CN211233504U - A heat sink for well lid production - Google Patents

A heat sink for well lid production Download PDF

Info

Publication number
CN211233504U
CN211233504U CN201921883589.9U CN201921883589U CN211233504U CN 211233504 U CN211233504 U CN 211233504U CN 201921883589 U CN201921883589 U CN 201921883589U CN 211233504 U CN211233504 U CN 211233504U
Authority
CN
China
Prior art keywords
fixedly connected
well lid
cooling
water pump
inner chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921883589.9U
Other languages
Chinese (zh)
Inventor
张早
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zansong Construction Co ltd
Original Assignee
Kang Jinyao
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kang Jinyao filed Critical Kang Jinyao
Priority to CN201921883589.9U priority Critical patent/CN211233504U/en
Application granted granted Critical
Publication of CN211233504U publication Critical patent/CN211233504U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a heat sink for well lid production, including the cooling case, one side of cooling case is through mount pad fixedly connected with storage water tank, the first water pump of support fixedly connected with is passed through at the top of storage water tank, the top intercommunication of first water pump has the outlet pipe, the one end of outlet pipe extends to the inner chamber and the intercommunication of cooling case has the collector pipe, the inner wall fixed connection of collector pipe and cooling case, the surface of collector pipe is provided with the shower nozzle, the equal fixedly connected with support column in both sides of cooling incasement chamber bottom. The utility model discloses a cooperation of storage water tank, first water pump, outlet pipe, collector pipe, well lid body, header tank and second water pump is used, possesses the advantage of cyclic utilization water resource, has solved the heat sink waste water resource that is used for in the well lid production process now, does not possess the function of cyclic utilization water resource, has increased the cost of production, is unfavorable for the problem of use.

