: the reinforcing hoop (31) is transversely inserted with a reinforcing screw (5), the reinforcing screw (5) is transversely inserted into the inner cavity of the pier stud body (1), and butterfly nuts (6) are screwed on the outer side ends of the reinforcing screw (5).
7. The reinforced pier column for cement-based composite materials according to claim 1, wherein: the reinforcing hoop (31) is sleeved on the outer side of the connecting block (22).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921579480.6U CN211256636U (en) | 2019-09-23 | 2019-09-23 | Reinforced pier column for cement-based composite material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921579480.6U CN211256636U (en) | 2019-09-23 | 2019-09-23 | Reinforced pier column for cement-based composite material |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211256636U true CN211256636U (en) | 2020-08-14 |
Family
ID=71966317
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921579480.6U Active CN211256636U (en) | 2019-09-23 | 2019-09-23 | Reinforced pier column for cement-based composite material |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211256636U (en) |
-
2019
- 2019-09-23 CN CN201921579480.6U patent/CN211256636U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103074941B (en) | Assembling regeneration concrete node and the practice of steel bar girder beam are contained in a kind of end | |
CN100567659C (en) | The base configuration of iron tower | |
CN106223368B (en) | Glass fibre prestressed anchor anchor structure, its loading device and loading method | |
CN106284655B (en) | Precast concrete beam stud connects connecting node and connection method | |
CN107268424A (en) | Can fast leveling precast assembly bridge pier structure and its construction method | |
CN106401069A (en) | Damage repairing assembly type combined column with self-reset function | |
CN105386454B (en) | A kind of joint assembling type base for power transmission tower | |
CN106193615B (en) | A kind of glass fiber-reinforced polymer prestressed anti-floating anchor rod loading device and its construction method | |
CN102182197B (en) | Bundled grouting anchor rope reinforcing method for road rock slope | |
CN1873112A (en) | New type base for mast type mechanical equipment | |
CN104947603A (en) | Reinforced concrete girder bridge girder reinforcing structure and method | |
CN106320537A (en) | Prefabricated concrete-filled square steel tube column and steel girder connecting joint | |
CN205531016U (en) | Precast concrete post component and connected node | |
CN107435293A (en) | Pre-stress FRP bar stretching and anchoring device and its construction method for precast assembly bridge pier | |
CN1804238A (en) | Combined foundation of backstay type machinery apparatus | |
CN211256636U (en) | Reinforced pier column for cement-based composite material | |
CN103790176A (en) | Embedded short limb column structure and construction method thereof | |
CN85202839U (en) | Assembled prefabricated components made of reinforced concrete | |
CN209586373U (en) | The support system of the lower rock compound cross-section stratum jacking construction inlet and outlet cave of upper soil | |
CN208136920U (en) | A kind of triangle prestressing force foundation pit supporting pile and its connection structure | |
CN108729541B (en) | Connect beam type Building block construction method | |
CN108221954B (en) | Easy-to-detach prefabricated underground diaphragm wall, lifting appliance and construction method | |
CN115821972A (en) | Assembled rock anchor rod foundation of power transmission line and construction method | |
CN212865889U (en) | Tubular pile foundation reinforcing apparatus | |
CN112252169B (en) | Hollow box-rock anchor combined light ground anchor bridge abutment and construction process thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |