CN211215154U - High platform diving and diving platform training field - Google Patents

High platform diving and diving platform training field Download PDF

Info

Publication number
CN211215154U
CN211215154U CN201922188919.9U CN201922188919U CN211215154U CN 211215154 U CN211215154 U CN 211215154U CN 201922188919 U CN201922188919 U CN 201922188919U CN 211215154 U CN211215154 U CN 211215154U
Authority
CN
China
Prior art keywords
steel pipe
platform
diving
support steel
springboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922188919.9U
Other languages
Chinese (zh)
Inventor
冯应雄
庄宏武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Yingxiong Sports Culture Industry Development Co ltd
Original Assignee
Guangdong Yingxiong Sports Culture Industry Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Yingxiong Sports Culture Industry Development Co ltd filed Critical Guangdong Yingxiong Sports Culture Industry Development Co ltd
Priority to CN201922188919.9U priority Critical patent/CN211215154U/en
Application granted granted Critical
Publication of CN211215154U publication Critical patent/CN211215154U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a high platform diving and diving platform training field, including the upright post bodies of four concrete materials that preceding, back symmetry set up, every the equal flange joint in upper end of upright post body has a support steel pipe, all be provided with first support steel pipe in the left and right sides department of upright post body, the lower extreme of first support steel pipe is pour in the ground, the upper end of first support steel pipe with the upper end of support steel pipe flushes, between the support steel pipe with the first support steel pipe, and first support steel pipe with all be equipped with the crossbearer part between the upright post body, pour more than 2 first platforms between four upright post bodies, pour the stair of concrete material between two adjacent first platforms; this product adopts the steel construction, and the later stage can carry out nimble additional work as required according to the training.

Description

High platform diving and diving platform training field
Technical Field
The utility model relates to a high platform diving and diving platform training field.
Background
Diving (diveng) is a beautiful water sport, which is a sport that jumps into water from a high place with various postures or jumps from a Diving apparatus, completes certain action postures in the air and enters water with specific actions.
The diving sports comprise practical diving, performance diving and competitive diving. The diving sport is carried out in a diving pool. Diving athletes diving from 1 meter diving boards, 3 meters diving boards, or from 3 meters, 5 meters, 7.5 meters, and 10 meters diving platforms. The diving sports requires the air feeling, coordination, flexibility, beauty, balance feeling, time feeling and other qualities.
Competitive diving is a competition event that is attended by individuals. The diving athlete is vacated by a diving platform or a diving board, and the diving athlete can directly enter water or do various difficult gymnastics figure motions in the air to enter water in a clean, tidy and beautiful posture. The excellent diving athletes in China have Tianliang, Guojingjing, Wuminoxia and the like.
Diving refers to a water skill sport that the sporter takes off the apparatus at a certain height and finishes the action in the air by entering water. Diving sports can be generally divided into competitive diving and non-competitive diving.
The diving training field specially provided for training diving athletes needs to build a large diving platform, and the height is usually more than 15 meters.
In the prior art, the diving platform is of a concrete pouring structure, and holes can be drilled in the concrete structure only when the concrete pouring structure needs to be expanded or a new gangway is built at the later stage, so that the structural strength of the diving platform is reduced to a great extent.
Based on the problems, a high-platform diving and diving platform training field which adopts a steel structure and can be flexibly added according to training requirements in the later stage is designed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that an adopt the steel construction is provided, the later stage can carry out nimble high platform diving platform training field of joining in marriage according to the training needs.
The utility model discloses a realize through following technical scheme:
a high-platform diving and diving platform training field comprises four upright columns which are symmetrically arranged in front and back and made of concrete, wherein the upper end of each upright column is connected with a support steel pipe in a flange mode, the left side surface and the right side surface of each upright column are respectively provided with a first support steel pipe, the lower end of each first support steel pipe is poured in the ground, the upper end of each first support steel pipe is flush with the upper end of each support steel pipe, cross frame parts are respectively arranged between each support steel pipe and each first support steel pipe and between each first support steel pipe and each upright column, more than 2 first platforms are poured between the four upright columns, and a stair made of concrete is poured between every two adjacent first platforms;
the transverse frame part comprises a plurality of sleeves and a connecting beam welded between two adjacent sleeves, and the sleeves are respectively welded and fixed with the support steel pipes and the first support steel pipe;
there is the platform through the cooperation of crossbearer part, and the front end welding of platform has the springboard steelframe, through the springboard is installed to the springboard steelframe the marginal position department welding of platform has first guardrail, and first guardrail leaves the mouth that the personnel used in corresponding springboard steelframe position department, has built steel cat ladder between upper and lower platform, reserves on the platform to build the cat ladder and through the opening that the people used.
Preferably, the connection beam is an i-beam.
Preferably, the springboard steel frame comprises a plurality of steel beams which are arranged in parallel from left to right and a connecting steel pipe welded between the adjacent steel beams, the springboard is supported on the connecting steel pipe, the springboard and the connecting steel pipe are fixed by screws, and guardrails are welded at the left and right positions of the top of the springboard.
Preferably, a wallboard is poured at the position of the upright post body positioned at the rear part, and the wallboard is protected at the positions of the left side and the right side of the stair.
Preferably, the support steel pipe and the first support steel pipe are galvanized steel pipes, and the thickness of the support steel pipes is 12 mm-24 mm.
Preferably, the bottom of platform is provided with the crisscross steel construction of horizontal and vertical, welded fastening between steel construction and the crossbearer structure.
The utility model has the advantages that: in the product, the upright post body is used as a main supporting structure, the effect of auxiliary supporting is achieved through the first supporting steel pipe, the cross frame part is assembled between the upright post body and the first supporting steel pipe for reinforcement, and the cross frame part is also assembled between the supporting steel pipe and the first supporting steel pipe for reinforcement, so that the product forms a building body with stable structure and strong wind and earthquake resistance; the construction is comparatively nimble, and the later stage extension is comparatively convenient, compares in traditional concrete simultaneously, and the quality of this structure is light more, reduces the sunken phenomenon to the load on ground, the simple structure of this product, and low cost is fit for using widely.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a front view of the present invention;
