CN211225007U CN201922360922.4U CN201922360922U CN211225007U CN 211225007 U CN211225007 U CN 211225007U CN 201922360922 U CN201922360922 U CN 201922360922U CN 211225007 U CN211225007 U CN 211225007U
Authority
CN
China
Prior art keywords
water conservancy
lead screw
motor
management equipment
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922360922.4U
Other languages
Chinese (zh)
Inventor
刘行健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922360922.4U priority Critical patent/CN211225007U/en
Application granted granted Critical
Publication of CN211225007U publication Critical patent/CN211225007U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

The utility model discloses a water conservancy water and electricity is storage management equipment for construction relates to the construction and uses the storage management field, including the install bin, the equal fixedly connected with pulley in bottom both sides of install bin, the bottom middle part fixed mounting of install bin has the battery, and upper surface one side fixed mounting of install bin has first motor, and the first awl tooth of transmission shaft fixedly connected with is passed through at the bottom middle part of first motor, and the outside meshing of first awl tooth is connected with the second cone tooth, and the both sides middle part of second cone tooth is fixedly connected with bracing piece and lead screw respectively, and the middle part swing joint of lead screw has spacing stake. The utility model discloses a pulley can make equipment be convenient for remove and turn to can improve equipment's flexibility, through the setting of first motor, first awl tooth and second awl tooth, can drive the lead screw and rotate, thereby can adjust the distance between two alignment brackets, thereby can make equipment be suitable for the device of different width and place.

