CN211231849U - Supporting pipe installation bracket of building - Google Patents

Supporting pipe installation bracket of building Download PDF

Info

Publication number
CN211231849U
CN211231849U CN201921607922.3U CN201921607922U CN211231849U CN 211231849 U CN211231849 U CN 211231849U CN 201921607922 U CN201921607922 U CN 201921607922U CN 211231849 U CN211231849 U CN 211231849U
Authority
CN
China
Prior art keywords
stand
tray frame
slipmat
pipeline
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921607922.3U
Other languages
Chinese (zh)
Inventor
张宁
王泽宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921607922.3U priority Critical patent/CN211231849U/en
Application granted granted Critical
Publication of CN211231849U publication Critical patent/CN211231849U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model belongs to the technical field of pipeline bracket, especially, be a supporting pipeline mounting bracket of building, including the tray frame, the upper surface of tray frame is connected with the stand, and the both sides of tray frame have seted up the connecting hole, and the inside of connecting hole is connected with the clamp subassembly, and the both sides of stand are connected with first slipmat and second slipmat, and first slipmat and second slipmat all locate the position that clamp subassembly and stand are relatively close to, and the inside of tray frame has seted up four mounting holes, and the both sides of stand all are connected with the penetration hole; the tray frame is installed on ground or building top through the mounting hole, is provided with clamp assembly on the stand, and mountable pipeline in the clamp assembly is provided with first slipmat and second slipmat between clamp assembly and stand, has increased the frictional force between clamp assembly and the stand for the pipeline can be fully fixed, and clamp assembly and pipeline can also be installed to the upper surface of stand, reaches the effect of nimble installation pipeline.