FIG. 2 is a side view of the stand column;
FIG. 3 is a schematic view of the engagement of the cross-frame portion with the platform;
fig. 4 is a top view of the cross-frame portion.
Detailed Description
All of the features disclosed in this specification, or all of the steps in any method or process so disclosed, may be combined in any combination, except combinations of features and/or steps that are mutually exclusive.
Any feature disclosed in this specification (including any accompanying claims, abstract and drawings), may be replaced by alternative features serving equivalent or similar purposes, unless expressly stated otherwise. That is, unless expressly stated otherwise, each feature is only an example of a generic series of equivalent or similar features.
In the description of the present invention, it is to be understood that the terms "one end", "the other end", "the outside", "upper", "inside", "horizontal", "coaxial", "central", "end", "length", "outer end", etc. indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Furthermore, in the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
In the present invention, unless otherwise explicitly specified or limited, the terms "set", "coupled", "connected", "penetrating", "plugging", and the like are to be understood in a broad sense, and may be, for example, fixedly connected, detachably connected, or integrated; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
As shown in fig. 1, fig. 2, fig. 3 and fig. 4, the training field for diving and diving tower of high platform comprises four upright posts 1 made of concrete and symmetrically arranged in front and back, the diameter of the upright posts 1 is 80cm, a reinforcement cage is poured inside the upright posts, the upper end of each upright column body 1 is connected with a supporting steel pipe 2 in a flange way, the left side surface and the right side surface of each upright column body 1 are respectively provided with a first supporting steel pipe 3, the lower end of the first support steel pipe 3 is poured in the ground, the upper end of the first support steel pipe 3 is flush with the upper end of the support steel pipe 2, cross frame parts 4 are respectively arranged between the support steel pipe 2 and the first support steel pipe 3 and between the first support steel pipe 3 and the upright post body 1, 2 first platforms 5 are poured among the four upright columns 1, and a stair 6 made of concrete is poured between every two adjacent first platforms 5; the position of the stairs 6 can be welded as required, but the built position needs to be guaranteed at the inner side of the cross frame part 4 to guarantee safety.
The cross frame part 4 comprises a plurality of sleeves 401 and a connecting beam 402 welded between two adjacent sleeves 401, and the sleeves 401 are respectively welded and fixed with the support steel pipes 2 and the first support steel pipes 3;
there is platform 7 through the cooperation of crossbearer part 4, and the front end welding of platform 7 has springboard steelframe 8, through springboard 9 is installed to springboard steelframe 8 the marginal position department welding of platform 7 has first guardrail 777, and first guardrail 777 leaves the mouth that the personnel used in the position department of corresponding springboard steelframe 8, has built steel cat ladder 778 between upper and lower platform 7, reserves on the platform 7 to build the cat ladder and through the opening 779 that the people used.
In a preferred embodiment of the present invention, the connecting beam 402 is an i-beam.
The utility model discloses in the embodiment of a preferred, springboard steelframe 8 is including controlling parallel arrangement's many girder steels 811, and the welding is at the connecting steel pipe 812 between adjacent girder steel 811, springboard 9 is supported on the connecting steel pipe 812, screw fixation between springboard 9 and the connecting steel pipe 812 the guardrail 911 has all been welded to position department about the top of springboard 9.
The utility model discloses the embodiment of a preferred, the upright post body 1 department that is located the rear has pour wallboard 10, wallboard 10 protects the left and right sides position department of stair 6.
In one preferred embodiment of the present invention, the support steel pipe 2 and the first support steel pipe 3 are galvanized steel pipes, and the thickness is 16 mm.
In a preferred embodiment of the present invention, the bottom of the platform 7 is provided with steel structures 787 which are staggered horizontally and vertically, and the steel structures 787 and the cross frame structure 4 are welded and fixed; the steel structure needs to be broken to form an opening at the location where the first staircase is to be traversed.
The utility model has the advantages that: in the product, the upright post body is used as a main supporting structure, the effect of auxiliary supporting is achieved through the first supporting steel pipe, the cross frame part is assembled between the upright post body and the first supporting steel pipe for reinforcement, and the cross frame part is also assembled between the supporting steel pipe and the first supporting steel pipe for reinforcement, so that the product forms a building body with stable structure and strong wind and earthquake resistance; the construction is comparatively nimble, and the later stage extension is comparatively convenient, compares in traditional concrete simultaneously, and the quality of this structure is light more, reduces the sunken phenomenon to the load on ground, the simple structure of this product, and low cost is fit for using widely.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that are not thought of through the creative work should be covered within the scope of the present invention. Therefore, the protection scope of the present invention should be subject to the protection scope defined by the claims.