Description

Storage management equipment for water conservancy and hydropower construction
Technical Field
The utility model relates to a storage management field is used in the construction, in particular to storage management equipment is used in water conservancy water and electricity construction.
Background
The culture of the hydraulic and hydroelectric engineering has knowledge in the aspects of exploration, planning, design, construction, scientific research, management and the like of the hydraulic and hydroelectric engineering, and can be used for high-level engineering technical talents working in the aspects of planning, design, construction, scientific research, management and the like in departments of water conservancy, hydropower and the like. Students in the water conservancy and hydropower engineering major study basic theories and basic knowledge in the aspects of mathematics, mechanics, building structures and the like necessary for the water conservancy and hydropower engineering construction, so that the students obtain necessary basic training of an engineering design method, a construction management method and a scientific research method, and have basic capabilities in the aspects of water conservancy and hydropower engineering surveying, planning, designing, constructing, scientific research, management and the like.
However, the analysis shows that the existing storage management equipment for water conservancy and hydropower construction has the following defects: one is as follows: the management equipment is inconvenient to adjust, so that the application range of the equipment is small, and the management equipment comprises the following two steps: the height of the placing plate is not convenient to adjust, so that construction equipment is not convenient to take and place, and therefore, the storage management equipment for water conservancy and hydropower construction is needed to solve the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a water conservancy is storage management equipment for water and electricity construction to solve the application scope who provides among the above-mentioned background art and little and be not convenient for get the problem of putting.
In order to achieve the above object, the utility model provides a following technical scheme: the warehousing management equipment for water conservancy and hydropower construction comprises an installation box, pulleys are fixedly connected to two sides of the bottom end of the installation box, a storage battery is fixedly installed in the middle of the bottom end of the installation box, a first motor is fixedly installed on one side of the upper surface of the installation box, a first bevel gear is fixedly connected to the middle of the bottom end of the first motor through a transmission shaft, a second bevel gear is meshed and connected to the outer side of the first bevel gear, and a support rod and a lead screw are fixedly connected to the middle of two sides of the second bevel gear respectively;
the utility model discloses a lead screw, including lead screw, the equal swing joint in both ends of lead screw has spacing stake, the equal swing joint in middle part of lead screw has the alignment jig, one side top of alignment jig is provided with the second motor, transmission shaft fixed connection wire winding roller is passed through at one side middle part of second motor, the outside swing joint of wire winding roller has the haulage rope, the board is placed to the middle part fixedly connected with of haulage rope, the both sides of placing the board all are provided with the slide bar.
Optionally, the pulley is a universal pulley;
the pulley is provided with four, four the pulley is located the bottom four corners department of install bin.
Optionally, a movable hole is formed in the top end of the installation box;
the inner part of the movable hole is movably connected with the bottom end of the adjusting frame.
Optionally, one end of the support rod, which is far away from the second conical tooth, is movably connected with one side of the interior of the installation box;
one end of the screw rod, which is far away from the second conical tooth, is movably connected with the other side of the interior of the mounting box.
Optionally, the bottom end of the limiting pile is movably connected with the inner bottom wall of the installation box;
the limiting pile is positioned between the two adjusting frames.
Optionally, the thread directions of the two ends of the lead screw are opposite;
the top fixedly connected with mounting panel of alignment jig, the upper surface of mounting panel and the bottom fixed connection of second motor.
Optionally, through holes are formed in both sides of the placing plate;
the inside of the through hole is movably connected with the outer side of the sliding rod.
The utility model discloses a technological effect and advantage:
1. the utility model discloses a pulley can make equipment be convenient for remove and turn to can improve equipment's flexibility, through the setting of first motor, first awl tooth and second awl tooth, can drive the lead screw and rotate, thereby can adjust the distance between two alignment brackets, thereby can make equipment be suitable for the device of different width and place.
2. The utility model discloses a second motor, winding roller and haulage rope set up, can adjust the height of placing the board to can make the device be convenient for get and put, can prevent through the slide bar to place the board and rock at the in-process that goes up and down, thereby can improve equipment's reliability.
Drawings
Fig. 1 is a schematic front view of the cross-sectional view of the present invention.
Fig. 2 is a schematic side view of the adjusting bracket structure of the present invention.
Fig. 3 is a schematic perspective view of the installation box structure of the present invention.
In the figure: 1. installing a box; 2. a pulley; 3. a storage battery; 4. a first motor; 5. a first bevel gear; 6. a second taper tooth; 7. a support bar; 8. a lead screw; 9. limiting piles; 10. an adjusting bracket; 11. a second motor; 12. a winding roller; 13. a hauling rope; 14. placing the plate; 15. a slide bar; 16. and (4) a movable hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", and the like, indicate the orientation or positional relationship indicated based on the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "disposed," "mounted," "connected," and "fixed" are to be construed broadly, e.g., as meaning either a fixed connection or a removable connection; may be a mechanical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
The utility model provides a water conservancy water and electricity construction is with storage management equipment as shown in figure 1-3, including the installation case 1, the bottom both sides of installation case 1 are all fixedly connected with pulley 2, pulley 2 is the universal pulley, pulley 2 is provided with four, four pulley 2 are located the bottom four corners department of installation case 1, can make the equipment be convenient for remove and turn to through pulley 2, thereby can improve the flexibility of equipment, the bottom middle part of installation case 1 is fixedly installed with battery 3, the upper surface one side of installation case 1 is fixedly installed with first motor 4, the bottom middle part of first motor 4 is fixedly connected with first awl tooth 5 through the transmission shaft, the outside meshing of first awl tooth 5 is connected with second awl tooth 6, through the setting of first motor 4, first awl tooth 5 and second awl tooth 6, can drive lead screw 8 and rotate, thereby can adjust the distance between two alignment brackets 10, therefore, the equipment is suitable for placing devices with different widths, the middle parts of two sides of the second conical tooth 6 are respectively and fixedly connected with a supporting rod 7 and a screw 8, one end of the supporting rod 7, far away from the second conical tooth 6, is movably connected with one side of the inside of the installation box 1, one end of the screw 8, far away from the second conical tooth 6, is movably connected with the other side of the inside of the installation box 1, and the thread directions of two ends of the screw 8 are opposite;
the middle part of the lead screw 8 is movably connected with a limiting pile 9, the bottom end of the limiting pile 9 is movably connected with the inner bottom wall of the installation box 1, the limiting pile 9 is positioned between two adjusting frames 10, both ends of the lead screw 8 are movably connected with the adjusting frames 10, the top end of the installation box 1 is provided with a movable hole 16, the inside of the movable hole 16 is movably connected with the bottom ends of the adjusting frames 10, the top part of one side of each adjusting frame 10 is provided with a second motor 11, the top end of each adjusting frame 10 is fixedly connected with an installation plate, the upper surface of the installation plate is fixedly connected with the bottom end of the second motor 11, the middle part of one side of the second motor 11 is fixedly connected with a winding roller 12 through a transmission shaft, the outer side of the winding roller 12 is movably connected with a traction rope 13, the height of a placing plate 14 can be adjusted through the second motor 11, the winding roller 12 and the traction rope, both sides of placing board 14 all are provided with slide bar 15, and the through-hole has all been seted up to the both sides of placing board 14, and the inside of through-hole and slide bar 15's outside swing joint can prevent through slide bar 15 to place board 14 and rock at the in-process that goes up and down to can improve equipment's reliability.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
This practical theory of operation: when the device need be placed, adjust the distance between two alignment brackets 10 according to the specification of device, start first motor 4, first motor 4 drives second conical tooth 6 through first conical tooth 5 and rotates, drive bracing piece 7 through second conical tooth 6 and rotate, thereby can make alignment bracket 10 reverse movement, when the device need be got and put, start second motor 11, second motor 11 passes through the elasticity degree that winding roller 12 adjusted haulage rope 13, thereby can adjust the height of placing board 14, because of the gravity reason of device, when haulage rope 13 relaxes, only the board 14 that places of below moves downwards, thereby can make the device be convenient for get and put.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (7)