Description

Supporting pipe installation bracket of building
Technical Field
The utility model belongs to the technical field of the pipe bracket, concretely relates to supporting piping erection bracket of building.
Background
The pipeline support is used in any place where pipeline is laid, and is also called pipeline support, pipe portion and so on, and it is used as support structure of pipeline, and according to the running performance and arrangement requirement of pipeline, the pipe support is divided into two kinds of fixed and movable, and the place where the fixed point is set is made into fixed support, and said pipeline and pipeline support can not produce relative displacement.
When building construction is carried out, the pipelines need to be installed and supported, when some pipelines are installed, the pipelines cannot be sufficiently fixed, and the number of the pipelines installed in the same space is small, so that the pipelines are not beneficial to installation and fixation.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a supporting piping erection bracket of building has the characteristics of the installation of being convenient for.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a supporting pipeline installation bracket of building, includes the tray frame, the last surface connection of tray frame has the stand, the connecting hole has been seted up to the both sides of tray frame, the internal connection of connecting hole has the clamp subassembly, the both sides of stand are connected with first slipmat and second slipmat, first slipmat with the second slipmat is all located the clamp subassembly with the position that the stand is close to relatively, four mounting holes have been seted up to the inside of tray frame, the both sides of stand all are connected with the penetration hole.
Preferably, the upper surface of the upright post is provided with a connecting hole, and the upper surface of the upright post is connected with a third anti-skidding pad.
Preferably, one side of the tray frame is connected with a connecting plate, the other side of the tray frame is provided with a connecting groove, and the connecting plate and the connecting groove are fixedly connected in an inserting mode.
Preferably, the upper surfaces of the connecting plate and the connecting groove are both provided with fixing holes.
Preferably, the front and rear surfaces of the pillar are connected with a handle.
Preferably, the clamp subassembly includes clamp, connecting rod and connecting bolt, wherein, the connecting rod is connected the inside of connecting hole, connecting bolt connects the one end lateral wall of connecting rod, the clamp is connected the other end of connecting rod.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the pallet frame is installed on the ground or the top of a building through the installation hole, the hoop assembly is arranged on the stand column, a pipeline can be installed in the hoop assembly, the first anti-slip pad and the second anti-slip pad are arranged between the hoop assembly and the stand column, the friction force between the hoop assembly and the stand column is increased, the pipeline can be sufficiently fixed, the hoop assembly and the pipeline can be installed on the upper surface of the stand column, and the effect of flexibly installing the pipeline is achieved;
2. fixing through connecting plate and spread groove between tray frame and the tray frame, all having seted up the fixed orifices on connecting plate and the spread groove, the fixed orifices can fixing bolt, reaches the effect of fully fixing two tray frames for it is inseparabler to install between pipeline and the pipeline, and is more stable simultaneously.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic perspective view of the center pillar of the present invention;
fig. 3 is a schematic structural view of the middle clamp assembly of the present invention;
in the figure: 1. a tray rack; 2. a column; 3. a handle; 4. a first non-slip mat; 5. a clamp assembly; 51. clamping a hoop; 52. a connecting rod; 53. a connecting bolt; 6. a through hole; 7. a connecting plate; 8. mounting holes; 9. a fixing hole; 10. connecting grooves; 11. a second non-slip mat; 12. connecting holes; 13. and a third anti-slip pad.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides the following technical solutions: the utility model provides a building supporting pipeline installation bracket, including tray frame 1, the last surface connection of tray frame 1 has stand 2, connecting hole 12 has been seted up to tray frame 1's both sides, the internal connection of connecting hole 12 has clamp subassembly 5, the both sides of stand 2 are connected with first slipmat 4 and second slipmat 11, clamp subassembly 5 and the relative position that is close to of stand 2 are all located to first slipmat 4 and second slipmat 11, four mounting holes 8 have been seted up to tray frame 1's inside, the both sides of stand 2 all are connected with penetrating hole 6.
In this embodiment: the tray frame 1 is installed on the ground or the top of a building through the installation hole 8, the stand column 2 is provided with the hoop assembly 5, a pipeline can be installed in the hoop assembly 5, the first anti-skid pad 4 and the second anti-skid pad 11 are arranged between the hoop assembly 5 and the stand column 2, the friction force between the hoop assembly 5 and the stand column 2 is increased, and the pipeline can be fully fixed.
Specifically, the upper surface of the upright post 2 is provided with a connecting hole 12, and the upper surface of the upright post 2 is connected with a third anti-skidding pad 13; clamp component 5 and pipeline also can be installed to the upper surface of stand 2, reach the effect of nimble installation pipeline, and smooth pad 13 of third prevention has increased the frictional force between clamp component 5 and the stand 2 for the pipeline can be fully fixed.
Specifically, one side of the tray frame 1 is connected with a connecting plate 7, the other side of the tray frame 1 is provided with a connecting groove 10, and the connecting plate 7 and the connecting groove 10 are fixedly inserted; the tray frame 1 and the tray frame 1 can be fixed through the connecting plate 7 and the connecting groove 10, so that the effect of fixing the two tray frames 1 is achieved, and the pipeline are installed more tightly.
Specifically, the upper surfaces of the connecting plate 7 and the connecting groove 10 are both provided with a fixing hole 9; fixing can be carried out through connecting plate 7 and spread groove 10 between tray frame 1 and the tray frame 1, has all seted up fixed orifices 9 on connecting plate 7 and the spread groove 10, can fixing bolt in the fixed orifices 9, reaches the effect of fully fixed two tray frames 1 for it is inseparabler to install between pipeline and the pipeline, and is more stable simultaneously.
Specifically, the front and rear surfaces of the upright post 2 are connected with a handle 3; the handle 3 can be convenient for the staff to carry the stand 2 and install.
Specifically, the clamp assembly 5 comprises a clamp 51, a connecting rod 52 and a connecting bolt 53, wherein the connecting rod 52 is connected inside the connecting hole 12, the connecting bolt 53 is connected to the outer side wall of one end of the connecting rod 52, and the clamp 51 is connected to the other end of the connecting rod 52; the clamp 51 is inserted into the column 2 through the connecting rod 52, and the connecting bolt 53 fixes the connecting rod 52 on the column 2, so that the effect of convenient installation and fixation is achieved.
In this embodiment, the height of the stand column 2 is not adjustable in the construction process, and if the stand columns 2 with different heights need to be used, the stand columns 2 with different heights should be purchased.
The utility model discloses a theory of operation and use flow: the tray frame 1 is installed on the ground or the top of a building through the installation hole 8, the column 2 is provided with the hoop component 5, a pipeline can be installed in the hoop component 5, the hoop 51 is inserted into the column 2 through the connecting rod 52, meanwhile, the connecting rod 52 is fixed on the column 2 through the connecting bolt 53, the effect of convenient installation and fixation is achieved, the first anti-slip pad 4 and the second anti-slip pad 11 are arranged between the hoop component 5 and the column 2, the friction force between the hoop component 5 and the column 2 is increased, the pipeline can be fully fixed, the hoop component 5 and the pipeline can also be installed on the upper surface of the column 2, the effect of flexibly installing the pipeline is achieved, the tray frame 1 and the tray frame 1 can be fixed through the connecting plate 7 and the connecting groove 10, the connecting plate 7 and the connecting groove 10 are both provided with the fixing hole 9, the bolt can be fixed in the fixing hole 9, the effect of fully, make the installation more inseparabler between pipeline and the pipeline, it is simultaneously more stable, handle 3 can make things convenient for the staff to carry stand 2 and installation.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a supporting pipe installation bracket of building, includes tray frame (1), its characterized in that: the upper surface of tray frame (1) is connected with stand (2), connecting hole (12) have been seted up to the both sides of tray frame (1), the internal connection of connecting hole (12) has clamp subassembly (5), the both sides of stand (2) are connected with first slipmat (4) and second slipmat (11), first slipmat (4) with second slipmat (11) are all located clamp subassembly (5) with the position that stand (2) are close to relatively, four mounting holes (8) have been seted up to the inside of tray frame (1), the both sides of stand (2) all are connected with through hole (6).
2. A construction kit mounting bracket as claimed in claim 1, in which: connecting holes (12) are formed in the upper surface of the stand column (2), and a third anti-skidding pad (13) is connected to the upper surface of the stand column (2).
3. A construction kit mounting bracket as claimed in claim 1, in which: one side of tray frame (1) is connected with connecting plate (7), spread groove (10) have been seted up to the opposite side of tray frame (1), connecting plate (7) with spread groove (10) are pegged graft fixedly.
4. A construction kit mounting bracket as claimed in claim 3, in which: the upper surfaces of the connecting plate (7) and the connecting groove (10) are provided with fixing holes (9).
5. A construction kit mounting bracket as claimed in claim 1, in which: the front surface and the rear surface of the upright post (2) are connected with a handle (3).
6. A construction kit mounting bracket as claimed in claim 1, in which: clamp subassembly (5) include clamp (51), connecting rod (52) and connecting bolt (53), wherein, connecting rod (52) are connected the inside of connecting hole (12), connecting bolt (53) are connected the one end lateral wall of connecting rod (52), clamp (51) are connected the other end of connecting rod (52).
CN201921607922.3U 2019-09-25 2019-09-25 Supporting pipe installation bracket of building Expired - Fee Related CN211231849U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921607922.3U CN211231849U (en) 2019-09-25 2019-09-25 Supporting pipe installation bracket of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921607922.3U CN211231849U (en) 2019-09-25 2019-09-25 Supporting pipe installation bracket of building

Publications (1)

Publication Number Publication Date
CN211231849U true CN211231849U (en) 2020-08-11

Family

ID=71942114

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921607922.3U Expired - Fee Related CN211231849U (en) 2019-09-25 2019-09-25 Supporting pipe installation bracket of building

Country Status (1)

Country Link
CN (1) CN211231849U (en)

Similar Documents

Publication Publication Date Title
CN211231849U (en) Supporting pipe installation bracket of building
CN210179067U (en) Pipeline installation fixing clamp
CN114197679A (en) Shock-absorbing mechanism replaceable anti-seismic steel structure for building
CN206376506U (en) A kind of assembly type scaffold base
CN216689811U (en) Steel construction rack easy to assemble dismantlement
CN210857737U (en) Upper beam structure
CN205637823U (en) Ready -package wall body covering or awning on a car, boat, etc. room
CN215488027U (en) Pipeline fixing frame
CN211714590U (en) Support frame for building that shock attenuation effect is excellent
CN215343771U (en) Cable bridge with strong bearing capacity
CN220378783U (en) Anti-seismic support base for cable bridge
CN219242960U (en) Supporting and hanging frame structure for building earthquake resistance
CN220620628U (en) Curtain wall reinforcing assembly and curtain wall
CN212427919U (en) Special-shaped floor support
CN220471992U (en) Wall-mounted refrigerator and hanging frame structure thereof
CN215343770U (en) Cable bridge convenient to maintenance is changed
CN219712735U (en) Municipal administration road supply and drainage pipe protector
CN217601828U (en) Indoor suspended ceiling mounting bracket for architectural decoration
CN216699409U (en) Groove type horizontal tee joint with leakage holes
CN212808732U (en) Optical fiber channel convenient to install
CN214850217U (en) Bridge support for weak current bridge
CN217081704U (en) Adjustable water pipe base
CN217345446U (en) Bracket for part processing
CN217683653U (en) Piping lane support based on antidetonation type
CN212564707U (en) High-strength base structure of anti-slip anti-seismic comprehensive pipeline support hanger

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200811

Termination date: 20210925

CF01 Termination of patent right due to non-payment of annual fee