Description

A heat sink for well lid production
Technical Field
The utility model relates to a heat sink technical field specifically is a heat sink for well lid production.
Background
Well lid, a deep well for hiding road or family, prevent that people or object from falling, can divide into the metal well lid according to the material, high strength fiber cement concrete well lid, resin well lid etc, generally adopt circularly, can be used to the greenbelt, the pavement, the motorway, the pier, lane etc, the well lid need use the heat sink to cool down when processing production, the current heat sink's that is arranged in the dome production process cooling efficiency is slow, the time of production has been increased, and the heat sink who is arranged in the well lid production process now wastes water resource, do not possess the function of cyclic utilization water resource, the cost of production has been increased, be unfavorable for the use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a heat sink for well lid production possesses the advantage of cyclic utilization water resource, has solved the heat sink waste water resource that has now been arranged in the well lid production process, does not possess the function of cyclic utilization water resource, has increased the cost of production, is unfavorable for the problem of using.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a heat sink for well lid production, includes the cooling case, the mount pad fixedly connected with storage water tank is passed through to one side of cooling case, the first water pump of support fixedly connected with is passed through at the top of storage water tank, the top intercommunication of first water pump has the outlet pipe, the one end of outlet pipe extends to the inner chamber and the intercommunication of cooling case has the collector pipe, the inner wall fixed connection of collector pipe and cooling case, the surface of collector pipe is provided with the shower nozzle.
Preferably, the equal fixedly connected with support column in both sides of cooling box inner chamber bottom, the platform is placed to the top fixedly connected with of support column, places the top of platform and has placed the well lid body.
Preferably, the bottom intercommunication of cooling case has the drain pipe, the bottom fixedly connected with header tank of cooling case, the drain pipe is linked together with the header tank, mount pad fixedly connected with second water pump is passed through to the bottom of cooling case one side, the bottom of second water pump is linked together with the header tank through the pipeline, the top of second water pump is linked together with the storage water tank through the pipeline, the equal fixedly connected with filter screen in top of header tank inner chamber both sides, the equal fixedly connected with active carbon adsorption net in both sides of header tank inner chamber.
Preferably, the equal fixedly connected with montant in both sides at cooling box inner chamber top passes through support fixedly connected with motor between two montants, the output fixedly connected with flabellum of motor, the equal fixedly connected with fixed block in both sides at cooling box top is provided with the dust screen between two fixed blocks, the inner chamber threaded connection of fixed block has the bolt, the bolt runs through the fixed block and extends to the inner chamber of dust screen.
Preferably, the front of the cooling box is provided with a through groove, the two sides of the bottom of the cooling box are fixedly connected with supporting legs, and the bottom of each supporting leg is fixedly connected with a support.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a cooperation of storage water tank, first water pump, outlet pipe, collector pipe, well lid body, header tank and second water pump is used, possesses the advantage of cyclic utilization water resource, has solved the heat sink waste water resource that is used for in the well lid production process now, does not possess the function of cyclic utilization water resource, has increased the cost of production, is unfavorable for the problem of use.
2. The utility model discloses a set up the support column and place the platform, can be convenient for place the well lid body, through setting up the second water pump, can be convenient for recycle the water of header tank inner chamber, through setting up motor and flabellum, can be convenient for dispel the heat to the inner chamber of cooling box to improve the cooling effect of well lid, through setting up landing leg and support, can be convenient for fix the cooling box.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a front view of the structure of the present invention;
fig. 3 is an enlarged view of a in fig. 1 according to the present invention.
In the figure: 1. a cooling box; 2. a water storage tank; 3. a first water pump; 4. a water outlet pipe; 5. a water collection pipe; 6. a well lid body; 7. a water collection tank; 8. a second water pump; 9. a filter screen; 10. an activated carbon adsorption net; 11. a vertical rod; 12. a motor; 13. a fixed block; 14. a dust screen; 15. a bolt; 16. a through groove; 17. a support leg; 18. and (4) a support.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a cooling device for well lid production comprises a cooling box 1, one side of the cooling box 1 is fixedly connected with a water storage tank 2 through a mounting seat, the top of the water storage tank 2 is fixedly connected with a first water pump 3 through a support, the top of the first water pump 3 is communicated with a water outlet pipe 4, one end of the water outlet pipe 4 extends to the inner cavity of the cooling box 1 and is communicated with a water collecting pipe 5, the water collecting pipe 5 is fixedly connected with the inner wall of the cooling box 1, the surface of the water collecting pipe 5 is provided with a spray head, the two sides of the bottom of the inner cavity of the cooling box 1 are fixedly connected with supporting columns, the top of each supporting column is fixedly connected with a placing table, through the arrangement of the supporting columns and the placing table, a well lid body 6 can be conveniently placed, the top of the placing table is provided with the well lid body 6, the bottom of the cooling box 1 is communicated with, the bottom of one side of the cooling box 1 is fixedly connected with a second water pump 8 through a mounting seat, the second water pump 8 is arranged, the water in the inner cavity of the water collecting box 7 can be conveniently recycled, the bottom of the second water pump 8 is communicated with the water collecting box 7 through a pipeline, the top of the second water pump 8 is communicated with the water storage tank 2 through a pipeline, the top of two sides of the inner cavity of the water collecting box 7 is fixedly connected with a filter screen 9, two sides of the inner cavity of the water collecting box 7 are fixedly connected with an active carbon adsorption net 10, two sides of the top of the inner cavity of the cooling box 1 are fixedly connected with vertical rods 11, a motor 12 is fixedly connected between the two vertical rods 11 through a bracket, the output end of the motor 12 is fixedly connected with fan blades, the inner cavity of the cooling box 1 can be conveniently cooled through the motor 12 and the fan blades, so that the cooling effect of, be provided with dust screen 14 between two fixed blocks 13, the inner chamber threaded connection of fixed block 13 has bolt 15, bolt 15 runs through fixed block 13 and extends to the inner chamber of dust screen 14, logical groove 16 has been seted up in cooling box 1's front, the equal fixedly connected with landing leg 17 in both sides of cooling box 1 bottom, landing leg 17's bottom fixedly connected with support 18, through setting up landing leg 17 and support 18, can be convenient for fixed cooling box 1, through storage water tank 2, first water pump 3, outlet pipe 4, collector pipe 5, well lid body 6, the cooperation of collection tank 7 and second water pump 8 is used, the advantage that possesses the cyclic utilization water resource, it wastes water resource to have solved current heat sink that is used for in the well lid production process, do not possess the function of cyclic utilization water resource, the cost of production has been increased, be unfavorable for the problem of use.
During the use, operating personnel starts first water pump 3 through external controller, and first water pump 3 is with the water suction collector pipe 5 of storage water tank 2, then through the shower nozzle blowout, and the water after the use can be through drain pipe drainage header 7, starts second water pump 8 through external controller, and second water pump 8 is with the water suction storage water tank 2 after filtering, recycles.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a heat sink for well lid production, includes cooling box (1), its characterized in that: one side of cooling case (1) is through mount pad fixedly connected with storage water tank (2), the first water pump of support fixedly connected with (3) is passed through at the top of storage water tank (2), the top intercommunication of first water pump (3) has outlet pipe (4), the one end of outlet pipe (4) extends to the inner chamber and the intercommunication of cooling case (1) has collector pipe (5), the inner wall fixed connection of collector pipe (5) and cooling case (1), the surface of collector pipe (5) is provided with the shower nozzle.
2. The cooling device for well lid production according to claim 1, characterized in that: the equal fixedly connected with support column in both sides of cooling case (1) inner chamber bottom, the platform is placed to the top fixedly connected with of support column, places the top of platform and has placed well lid body (6).
3. The cooling device for well lid production according to claim 1, characterized in that: the bottom intercommunication of cooling case (1) has the drain pipe, the bottom fixedly connected with header tank (7) of cooling case (1), drain pipe and header tank (7) are linked together, mount pad fixedly connected with second water pump (8) are passed through to the bottom of cooling case (1) one side, the bottom of second water pump (8) is linked together through pipeline and header tank (7), the top of second water pump (8) is linked together through pipeline and storage water tank (2), the equal fixedly connected with filter screen (9) in top of header tank (7) inner chamber both sides, the equal fixedly connected with active carbon in both sides of header tank (7) inner chamber adsorbs net (10).
4. The cooling device for well lid production according to claim 1, characterized in that: the equal fixedly connected with montant (11) in both sides at cooling box (1) inner chamber top passes through support fixedly connected with motor (12) between two montants (11), the output fixedly connected with flabellum of motor (12), the equal fixedly connected with fixed block (13) in both sides at cooling box (1) top is provided with dust screen (14) between two fixed blocks (13), the inner chamber threaded connection of fixed block (13) has bolt (15), bolt (15) run through fixed block (13) and extend to the inner chamber of dust screen (14).
5. The cooling device for well lid production according to claim 1, characterized in that: the front of cooling box (1) has been seted up logical groove (16), the equal fixedly connected with landing leg (17) in both sides of cooling box (1) bottom, the bottom fixedly connected with support (18) of landing leg (17).
CN201921883589.9U 2019-11-04 2019-11-04 A heat sink for well lid production Active CN211233504U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921883589.9U CN211233504U (en) 2019-11-04 2019-11-04 A heat sink for well lid production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921883589.9U CN211233504U (en) 2019-11-04 2019-11-04 A heat sink for well lid production

Publications (1)

Publication Number Publication Date
CN211233504U true CN211233504U (en) 2020-08-11

Family

ID=71920625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921883589.9U Active CN211233504U (en) 2019-11-04 2019-11-04 A heat sink for well lid production

Country Status (1)

Country Link
CN (1) CN211233504U (en)

Similar Documents

Publication Publication Date Title
CN213573379U (en) Urban construction is with enclosing fender that can reduce dirt
CN210959778U (en) System is irritated high-efficiently
CN211233504U (en) A heat sink for well lid production
CN209848425U (en) Sewage treatment tank for sewage treatment equipment
CN210261369U (en) Green building rainwater circulating and filtering device
CN207703063U (en) A kind of waste water residual heat recycling device
CN109250844A (en) A kind of environment-protecting industrial sewage disposal device
CN209742487U (en) Totally enclosed green construction encloses fender
CN211639216U (en) Collection device for machine tool machining chips
CN209615930U (en) A kind of fixed frame of prefabricated component installation
CN214188112U (en) Thermosetting inspection well cover curing device
CN206631295U (en) One kind is granulated steel band temperature reduction circulation device
CN105317620B (en) Efficient hydroelectric generation device
CN210544140U (en) Construction dust collector who facilitates use
CN211462528U (en) Dust absorbing device is used in biological particle production
CN216224824U (en) Water purifying and filtering device
CN214792764U (en) Energy-saving cooling tower water collecting tank for thermos bottle machine
CN210049320U (en) Multifunctional purification device for sponge city construction
CN206508655U (en) A kind of polyester fiber filter screen water treatment facilities
CN218106911U (en) Battery cooling water filter equipment
CN205382477U (en) Power station intakes upper reaches uses trash device
CN216107890U (en) Water collecting device formed by sand-based water permeable bricks
CN216936397U (en) Energy-saving bruisher for concrete
CN204369627U (en) A kind of filler grid flocculation conversion unit
CN215241431U (en) High efficiency cutting ring table device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230807

Address after: No. 70, 1st Floor, Building 2, No. 818, Development Avenue East Section, Development Zone, Taizhou City, Zhejiang Province, 318000

Patentee after: Zhejiang Zansong Construction Co.,Ltd.

Address before: 362000 No. 263, Yudou village, Yudou Town, Yongchun County, Quanzhou City, Fujian Province

Patentee before: Kang Jinyao

TR01 Transfer of patent right