1. The utility model provides a water conservancy is storage management equipment for water and electricity construction, includes install bin (1), its characterized in that: pulleys (2) are fixedly connected to two sides of the bottom end of the installation box (1), a storage battery (3) is fixedly installed in the middle of the bottom end of the installation box (1), a first motor (4) is fixedly installed on one side of the upper surface of the installation box (1), a first bevel gear (5) is fixedly connected to the middle of the bottom end of the first motor (4) through a transmission shaft, a second bevel gear (6) is meshed and connected to the outer side of the first bevel gear (5), and a support rod (7) and a lead screw (8) are fixedly connected to the middle of two sides of the second bevel gear (6) respectively;
the utility model discloses a lead screw, including lead screw (8), the equal swing joint in both ends of lead screw (8) has spacing stake (9), there are alignment jig (10) at the equal swing joint in both ends of lead screw (8), one side top of alignment jig (10) is provided with second motor (11), transmission shaft fixed connection wire winding roller (12) are passed through at one side middle part of second motor (11), the outside swing joint of wire winding roller (12) has haulage rope (13), board (14) are placed to the middle part fixedly connected with of haulage rope (13), the both sides of placing board (14) all are provided with slide bar (15).
2. The warehousing management equipment for water conservancy and hydropower construction according to claim 1, characterized in that:
the pulley (2) is a universal pulley;
the pulley (2) is provided with four, four the pulley (2) is located the bottom four corners department of install bin (1).
3. The warehousing management equipment for water conservancy and hydropower construction according to claim 1, characterized in that:
the top end of the installation box (1) is provided with a movable hole (16);
the inner part of the movable hole (16) is movably connected with the bottom end of the adjusting frame (10).
4. The warehousing management equipment for water conservancy and hydropower construction according to claim 1, characterized in that:
one end of the support rod (7) far away from the second conical tooth (6) is movably connected with one side of the interior of the installation box (1);
one end of the screw rod (8) far away from the second bevel gear (6) is movably connected with the other side of the interior of the installation box (1).
5. The warehousing management equipment for water conservancy and hydropower construction according to claim 1, characterized in that:
the bottom end of the limiting pile (9) is movably connected with the inner bottom wall of the installation box (1);
the limiting pile (9) is positioned between the two adjusting frames (10).
6. The warehousing management equipment for water conservancy and hydropower construction according to claim 1, characterized in that:
the thread directions of the two ends of the lead screw (8) are opposite;
the top fixedly connected with mounting panel of alignment jig (10), the upper surface of mounting panel and the bottom fixed connection of second motor (11).
7. The warehousing management equipment for water conservancy and hydropower construction according to claim 1, characterized in that:
through holes are formed in both sides of the placing plate (14);
the inner part of the through hole is movably connected with the outer side of the sliding rod (15).
CN201922360922.4U 2019-12-25 2019-12-25 Storage management equipment for water conservancy and hydropower construction Expired - Fee Related CN211225007U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922360922.4U CN211225007U (en) 2019-12-25 2019-12-25 Storage management equipment for water conservancy and hydropower construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922360922.4U CN211225007U (en) 2019-12-25 2019-12-25 Storage management equipment for water conservancy and hydropower construction

Publications (1)

Publication Number Publication Date
CN211225007U true CN211225007U (en) 2020-08-11

Family

ID=71931590

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922360922.4U Expired - Fee Related CN211225007U (en) 2019-12-25 2019-12-25 Storage management equipment for water conservancy and hydropower construction

Country Status (1)

Country Link
CN (1) CN211225007U (en)

Similar Documents

Publication Publication Date Title
CN207690405U (en) A kind of vertical lift elevator show brand fixing device
KR101817228B1 (en) Supporting Device for Floating Photovoltaic Module
CN211226189U (en) Construction equipment is laid to building
CN113639712A (en) Perpendicularity detection device with multiple measurement modes for building engineering
CN211225007U (en) Storage management equipment for water conservancy and hydropower construction
CN212255206U (en) Ultrasonic probe device
CN219220293U (en) Petroleum directional well anti-blocking device
CN216815405U (en) Height measuring device for engineering investigation and monitoring
CN217419780U (en) Building foundation leveling device
CN213625632U (en) Slope protection device for hydraulic and hydroelectric engineering
CN215004165U (en) Building structure is with anti-seismic performance detection device of easily installing
CN210998587U (en) Current transformer installs auxiliary device
CN210779902U (en) Line hanging bracket for construction site
CN212917678U (en) Double-station drilling machine for plate processing
CN211286544U (en) Construction strengthening engineering operation panel
CN217820353U (en) Ecological environment groundwater monitoring devices
CN219316904U (en) Punching positioning equipment for constructional engineering
CN217654447U (en) Measuring device for hydraulic engineering
CN212689557U (en) Telescopic building template
CN216729678U (en) Electric control bar planting drilling device
CN217950457U (en) Auxiliary positioning mechanism is used in installation of subway people's air defense door
CN219261718U (en) House building construction platform
CN210389711U (en) Brickwork fluting instrument
CN216190879U (en) Safety protection tool for power cable installation
CN217267441U (en) Slope pile driver that U type canal construction was used

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200811

Termination date: 20201225

CF01 Termination of patent right due to non-payment of annual fee