Claims (6)

1. The utility model provides a high platform diving platform training field which characterized in that: the stair-climbing support is characterized by comprising four upright columns which are symmetrically arranged in front and back and made of concrete, wherein the upper end of each upright column is connected with a support steel pipe in a flange mode, the left side surface and the right side surface of each upright column are respectively provided with a first support steel pipe, the lower end of each first support steel pipe is poured in the ground, the upper end of each first support steel pipe is flush with the upper end of each support steel pipe, cross frame parts are respectively assembled between each support steel pipe and each first support steel pipe and between each first support steel pipe and each upright column, more than 2 first platforms are poured among the four upright columns, and a stair made of concrete is poured between every two adjacent first platforms;
the transverse frame part comprises a plurality of sleeves and a connecting beam welded between two adjacent sleeves, and the sleeves are respectively welded and fixed with the support steel pipes and the first support steel pipe;
there is the platform through the cooperation of crossbearer part, and the front end welding of platform has the springboard steelframe, through the springboard is installed to the springboard steelframe the marginal position department welding of platform has first guardrail, and first guardrail leaves the mouth that the personnel used in corresponding springboard steelframe position department, has built steel cat ladder between upper and lower platform, reserves on the platform to build the cat ladder and through the opening that the people used.
2. The high jump diving tower training ground of claim 1, characterized in that: the connecting beam is an I-beam.
3. The high jump diving tower training ground of claim 1, characterized in that: the springboard steel frame comprises a plurality of steel beams which are arranged in parallel from left to right and a connecting steel pipe welded between the adjacent steel beams, the springboard is supported on the connecting steel pipe, the springboard and the connecting steel pipe are fixed through screws, and guardrails are welded at the left and right positions of the top of the springboard.
4. The high jump diving tower training ground of claim 1, characterized in that: the vertical column body positioned at the rear part is poured with a wallboard, and the wallboard is protected at the positions of the left side and the right side of the stair.
5. The high jump diving tower training ground of claim 1, characterized in that: the supporting steel pipe and the first supporting steel pipe are galvanized steel pipes, and the thickness of the supporting steel pipes ranges from 12mm to 24 mm.
6. The high jump diving tower training ground of claim 1, characterized in that: the bottom of the platform is provided with a steel structure which is staggered transversely and longitudinally, and the steel structure and the cross frame structure are welded and fixed.
CN201922188919.9U 2019-12-10 2019-12-10 High platform diving and diving platform training field Active CN211215154U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922188919.9U CN211215154U (en) 2019-12-10 2019-12-10 High platform diving and diving platform training field

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922188919.9U CN211215154U (en) 2019-12-10 2019-12-10 High platform diving and diving platform training field

Publications (1)

Publication Number Publication Date
CN211215154U true CN211215154U (en) 2020-08-11

Family

ID=71939153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922188919.9U Active CN211215154U (en) 2019-12-10 2019-12-10 High platform diving and diving platform training field

Country Status (1)

Country Link
CN (1) CN211215154U (en)

Similar Documents

Publication Publication Date Title
US7572207B2 (en) Climbing wall structure and method of construction
CN107227814A (en) A kind of large cantilever concrete structure section construction method
CN201762974U (en) System for simultaneous construction of upper horizontal structure and lower horizontal structure in core tube
CN211215154U (en) High platform diving and diving platform training field
CN207079485U (en) Cast-in-situ Beam baseplate reinforcing bar positions and the stiff skeleton of top plate supporting
CN112854716A (en) Building floor corner outer frame support system that encorbelments
CN111927071A (en) Movable operating platform
CN209799126U (en) roof large-span supporting structure that encorbelments
CN111005547A (en) Construction method of external scaffold with two-way twist staggered floor vertical face
CN207686147U (en) Floor and double steel bar protective layer thickness control device
CN101906820B (en) System capable of constructing in vertical structure and horizontal structure simultaneously in core tube
CN211273322U (en) Diving platform springboard supporting steel frame structure
US6945003B2 (en) Monumental, stainless-steel cross with I-beam and cable structure
CN208830767U (en) A kind of assembled architecture hoistway regularization protection and vertical passageway device
CN208039787U (en) The assembled operating platform of side operation is faced in a kind of high-altitude
CN216360884U (en) Building floor corner outer frame support system that encorbelments
CN211188920U (en) Large-scale diving platform steel frame construction
CN211536320U (en) Liftable diving platform
CN219491717U (en) Roof truss overhanging steel platform formwork device
CN219060811U (en) Adjustable operation platform device of stairwell
CN216276830U (en) Super high-rise core tube formwork lowering construction device
CN213539817U (en) Horizontal frame of frame type safety ladder cage
CN213804941U (en) Variable cross section day style of calligraphy empty stomach thin wall mound reinforcing bar subregion prefabricated bed-jig
CN214462918U (en) Disc buckle connection type temporary stair
CN215461899U (en) Multifunctional combined pile frame for suspension bridge training system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant